2026_PREQUAL_APPLICATION_(Fillable).pdf

PDF 880 KB Posted

Attached to
PREQUALIFICATION - Bldg. 4 - Mail Services Remodel
Solicitation number
2027-093
Issued by
Los Angeles County, California

About this file

This is a Bidder's Pre-Qualification Package issued by Mt. San Antonio College for construction projects exceeding $220,000. The document establishes the pre-qualification requirements and evaluation criteria that prime contractors must satisfy to be eligible to bid on the college's construction projects. The Building 4 - Mail Services Remodel project, referenced in the related contract opportunity, involves approximately 1,200 square feet of remodeling work including demolition and installation of walls, flooring, mailboxes, ceilings, lighting, electrical, and data connections. Contractors seeking pre-qualification must submit a complete application with all supporting documentation at least 30 days prior to the formal bid opening. Pre-qualification approval letters remain valid for 12 months, and the District reserves the right to request updated statements at any time or consider ratings expired if not updated within 18 months of submission. Successfully pre-qualified contractors will receive advance notice of upcoming projects for which they are approved to bid.

Pre-qualification financial capacity is determined using the lesser of ten times working capital or ten times net worth, and may be augmented by submission of a Letter of Bank Credit. Contractors must provide reviewed or audited financial statements less than 14 months old; compilations are not acceptable. Applicants must demonstrate completion of at least two public works projects within the past five years with an actual construction cost totaling 75 percent of the cumulative average for projects under $15 million, or 50 percent cumulative average for projects $15 million or greater. Additional requirements include minimum $2,000,000 combined comprehensive single limit liability insurance, current California contractor's license, compliance with prevailing wage requirements, bondability through an admitted California surety with an A- rating or better, and achievement of a minimum rating score of 70 points on the 86-point evaluation scale. Automatic disqualification may result from omission of requested information, falsification of information, excessive stop notices or prevailing wage violations, or debarment from the Division of Labor Standards Enforcement.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT. SAN ANTONIO COLLEGE

BIDDER'S PRE-QUALIFICATION

PACKAGE Projects Greater Than $220,000

REQUEST FOR PRE-QUALIFICATION OF BIDDERS

(Public Contract Code Section 20651.5) Prime contractors wishing to bid projects greater than $220,000 at Mt. San Antonio College must fully complete this application and provide all materials requested herein. The contractor’s pre-qualification status will remain current for 12 months from the notice of qualification, and its public works rating, or financial rating may be updated at any time. The contractor will receive advance notice from the District of upcoming projects for which it has been deemed pre-qualified to bid, and may choose to bid any or all of the projects for which it is pre-qualified.

Answers to questions contained in the attached application are required, including a complete statement of prospective bidder's financial ability and experience in performing public works. These documents will be the basis of rating bidders in respect to the size and scope of contracts upon which each bidder is qualified to bid.

The District reserves the right to check other sources available.

In addition to disqualification for failure to meet the District’s criteria, a Contractor may be automatically disqualified for any one of the following: (1) omission of requested information; (2) falsification of information;

(3) excessive stop notices and/or prevailing wage violations; (4) debarment from the Division of Labor Standards Enforcement.

The application responses and financial statements are not public records and are not open to public inspection. All information provided will be kept confidential to the extent permitted by law. The District reserves the right to reject any and all pre-qualification questionnaires and to waive any irregularities in the information contained therein.

The application must be signed under penalty of perjury by an individual who has the legal authority to bind the contractor on whose behalf that person is signing. If any information provided by a contractor becomes inaccurate, the contractor must immediately notify the awarding body and provide updated accurate information in writing and under penalty of perjury.

SUBMISSION OF COMPLETED STATEMENTS

Email completed Contractor's Statement of Experience and Financial Condition to purconstruction@mtsac.edu (review application requirements) Confidential information can be emailed to our secure dropbox, dropbox.mtsac.edu.

MT. SAN ANTONIO COLLEGE PRE-QUALIFICATION PACKAGE - Instructions (Rev. 3/25) Page i https://dropbox.mtsac.edu/

Quick Check

Should I fill out this package?

The following are screening statements which should be used to determine whether or not you pass the test to require you to enter the prequalification process.

You must be able to answer “YES” to each statement below.

1. I am bidding as the prime contractor.

2. I am appropriately licensed, insured and bondable.

3. I have an audited or reviewed financial statement, (as appropriate), that is less than 14 months old.

4. I have completed at least 2 public works building projects within the last 5 years. (Public Works is defined as facilities built for government agencies including school districts, special districts, local, county, state and federal agencies requiring prevailing wage rates paid to workers.)

5. I am eligible to bid a Public Works contract as per Section 1777.1 of the Labor Code.

If you can answer yes to all of the above statements, please proceed with submission Pre-qualification application.

MT. SAN ANTONIO COLLEGE PRE-QUALIFICATION PACKAGE - Instructions (Rev. 3/25) Page ii

DISTRICT PRE-QUALIFICATION STANDARDS

Only one copy of the pre-qualification is required to be submitted. A new and current submittal shall be required each year. Additionally, the District may, at any time, specifically request a new statement, in which case, the Contractor must comply within thirty (30) days, or the rating on file may, at the discretion of the District, be considered expired. A contractor may also file new statements at more frequent intervals if there is substantial change in the Contractor's financial status, and a new rating based on the latest statement will be issued. In no case will pre-qualification remain in effect longer than 18 months from the date submitted by the contractor for review. The following items must be provided or the qualification submittal will not be accepted.

FINANCIAL INFORMATION

A. Audited & Reviewed Statement Requirements

Reviewed or audited statements will be required for projects under $15 million.

Audited statements will be required for all construction projects totaling $15 million or greater.

Note: A compilation is not acceptable. A Compilation is financial statements prepared by an accountant based on the amounts provided by a client. The accountant does not review or audit the amounts provided and therefore does not provide any assurances regarding the validity of the amounts.

B. Financial Capacity

Prospective bidders will be pre-qualified to bid on projects up to a maximum dollar amount based on the lesser of ten times working capital (current assets less current liabilities) or ten times net worth (total assets less liabilities) whichever is less. Financial rating may be augmented by submission of a Letter of Bank Credit on the form included in pre-qualification application, section 7. Particular attention is called to the fact that the certificate of the certified public accountant or licensed public accountant must express an unqualified opinion or a qualified opinion which does not negate an opinion on the statements as a whole in order to receive a "financial capacity" qualification. Note: Statements with a "negative quick asset" amount may not be augmented.

Working capital and net worth are important factors in determining the bidding capacity of a Contractor; therefore, the accountant must furnish, by a supplementary schedule or as a part of the accountant’s certificate, any information not specifically called for by the statement which, in the accountant’s opinion, might properly be taken into consideration.

In the event that the Contractor’s job income and expenditures are accounted on a completed contract basis and the balance sheet includes an item reflecting the excess of costs to date over billing to date, or vice versa, the elements of “Accumulated Cost” and “Billings to Date” must be shown in support of the balance sheet item.

(Rev. 3/25) Page iii

C. Accountant's Certificate and Release

The certificate of a licensed Certified Public Accountant will be required in all cases. The forms of certificate for both an audit and a review are included in pre-qualification application, section 7. Use whichever is appropriate to your submittal. It will be acceptable for the accountant to submit a certificate in the accountant's own words. However, such qualifications shall not be so extensive as to nullify the value of the statement or its usefulness to the District.

Accountant's Release Letter will be required. The responsible accountant must verify the validity of the applicant’s financial statement. Use the form included in pre-qualification application, section 7.

D. Term of Financial Statements

A Contractor's financial information is valid until the date shown is more than one year old.

Statements will be held on file until the financial information is 18 months old at which time it will be destroyed. The District reserves the right to reject statements in which the financial information is more than six months old. All applicable portions of the form should be completed with schedules attached if the space provided does not suffice.

PUBLIC WORKS REQUIREMENTS

Projects estimated at less than $15,000,000 require the successful completion of at least two public works projects with an actual cost of construction totaling 75% cumulative average, completed in the State of California in the past five (5) years.

Projects estimate at $15,000,000 or greater require the successful completion of at least two public works projects with an actual cost of construction totaling 50% cumulative average completed in the State of California in the past five (5) years. For example - Project 1 contract value of $1,627,511 plus Project 2 contract value of $1,437,026 equals an average contract value of $1,532,269. Take this value multiply by 1.33 (allowing for a growth factor) reaches the sum of $2,037,917. This figure is rounded to the nearest $100,000 for a rating of $2,000,000. This process only obtains the Public Works Rating and does not necessarily set the final rating.

INSURANCE

A minimum combined comprehensive single limit liability insurance of $2,000,000 or an amount equal to or greater than the coverage as identified in the District’s bid documents is required. A Certificate of Insurance must be issued to Mt. San Antonio College which states levels and dates of coverage.

BONDABILITY

The bonding surety is required to be an admitted surety in the State of California with an A- rating or better. The surety will be contacted to confirm willingness to bond to a particular limit. It is required that the contractor include a letter of bondability from the surety indicating its support levels.

In the event that the contractor is unable to obtain a letter of bondability in the time prescribed by the District, the Contractor may be suspended from the qualified contractors’ list and not be allowed to bid on District projects until proof of bondability is provided.

(Rev. 3/25) Page iv

AFFIDAVIT

An affidavit as to the veracity, accuracy and completeness of the Pre-qualification Application being submitted must be completely executed by an authorized agent of the company. Use the form included in the pre-qualification application, section 8.

NOTIFICATION OF PREQUALIFICATION RESULT

Completed pre-qualification forms should be submitted 30 days prior to bid, or as advertised. (All in accordance with Public Contract Code 20651.5) Contractors will be notified of their pre-qualification rating as soon as possible via email, but not later than 24 hours prior to bid opening.

PROCEDURE FOR APPEAL OF PREQUALIFICATION RESULTS

If the contractor chooses to challenge a disqualification, the contractor shall request a hearing by providing a written request within two (2) working days after notification of disqualification. The written request shall set forth in detail all grounds for the request including without limitation all facts, supporting documentation, legal authorities and arguments in support of the grounds for the request;

any matters not set forth in the written request shall be deemed waived. All factual contentions must be supported by competent, admissible and creditable evidence.

The District shall establish a committee for the hearing to review the facts and reconsider the disqualification. The committee shall render a final and binding decision within five (5) working days of the hearing.

If a clerical error, or an error of omission, is discovered after a contractor is notified of the review committee’s results, the contractor may submit the additional information for final consideration by the committee.

District counsel may be in attendance or on call during the appeal. The contractor or his/her representative is invited to appear in person to bring before the committee any additional or new information. The committee advises the contractor on the points where its rating has fallen below required limits, and allows the contractor to speak to the issues. The contractor is then released from the meeting and the committee members come to consensus on whether or not to allow the contractor to pre-qualify. The contractor is emailed notification of the committee's decision at least 24 hours prior to bid opening.

(Rev. 3/25) Page v

CONTRACTOR'S STATEMENT OF EXPERIENCE

AND FINANCIAL CONDITION

Please Type or Print Clearly

PREPARATION OF APPLICATION:

Prime contractors wishing to bid projects greater than $220,000 at Mt. San Antonio College must fully complete this application and provide all materials requested herein. Pre-qualification should be submitted by email to purchasing@mtsac.edu. It is the sole responsibility of the contractor to ensure that its application is correctly completed and that all blanks are filled

in. Incomplete applications will not be reviewed. The following documents are required and must be included with the application (use the links provided to access the verification documents).

License Verification https://www2.cslb.ca.gov/OnlineServices/CheckLicenseII/CheckLicense.aspx DIR Verification https://cadir.secure.force.com/ContractorSearch

Standing Verification https://bizfileonline.sos.ca.gov/ General Application – Section 1 Rating Questions – Section 2 Experience – Section 3 Safety Record – Section 4 Certificate of Insurance – Section 5 Bonding Letter from surety – Section 6 Financials – Review or Audited Statements – Section 7

SECTION 1 - GENERAL INFORMATION

Contractor: _______________________________________________________________ (as name appears on license)

Contact Person:__________________________________ Check One: Corporation ____ Title: ___________________________________ Partnership ____ Address: _______________________________________ Sole Prop. ____

(Street Address) _______________________________________ Joint Ven. ____ (City, State, Zip Code)

Phone: (___)______________ Fax: (___)_____________ Email:__________________________ License No. ________________ Class(es): _______________________ Exp. Date: __________ DIR Registration No. _________________________________ Have you ever been licensed in California under a different name or different license number?

____Yes ____No -- If yes, list all name(s) and license number(s) on a separate sheet.

Tax ID Number: ____________________ Date Business Formed: __________________

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 1 mailto:purchasing@mtsac.edu https://www2.cslb.ca.gov/OnlineServices/CheckLicenseII/CheckLicense.aspx https://efiling.dir.ca.gov/PWCR/Search.action https://businesssearch.sos.ca.gov/ https://bizfileonline.sos.ca.gov/ https://cadir.secure.force.com/ContractorSearch

Please check the following if they apply to your firm:

_____ DVBE Certified _____ Large Business (500 or more employees) _____ Small Business (Under 500 employees) _____ Disadvantaged Business (Minority Owned) _____ Woman-Owned & Operated _____ Sheltered Workshop _____ Local (Office within 10 miles of the District)

1. In the past 10 yrs., what other business have the principal or corporate officers been involved in? _________________________

2. Has there been any recent change in control of company? (If yes, explain on separate signed page.) __________Yes _________No

3. Is the company or its owners connected with other companies as a subsidiary, parent, holding or affiliate? __________Yes _________No (If yes, explain on separate signed page, listing companies, business addresses, and phone numbers.)

4. Corporate Officers - Partners - Proprietor - Owners - Key Personnel:

Name Position Years W/Firm

% of Ownership

5. If a corporation: Date incorporated ______________ State ___________________

6. If a partnership: Date of organization _____________ State ___________________ ___ General ___ Limited ___ Association

7. In what type of construction do you specialize?

8. What was the largest amount of work completed in one calendar year?

Dollar Amount Number of Jobs Year Largest Job Amount

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 2

9. List annual gross income for last three (3) years: Year: ________ $___________

Year: ________ $___________

Year: ________ $___________

10. Are you currently prequalified with any other school district in Southern California?

_____Yes _____No If yes, list district and dollar rating:

I hereby allow Mt. San Antonio College to contact the district(s) above to discuss my rating/ prequalification.

Signed: _________________________________________ Date: _________________

Name/Title: ______________________________________

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 3

SECTION 2 – RATING QUESTIONS

Highest Possible Rate = 86 Points.

A score less than 70 points disqualifies you from bidding projects proposed by Mt. San Antonio College that use this prequalification process as a condition of bidding.

Question

1. How many years has your firm been in business in California as a contractor under your present business name and license number?

(less than 3 Yrs. = 1 pt., 3-6 Yrs. = 3 pts., 6+ = 5 pts.)

__________ Years _________ pts.

2. How many years’ experience does your **RMO/ RME have as a licensed contractor?

(less than 3 Yrs. = 1 pt., 3-6 Yrs. = 3 pts., 6+ = 5 pts.) __________ Years _________ pts.

3. Is your firm and RMO/RME in good standing with the Contractors State License Board, or have they ever had their contractor's licenses suspended, put on probation, or revoked? (Check One) (Revoked = 0 pts., suspended = 2 pts., probation = 3 pts., good standing = 5 pts.)

__________Good Standing __________Suspended __________Probation __________Revoked

_________ pts.

4. How many years has your firm performed construction work under the California Division of the State Architect (DSA) rules and regulations?

(less than 3 Yrs. = 1 pt., 3-6 Yrs. = 3 pts., 6+ = 5 pts.)

__________ Years _________ pts

5. How many stop notices have been defended in court by your firm and proceeded to judgment against your firm and/or the owner?

(0 = 6 pts., 1-3 = 4 pts., >3 = 0 pts.)

__________ Stop Notices _________ pts

6. How many legal proceedings, including arbitration, has your firm initiated against an owner?

(0 = 6 pts., 1-3 = 4 pts., >3 = 0 pts.) __________ Legal Proceed _________ pts

7. Has an owner ever declared your firm in default on a project in the past 5 years?

(Yes = 0 pts., No = 5 pts.) ____ Yes ____ No _________ pts

8. Has your firm been assessed liquidated damages in the past 5 years?

(Yes = 0 pts., No = 6 pts.) ____ Yes ____ No _________ pts

9. Has an owner ever made a demand on your payment or performance bonds?

(Yes = 0 pts., No = 6 pts.) ____ Yes ____ No _________ pts

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 4

10.Has your firm ever had insurance terminated by a carrier in the past 5 years due to an excessive claims history and/or nonpayment of premium?

(Yes = 0 pts., No = 5 pts.)

____ Yes ____ No _________ pts

11.How many OSHA citations has your firm received in the last 5 years?

(0 = 5 pts., 1-3 = 3 pts., >3 = 0 pts.) __________ Citations _________ pts

12.Does your firm currently have a safety plan which complies with the current OSHA standards?

(Yes = 2 pts., No = 0 pts.) ____ Yes ____ No _________ pts

13.What is your current Worker’s Compensation Experience Modification Rate (EMR)?

(<1 = 5 pts., 1.0 – 1.5 = 3 pts., 1.6 – 2.0 = 2 pts., >2 = 0 pts.) __________ Rate _________ pts

14.How many school projects has your firm completed in California in the past 5 years?

(5+ = 5 pts., 4 = 4 pts., 3 = 3 pts., 2 = 2 pts., 1 or less = 0 pts.)

__________ School Work _________ pts

15.Within the past 5 years, have any of your employees or another entity filed a complaint against your firm with the California Contractors State License Board? If yes, how many complaints were filed?

(No = 5 pts., 1 = 4 pts., 2 = 3 pts., 3 = 2 pts., >3 = 0 pts.)

____ Yes ____ No

__________ Complaints _________ pts

16.Within the past 5 years, have any of your employees filed a complaint with the Labor Board? If yes, how many complaints were filed?

(No = 5 pts., 1 = 4 pts., 2 = 3 pts., 3 = 2 pts., >3 = 0 pts.)

____ Yes ____ No

__________ Complaints _________ pts

17.Has your firm or any principals of your firm* been cited or found guilty of violating any federal, state or local law, rule or regulation regarding a construction contract?

(Yes = 0 pts., No = 5 pts.)

____ Yes ____ No _________ pts

* Principals of the firm are defined as any officers, directors, partners, TOTAL RMO/RMEs, or any others having an ownership interest in the firm. POINTS

**RMO/RME meaning - A non-licensed contracting business pays an individual who holds a California contractor's license to act as the Responsible Managing Officer (“RMO”) or Responsible Managing Employee (“RME”) of a construction company, when that person has no actual involvement in the day-to-day operations.

ATTENTION:

If you answered “Yes” to questions 6-11, and/or 15-17, you must attach an explanation for each on a separate sheet.

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 5

SECTION 3 – EXPERIENCE

1. Provided the size of projects do you feel your company can undertake:

Single job: $__________________ Total work in progress: $________________

2. List the two (2) largest public works contracts completed in the past five (5) years:

Owner Information Project Manager

(PM)

Project Name/ Job Description Contract

Amount/Completion Date

Owner: PM Company: $

Owner Contact Name: PM Contact Name: Completion Date:

Contact Email: PM Contact Email:

Owner: PM Company: $

Owner Contact Name: PM Contact Name: Completion Date:

Contact Email: PM Contact Email:

3. List all projects completed for School Districts, including community college districts, in the last five (5) years not listed in #2 above: (Attach separate sheet if needed.)

Owner Information Project Manager

(PM)

Project Name/ Job Description Contract

Amount/Completion Date

Owner: PM Company: $

Owner Contact Name: PM Contact Name: Completion Date:

Contact Email: PM Contact Email:

Continue list on the next page

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 6

Owner Information Project Manager

(PM)

Project Name/ Job Description Contract

Amount/Completion Date

Owner: PM Company: $

Owner Contact Name: PM Contact Name: Completion Date:

Contact Email: PM Contact Email:

Owner: PM Company: $

Owner Contact Name: PM Contact Name: Completion Date:

Contact Email: PM Contact Email:

District Use Only:

Two projects used for rating development: Highest: _______________________________ 2nd Highest: ________________________________

Combined Total: _____________________________ x 1.33 = $________________________________

Public Works Rating: $______________________________________ (Above total rounded to the nearest $100,000)

4. List at least three (3) current principal Subcontractors:

Sub Name Material or Service Provided

Contact Name Email/Phone

Email:

Email:

Email:

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 7

5. List at least two (2) current principal Material Suppliers:

Company Name Material Provided Contact Name Email/Phone

Email:

Email:

Interview Questions

The following questions will be used by the District to interview randomly selected contacts from at least 2 completed projects. No action on your part is necessary; these questions are for your information only.

Highest Possible Rate = 110 Points. A score less than 60 points disqualifies you from bidding projects proposed by Mt. San Antonio College that use this prequalification process as a condition of bidding.

1. Are there any outstanding stop notices or liens currently unresolved on contracts that have had notices of completion recorded for more than 90 days? (1 point for each is deducted from overall score.)

2. Did the contractor provide adequate personnel? (Max. 10 points)

3. Did the contractor provide adequate supervision? (Max. 10 points)

4. Was there adequate equipment provided on the job? Max. 10 points)

5. Was the contractor timely in providing submittals, reports and other paperwork, including change order paperwork? (Max. 10 points)

6. Was the contractor timely in completing the project? (Max. 10 points)

7. Were there excessive change orders on the job that can be faulted to the Contractor or his subcontractors? (Max. 10 points)

8. When a change order was issued, did the contractor perform the work well, and did it integrate into the existing work easily? (Max. 10 points)

9. How has the contractor been performing in taking care of warranty items? (Max. 10 points)

10. Did you have difficulty with claims? (Max. 10 points)

11. How would you rate the contractor's overall performance? Would you want to work with them again? (Max 10 points)

12. Does this contractor pay his bills from subcontractor/suppliers on time? (Max 10 points)

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 8

SECTION 4 – SAFETY RECORD

1. List your firm’s Workers Compensation Experience Modification Rate (EMR) for the three (3) most recent years. Your EMR should be obtained from your insurance agent.

2026_________________ 2025 _________________ 2024________________

2. Use the three (3) most recent years’ OSHA No. log to fill in the following required information:

2026 2025 2024 Number of fatalities:

Number of workdays lost:

No. of lost time due to accidents:

No. of restricted workday cases:

No. of medical attention cases:

Approximate number of employee (direct hire) hours worked (do not include any non-work time even though paid)

3. Do you hold safety meetings for field supervisors and employees? _____ Yes _____ No

How often? _____ Weekly _____ Bi-Weekly _____ Monthly _____ As Needed

4. Does your company conduct project safety inspections? _____ Yes _____ No

5. Does your company have a written safety program? _____ Yes _____ No

6. Does your company have a safety orientation program for new employees? _____ Yes _____ No

7. State any additional areas of your company’s safety program and policies that you feel would be appropriate in the District’s evaluation.

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 9

SECTION 5 - INSURANCE

Do you currently have a minimum of $1,000,000 Combined Comprehensive Single Limit Liability Insurance? ______ Yes ______ No Please provide a Certificate of Insurance as verification

AMOUNT OF INSURANCE $___________________ Years With Ins. Co.: ________

Insurance Company Information Name: ___________________________________ Address: ___________________________________

Phone #: (____)______________________________ Contact: ___________________________________

If under two years with your current insurance company, please list prior insurance companies below, including phone numbers and contact names.

Previous Insurance Company Name: ___________________________________ Address: ___________________________________

Phone #: (____)______________________________ Contact: ___________________________________

Years with Ins. Co. ___________________________

Previous Insurance Company Name: ___________________________________ Address: ___________________________________

Phone #: (____)______________________________ Contact: ___________________________________

Years with Ins. Co. ___________________________

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 10

SECTION 6 - SURETY INFORMATION

List all surety companies, not agencies, utilized by your company in the last five (5) years. Please provide a letter stating bondability from surety company.

Company Contact & Phone# / Email Largest Bond List Years Used

Please explain on a separate page, with dates of occurrences, any positive answer to the following questions.

Has your company, any owner, or affiliated company ever: No Yes

1. Been unable to obtain a bond or been denied a bond for a contract? ____ ____

2. Defaulted on a contract forcing a Surety to suffer a loss? ____ ____

3. Failed to complete a District contract within the authorized contract time? ____ ____

4. Ever declared bankruptcy? ____ ____

5. Been in receivership? ____ ____

6. Had any arbitration (not litigation) on a contract? ____ ____

7. Are there any outstanding liens/stop notices for labor and/or material filed against your firm on any contracts which have been completed or are being completed by your firm? ____ ____

8. Is the company involved in litigation related to construction? ____ ____

9. Have any of the sureties bonding your jobs been required or requested to complete any part of your work during the last five (5) years? ____ ____

10. How many projects is your company currently bonded for? ___________

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 11

SECTION 7 ‐ FINANCIAL INFORMATION

A COMPILATION IS NOT ACCEPTABLE.

1. Financial Statement: Submit the appropriate financial statement with this completed form.

Reviewed or audited statements will be required for projects under $15 million.

Audited statements will be required for all construction projects totaling $15 million and over.

PLEASE CHECK ONE:

This is based on an Audit Review

2. Accountant’s Certificate of Audit of Financial Statement:

Your accountant must complete and sign one of the following certificates (page 14), depending on the type of financial statement you are submitting with this application. Include the certificate with your completed application.

3. Accountant’s Release Letter: Your completion of this form (page 15) permits the District to contact your accountant to verify that the financial statement you have submitted is the most recent one.

4. Financial Institution Release Letter: Your completion of this form (page 15) permits the District to contact the financial institution that provided a Letter of Credit for this application.

You only need to complete this form if you have submitted a Letter of Credit with your application.

5. General Letter of Credit: If you wish the District to consider your line of credit as part of its calculation of your financial capacity, you must submit a Letter of Credit from your financial institution with your application.

The financial institution may use the following form (Page 16) or it may use its own letterhead as long as it certifies the credit amount and agrees that the credit will not be withdrawn or reduced without 45 days written notice to the District.

Fill in the following information below:

Based on Working Capital Current Assets:

Current Liabilities:

Based on Net Worth Total Assets:

Total Liabilities:

Financial Capacity Lessor of Above:

Line of Credit:

Total

(optional)

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 12

COMPLETE THIS CERTIFICATE FOR AN AUDIT OF FINANCIAL STATEMENT:

STATE OF: ______________________

We have examined the Financial Statement of _____________________________________ as of ___________________. Our examination was made in accordance with generally accepted auditing standards, and accordingly included such tests of the accounting records and such other auditing procedures as we considered necessary in the circumstances.

In our opinion, the accompanying financial statement included on pages ___ to ___ inclusive, present fairly, in all material respects, the financial position of ______________________ as of ______________________, and the results of their operations and their cash flows for the year(s) then ended in conformity with generally accepted accounting principles.

Print name of Firm Accountant’s Signature

Telephone No. License No.

COMPLETE THIS CERTIFICATE FOR A REVIEW ONLY OF FINANCIAL STATEMENT:

I (we) have reviewed the accompanying financial statement of ______________________________ as of ____________________. The information included in the financial statement is the representation of the management of the above firm.

Based on my (our) review with the exception of the matter(s) described in the following paragraphs(s), I am (we are) not aware of any material modifications that should be made to the accompanying financial statements in order for them to be in conformity with generally accepted accounting principles.

Print name of Firm Accountant’s Signature

Telephone No. License No.

(Note this review consists principally of inquiries of management and appropriate analytical procedures applied to this financial data. It is substantially less in scope than an examination in accordance with generally accepted auditing standards, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we have not expressed such an opinion.)

Special note to Accountant: The above Certificates of Accountant shall not be made by any individual who is the regular employ of the individual, partnership or corporation submitting the statement; nor by any individual who is a member of the firm with more than a ten percent financial interest.

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 13

ACCOUNTANT'S RELEASE LETTER

By signing the form below, I authorize Mt. San Antonio College to contact our company's licensed accounting firm to verify our most recent audited or reviewed financial statement. I understand the financial statement is confidential information and is not open to public inspection.

Name Contractor’s Signature

Title

Company Name

Date

District Use Only:

Verified by ______________________________ on _______________________ by speaking with _____________________.

FINANCIAL INSTITUTION RELEASE LETTER

(For use only when augmenting financial rating with a Letter of Credit)

By signing the form below, I authorize Mt. San Antonio College to contact our financial institution to verify our line of credit information. I understand this information is confidential information and is not open to public inspection.

Name Signature

Title

Company Name

Date

District Use Only:

Verified by _______________________ on _______________________ by speaking with _____________________.

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 14

LETTER OF CREDIT - OPTIONAL

The following form may be completed by your financial institution to augment your financial rating. If it prefers, your institution may issue a Letter of Credit on its own letterhead, provided the Letter of Credit contains substantially the same provisions, and is addressed to the District and bears an original signature. A letter of credit is optional, not mandatory. It may be used to increase your financial capacity by the value of the letter of credit.

General lines of credit are not accepted. A letter of credit must be issued specifically to the District as outlined below to be used. Email Letter to purconstruction@mtsac.edu.

TO: Mt. San Antonio College 1100 North Grand Avenue Walnut, CA 91789

ATTENTION: Purchasing Department

SUBJECT: GENERAL LETTER OF CREDIT

Reference is made to the prequalification of: ______________________________________ Name of Contractor

Under Board Rules of the Board of Trustees pertaining to the construction, alteration and maintenance of School District Facilities, we certify that the above Contractor has been extended an unqualified line of credit not to exceed $________________________________ and that such credit will not be withdrawn or reduced without 45 days written notice to the District.

Name of Financial Institution Institution No. Code

Address: _________________________________________________________________

Signature/Date: ____________________________ _________________________

Print Name & Title: ____________________________ _________________________

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 15 mailto:purconstruction@mtsac.edu

SECTION 8 - AFFIDAVIT

DECLARATION

I, __________________________________________________, hereby declare that I am the (printed name)

_______________________________ of ___________________________________________ (title) (name of applicant firm) submitting this Prequalification Statement; that I am duly authorized to execute this Prequalification Statement on behalf of the above named firm; and that all information set forth in this Prequalification Statement and all attachments hereto are, to the best of my knowledge, true, accurate, and complete as of its submission date.

I declare, under penalty of perjury, that the foregoing is true and correct and that this declaration was

Subscribed at _______________________________________ (location and city), County of

____________________________________, State of ___________________________________ on __________________________________ (date).

Signature of Applicant: _____________________________________

(If signed by other than the sole proprietor, a general partner, or corporate officer, attach original notarized power of attorney or corporate resolution.)

All information submitted for prequalification evaluation will be considered official information acquired in confidence and the District will maintain its confidentiality to the extent permitted by law.

The submitter of the foregoing statement of experience and financial condition has read the same and it is true to the best of his knowledge. The statement is for the purpose of inducing the District to supply the submitter with plans and specifications and any depository, vendor, or other agency named therein is hereby authorized to supply the District with any information necessary to verify the statement. Should the foregoing statement at any time cease to properly and truly represent the financial condition of the submitter in any substantial respect, the submitter will refrain from further bidding on District work until a revised and corrected statement is submitted.

MT. SAN ANTONIO COLLEGE – PRE-QUALIFICATION APPLICATION (Rev. 03/25) Page 16

PQ Application Instuctions 2023
FILLABLE PQ Application 2023
PQ Application 2019 (TP)
Please Type or Print Clearly
SECTION 3 – EXPERIENCE
Interview Questions
3. Do you hold safety meetings for field supervisors and employees? _____ Yes _____ No
4. Does your company conduct project safety inspections? _____ Yes _____ No
5. Does your company have a written safety program? _____ Yes _____ No
6. Does your company have a safety orientation program for new employees? _____ Yes _____ No
7. State any additional areas of your company’s safety program and policies that you feel would be appropriate in the District’s evaluation.
______________________________________________________________________________
2016
2017
2018
Number of fatalities:
Number of workdays lost:
No. of lost time due to accidents:
No. of restricted workday cases:
No. of medical attention cases:
Approximate number of employee (direct hire) hours worked (do not include any non-work time even though paid)
SECTION 5 - INSURANCE
License Verification httpswww2cslbcagovOnlineServicesCheckLicenseIICheckLicenseaspx: Off
DIR Verification httpsefilingdircagovPWCRSearchaction: Off
Standing Verification httpsbusinesssearchsoscagov: Off
General Application Section 1: Off
Rating Questions Section 2: Off
Experience Section 3: Off
Safety Record Section 4: Off
Certificate of Insurance Section 5: Off
Bonding Letter from surety Section 6: Off
Financials Review or Audited Statements Section 7: Off
Contractor:
Contact Person:
undefined:
Address 1:
Address 2:
Phone:
undefined_2:
Fax:
undefined_3:
Email:
License No:
Classes:
Exp Date:
DIR Registration No:
Tax ID Number:
Date Business Formed:
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
undefined_4:
NameRow1:
PositionRow1:
Years WFirmRow1:
of OwnershipRow1:
NameRow2:
PositionRow2:
Years WFirmRow2:
of OwnershipRow2:
NameRow3:
PositionRow3:
Years WFirmRow3:
of OwnershipRow3:
NameRow4:
PositionRow4:
Years WFirmRow4:
of OwnershipRow4:
5 If a corporation Date incorporated:
State:
6 If a partnership Date of organization:
State_2:
7 In what type of construction do you specialize:
Number of Jobs:
Year:
Largest Job:
fill_40:
Check Box9:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Text17:
Year_2:
undefined_5:
Year_3:
undefined_6:
Year_4:
undefined_7:
No 1:
No 2:
No 3:
undefined_8:
undefined_9:
undefined_10:
NameTitle:
Date:
Check Box18: Off
Check Box19: Off
Years_2:
Years_4:
Years_6:
Stop Notices:
Legal Proceed:
Check Box20:
0: Off
1: Off
2: Off
3: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Citations:
Rate_2:
School Work:
Complaints:
Complaints_2:
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Single job:
Total work in progress:
Owner:
PM Company:
Owner Contact Name:
PM Contact Name:
Contact Email:
PM Contact Email:
Project Name Job DescriptionRow1:
fill_9:
Completion Date:
Owner_2:
PM Company_2:
Owner Contact Name_2:
PM Contact Name_2:
Contact Email_2:
PM Contact Email_2:
Project Name Job DescriptionRow2:
fill_17:
Completion Date_2:
Owner_3:
PM Company_3:
Owner Contact Name_3:
PM Contact Name_3:
Contact Email_3:
PM Contact Email_3:
Project Name Job DescriptionRow1_2:
fill_26:
Completion Date_3:
Owner_4:
PM Company_4:
Owner Contact Name_4:
PM Contact Name_4:
Contact Email_4:
PM Contact Email_4:
Project Name Job DescriptionRow1_3:
fill_18:
Completion Date_4:
Owner_5:
PM Company_5:
Owner Contact Name_5:
PM Contact Name_5:
Contact Email_5:
PM Contact Email_5:
Project Name Job DescriptionRow2_2:
fill_26_2:
Completion Date_5:
Sub NameRow1:
Material or Service ProvidedRow1:
Contact NameRow1:
Email_2:
fill_34:
Sub NameRow2:
Material or Service ProvidedRow2:
Contact NameRow2:
Email_3:
Sub NameRow3:
Material or Service ProvidedRow3:
Contact NameRow3:
Email_4:
Text38:
Text39:
Text40:
Text41:
Text42:
Highest:
2ndHighest:
Text3:
Text4:
Text5:
Company NameRow1:
Material ProvidedRow1:
Contact NameRow1_2:
Email_5:
Company NameRow2:
Material ProvidedRow2:
Contact NameRow2_2:
Email_6:
Text43:
Text44:
Text45:
Text46:
2018Number of fatalities:
2017Number of fatalities:
2016Number of fatalities:
2018Number of workdays lost:
2017Number of workdays lost:
2016Number of workdays lost:
2018No of lost time due to accidents:
2017No of lost time due to accidents:
2016No of lost time due to accidents:
2018No of restricted workday cases:
2017No of restricted workday cases:
2016No of restricted workday cases:
2018No of medical attention cases:
2017No of medical attention cases:
2016No of medical attention cases:
2018Approximate number of employee direct hire hours worked do not include any nonwork time even though paid:
2017Approximate number of employee direct hire hours worked do not include any nonwork time even though paid:
2016Approximate number of employee direct hire hours worked do not include any nonwork time even though paid:
1_2:
2_2:
3_2:
4_2:
Check Box47: Off
Check Box48: Off
Check Box49: Off
Check Box50: Off
Check Box51: Off
Check Box52: Off
Check Box53: Off
Check Box54: Off
Check Box55: Off
Check Box56: Off
Check Box57: Off
Check Box58: Off
AMOUNT OF INSURANCE:
Years With Ins Co:
Name:
Address:
fill_19:
Contact:
Name_2:
Address_2:
fill_20:
Contact_2:
Years with Ins Co:
Name_3:
Address_3:
fill_21:
Contact_3:
Years with Ins Co_2:
Check Box59: Off
Check Box60: Off
Text61:
Text62:
Text63:
Text64:
Text65:
Text66:
CompanyRow1:
Contact Phone EmailRow1:
Largest BondRow1:
List Years UsedRow1:
CompanyRow2:
Contact Phone EmailRow2:
Largest BondRow2:
List Years UsedRow2:
CompanyRow3:
Contact Phone EmailRow3:
Largest BondRow3:
List Years UsedRow3:
2_5:
Check Box67:
0:
0: Off
1: Off
1:
0: Off
1: Off
2:
0: Off
1: Off
3:
0: Off
1: Off
4:
0: Off
1: Off
5:
0: Off
1: Off
Check Box69:
0:
0: Off
1: Off
1:
0: Off
1: Off
Check Box70:
0: Off
1: Off
CurrentAssets: 0
TotalAssets: 0
CurrentLiabilities: 0
TotalLiabilities: 0
Difference: 0
Difference2: 0
x10: 0
x10_2: 0
LessorofAbove: 0
LineofCredit: 0
Total: 0
Check Box1: Off
Check Box2: Off
STATE OF:
Our examination was made in accordance with generally accepted auditing:
standards and accordingly included such tests of the accounting records and such other auditing:
In our opinion the accompanying financial statement included on pages:
as of:
and the results of their operations and their cash flows for the years:
then ended in conformity with generally accepted accounting principles:
Print name of Firm:
Telephone No:
License No_2:
The information included in the financial statement is the:
representation of the management of the above firm:
Print name of Firm_2:
Telephone No_2:
License No_3:
Name_4:
Title:
Company Name:
Date_2:
Name_5:
Title_2:
Company Name_2:
Date_3:
Reference is made to the prequalification of:
unqualified line of credit not to exceed:
Name of Financial Institution:
Institution No Code:
Address 1_2:
Address 2_2:
Print Name Title:
2_6:
I 1:
I 2:
of:
Subscribed at 1:
Subscribed at 2:
State of:
on:
2026:
2025:
2024:

File details come from the government source that posted it. Updated .