This is a preliminary architectural drawing for the Temporary Sewer Bypass Plan prepared for the City of Fairfield and County of Solano's Justice Campus Asset Protection Project. The drawing, created by the Office of the County Administrator in February 2026, provides the horizontal sanitary sewer bypass provisions for the Downtown Fairfield Justice Campus located at multiple properties across Union Avenue, Clay Street, Delaware Street, and Texas Street in Fairfield, California. The drawing is dated February 24, 2026, and is presented at a scale of 1 inch equals 30 feet. This preliminary plan is designated "Not for Construction" and supports the broader Asset Protection Project, which encompasses flood protection infrastructure including barrier walls, berms, stormwater management systems, flood gates, underground utility reconfiguration, and pump systems designed to protect County assets from seasonal flooding. The miscellaneous metals bid package for this project requires sealed bid submission by 2:00 p.m. on March 9, 2026, with a mandatory pre-bid conference scheduled for February 19, 2026, at 10:00 a.m. at the County Administration Center.

The Asset Protection Project is funded through FEMA and California Governor's Office of Emergency Services (Cal OES) grants, with construction phases extending through November 2026 and final project closeout by January 12, 2027. The successful contractor must achieve substantial completion within 231 calendar days from the Notice to Proceed, with liquidated damages of $2,000 per day assessed for delays. All bidders must be licensed California contractors and are required to submit a bid bond equal to 10 percent of the total bid amount, along with performance and payment bonds each equal to 100 percent of the contract amount and a one-year warranty bond equal to 10 percent of the final contract amount. Contractors must comply with Davis-Bacon Act prevailing wage determinations, federal procurement standards under Title 2 CFR 200, Byrd Anti-Lobbying provisions, and CEQA environmental requirements, and must maintain comprehensive insurance coverage including workers' compensation and commercial general liability insurance naming the County as additional insured. The total contract value for the miscellaneous metals portion is not disclosed in available procurement documents.

View the file

Other files

File Type Posted
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Miscellaneous_Metals_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Miscellaneous_Metals_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Miscellaneous_Metals_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Miscellaneous_Metals_-_Project_Manual.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R, S

EP

FE

BR

UA

RY

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ Ov erl an d S S

By pa ss P lan .dw g F eb

4,

- 8 :57 am

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

JU

ST

IC

E

CA

MP

US

A

SS

ET

P

RO

TE

CT

IO

N

CI

TY

O F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

SS1

TE

MP

OR

AR

Y

SE

W

ER

B

YP

AS

S

TEMPORARY SEWER BYPASS PLAN

HORIZONTAL: 1"=30'

SANITARY SEWER BYPASS PROVISIONS

File details come from the government source that posted it. Updated .