20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf
PDF 2 MB Posted
- Attached to
- Asset Protection - Miscellaneous Metals
- Solicitation number
- 967-0213-26
- Issued by
- Tehama County, California
About this file
This is a preliminary architectural drawing for the Temporary Sewer Bypass Plan prepared for the City of Fairfield and County of Solano's Justice Campus Asset Protection Project. The drawing, created by the Office of the County Administrator in February 2026, provides the horizontal sanitary sewer bypass provisions for the Downtown Fairfield Justice Campus located at multiple properties across Union Avenue, Clay Street, Delaware Street, and Texas Street in Fairfield, California. The drawing is dated February 24, 2026, and is presented at a scale of 1 inch equals 30 feet. This preliminary plan is designated "Not for Construction" and supports the broader Asset Protection Project, which encompasses flood protection infrastructure including barrier walls, berms, stormwater management systems, flood gates, underground utility reconfiguration, and pump systems designed to protect County assets from seasonal flooding. The miscellaneous metals bid package for this project requires sealed bid submission by 2:00 p.m. on March 9, 2026, with a mandatory pre-bid conference scheduled for February 19, 2026, at 10:00 a.m. at the County Administration Center.
The Asset Protection Project is funded through FEMA and California Governor's Office of Emergency Services (Cal OES) grants, with construction phases extending through November 2026 and final project closeout by January 12, 2027. The successful contractor must achieve substantial completion within 231 calendar days from the Notice to Proceed, with liquidated damages of $2,000 per day assessed for delays. All bidders must be licensed California contractors and are required to submit a bid bond equal to 10 percent of the total bid amount, along with performance and payment bonds each equal to 100 percent of the contract amount and a one-year warranty bond equal to 10 percent of the final contract amount. Contractors must comply with Davis-Bacon Act prevailing wage determinations, federal procurement standards under Title 2 CFR 200, Byrd Anti-Lobbying provisions, and CEQA environmental requirements, and must maintain comprehensive insurance coverage including workers' compensation and commercial general liability insurance naming the County as additional insured. The total contract value for the miscellaneous metals portion is not disclosed in available procurement documents.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RE
VI
SI
ON
S
DA
TE
DR
AW
N
BY
CH
EC
KE
D
BY
SI
GN
AT
UR
E
BL
OC
K
OF
CE
R, S
EP
FE
BR
UA
RY
FI
LE
L O
C
AT
IO
N
LA
ST
R
EV
IS
IO
N
:S:
\P ro jec ts\
\2
8-
\3_ Dr aw ing s\I mp ro ve m en t P lan
\25
-0
0_ Ov erl an d S S
By pa ss P lan .dw g F eb
4,
- 8 :57 am
SO
LA
NO
C
O
UN
TY
DO
W
NT
O W
N
FA
IR
FI
EL
D
JU
ST
IC
E
CA
M
PU
S
R
EV
D
AT
E
BY
D
ES
C R
IP
TI
O N
PRELIM
INARY
NOT FOR
CONSTRUCTION
JU
ST
IC
E
CA
MP
US
A
SS
ET
P
RO
TE
CT
IO
N
CI
TY
O F
FA
IR
FI
EL
D
- C
OU
NT
Y
OF
S
OL
AN
O
SS1
TE
MP
OR
AR
Y
SE
W
ER
B
YP
AS
S
TEMPORARY SEWER BYPASS PLAN
HORIZONTAL: 1"=30'
SANITARY SEWER BYPASS PROVISIONS
File details come from the government source that posted it. Updated .