About this file
This is an Access Requirements document for Solano County, California, detailing construction phasing and access management for an Asset Protection Project spanning multiple county facilities including the Hall of Justice, Solano Justice Center, Solano County Emergency Services, Solano Detention Facility, Sheriff's Office, Communications Center, Cogeneration Plant, and Coroner's Office located across Union Avenue, Clay Street, and Delaware Street in the county. The document establishes three categories of vehicle access points and three categories of pedestrian access points, each with specific notice requirements and mitigation protocols. Critical Emergency Vehicle Access Points (Category A) must remain open 24 hours per day, 7 days per week with immediate mitigation required for any disruptions. Important Operational Vehicle Access Points (Category B) require a minimum 2-week advance notice and may require alternate access provisions by the contractor. Major Traffic Access Ways (Category C) require a minimum 3-week advance notice along with traffic control plans and encroachment permits. Pedestrian access is similarly categorized, with major public and staff entry points requiring 3-week notice and an Accessible Alternate Pedestrian Access Plan, secure staff entry points requiring 2-week notice, and possible egress points requiring 2-week notice with potential fire marshal approval.
The document functions as a planning tool to ensure that construction activities associated with the Asset Protection Project—which includes barrier walls, berms, landscaping, hardscape, flood gates, underground utility reconfiguration, and pump systems designed to protect county assets from seasonal flooding—do not unduly disrupt critical operations at these justice and emergency services facilities. The map-based diagram identifies specific locations of sally ports, loading bays, parking areas, and maintenance access points, allowing bidders and contractors to understand the operational constraints and coordinate their work schedules accordingly with appropriate advance notification to facility management.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA LITE
AREA LITE
NO
PARKING
RESERVED
RESERVED
NO
PARKING
RESERVED
NO
PARKING
NO
PARKING
NO
PARKING
NO
PA
RK
IN
G
NO
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
B
BB
B
B
B
B
B
B
B
B
B
B
B
B
B
BB
B
B
B
B
B
B
B
B
B
B
BB
B
B
NO
PA
RK
IN
G
NO
PARKING
NO
PARKING
CR
IC
C R
IC IC
IC
IC
C R
C R
C R
CR
IC
IC
CR
C R
C R
C R
CR
IC
IC
IC
IC
CR
C R
CR
C R
C R
CR
C R
C R
CONSTRUCTION
PHASING
X:
\1
\1
4.
\T
EC
H \C
AD
\P
AR
KI
N G
L O
T
IM
PR
O
VE
M
EN
TS
\G -0
C
O N
ST
R
U C
TI
O
N P
H
AS
IN
G
.D W
G
/2
1/
:4 9:
P
M
SHEET CONTENTS
or l
00 60 120
Vehicle Access Points
A Critical Emergency Vehicle Access Point.
Must remain open to large vehicle access 24 hours a day, 7 days a week. Any disruption to vehicle access route will require immediate mitigation.
B Important Operational Vehicle Access Point. Contractor to provide minimum 2 week notice prior to any activities disrupting access or vehicle route. Alternate access provisions by contractor may be required
C Major Traffic Access Way. Contractor to provide minimum 3 week notice prior to any activity disrupting access. A traffic control plan & encroachment permits are required.
Pedestrian Access Points
1 Major public & staff entry point. Contractor to provide minimum 3 week notice prior to any construction activities disrupting access. An Accessible Alternate Pedestrian Access Plan will be required.
2 Secure Staff entry point. Contractor to provide minimum 2 week notice prior to any activities disrupting access. An Accessible Alternate Pedestrian Access Plan may be required.
3 Possible egress point. Contractor to provide minimum 2 week notice prior to any activities disrupting egress. An alternate exit plan with fire marshal approval may be required.
501 Texas Co-Op Extension / Sheriff Investigations
600 Union Ave Hall of Justice North Wing
600 Union Ave Hall of Justice South Wing
530 Union Ave Solano Justice Center 530 Clay St
Solano County Emergency Services
500 Union Ave Solano Detention Facility
512 Clay St Sheriff Professional Standards
500 Clay St Communications
501 Delaware St Cogeneration Plant
512 Clay St Emergency Services Vehicle Storage
520 Clay st Solano Coroner's Office
Delaware Street
A
A
B
JCDF Sally Port Entrance
Coroner Sally Port Entrance
JCDF
Loading Bay
A JCDF Sally Port Entrance
B OES &
Facilities Vehicles
B
OES &
Facilities Vehicles
B Cogen Loading Bay
C
Washington Street C
Clay Street C
Access Requirements
B
Court Maintenance Area
B Judges Parking
B Sheriff Response Vehicle Parking
B Sheriff Response Vehicle Parking
OES Entry
Office of Professional Standards2 Staff
Entrance
2 Communications
Court Entry
1 Court Entry
1 JCDF
Entry
B Loading Bay
Coop & Sheriff Investigations
B
Maintenance Access
2 Maintenance
2 Maintenance
JCDF
Release Point
B Loading Bay
Staff Entry
2 Staff
Entry
B
Loading Bay
2 Staff Entry
B Loading Bay
2 Staff Entrance
2 Staff Entrance
2 Staff Entrance
A Sally Port
2 Staff Entrance
Staff Entrance
2 Staff Entrance
Staff Entrance 3
File details come from the government source that posted it. Updated .