20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf

PDF 12 MB Posted

Attached to
Asset Protection - Miscellaneous Metals
Solicitation number
967-0213-26
Issued by
Tehama County, California

About this file

This is a pre-bid conference presentation for Solano County's Asset Protection Project, a multi-prime competitive sealed bid procurement for miscellaneous metals work supporting flood protection infrastructure across multiple County facilities in Fairfield, California. The project encompasses barrier walls, berms, stormwater management infrastructure, flood gates, underground utility reconfiguration, and pump systems designed to protect County assets at Union Avenue, Clay Street, Delaware Street, and Texas Street properties, including the Hall of Justice and Solano Justice Center. The mandatory pre-bid conference is scheduled for February 19, 2026, at 10:00 a.m. at the County Administration Center. Sealed bids are due by 2:00 p.m. on March 9, 2026, submitted through the Solano County OpenGov E-Procurement Portal. The contract requires substantial completion within 231 calendar days from the Notice to Proceed, with design completion targeted for February 27, 2026, construction phases extending through November 2026, and final closeout by January 12, 2027.

The project is federally funded through FEMA and California Governor's Office of Emergency Services grants, requiring compliance with Davis-Bacon Act prevailing wage determinations, Title 2 CFR 200 federal procurement standards, Byrd Anti-Lobbying provisions, and CEQA environmental requirements. Bidders must submit a bid bond equal to 10 percent of the total bid amount, non-collusion declarations, and worker's compensation certifications with their proposals. The successful contractor must provide performance and payment bonds each equal to 100 percent of the contract amount, plus a one-year warranty bond equal to 10 percent of the final contract amount. Liquidated damages are assessed at $2,000 per day for delays beyond the completion deadline. Qualified bidders must be licensed California contractors and must maintain comprehensive insurance coverage, including workers' compensation and commercial general liability insurance naming the County as additional insured. The total contract value or budget range for the miscellaneous metals portion is not disclosed in the available procurement documents.

View the file

Other files

File Type Posted
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20260210_Asset_Protection_Miscellaneous_Metals_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Miscellaneous_Metals_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Miscellaneous_Metals_-_Project_Manual.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASSET PROTECTION

PUMPS & VAULTS

JANUARY 6, 2026

KCONNER

Text Box

FEBRUARY 19, 2026

JGonzal4 Text Box *This is not a contract document. For reference only

KCONNER

Text Box

FEBRUARY 19, 2026

AGENDA

• Asset Protection Project Background

• Pump Station Scope

• Schedule

• Access Requirements

• Bidding Instructions

• Addendum 1

• Questions

JGonzal4 Text Box *This is not a contract document. For reference only

KCONNER

Text Box

KCONNER

Text Box

• Asset Protection Project Background

• Scope Review

• Schedule

• Access Requirements

• Bidding Instructions

• Questions

JGonzal4 Text Box *This is not a contract document. For reference only

Storm Walls

Berms

Raised Access Points

Passive Storm Gates

JGonzal4

PUMPS & VAULTS

JANUARY 6, 2026

JGonzal4 Text Box *This is not a contract document. For reference only

KCONNER

Text Box

SCOPES INCLUDES

1. Fencing and Gates

2. Painting and Coating

3. Electrical

4. Miscellaneous Metals

5. Earthwork and Paving

6. Landscaping

7. Concrete

8. Site Utilities

KCONNER

Image

QUESTIONS?

JGonzal4

File details come from the government source that posted it. Updated .