2026 Loma POE Drawings.pdf

PDF 5 MB Posted

Attached to
Loma Port of Entry - ANS Traffic Rerouting
Solicitation number
IFB1 PMAA 2027000042 3
Issued by
Mesa County, Colorado

About this file

This file consists of engineering drawings for the Loma Port of Entry, a Colorado state facility, related to ANS (Automated Notification System) traffic rerouting improvements. The drawings document the proposed infrastructure modifications and layout changes necessary to implement the traffic rerouting system at the port of entry. The plans include detailed specifications for facility reconfiguration, signage placement, traffic flow patterns, and related physical improvements required to support the ANS traffic management initiative. These technical drawings serve as the basis for construction planning and bidder understanding of the scope of work involved in the project.

The drawings provide the visual and technical foundation for contractors to develop accurate cost estimates and implementation timelines for the traffic rerouting project. As design documentation, these plans establish the physical requirements and specifications that bidders must reference when submitting proposals for construction or installation work associated with the ANS traffic rerouting system at the Loma Port of Entry facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Loma Port of Entry ANS Traffic Rerouting

CONSTRUCTION DRAWINGS

PROJECT I.D. NO. C26AU5

IFB1: IFB1 2027*042

PRE-BID CONFERENCE: Wednesday, October 15, 2026 at 11:00 a.m.

BID OPENING: Tuesday, October 27, 2026 at 11:30 a.m.

© 2025 Microsoft Corporation © 2025 TomTom

Sheet: 1File: .\Loma Port-CPW Alternatives 02.19.25 (2).pdfMissing or invalid reference

© 2025 Microsoft Corporation © 2025 TomTom

Q

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PE

_A

N S_

CO

VE

R

SH

EE

T.

dw g, 0/

9/

0:

:5

AM

Source: Esri, Vantor, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Powered by Esri

Q

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E_

AN

S_

BA

SE

M

AP

.d w g, 0/ 9/

0:

:4

AM

FL

FL

EOG

FL

EOP

EOP

EOP

EOP

EOG

EOG

FL

EOG

EOP

EOG

EOG

FL

FL

EOP

EOG

EOG

EOG

EOG

EOG

FL

FL

FL

EOP

EOP

EOP

EOP

FL

EOP

EOP

EOP

EOP

EOP

EOG

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E-

AN

S_

RE

M

O

VA

LS

E

X

CO

N D

IT

IO

N S.

dw g, 0/

9/

0:

:4

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E-

AN

S_

RE

M

O

VA

LS

E

X

CO

N D

IT

IO

N S.

dw g, 0/

9/

0:

:1

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E_

AN

S_

BA

SE

M

AP

.d w g, 0/ 9/

0:

:1

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E-

AN

S_

SI

TE

_U

TI

LI

TY

P

LA

N .d w g, 0/

9/

0:

:1

AM

FL

FL

EOG

FL

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOG

EOG

FL

EOP

EOP

EOP

EOP

EOG

EOG

FL

FL

EOP

EOP

EOP

EOP

EOP

EOG

EOG

EOG

EOG

FL

EOP

EOP

FL

FL

EOP

EOP

EOP

EOP

EOP

EOG

EOG

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

A

B

Q

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E-

AN

S_

GR

AD

IN

G

PL

AN

.d w g, 0/ 9/

0:

:0

AM

FL

FL

EOG

FL

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOG

EOG

FL

EOP

EOG

EOG

FL

FL

EOP

EOP

EOP

EOP

EOP

EOG

EOG

EOG

EOG

FL

EOP

EOP

EOP

FL

FL

FL

FL

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOG

FL

EOG

FL

FL

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E-

AN

S_

GR

AD

IN

G

PL

AN

.d w g, 0/ 9/

0:

:0

AM

EOG

FL

FL

EOP

EOP

EOP

EOP

EOP

EOG

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

EOP

Q

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E_

AN

S_

BA

SE

M

AP

.d w g, 0/ 9/

0:

:3

AM

FL

FL

EOG

FL

EOP

EOP

EOP

EOP

EOG

EOG

FL

EOG

EOP

EOG

EOG

FL

FL

EOP

EOG

EOG

EOG

EOG

FL

FL

FL

EOP

EOP

EOP

Q

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E_

AN

S_

BA

SE

M

AP

.d w g, 0/ 9/

0:

:5

AM

EOG

FL

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E-

AN

S_

GR

AD

IN

G

PL

AN

.d w g, 0/ 9/

0:

:3

AM

EOG

EOG

POND SECTION A

HORIZONTAL:1"=30'

VERTICAL: 1"=6'

0 10 20 30 40 50 60 700-10-20-30-40

4:1 4:1

VERTICAL: 1"=6'

POND SECTION B

HORIZONTAL:1"=30'

VERTICAL: 1"=6'

0 10 20 30 40 500-10-20-30-40-50

8:1 4:1 4:1

Q

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E-

AN

S_

GR

AD

IN

G

PL

AN

.d w g, 0/ 9/

0:

:2

B B

Q

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E_

AN

S_

BA

SE

M

AP

.d w g, 0/ 9/

0:

:0

All bollards shall be installed vertically with welded top caps, and shall be available for Project Manager inspection before placement of the footing concrete. All bollards shall have a 3/8-inch air vent hole approximately 3-3/4 feet below the top cap, to facilitate footing concrete infill into the pipe.

The vent hole shall be covered by concrete in the final installation. All bollards shall be painted yellow.

Q

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E_

AN

S_

BA

SE

M

AP

.d w g, 0/ 9/

0:

:5

P R

O J

E C

T S~

\N O

N -S

W A

Pr oj ec ts

AN

S~ \2

Lo m a

PO

E St at io n\ 1-

D

ES

IG

N

\7

- D ra w in gs

\2

LO

M A_

PO

E_

AN

S_

BA

SE

M

AP

.d w g, 0/ 9/

0:

:4

Sheets and Views
1 COVER SHEET
2 OVERALL SITE MAP
3 EX CONDITIONS, REMOVALS & ERIOSION CONTROL
4 EX CONDITIONS, REMOVALS & EROSION CONTROL
5 GENERAL NOTES & TYPICAL SECTIONS
6 SITE & UTILITY PLAN
7 SITE & UTILITY PLAN
8 GRADING PLAN
9 GRADING PLAN
10 ROADWAY PLAN & PROFILE
11 ROADWAY PLAN & PROFILE
12 STORM SEWER PLAN & PROFILE
13 RETENTION POND CROSS SECTIONS
14 ANS WASH PAD DETAIS
15 UTLILITY DETAILS
16 MISC DETAILS

File details come from the government source that posted it. Updated .