This is a civil engineering specifications document for the Solano County Downtown Fairfield Justice Campus Fairfield Law and Justice Campus Security Project Phase 1: Offsite Sanitary Sewer Improvements, prepared by project manager KSN, Inc. and project engineer Baumbach & Piazza, Inc. The 100% design specifications, effective February 23, 2026, detail comprehensive requirements for sanitary sewer infrastructure improvements including trenching and backfilling, erosion and sedimentation controls, shoring, CCTV inspections, and sanitary sewerage installation. The work encompasses excavation of designated trench sections, placement of fill materials with specified compaction densities (85-95% relative compaction depending on location), installation of polyvinyl chloride (PVC), vitrified clay pipe (VCP), and ductile iron pipe systems in various diameters, construction of precast reinforced concrete manholes with specific dimensions and waterproofing requirements, and implementation of water pollution control and erosion management best management practices. The contract requires a Preliminary Project Schedule within the Pre-construction Conference and a detailed Critical Path Method (CPM) schedule within 30 days of the Notice to Proceed, with monthly updates and cost-loaded schedules tied to approved values. The contractor must employ a registered Civil Engineer or licensed Land Surveyor to establish reference points and certify finish grades, complete all work within the specified contract time, and maintain compaction testing records throughout backfill operations.
The specifications mandate that contractors obtain independent soils consultant services and testing laboratory support for soil analysis, field compaction density tests, and deflection testing of PVC pipe to ensure 5% maximum vertical deflection. All materials must comply with ASTM standards, CalTrans specifications, and requirements of either the City of Fairfield (for pipes 10 inches or smaller) or the Fairfield-Suisun Sewer District (for pipes larger than 12 inches), with the District's design standards governing where conflicts exist. Testing requirements include compaction verification per ASTM D1557, air pressure testing of PVC pipe at 3.5 psig with specified pressure retention times by diameter, deflection mandrel testing, factory testing of vitrified clay pipe per ASTM C301, and manhole vacuum testing per ASTM C1244. The contractor assumes full responsibility for designing temporary and permanent sheeting, shoring, and cofferdams in compliance with California Building Code and Cal-OSHA requirements, with designs signed by registered engineers. The contractor must also prepare and implement a Water Pollution Control Program with a certified Construction General Permit Qualified SWPPP Practitioner or Developer, maintain erosion control features throughout construction, perform CCTV inspections using NASSCO PACP certified operators with equipment meeting specified resolution and frame rate standards, and deliver final record drawings indicating all as-built coordinates and elevations of sewers, manholes, and cleanouts.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLANO COUNTY DOWNTOWN FAIRFIELD JUSTICE CAMPUS
FAIRFIELD LAW AND JUSTICE CAMPUS SECURITY PROJECT
PHASE 1: OFFSITE SANITARY SEWER IMPROVEMENTS
CIVIL SPECIFICATIONS – 100% SET
FEBRUARY 23, 2026
Project Manager KSN, Inc.
1550 Harbor Blvd.
West Sacramento, CA 95691
Project Engineer Baumbach & Piazza, Inc.
323 W. Elm St.
Lodi, CA 95240
Solano County Downtown Fairfield Justice Campus Specifications Table of Contents Fairfield Law and Justice Campus Security Project Phase 1: Offsite Sanitary Sewer Improvements
SOLANO COUNTY DOWNTOWN FAIRFIELD JUSTICE CAMPUS
FAIRFIELD LAW AND JUSTICE CAMPUS SECURITY PROJECT
PHASE 1: OFFSITE SANITARY SEWER IMPROVEMENTS
CIVIL SPECIFICATIONS – 100% SET
February 23, 2026
TABLE OF CONTENTS
Section 01 32 00 Construction Progress Documentation
Section 01 50 00 Temporary Facilities and Controls
Section 01 57 23 Water Pollution Control
Section 01 77 00 Closeout Procedures
Section 02 30 00 Subsurface Investigation
Section 31 23 33 Trenching and Backfilling
Section 31 25 00 Erosion and Sedimentation Controls
Section 31 40 00 Shoring
Section 33 01 30.11 CCTV Inspections
Section 33 30 00 Sanitary Sewerage
Solano County Downtown Fairfield Justice Campus Construction Progress Documentation Fairfield Law and Justice Campus Security Project 01 32 00-1 Phase 1: Offsite Sanitary Sewer Improvements
SECTION 01 32 00
CONSTRUCTION PROGRESS DOCUMENTATION
PART 1 - GENERAL
1.01 GENERAL
A. The scheduling of the Work under the Contract shall be performed by the Contractor in accordance with the requirements of this Section. The development of the schedule, the cost loading of the schedule, monthly payment requisitions and project status reporting requirements of the Contract shall employ computerized Critical Path Method (CPM) scheduling. The CPM Schedule shall be cost loaded based on the schedule of values as approved by the Engineer in accordance with the requirements of Section 01 29 73. The CPM schedule and all reports should be prepared using software. Where submittals are required hereunder, the Contractor shall submit two copies of each submittal item.
1.02 INITIAL SCHEDULE SUBMITTALS
A. The Contractor shall submit a Preliminary Project Schedule (PPS) at the Pre-construction Conference which shall serve as the Contractor’s Plan of Operation for the initial 60 day period of the Contract Time and to identify the manner in which the Contractor intends to complete all work within the Contract time.
1.03 CPM SCHEDULE SUBMITTALS
A. Original CPM Schedule Submittal: With 30 days after the commencement date stated in the Notice to Proceed, the Contractor shall submit for review by the Engineer a hard copy of the CPM Network Schedule and the Computerized Schedule Report tabulations. The Contractor shall also submit a CD or USB drive that contain all of the schedule submittal information. The submittal shall have already been reviewed and approved by the Contractor’s Project Manager, Project Superintendent, and the Project Estimator prior to submission. The CPM Schedule shall be a time-scaled network diagram of the “i-j” activity-on-arrow or precedence type. The Network Diagram shall describe the activities to be accomplished and their logical relationships and show the Critical Path. The Contractor’s attention is directed to the requirement that the schedule shall contain sufficient detail and information to cost load the CPM schedule in accordance with the approved schedule of values as specified under Section 01 29 73. Each installation and site work activity shall have been cost loaded as specified.
B. As stated in Paragraph 1.06 herein, all float indicated in the schedule shall belong to the project. The Computerized Schedule Report tabulations shall include the following:
1. Report of activities sorted by Activity Number.
2. Report of activities sorted by Early Start date.
3. Report of activities sorted by Total Float.
4. Report of activities sorted by Responsibility Code. Responsibility Codes shall be established for the Contractor, Engineer, Agency, Subcontractors, Suppliers, etc.
These codes shall be identified in the Network Diagram.
5. A successor-predecessor report which shall identify the successor and predecessor activities for each activity and ties between schedule activities.
Solano County Downtown Fairfield Justice Campus Construction Progress Documentation Fairfield Law and Justice Campus Security Project 01 32 00-2 Phase 1: Offsite Sanitary Sewer Improvements
C. Within 14 days after receipt of the submittal, the Engineer and the Owner’s Representative shall review the submitted schedule and return one copy of the marked up original to the Contractor. If the Engineer finds that the submitted schedule does not comply with specified requirements, the corrective revisions will be noted on the submittal copy returned to the Contractor for corrections and re-submittal as specified in Section 01 33 00. Upon receipt of a schedule and breakdown of contract prices conforming to the contract, the Contractor shall submit the final version of the construction schedule and database to the Engineer in accordance with Section 01 33 00.
D. Revisions to the accepted cost-loaded construction schedule may be made only with written approval of the Engineer and Owner. Changes in timing for activities which are not on the critical path may be modified within the available period of the activities’ specific available float but not in a manner which will place them on the critical path, with the written agreement of the Contractor and Engineer. A change affecting the contract value of any activity, the timing of any activity on the critical path, the completion time and specific dates (Special Provisions) may be made only in accordance with the General Conditions.
E. Monthly Updates and Periodic CPM Schedule Submittals: Following the acceptance of the Contractor’s Original Construction Schedule, the Contractor shall monitor the progress of the work and adjust the schedule each month to reflect actual progress and any changes in planned future activities. Each schedule update submitted must be complete including all information requested in the original schedule submittal and that shown in Paragraph 1.07. Each update shall continue to show all work activities including those already completed. These completed activities shall accurately reflect the “as built” information by indicating when the work was actually started and completed.
F. Project schedule status and update on computer diskette shall be provided each month and submitted with the monthly pay request. Monthly progress payments will not be made until the project status reviews have been submitted and accepted by the Engineer.
Project status updates shall be submitted to the Engineer in accordance with Section 01 33 00, including a completed submittal review transmittal form.
1.04 CHANGE ORDERS
A. Upon approval of a change order, or upon receipt by the Contractor of authorization to proceed with additional work, the change shall be reflected in the next submittal of the CPM schedule by the Contractor. The Contractor shall utilize a sub-network in the schedule depicting the changed work and its effect on other activities. This sub-network shall be tied to the main network with the appropriate logic so that a true analysis of the Critical Path can be made.
1.05 INCLEMENT WEATHER PROVISIONS OF THE SCHEDULE
A. The Contractor’s construction schedule shall include the specified numbers and lost days on the CPM schedule’s critical path due to inclement weather.
1.06 SCHEDULING AND REPORTING
A. The Contractor’s construction schedule shall include the specified numbers and lost days on the CPM’s critical path due to delays arising from permit or regulatory issues.
PART 2 - PRODUCTS – NOT USED
PART 3 - EXECUTION – NOT USED
Solano County Downtown Fairfield Justice Campus Construction Progress Documentation Fairfield Law and Justice Campus Security Project 01 32 00-3 Phase 1: Offsite Sanitary Sewer Improvements
END OF SECTION 01 32 00
Solano County Downtown Fairfield Justice Campus Temporary Facilities and Controls Fairfield Law and Justice Campus Security Project 01 50 00-1 Phase 1: Offsite Sanitary Sewer Improvements
SECTION 01 50 00
TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.01 DESCRIPTION
A. The work to be performed under this Section shall consist of furnishing, maintaining, and removing all facilities and controls, necessary or required to execute the work efficiently and successfully including, but not limited to, the following:
1. Utilities
2. Construction aids
3. Barriers and barricades
4. Tree and plant protection
5. Security
6. Rubbish and debris removal
7. Traffic Control
8. Dirt & Dust control
9. Erosion and sedimentation control
10. Field offices & sheds
1.02 TEMPORARY UTILITIES
A. General
1. Furnish, install, maintain, and pay for all temporary utilities as required to perform the work.
2. Maintain all temporary utilities and pay for monthly billings.
3. Remove temporary utilities, including associated materials and equipment when no longer required. Restore and reconcile areas of the site damaged by temporary utilities or their installations.
B. Temporary Power
1. Arrange with the electric utility company to provide services required for lighting, power, and distribution on site.
2. Pay all utility company costs.
C. Temporary Water
1. Obtain a temporary water permit and connection from the City or utility company and pay all costs.
Solano County Downtown Fairfield Justice Campus Temporary Facilities and Controls Fairfield Law and Justice Campus Security Project 01 50 00-2 Phase 1: Offsite Sanitary Sewer Improvements
2. Provide backflow prevention at point of connection to water system.
3. Make potable water available for human consumption.
D. Temporary Sanitary Facilities
1. Provide approved temporary sanitary facilities and maintain them in a neat, sanitary condition, adequately supplied. Sanitary facilities shall comply with applicable laws, ordinances, and regulations pertaining to the public health and sanitation of temporary facilities and construction sites.
E. Temporary Parking
1. The Contractor shall provide all-weather parking for his workmen and the workmen employed by all subcontractors and suppliers providing work at the site.
1.03 CONSTRUCTION AIDS
A. Provide construction aids in accordance with applicable regulatory requirements.
1.04 BARRIERS AND BARRICADES
A. Barricades and portable markers shall be furnished and maintained in accordance with CalTrans Section 5-04 of Chapter 5 Manual of Traffic Control.
B. Fences and gates shall be constructed where required for security of the work and/or safety of the general public.
C. Trees and plant material to be saved shall be protected from damage by erecting suitable barricades.
1.05 TREE AND PLANT PROTECTION
A. Provide adequate protection of existing trees and plants to remain against damage from construction operations. Employ protective measures at the Contractor's discretion.
B. Where barricades are necessary, make four feet high and locate at or beyond the drip lines of the items so protected.
C. Especially protect roots, trunk, and foliage of existing and new shrubs and trees.
D. Any tree or shrub to remain, damaged or destroyed due to the Contractor's negligence or failure to provide adequate protection shall be compensated for in accordance with the Engineer's calculation of the value of said tree or shrub.
1.06 SECURITY
A. The Contractor shall be responsible for providing security measures to prevent unauthorized entrance, vandalism, and theft of equipment, and materials from the work site. Any loss suffered shall be the Contractor's sole responsibility.
1.07 RUBBISH AND DEBRIS REMOVAL
A. Keep the site clean of rubbish and debris and provide adequate containers for the depositing of rubbish and debris. Arrange for the removal and disposal of trash, rubbish, Solano County Downtown Fairfield Justice Campus Temporary Facilities and Controls Fairfield Law and Justice Campus Security Project 01 50 00-3 Phase 1: Offsite Sanitary Sewer Improvements etc. Keep the site in a clean condition. Conform with other Sections of these specifications regarding clean up of the site.
1.08 TRAFFIC CONTROL
A. Contractor shall refer to separate Traffic Control Plans for the Project by AWP Safety, 130 Grobic Court, Fairfield, CA 94533; phone number: (707) 864-9952.
B. Should the Contractor wish to propose alternate Traffic Control to that contained within the Traffic Control Plans by AWP Safety, the Contractor shall submit, prior to commencing construction, a traffic control plan (TCP) detailing the means, methods, and timing he will use to provide the temporary signs, traffic control procedures, and maintenance of access to the site as required herein, to the City of Fairfield for approval.
The TCP shall be conform to the requirements of CalTrans Section 5-01 of Chapter 5 Manual of Traffic Control.
C. The Contractor shall procure an Encroachment Permit from the jurisdictional agency (City of Fairfield) for any work which takes place within any public street, right-of-way, easement, or property.
1.09 DUST AND DIRT CONTROL
A. Conduct construction operations in a manner to prevent windblown dust or dirt. Conform with other Sections of these specifications regarding dust and dust control.
1.10 EROSION AND SEDIMENTATION CONTROL
A. Erosion and sedimentation control shall consist of, but not be limited to, constructing such facilities and taking such measures as are necessary to prevent, control, and abate water, mud, and erosion damage to public and private property as a result of the construction of this project, including the stockpiling of excavated material. Temporary erosion measures include, but are not limited to, the following:
1. The Contractor shall conduct his operations in such a manner that storm runoff will be contained within the Project.
2. Temporary drainage structures and other devices shall be provided to channel storm runoff water into the respective storm drainage systems during construction. Mud and silt shall be settled out of the storm runoff before said runoff enters the storm drainage system or waterway adjacent to the project site.
3. Embankment, graded, and excavation areas shall be protected from erosion and the resulting siltation of downstream facilities and adjacent areas by the use of temporary erosion control measures.
4. Repair and/or clean any facilities or areas which have been damaged by erosion or sedimentation.
5. Refer to Section 01 57 23 “Water Pollution Control” of these Project specifications and the Water Pollution Control Plan for this project.
PART 2 - PRODUCTS – NOT USED
Solano County Downtown Fairfield Justice Campus Temporary Facilities and Controls Fairfield Law and Justice Campus Security Project 01 50 00-4 Phase 1: Offsite Sanitary Sewer Improvements
END OF SECTION 01 50 00
Solano County Downtown Fairfield Justice Campus Water Pollution Control Fairfield Law and Justice Campus Security Project 01 57 23 Phase 1: Offsite Sanitary Sewer Improvements
SECTION 01 57 23
WATER POLLUTION CONTROL
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Water pollution control program (WPCP) B. Removal.
1.02 MEASUREMENT AND PAYMENT
A. Full compensation for conforming to the requirements of this Section shall be considered as included in the price paid for the various items of work, and no separate payment will be made therefor, and shall include all labor, materials, tools, equipment, and transportation, and for doing all the work involved, as specified herein and as directed by the Authority’s representative.
1.03 REFERENCES
A. Water pollution control work shall conform to the provisions in Section 13, "Water
Pollution Control," of the Caltrans Specifications and these specifications.
1.04 QUALITY ASSURANCE
A. References: This section contains references to some or all of the following documents, latest revision. They are a part of this section as specified and modified. In case of conflict between the requirements of this section and those of the listed documents, the requirements of this section shall prevail.
References Title ASTM D3786 Standard Test Method for Bursting
Strength of Textile Fabrics ASTM D4355 Standard Test Method for Deterioration of
Geotextiles by Exposure to Light, Moisture and Heat in a Zenon Arc-Type Apparatus
1.05 SUBMITTALS
A. The Contractor’s Water Pollution Control Manager (WPCM) will submit a statement of qualifications describing the training, work history, and expertise of the proposed WPCM.
The qualifications shall include either:
1. Certification as a Construction General Permit Qualified SWPPP Practitioner (QSP);
or
2. Certification as a Construction General Permit Qualified SWPPP Developer (QSD).
B. Obtain approval from local authorities prior to submitting.
C. Submit WPCP to Authority’s representative for acceptance within 15 days after date of
Notice to Proceed.
1. Revise and resubmit as directed by Authority’s representative.
1.06 WATER POLLUTION CONTROL PROGRAM (WPCP)
A. The Contractor’s WPCM will prepare WPCP. The anticipated area disturbed by construction activities is less than 1 acre. This plan shall be prepared and implemented in accordance with Caltrans Standard Specification Section 13-2, “Water Pollution Control Program”, and the standards of agencies in the jurisdiction (e.g. City of Fairfield, Solano County, and State of California).
Solano County Downtown Fairfield Justice Campus Water Pollution Control Fairfield Law and Justice Campus Security Project 01 57 23 Phase 1: Offsite Sanitary Sewer Improvements
B. Pollution control facilities shall conform to:
1. The Latest State of California NPDES requirements.
2. The Caltrans Standard Plans, Temporary Water Pollution Control Details.
3. The “Construction BMP Handbook,” current edition, California Stormwater Quality
Association (http://www.cabmphandbooks.com) and these Specifications.
C. WPCP shall include water pollution control practices:
1. For storm water and non-storm water from areas outside of the job site related to construction activities for this contract such as:
a. Staging areas.
b. Storage yards.
c. Access roads.
2. Appropriate for each season as described in "Implementation Requirements" of these Specifications.
3. For activities or mobile operations related to all NPDES permits.
PART 2 - PRODUCTS
2.01 TEMPORARY CONCRETE WASHOUT FACILITY
A. Plastic – liner shall be single ply, new polyethylene sheeting, a minimum of 0.01-inch thick and shall be free of holes, punctures, tears or other defects that compromise the impermeability of the material. Plastic liner shall not have seams or overlapping joints.
B. Straw Bales
1. Straw for straw bales shall conform to the provisions in Section 21-1.02l, "Straw," of the Caltrans Specifications.
2. Straw bales shall be a minimum of 1.1 feet in width, 1.5 feet in height, 3 feet in length and shall have a minimum mass of 50 pounds. The straw bale shall be composed entirely of vegetative matter, except for binding material.
3. Straw bales shall be bound by either wire, nylon, or polypropylene string. Jute or cotton binding shall not be used. Baling wire shall be a minimum 0.06 inch in diameter. Nylon or polypropylene string shall be approximately 0.08 inch in diameter with 360 N of breaking strength.
C. Stakes - shall be wood or metal. Wood stakes shall be untreated fir, redwood, cedar, or pine, shall be cut from sound timber, and shall be straight and free from loose or unsound knots and other defects which would render them unfit for the purpose intended. Wood stakes shall be minimum 2 inches x 2 inches in size. Metal stakes may be used as an alternative, and shall be a minimum 13 mm in diameter. Stakes shall be a minimum 4 feet in length. The tops of the metal stakes shall be bent at a 90-degree angle or capped with an orange or red plastic safety cap that fits snugly to the metal.
D. Staples - shall be metal. An alternative attachment device such a geotextile pins or plastic pegs may be used instead of staples. The Contractor shall submit a sample of the alternative attachment device for Engineer's approval prior to installation.
E. Signs - Wood posts for signs shall conform to the provisions in Section 56-4.02C, "Wood Posts," of the Caltrans Specifications. Lag screws shall conform to the provisions in Section 56-4.02E, "Sign Panel Fastening Hardware," of the Caltrans Specifications.
Plywood shall be freshly painted for each installation with not less than 2 applications of flat white paint. Sign letters shall be stenciled with commercial quality exterior black paint.
Testing of paint will not be required.
2.02 FIBER ROLLS
A. Fiber roll material shall be either:
1. Constructed with a pre manufactured blanket consisting of either wood excelsior, rice or wheat straw, or coconut fibers or a combination of these materials. The http://www.cabmphandbooks.com/
Solano County Downtown Fairfield Justice Campus Water Pollution Control Fairfield Law and Justice Campus Security Project 01 57 23 Phase 1: Offsite Sanitary Sewer Improvements blanket shall be between 6 feet and 8 feet in width and between 65 feet and 95 feet in length. Wood excelsior shall be individual fibers, of which 80 percent shall be 6 inches or longer in length. The blanket shall have a photodegradable plastic netting or biodegradable jute, sisal, or coir fiber netting on at least one side. The blanket shall be rolled along the width and secured with jute twine spaced 6 feet apart along the full length of the roll and placed 6 inches from the ends of each roll.
The finished roll shall be between 8 inches and 10 inches in diameter, a minimum of 20 feet in length, and shall weigh a minimum of 0.5 pound per linear foot. More than one blanket may be required to achieve the finished roll diameter. When more than one blanket is required, blankets shall be jointed longitudinally with an overlap of 6 inches along the length of the blanket.
2. A pre manufactured roll of rice or wheat straw, wood excelsior, or coconut fiber encapsulated within a photodegradable plastic or biodegradable jute, sisal, or coir fiber netting. The netting shall have a minimum durability of one year after installation. The netting shall be secured tightly at each end of the roll. Rolls shall be between 8 inches and 12 inches in diameter. Rolls between 8 inches and 10 inches in diameter shall have a minimum weight of 1 pound per linear foot and a minimum length of 20 feet. Rolls between 10 inches and 12 inches in diameter shall have a minimum weight of 3 pounds per linear foot and a minimum length of 10 feet.
B. Wood stakes shall be a minimum of 1"x1"x24" in size. Wood stakes shall be untreated fir, redwood, cedar, or pine and cut from sound timber. They shall be straight and free of loose or unsound knots and other defects which would render them unfit for the purpose intended. Metal stakes shall not be used.
C. Rope shall be biodegradable, such as sisal or manila, with a minimum diameter of 1/4 inch.
2.03 STREET SWEEPING
A. Retain and submit records of street sweeping including:
1. Quantity of sweeping waste disposal.
2. Sweeping times and locations.
2.04 INLET PROTECTION
A. Inlet Filter Bags:
1. Filter bags shall be manufactured from ultraviolet resistant polypropylene nylon, polyester, or ethylene fabric with :
a. A minimum tensile strength of 50 pounds per linear foot;
b. An equivalent opening size not greater than a 20 sieve; and
c. A minimum flow rate of 40 gallons per minute per square foot.
B. Sediment Control (Gravel Bags):
1. Bag Material:
a. Bags should be woven polypropylene, polyethylene or polyamide fabric or burlap, minimum unit weight of 4 ounces per square yard, Mullen burst strength exceeding 300 pounds per square inch in conformance with the requirements in ASTM designation D3786, and ultraviolet stability exceeding 70% in conformance with the requirements in ASTM designation D4355.
2. Bag size:
a. Each gravel-filled bag should have a length of 18 inches, width of 12 inches, thickness of 3 inches, and mass of approximately 33 pounds. Bag dimensions are nominal, and may vary based on locally available materials.
3. Fill material:
a. Fill material should be 0.5 to 1 inch crushed rock, clean and free from clay, organic matter, and other deleterious material, or other suitable open graded, non-cohesive, porous gravel.
Solano County Downtown Fairfield Justice Campus Water Pollution Control Fairfield Law and Justice Campus Security Project 01 57 23 Phase 1: Offsite Sanitary Sewer Improvements
PART 3 - EXECUTION
3.01 TEMPORARY CONCRETE WASHOUT FACILITY
A. Installation
1. Temporary concrete washout facilities shall be as follows:
a. The minimum length and width of a temporary concrete washout facility shall be
10 feet by 10 feet.
b. Temporary concrete washout facilities shall be installed prior to beginning placement of concrete and located a minimum of 50 feet from storm drain inlets, open drainage facilities, and water courses unless determined infeasible by the Authority’s representative. Temporary concrete washout facilities shall be located away from construction traffic or access areas at a location determined by the Contractor and approved by the Authority’s representative.
c. The length and width of a temporary concrete washout facility may be increased from the minimum dimensions at the Contractor's expense and upon approval of the Authority’s representative.
d. Temporary concrete washout facilities shall be constructed in sufficient quantity and size to contain liquid and concrete waste generated by washout operations for concrete wastes. These facilities shall be constructed to contain liquid and concrete waste without seepage, spillage or overflow.
2. Details, for an alternative temporary concrete washout facility shall be submitted to the Authority’s representative for approval at least 7 days prior to installation.
3. When temporary concrete washout facilities are no longer required for the work, as determined by the Engineer, the hardened concrete and liquid residue shall be removed and disposed of in conformance with the provisions in Section 13-9.03, "Construction," of the Caltrans Specifications. Temporary concrete washout facilities shall become the property of the Contractor and be disposed of in conformance with the provisions in Section 13-9.03, "Construction," of the Caltrans Specifications.
4. Ground disturbance, including holes and depressions, caused by the installation and removal of the temporary concrete washout facilities shall be backfilled and repaired in conformance with the provisions in Section 5-1.36A, " Property Preservation," of the Caltrans Specifications.
B. Maintenance
1. Temporary concrete washout facilities shall be maintained to provide adequate holding capacity with a minimum freeboard of 1 foot. Maintaining temporary concrete washout facilities shall include removing and disposing of hardened concrete and returning the facilities to a functional condition. Hardened concrete materials shall be removed and disposed of in conformance with the provisions in Section 15-3.02, "Removal Methods," of the Caltrans Specifications. Holes, rips, and voids in the plastic liner shall be patched and repaired by taping or the plastic liner shall be replaced. Plastic liner shall be replaced when patches or repairs compromise the impermeability of the material as determined by the Authority’s representative.
2. Temporary concrete washout facility shall be repaired or replaced on the same day when the damage occurs. Damage to the temporary concrete washout facility resulting from the Contractor's vehicles, equipment, or operations shall be repaired at the Contractor's expense.
3.02 FIBER ROLLS
A. Installation - Fiber rolls shall be installed as follows:
1. Furrows shall be constructed to a depth between 2 inches and 4 inches, and to a sufficient width to hold the fiber roll. Stakes shall be installed 24 inches apart along the length of the fiber rolls and stopped at 12 inches from each end of the rolls.
Stakes shall be driven to a maximum of 2 inches above, or flush with the top of the roll.
Solano County Downtown Fairfield Justice Campus Water Pollution Control Fairfield Law and Justice Campus Security Project 01 57 23 Phase 1: Offsite Sanitary Sewer Improvements
2. Fiber rolls shall be placed 10 feet apart along the slope for slope inclination (horizontal:vertical) of 2H:1V and steeper, 15 feet apart along the slope for slope inclination between 2H:1V and 4H:1V, 20 feet apart along the slope for slope inclination between 4H:1V and 10H:1V, and a maximum of 50 feet apart along the slope for slope inclination of 10H:1V and flatter.
3. The bedding area for the fiber rolls shall be cleared of obstructions including rocks, clods, and debris greater than one inch in diameter before installation.
4. Fiber rolls shall be installed approximately parallel to the slope contour.
5. Fiber rolls shall be installed before the application of other erosion control or soil stabilization materials in the same area.
B. Maintenance
1. If the intended function of the fiber rolls to disperse concentrated water runoff and to reduce runoff velocities is impaired, the Contractor shall take action to repair or replace the fiber rolls. Split, torn, flattened, or unraveling rolls shall be repaired or replaced. Broken or split stakes shall be replaced. Sagging or slumping fiber rolls shall be repaired with additional stakes or replaced. Locations where rills and other evidence of concentrated runoff have occurred beneath the rolls shall be corrected.
Fiber rolls shall be repaired or replaced within 24 hours of identifying the deficiency.
2. Damage to fiber rolls resulting from the Contractor's vehicles, equipment, or operations shall be repaired at the Contractor's expense.
3.03 STREET SWEEPING
A. Street sweeping must be done at:
1. Paved roads at job site entrance and exit locations.
B. Street sweeping must be done:
1. After observing offsite tracking of material.
C. Monitor paved areas and roadway within the jobsite. Street sweeping must be done:
1. Within 1 hour, if sediment or debris is observed during activities that require sweeping.
2. Within 24 hours, if sediment or debris is observed during activities that do not require sweeping.
D. Perform street sweeping to minimize dust. If dust generation is excessive or sediment pickup is ineffective, use water or a vacuum.
E. Material collected during street sweeping must be removed and disposed of under Section 13-4.03F, "Sweeping," of the Caltrans Specifications.
F. WPCM must inspect paved roads at job site access points:
1. Daily if earthwork and other sediment or debris generating activities occur daily.
2. Weekly if earthwork and other sediment or debris generating activities do not occur daily.
3. When the National Weather Service predicts precipitation with a probability of at least 50 percent.
3.04 INLET PROTECTION
A. Provide temporary drainage inlet protection around drainage inlets as changing conditions require.
B. For drainage inlet protection in paved or unpaved areas:
1. Prevent runoff ponds from encroaching onto the traveled way or overtopping the curb or dike. Use a linear sediment barrier to redirect runoff and control ponding.
2. Clear the area around each drainage inlet of obstructions, including rocks, clods, and debris greater than 1 inch in diameter, before installing the drainage inlet protection.
3. For protection at each inlet:
Solano County Downtown Fairfield Justice Campus Water Pollution Control Fairfield Law and Justice Campus Security Project 01 57 23 Phase 1: Offsite Sanitary Sewer Improvements
a. Place a sediment bag inside each inlet:
1) Remove the drainage inlet grate.
2) Place the sediment filter bag in the opening. The filter bag may be suspended from or held in place by the existing inlet grate (or other method approved by the engineer) providing that no modification or damage shall be done to the inlet grate or frame.
3) Replace the grate to secure the sediment filter bag in place such that the bag is in contact with the grate at all sides.
4) The inlet grate shall not be caused to rest more than 0.5 inches above the inlet frame.
5) The filter bag may extend to the bottom of the inlet box provided the outlet pipe is unobstructed.
6) Flows shall not be allowed to bypass the bag. The bag or its frame shall catch flows at all sides of the inlet.
b. Install sediment control (gravel bags) around each inlet:
1) Place gravel-filled bags tightly end-to-end to eliminate gaps and minimize seepage at joints. Stack the bags such that the upper row overlaps joints in the lower row. Arrange the bags to create a spillway by removing 1 or more gravel-filled bags from the upper layer.
2) Place the barrier to provide a tight joint with the curb or dike. Cut the cover fabric or jacket to ensure a tight fit.
3) Leave a gap of one bag on the top row to serve as a spillway. Flow from a severe storm (e.g., 10 year storm) should not overtop the curb.
C. While inlet protection is in place:
1. Inspect inlet protection weekly and after each rainfall during the wet seasons, and monthly during the dry season.
2. Remove sediment trapped upstream of sediment control around each inlet weekly and prior to a rainfall event.
3. Replace or repair damaged materials as soon as damage occurs.
4. Remove deposited sediment and replace clogged gravel bags. Sediment and debris shall be removed before accumulations have reached one third the depth of the bag.
D. Remove and restore to original condition once the drainage area is stabilized.
3.05 WPCP IMPLEMENTATION REQUIREMENTS
A. This plan shall be implemented, inspected, maintained, and reported on in accordance with Caltrans Standard Specification Section 13-2, “Water Pollution Control Program” B. The Contractor's responsibility for WPCP implementation shall continue throughout any temporary suspension of work ordered in conformance with the provisions in Section 8-1.06, "Suspensions," of the Caltrans Specifications.
C. If the Contractor or the Authority’s representative identifies a deficiency in the implementation of the approved WPCP, the deficiency shall be corrected immediately, unless an agreed date for correction is approved in writing by the Authority’s representative. The deficiency shall be corrected before the onset of precipitation. If the Contractor fails to correct the deficiency by the agreed date or before the onset of precipitation, the City may correct the deficiency and deduct the cost of correcting deficiencies from payments.
D. If the anticipated area disturbed by construction activities exceeds 1 acre, the Contractor shall be required to submit a SWPPP and pay all associated costs.
E. If the Contractor fails to conform to the provisions of this section, "Water Pollution Control," the Authority’s representative may order the suspension of work until the project complies with the requirements of this section.
***END OF SECTION 01 57 23***
Solano County Downtown Fairfield Justice Campus Closeout Procedures Fairfield Law and Justice Campus Security Project 01 77 00-1 Phase 1: Offsite Sanitary Sewer Improvements
SECTION 01 77 00
CLOSEOUT PROCEDURES
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Closeout procedures.
B. Final cleaning.
C. Adjusting.
D. Project record documents.
E. Spare parts and maintenance Products.
F. Maintenance service.
1.02 CLOSEOUT PROCEDURES
A. Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for Engineer's review.
B. Provide submittals to Engineer that are required by governing or other authorities.
C. Submit final Application for Payment identifying total adjusted Contract Sum, previous payments, and sum remaining due.
1.03 FINAL CLEANING
A. Execute final cleaning prior to final project assessment.
B. Clean debris from gutters and drainage systems.
C. Clean site; sweep paved areas, rake clean landscaped surfaces.
D. Remove waste and surplus materials, rubbish, and construction facilities from the site.
1.04 ADJUSTING
A. Adjust operating Products and equipment to ensure smooth and unhindered operation.
1.05 PROJECT RECORD DOCUMENTS
A. Maintain on site one set of the following record documents; record actual revisions to the Work:
1. Drawings.
2. Specifications.
3. Addenda.
4. Change Orders and other modifications to the Contract.
5. Reviewed Shop Drawings, Product Data, and Samples.
Solano County Downtown Fairfield Justice Campus Closeout Procedures Fairfield Law and Justice Campus Security Project 01 77 00-2 Phase 1: Offsite Sanitary Sewer Improvements
6. Manufacturer's instruction for assembly, installation, and adjusting.
B. Ensure entries are complete and accurate, enabling future reference by Agency.
C. Store record documents separate from documents used for construction.
D. Record information concurrent with construction progress.
E. Specifications: Legibly mark and record at each Product section description of actual Products installed, including the following:
1. Manufacturer's name and product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and modifications.
F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including:
1. Measured elevation of foundations in relation to project datum.
2. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.
3. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work.
4. Field changes of dimension and detail.
5. Details not on original Contract drawings.
G. Submit documents to Engineer with claim for final Progress Payment. Engineer shall withhold a minimum of 5% of the total contract amount from the final progress payments until acceptance of the Record Drawings. This amount is separate, apart, and in addition to any other retention provided for in Specification.
H. Final documents are a part of the Work and must be submitted by the contract completion date. If Record Documents are not completed and submitted by the contract completion date, liquidated damages may be assessed as stated in paragraph 00700/8- 130.
1.06 SPARE PARTS AND MAINTENANCE PRODUCTS
A. Provide spare parts, maintenance, and extra Products in quantities specified in individual specification sections.
B. Deliver to and place in location as directed; obtain receipt prior to final payment.
1.07 FINAL SUBMITTALS
A. The Contractor, prior to requesting final payment, shall obtain and submit the following items to the Engineer for transmittal to the Agency:
1. Written guarantees, where required.
2. Operating manuals and instructions.
3. Maintenance stock items; spare parts; special tools.
Solano County Downtown Fairfield Justice Campus Closeout Procedures Fairfield Law and Justice Campus Security Project 01 77 00-3 Phase 1: Offsite Sanitary Sewer Improvements
4. Completed record drawings.
5. Bonds for roofing, maintenance, etc., as required.
6. Certificates of inspection and acceptance by local governing agencies having jurisdiction.
7. Releases from all parties who are entitled to claims against the subject project, property, or improvement pursuant to the provisions of law.
1.08 MAINTENANCE AND GUARANTEE
A. The Contractor shall comply with the maintenance and guarantee requirements contained in the General Conditions and in individual specification sections.
B. Replacement of earth fill or backfill, where it has settled below the required finish elevations, shall be considered as a part of such required repair work, and any repair or resurfacing constructed by the Contractor which becomes necessary by reason of such settlement shall likewise be considered as a part of such required repair work unless the Contractor shall have obtained a statement in writing from the affected private owner or public agency releasing the Agency from further responsibility in connection with such repair or resurfacing.
C. The Contractor shall make all repairs and replacements promptly upon receipt of written order from the Agency. If the Contractor fails to make such repairs or replacements promptly, the Agency reserves the right to do the Work and the Contractor and his surety shall be liable to the Agency for the cost thereof.
1.09 BOND
A. The Contractor shall provide a bond to guarantee performance of the provisions contained in Paragraph “Maintenance and Guarantee” above, and the General Conditions in the amount specified in the General Conditions.
PART 2 - PRODUCTS – NOT USED
END OF SECTION 01 77 00
Solano County Downtown Fairfield Justice Campus Subsurface Investigation Fairfield Law and Justice Campus Security Project 02 30 00-1 Phase 1: Offsite Sanitary Sewer Improvements
SECTION 02 30 00
SUBSURFACE INVESTIGATION
PART 1 - GENERAL
1.01 DESCRIPTION
A. A geotechnical report or investigation is not available for this project. No warrant is made regarding subsurface conditions.
1.02 ADDITIONAL INFORMATION
A. Prior to bidding, the Contractor should visit the site and acquaint himself with all existing conditions. Bidders may make their own subsurface investigations to satisfy themselves as to site and subsurface conditions including, but not limited to, soil moisture conditions and current groundwater elevations. Such subsurface investigations shall be performed only under time schedules and arrangements approved in advance by the County of Solano and the City of Fairfield. Neither the County of Solano nor the Engineer guarantees the accuracy of the information related to subsurface conditions. Further, it shall be the responsibility of the Contractor to achieve satisfaction of the type of soil and the level of the water table to be encountered during construction of the facilities. The bidder shall make his own deductions and conclusions as to the nature of the materials to be excavated; the difficulties which may arise from the subsurface conditions and of doing any other work affected by the subsurface conditions and shall accept full responsibility therefore.
PART 2 - PRODUCTS – NOT USED
END OF SECTION 02 30 00
Solano County Downtown Fairfield Justice Campus Trenching and Backfilling Fairfield Law and Justice Campus Security Project 31 23 33-1 Phase 1: Offsite Sanitary Sewer Improvements
SECTION 31 23 33
TRENCHING AND BACKFILLING
PART 1 - GENERAL REQUIREMENTS
1.01 SCOPE OF WORK
A. The work under this Section shall consist of performing all operations necessary to excavate all materials, regardless of character and conditions by furnishing all labor, materials, tools, transportation, supplies, equipment, appurtenances, and incidentals and for doing all the work which are necessary for the completion of excavation and backfill of the trench as required and as shown on the plans and as specified in these specifications.
PART 2 - EQUIPMENT
A. Only equipment suitable to produce the quality of work and materials required will be permitted to operate on the project.
B. Mechanical equipment shall be designed and constructed in accordance with general practice for such equipment and shall be of sufficient capacity to insure the production of sufficient material to carry the work to completion within the time limit.
C. The Contractor shall provide adequate and suitable equipment to meet the requirements, and, when so directed by the Engineer, shall remove unsuitable equipment from the work and discontinue the operation of unsatisfactory.
D. Equipment and tools used on the project shall be maintained in satisfactory working and good mechanical condition.
PART 3 - EXECUTION
3.01 PREPARATION
A. Identify required lines, levels, contours, and datum locations.
B. Protect plant life, lawns, and other features remaining as a portion of final design.
C. Protect benchmarks, existing structures, fences, sidewalks, paving, and curbs from excavating equipment and vehicular traffic.
D. Maintain and protect above and below grade utilities, which are to remain.
3.02 CLEARING AND GRUBBING
A. All areas within the designated limits to be trenched/excavated shall be cleaned and cleared as shown and noted on the Plans.
3.03 EXCAVATION
A. Required excavation shall consist of, but not limited to, the following:
1. Excavate the designated trench sections in a manner as shown on the plans and described in these specifications.
Solano County Downtown Fairfield Justice Campus Trenching and Backfilling Fairfield Law and Justice Campus Security Project 31 23 33-2 Phase 1: Offsite Sanitary Sewer Improvements
2. The material excavated from the trench sections shall be placed as fill within the areas designated and as shown on the plans and described in these specifications.
3. Notify the Engineer of unexpected sub-surface conditions and discontinue work in the area until notified to resume work and as described in General Conditions, Section 5.06 “Hazardous Environmental Conditions at Site”.
B. Cut out soft areas of subgrade not capable of compaction in place, backfill with suitable material and compact to density equal to or greater than requirements for subsequent backfill material.
C. Hand trim excavation and remove the loose matter in trench as needed.
D. Remove lumped subsoil, cobbles and rock up to ¼ cubic yard, measured by volume.
E. Do not interfere with 45 degree bearing splay of foundations.
F. Correct and fill areas that were over excavated.
G. Stockpile excavated material on site and remove excess material not being used, from the site unless otherwise directed by the Engineer.
3.04 BACKFILL
A. Placement of Material - Contractor shall deliver fill material to the trench as uniform mixtures. The mixture shall be deposited and spread to the required thickness.
Segregation of material shall be avoided and each layer of material, as spread, shall be free from pockets of coarse or fine material.
1. Lumped subsoil, clods or hard lumps of material over 0.5-foot in greatest dimension shall be broken up before compaction of the material in the trench section.
2. The backfill material shall be placed within the limits shown on the plans. Fill material shall be spread uniformly on the prepared base to the lines and grades indicated on the plans or as directed. Finished grades shall be uniform and neat.
Placement of material by methods, which will tend to segregate particle sizes within the layer, will not be acceptable.
3. The backfill material shall be placed in a systematic manner with placement beginning at the base of the trench section and continuing up to the design elevation as indicated on the plans.
4. The Contractor shall place materials in horizontal layers of not more than 6 inches in thickness prior to compaction. The material shall be gently laid out. The surface that the compacted layer is to bond to must be scarified prior to the placement of the fill material.
B. In general, it is the intent of these specifications to secure the backfill material having the maximum density obtainable with the natural moisture content of the fill material.
However, if in the opinion of the Engineer, the material is too dry for proper compaction, the Contractor will be required to pre-wet the material to uniformly distribute sufficient moisture in each layer before rolling to permit the desired compaction. Material that is too wet shall be spread adjacent to the site and permitted to dry, assisted by scarifying, if necessary, until moisture content is reduced to permit the placement and compaction to continue as directed by the Engineer. The final adjustment shall be made on the fill, as required, until a uniform distribution of moisture is obtained.
Solano County Downtown Fairfield Justice Campus Trenching and Backfilling Fairfield Law and Justice Campus Security Project 31 23 33-3 Phase 1: Offsite Sanitary Sewer Improvements
C. When moisture content and conditions of the spread layers are satisfactory, each layer shall be compacted to 90 percent (90%) relative compaction in accordance with ASTM D 1557-07 procedure.
D. The entire backfill of the trench shall be brought to not less than the prescribed net grade and cross section at all points. Finished grades shall be uniform and neat, and shall be sloped as shown on the plans.
E. The Contractor shall be responsible for monitoring the progress of the material placement in insures compliance with the specified lines and grades.
3.05 COMPACTION
A. It is the intent of these specifications to secure an embankment having the maximum density obtainable with the natural moisture content of the embankment fill material.
However, if the material is too dry for proper compaction, the Contractor will be required to pre-wet the material to uniformly distribute sufficient moisture in each layer before rolling to permit the required compaction. Material that is too wet or contains excessive moisture shall not be compacted and shall be allowed to dry, assisted by scarifying if necessary, until moisture content is reduced to permit the placement and the required compaction.
B. The moisture content of the embankment material at the time of compaction shall be such that the specified relative compaction will be obtained and the embankment will be in a firm and stable condition.
C. Trench subgrade shall be compacted to 85 percent (85%) relative compaction in accordance with ASTM D 1557-07 Procedure.
D. The backfill material shall be deposited, spread, and compacted on the prepared subgrade to the required thickness.
1. Backfill in areas, where a trench is not located under areas to be paved, roadways, and under sidewalks, fill material shall be compacted to not less than 90 percent (90%) relative compaction in accordance with ASTM D 1557-07 Procedure for each layer of material placed.
2. Backfill in areas, where a trench is located under areas to be paved, roadways, or sidewalks to be placed, fill material shall be compacted to not less 95 percent (95%) relative compaction in accordance with ASTM D1557-07 Procedure for each layer of material placed.
3. Compaction shall always be commenced along the edge of the area to be compacted and compaction shall gradually advance toward the center of the fill area.
4. The complete trench fill…