About this file

This is a preliminary construction drawing for a temporary sewer bypass system prepared for the City of Fairfield and County of Solano as part of the Downtown Fairfield Justice Campus Asset Protection Project. The drawing, dated February 24, 2026, depicts the horizontal sanitary sewer bypass provisions at a scale of 1 inch equals 30 feet and is designated as Sheet SS1 of the Temporary Sewer Bypass Plan. The document indicates this is a preliminary plan not approved for construction and includes a revision block with signature authority for the officer. The drawing references the project file location and last revision timestamp, establishing the technical documentation framework for the temporary sewer bypass infrastructure component of the broader asset protection initiative designed to protect county properties from seasonal stormwater flooding.

The temporary sewer bypass plan is one component of a comprehensive multi-prime asset protection project that encompasses concrete masonry work, barrier walls, berms, flood gates, and underground utility reconfiguration across ten county locations. This drawing specifically addresses sanitary sewer bypass provisions as part of the Justice Campus Asset Protection initiatives. The document is preliminary in nature, indicating that final construction drawings and specifications remain under development. The sewer bypass system is integral to the overall flood protection infrastructure being implemented across the identified properties, with the concrete masonry component requiring sealed bids due by 2:00 p.m. on March 9, 2026, following a mandatory pre-bid conference on February 19, 2026. The project is federally funded through FEMA Hazard Mitigation Assistance programs with substantial completion required within 231 calendar days of the Notice to Proceed scheduled for November 12, 2025.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R, S

EP

FE

BR

UA

RY

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ Ov erl an d S S

By pa ss P lan .dw g F eb

4,

- 8 :57 am

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

JU

ST

IC

E

CA

MP

US

A

SS

ET

P

RO

TE

CT

IO

N

CI

TY

O F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

SS1

TE

MP

OR

AR

Y

SE

W

ER

B

YP

AS

S

TEMPORARY SEWER BYPASS PLAN