This is a 100% construction document specification and bid package issued by Pinellas County Schools for water intrusion repairs at Lealman Innovation Academy in St. Petersburg, Florida. The project encompasses comprehensive waterproofing repairs including removal and replacement of control joint sealants at walls and ground level, window sealant replacement, stucco crack repair and repainting, and split-face concrete masonry unit surface preparation and sealing. The contract period is 90 calendar days from the Notice to Proceed, with liquidated damages assessed at $500 per calendar day for failure to meet the completion deadline. A mandatory pre-bid conference is scheduled for April 8, 2026, at 8:00 a.m. at the project site, with failure to attend resulting in automatic bid disqualification. Bids are due electronically through the District's OpenGov Procurement portal by April 20, 2026, at 4:00 p.m. The project includes a separate contingency line item of $75,000 with no markup allowed, to be used only with documented evidence of expenditures and owner approval.
Bidders must hold current Florida State Certified General Contractor licenses and demonstrate five years of continuous operation under the same legal entity, along with documented evidence of waterproofing, window glazing, and roofing experience on three comparable projects completed within the past three years. All subcontractors must be licensed within their respective trades and pre-approved by the School Board. The estimated contract value is approximately $1,275,000, excluding the contingency, with the District reserving the right to award by line item, by section, or by aggregate total. Contractors must obtain comprehensive insurance coverage including General Liability Insurance with $1,000,000 per occurrence and Workers' Compensation Insurance at statutory limits within ten working days of contract award. All personnel with direct school access must complete Level 2 background screening clearance. Contractors must submit required affidavits including Human Trafficking Affidavit, sworn statement under Florida Statute 287.133(3)(a), drug-free workplace certification, and AD-1048 debarment form as part of their proposal response. The District may unilaterally extend the contract for up to three additional 30-day periods at the same terms and conditions.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| A2.2.pdf | ||
| A2.3.pdf | ||
| A2.1.pdf | ||
| 2026-04-08_9534_sign_in_sheet_Lealman_Innovation.pdf | ||
| Building_Repair_Envelope.pdf | ||
| Building_Repair_Envelope.pdf | ||
| Insurance_Specifications_for_Contractors.pdf | ||
| Bid_Protest_Procedure.pdf | ||
| Insurance_Specifications_for_Contractors.pdf | ||
| Bid_Protest_Procedure.pdf | ||
| 2026-02-25_9534_Final_Project_Manual_Bid_Specs.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PINALLAS COUNTY SCHOOLS
WATER INTRUSION
REPAIR SCOPE AND INSTRUCTIONS
100% CONSTRUCTION DOCUMENTS
SPECIFICATIONS
February 19, 2026
PROJECT OWNER:
Pinellas County Schools 301 SW 4th Street St. Petersburg, FL 33770
PROJECT LOCATION:
2800 49TH Street St. Petersburg, FL 33714
DESIGN OFFICE: 2047 Vista Pkwy., Suite 100; West Palm Beach, FL 33411 | 561-478-4457 Date of Issue: February 19, 2026 PBK Project Number: 25036.00
Issued: 5/2016 Revised: 6/12/25 1 of 37
The School Board of Pinellas County, Florida, prohibits any and all forms of discrimination and harassment based on race, color, sex, religion, national origin, marital status, age, sexual orientation or disability in any of its programs, PBK Architects, Inc. Repair Scope & Instructions PBK Project No. 25036.00 Pinellas County Schools 100% Construction Documents 2026/02/19
SPECIFICATIONS
FOR
PROJECT TITLE: Water Intrusion Repairs and Instructions
FACILITY: Lealman Innovation Academy
4900 28th Street N St. Petersburg FL 33714
PROJECT NUMBER: 453787
PROJECT COORDINATOR:
PHONE NUMBER: (727) 547-
FAX NUMBER: (727) 547-
PA/E NAME: Frank Sepcic, PBK
PA/E ADDRESS: 2714 Dr MLK Jr Street N
St. Petersburg, FL 33704
PA/E PHONE NUMBER: 727 896-4611
PA/E FAX NUMBER: N/A
Bryce Bannister
276-6452
N/A
Bryce Bannister
00 01 00 Bid Specifications
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016 Revised: 6/12/25
DIVISION 1 - GENERAL CONDITIONS
Table of Contents
1.1 SCOPE OF WORK
1.2 QUALIFICATIONS OF THE BIDDERS
1.3 CONTRACT PERIOD
1.5 PROTECTION OF PERSONS AND PROPERTY
1.6 ADMINISTRATION OF CONTRACT
1.7 DEFINITIONS
1.10 INSTRUCTION TO BIDDERS
1.11 ASBESTOS ABATEMENT
1.12 PRE-BID CONFERENCE
1.13 PRE-CONSTRUCTION CONFERENCE
1.14 NOTICE TO PROCEED, EFFECTIVE DATE OF INSURANCE AND BOND COVERAGE 27
1.15 STANDARD REQUIREMENTS
1.16 CONTRACTOR’S CONSTRUCTION SCHEDULES
1.17 SUBMITTALS & DOCUMENTATION
1.19 CONTRACTOR’S EMPLOYEE CONDUCT
1.20 VENUE AND GOVERNING LAW
1.21 EMERGENCIES
1.22 TAGGED OR SALVAGEABLE PROPERTY AND DEMOLITION PRODUCTS
1.23 CLEANING UP
1.24 CLOSEOUT DOCUMENTS REQUIRED UPON COMPLETION (AND BEFORE FINAL
PAYMENT IS MADE)
1.25 WARRANTY
INDEX OF DOCUMENT FORMS
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
DIVISION 1 – GENERAL CONDITIONS
1.1 SCOPE OF WORK
A. Title of the Project: Repair Scope & Instructions
B. The Scope of Work to be performed under this project consists of furnishing of all labor/ materials and performing all work necessary to the completion of waterproofing repairs.
C. All work described in this bid document and drawings prepared by PBK Architects.
Drawings can be obtained at www.opengov.com.
D. Dimensions on drawings shall be checked for accuracy by the Contractor. The
Contractor shall determine exact dimensions for proper fit. Drawings shall not be scaled.
E. Bidders and all Subcontractors shall have the following qualifications:
1. It is mandatory that contractors bidding as prime contractors on projects for
Pinellas County Schools be currently qualified on the date of opening of bids as a Florida Licensed State Certified General Contractor. Contractor by providing a copy of their contractor’s license, a business license for this type of work and the ability to meet the qualifications as specified in Section 1.2, “Qualifications of the
Bidders.”
2. Subcontractors shall be licensed within their respective trade and meet the qualifications as specified in Section 1.2, “Qualifications of the Bidders.”
3. Upon the request of the Owner’s representative, furnish documentation of the following:
a. That this firm has available, or can obtain, adequate personnel, equipment and financial resources to undertake and execute the contract properly and expeditiously, in accordance with the plans and specifications and in strict accord with the recognized standard of quality workmanship.
b. That this firm has a workable construction schedule with reference to number of manpower to be supplied, expected materials delivery dates and construction techniques if necessary.
c. That this firm has a list of intended materials suppliers, including alternates which shall be subject for review and approval by the Owner.
http://www.opengov.com/
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
F. The length of the contract shall be for ______ calendar days from the date of the
Notice to Proceed. This includes the installation and the ordering of the materials and products specified herein. This time stipulation is very explicit and is essential to the completion of the work specified.
G. The parties agree that it is impossible to determine actual damages resulting from failure to finish the work on time and therefore the Contractor agrees to pay the Owner, as liquidated damages and not as penalty, a rate of $500.00 dollars per day for each and every calendar day elapsing between the time set forth in this section as modified by change order, construction change directive, or Contractor’s Agreement and the actual date of substantial completion.
H. The Special Conditions for this project are as follows:
1. Add/Alternate Contingency: In addition to your bid, there shall be a
$75,000.00 contingency. The contingency shall be a separate line item with no markup added to it. The purpose of the contingency is for defraying expenses due to unforeseen circumstances related to construction. The contractor shall be required to furnish documentation evidencing expenditures prior to written approval and release of funds by the owner. In the event such change in the work is completed by a subcontractor or a sub-subcontractor, the contractor performing the work shall be limited to a maximum mark-up of 10% on its actual cost of material, labor, and equipment costs. Additionally, if the work is performed by a sub-subcontractor, the subcontractor will be limited to a markup of 5% on the actual cost passed through from the sub-subcontractor. The total cumulative markup on all changes in the work shall not exceed 15%.
This contingency shall be part of the contract, and if not used, or partially used, there shall be a deductive change order to reconcile the contract balance upon completion of the project.
1.2 QUALIFICATIONS OF THE BIDDERS
A. Bidding Entity: Any sole proprietor, firm, partnership, or corporation submitting a proposal for the specified work.
B. The Bidding Entity shall hold all active licenses specified in Section 1.1, Scope of Work, prior to the bid due date.
C. The Bidding Entity shall provide documented evidence of experience doing
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016 waterproofing of masonry walls, window glazing and sealing and roofing (type of project defined), including three (3) projects within three (3) years. Projects provided as evidence with the Bidding Entity’s proposal shall be of comparable size and scope of work.
D. The Bidding Entity shall provide documented evidence of maintaining a business license under the same legal entity for a period of at least five (5) continuous years, unless otherwise specified in Section 1.1, Scope of Work, prior to the bid due date.
“Legal entity” is defined as the same company, corporation, partnership, or sole proprietorship that is a successor-in-interest to the previous entity. In the case of a separate, successor-in-interest entity, that entity must have maintained a business license for a period of five (5) continuous years prior to this bid.
E. The Bidding Entity shall have a place of business for contact by the Owner during normal working hours on normal working days. Home operated businesses are permitted provided contact can be made as specified.
F. The Subcontractors shall provide documented evidence of experience doing waterproofing, window glazing and roofing (type of project defined), including number of projects within three (3) years. Projects provided as evidence with the
Bidding Entity’s proposal shall be of comparable size and scope of work.
G. Subcontractors used by the Bidding Entity are subject to review by the Owner.
Subcontractors shall provide evidence of work experience doing the (specified work from paragraph F), for a period of at least five (5) continuous years and shall provide documented evidence of maintaining a business license under the same legal entity for a period of at least five (5) continuous years, unless otherwise specified in Section 1.1, Scope of Work, prior to the bid due date. A proposed Subcontractor’s list shall be submitted with the Bidding Entity’s bid proposal. If the Owner has a good and sufficient reason, the Subcontractor may be rejected, requiring an alternate Subcontractor, acceptable to the Owner, be used without additional cost to the Owner.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
1.3 CONTRACT PERIOD
A. The length of the contract is specified in General Conditions, Section 1.1, Scope of
Work.
B. If necessary, work may be performed after school or on weekends, as long as such activities are coordinated with the school Principal and approved by the Project
Coordinator. If overtime is for the convenience of the Contractor, it shall be charged to the Contractor at a rate equal to the school employee’s current hourly rate and a Change
Order from the Contractor’s Purchase Order shall deduct the amount. When overtime is requested of school employees, the request shall be made to the Project Coordinator at least two (2) working days in advance.
C. All Special Conditions such as the availability of the specified work site and completion of work are specified in General Conditions, Section 1.1 Scope of Work.
1.4 LIQUIDATED DAMAGES
A. Inasmuch as time is of the essence in the performance of this contract, failure to complete the project within the time agreed upon shall result in substantial injury to the Owner. It is hereby agreed to by all parties that if the project is not substantially complete on time the
Contractor shall pay the Owner, as reasonable compensation for such delay and not as a penalty, a rate of as specified in General Conditions, Section 1.1, Scope of Work for each and every calendar day elapsing between the length of the contract specified therein, as modified by change order, construction change directive, or Contractor’s Agreement and the actual date of substantial completion. It is further agreed that the Owner may deduct from the balance retained by the Owner the amount of such liquidated damages incurred of such portion as the retained balance shall cover.
1.5 PROTECTION OF PERSONS AND PROPERTY
A. The Contractor and PA/E shall be responsible for reviewing the Asbestos Management
Plan with the Owner prior to initiation of work.
B. The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the performance of the contract.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
C. All property of the Owner including but not limited to curbs, driveways, sidewalks, planters, play courts, drainage structures, manholes and underground piping, shall be assumed to be in sound undamaged condition at the beginning of this construction contract. All such items shall therefore be left in a corrected or reconstructed to a sound undamaged condition by the Contractor at his own expense unless, before work commences, he/she identifies to the Owner's Representative and the PA/E that such items were damaged prior to commencing construction. Such previously identified items shall be recorded in writing to both parties, together with copies of photographs taken by the Contractor (as may be practical), prior to beginning construction.
D. When use or storage of hazardous materials or equipment or unusual methods is necessary for execution of the work, the Contractor shall exercise utmost care and shall carry on such activities under supervision of properly qualified personnel. No explosives shall be used or stored on the site.
E. The Contractor shall be fully and solely responsible (accepting the liabilities and responsibilities of his/her Subcontractors are not hereby eliminated) for all matters of safety of person and property arising from this contract. Neither the PA/E nor the Owner or any of their representatives or employees are to be assumed to have any role of responsibility of matters of safety except they (including the PA/E, school Principal or
Facility Director) shall have the authority to order stopping of a portion of the work which they notice may endanger students, faculty, school District employees or the public, or employees of the Contractor or Subcontractors. However, safety shall not be their responsibility but shall be solely the responsibility of the Contractor.
F. The Contractor shall take reasonable precautions for safety of and shall provide reasonable protection to prevent damage, injury or loss to:
1. Employees on the work site and other people who may be affected thereby.
2. The work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the
Contractor’s Subcontractors or Sub-Subcontractors; and
3. Other property at the site or adjacent hereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
G. The Contractor shall give notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on the safety of persons or property or their protection from damage, injury or loss.
H. The Contractor shall erect and maintain, as required by existing conditions and performance of the contract, or as identified by the PA/E reasonable safeguards for safety and protection, including but not limited to posting danger signs and other warnings against hazards, promulgating safety regulations and notifying the owners and users of adjacent sites and utilities.
I. The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property insurance required by the contract documents) to property caused in whole or in part by the Contractor, a Subcontractor, a Sub-Subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts either of them may be liable, even though not directly attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contractor are in addition to the Contractor’s obligations under the Indemnification paragraph.
J. The Contractor shall designate a responsible member of the Contractor’s organization at the site whose duty shall be the prevention of accidents. This person shall be the
Contractor’s superintendent unless otherwise designated by the Contractor in writing to the Owner and PA/E.
K. The Contractor shall not load or permit any part of the construction or site to be loaded so as to endanger its safety or to damage such.
L. The Contractor shall take all steps necessary to protect the students, faculty and general public from injury due to construction. Unsafe conditions, equipment, or work practices shall not exist at any time. Fences, signs and barricades shall be provided at the
Contractor's expense to keep the public and students away from the construction site.
The Contractor shall not perform work when students away from the construction site.
The Contractor shall not perform work when students are in the area, such as class period changes, activities, etc. Work causing interference with school classes or activities is to be halted until acceptable conditions exist. The Contractor shall coordinate with the school Principal and shall make every attempt to move school activities away from the construction site. However, if this cannot be arranged, the class activity takes priority and the Contractor shall reschedule his work.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
M. The Contractor is to provide OSHA-approved construction equipment, hand tools, power tools, ladders and scaffolding at all times. Equipment with safety defects is to be removed immediately from the construction site and work is not to be resumed until a safe condition exists.
N. Workers are to be properly trained and licensed for the job they are doing. The
Contractor or his supervisor/foreman shall be on the construction site at all times work is underway. Working foremen on jobs over $50,000 shall not be considered proper supervision, unless approved in writing by the Project Coordinator. Pinellas County
Schools’ Inspectors and Project Coordinators have the authority to stop construction whenever, in their opinion, safe conditions do not exist.
1.6 ADMINISTRATION OF CONTRACT
A. The contract shall be administered by Pinellas County Schools, Walter Pownall Service
Center, 11111 South Belcher Road, Largo, Florida 33773.
B. Pinellas County Schools shall designate the Project Coordinator/Liaison and
Inspector(s) as may be applicable.
C. The Project Coordinator shall have complete responsibility for the administration of the contract. All clarifications, changes, questions and conflicts concerning the project shall be brought to the attention of the Project Coordinator for resolution and/or approval. The
PA/E, if assigned, is the interpreter of all contract documents which he/she prepared.
1.7 DEFINITIONS
A. THE OWNER: The School Board of Pinellas County, Florida, acting through its
Superintendent or those people designated by the Superintendent to act on the
Superintendent behalf. The words OWNER, BOARD, SCHOOL BOARD or PINELLAS
COUNTY SCHOOLS may be used interchangeably.
• THE OWNER'S ROLE:
1. The Owner shall furnish information, services and decisions under the Owner's control with reasonable promptness.
2. The Owner shall make payments to the Contractor in accordance with the terms of this contract.
3. The Owner shall issue a “Notice to Proceed” form to the Contractor before moving onto the site of work.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
4. The Owner may order the Contractor to stop the work, or any portion thereof, until the cause for such order has been eliminated, or if the Contractor fails to correct the work or persistently fails to carry out the work in accordance with the requirements of the contract documents.
5. However, the right of the Owner to stop the work shall not give rise to a duty on the part of the Owner to exercise this right for the benefit of the Contractor or to any other person or entity.
6. The Owner shall have the sole authority to determine whether to modify the contract time completion date.
7. For projects for which there is no PA/E, the Owner shall perform the function of the PA/E.
B. THE PROJECT ARCHITECT/ENGINEER (PA/E): The properly licensed individual or firm or entity practicing as a Registered Architect and/or a Registered Professional
Engineer in Florida whose name, address, telephone and fax numbers are found on the cover page of this document.
• ROLE OF THE PROJECT ARCHITECT/ENGINEER (PA/E): The role of the
Project Architect/Engineer (PA/E) including services provided, duties and responsibilities are defined in the agreement for Professional
Architectural/Engineering services for this project and include but are not limited to:
1. The PA/E shall provide estimates of construction costs.
2. The PA/E shall review bid submittals for compliance with plans and specifications.
3. The PA/E will make periodic visits to the work site at intervals appropriate to the progress of the construction (or otherwise agreed to by the PA/E in writing).
Activities shall include but not be limited to the following:
a. Attend the preconstruction conference.
b. Prepare and print minutes of all meetings and distribute to the appropriate parties.
c. Provide special inspections required by the Maintenance Department in accordance with the Contract documents.
d. Review shop drawings for compliance with Contract documents.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
e. Attend job site meetings as dictated by the scope and size of the construction Project.
f. Review applications for payment by the Contractor.
g. Prepare change orders and/or field orders.
h. Prepare punch lists, inspect completed work and edit punch lists as conditions warrant.
i. Issue and sign Certificates of Substantial Completion.
j. Issue and sign Certificates of Final Inspection.
k. Review and approve project closeout documents.
4. The PA/E shall be the representative of the Board during the construction phase and shall advise and consult with the Board as to all phases of construction. Instructions from the Maintenance Department or Board to the
Contractor shall be forwarded through the PA/E.
5. The PA/E shall have authority to act on behalf of the Board only to the extent provided for in the Contract documents, unless otherwise modified by written mutual agreement.
6. The PA/E shall visit the site at intervals appropriate to various stages of construction and become generally familiar with the progress and quality of the work performed by the Contractor and to determine and advise the Board whether the work is proceeding in accordance with the Contract documents.
7. The PA/E shall review, approve, or take other appropriate action upon the
Contractor’s submittal of documents, including, but not limited to, shop drawings, project data and samples, but only for compliance with the design concept of the work and with the information given in the Contract documents.
Such action by the PA/E shall be taken with re promptness so as to cause no delay to the Project. The PA/E's approval of specific items shall not indicate approval of any assembly of which the item is a component.
8. The PA/E shall review and approve all payment requests from the Contractor.
This review will include an evaluation of the current work progress against the project schedule to ensure that all work is being completed as required. The
PA/E shall certify that the Contractor’s applications for payment based upon the percentage of the construction completed on the Project is in accordance with the plans and specifications.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
9. The PA/E shall determine the amounts owed to the Contractor based on observations at the site. After evaluating the Contractor’s application for payment, if the PA/E approves, the PA/E shall sign the certificate and forward it to the Project Coordinator. The failure of the PA/E to forward to the Board the completed submittal and all required backup data, or if the certificate (or request for payment) is incorrectly prepared or contains arithmetic errors, the
Board may reject the Contractor’s pay application and return it to the PA/E without penalty to the Board because of delay or error.
10. The PA/E shall invite and include the Project Coordinator to review meetings and to review inspections during the time when the Contractor’s applications for payment are evaluated by the PA/E.
11. The PA/E shall provide for special inspection and testing of materials and systems at Board expense that are included in the Construction Contract.
12. The PA/E shall keep the Board (Project Coordinator) informed as to the progress and quality of the work and endeavor to guard the Board against defects and deficiencies in the work by the Contractor or his Subcontractors and material suppliers.
13. The PA/E shall conduct appropriate observations to determine the dates of
Substantial and Final Completion, receive and forward to the Board written warranties and documents required by the construction Contract and certify the final certificate of payment in affidavit form, certifying that to the best of his knowledge the Project has been constructed according to the final plans and specifications and SREF of the DOE's rules and regulations and that all mandatory requirements of DOE have been satisfied.
14. The PA/E shall have the authority and duty to reject work by the Contractor that does not conform to the Contract Documents. If the PA/E observes faulty materials or workmanship on the Project, or if the PA/E observes the use of improper material or any work not being accomplished in a satisfactory manner by the Contractor or Subcontractors, the PA/E shall immediately notify the
Contractor and the Maintenance Department.
15. The PA/E shall exercise due diligence to protect the Board against defects and deficiencies in the work and use of improper materials by the Contractor and
Subcontractors.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
16. After Substantial Completion of the work, the PA/E shall furnish the Board with a certified statement, in affidavit form, that in his professional opinion, the
Project has been performed and finally completed according to the Contract documents and SREF of the DOE's rules and regulations and that all mandatory requirements of the DOE have been satisfied.
17. The PA/E shall interpret the requirements of the construction Contract documents. The PA/E shall render such interpretations as are necessary with reasonable promptness when a written request is made by the Board or the
Contractor. The PA/E shall render written decisions, within seventy-two hours, on all claims, disputes and other matters questioned by the Contractor or the
Project Coordinator relating to the execution or progress of the work or the interpretation of the Contract documents.
18. The PA/E shall ensure that the Board is provided correct, as-built or record drawings from the Contractor.
19. The PA/E shall provide one (1) set of specifications (unbound with no signature or seal) for duplication, one (1) set of original drawings for duplication and three
(3) signed, sealed and dated copies of Project Specifications and Drawings.
(Specifications will be in booklet form.) Also, one set of drawings on a flash drive using AUTOCAD and one copy of specifications on a flash drive in Word shall be provided.
20. The PA/E shall be the interpreter of the intent of the contract documents and shall be the authority to determine whether the work of the Contractor is in accordance with this intent.
21. The PA/E shall have authority to determine the quantity of work performed and whether such work complies with the intent of the contract documents; shall observe the Contractor’s work and shall endeavor to guard the Owner's interest and safeguard the Owner from risk of liability, lawsuit or fine.
22. The PA/E shall attend and coordinate all weekly/bi-weekly construction progress meetings.
23. The PA/E shall prepare and submit to the Owner construction progress reports, including as a minimum, weekly/bi-weekly construction progress meeting minutes, schedule changes and a Project Work summary based upon the
Contractor’s Daily Construction Reports.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
24. The PA/E shall have the authority to stop portions of the work of the Contractor in the event, in the opinion of the PA/E, work is being done in a manner which is unlawful (according to either Federal or Florida Law or Statutes or Rules) or which puts the Owner at risk in regards to liability, or which may be injurious to life and health, or in a manner contrary to the intent of the Contract Documents.
25. The PA/E may initiate changes to the scope of the work under this contract by a
Change Order (subject to Owner's approval and a Contractor’s Agreement) when the Contractor and the Owner are in agreement. If the Contractor does not agree, the Owner and the PA/E may sign and issue a Construction Change
Directive (subject to Owner's approval and a new Contractor’s Agreement) to effect a change or an increase in scope in which a change in contract sum and time judged fair by the Owner and the PA/E shall become a part of the contract and shall be made a part of a Contractor’s Agreement.
26. In the event a Construction Change Directive is issued for which the Contractor does not agree to the cost change or time change or to other terms, the
Contractor shall retain his right to further negotiate or litigate for additional compensation, BUT THE CONTRACTOR SHALL IMMEDIATELY PROCEED
TO COMPLY FULLY WITH THE TERMS OF THE CONSTRUCTION CHANGE
DIRECTIVE and, until otherwise resolved, the Owner shall make payments in accordance with the terms of the Construction Change Directive.
27. The PA/E shall observe and monitor the work of the Contractor. The PA/E shall have the authority to reject work which does not conform to the contract documents.
28. The PA/E shall have authority to stop the work if a responsible Superintendent of the Contractor is not on the site. Should the PA/E stop the work for reasons in paragraph "24" or "27" above, the Contractor shall have no right of claim against the Owner or PA/E.
29. The PA/E shall have authority in the event the Contractor fails to complete the work within the contract time, to recommend to the Owner's Representative to declare the Contractor in default.
30. The PA/E shall have the authority to order the removal of any person or workman he deems to be detrimental to the work or who fails to adhere to suitable rules of behavior.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
31. The PA/E shall submit an AHERA Certification for the Absence of Asbestos
Containing Building Materials upon project completion.
C. THE CONTRACTOR: The properly licensed person or firm or entity who is identified in the Contractor’s Agreement and who is referred to throughout the contract documents as if singular in number and masculine in gender. The term Contractor (or this
Contractor) shall mean the Contractor or his authorized representative.
• THE CONTRACTOR’S ROLE:
1. The Contractor shall do all work set forth in the drawings and specifications together with work described in any addendum issued during bidding or change in the contract requirements made by Field Order, Change Order or Construction
Change Directive.
2. The Contractor shall do all work in strict accordance with the requirements of the contract documents. The Contractor shall supervise and direct the work, providing full time on-site supervision of all employees including Subcontractors.
3. The Contractor shall be responsible to the Owner for the acts and omissions of the Contractor’s employees, Subcontractors and their agents and employees and other persons performing portions of work under a contract with the
Contractor.
4. The Contractor shall directly, or by subcontract, provide for labor, materials, equipment, tools, construction equipment and machinery, transportation and other facilities and services necessary for proper execution and completion of the work.
5. The Contractor shall enforce strict discipline and good order on the site among the Contractor’s employees and other persons carrying out the contract. The
Contractor shall not permit employment of unfit or untrained persons or persons not skilled in tasks assigned to them in his plant or on the site for work on this project.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
6. The Contractor shall be responsible for the quality control of the construction provided under this contract. It is his responsibility to ensure that appropriate systems and processes are in place to assess and measure the quality of construction called for in these plans and specifications. He shall have these processes in place prior to the start of construction and be prepared to discuss them at the pre-construction conference if appropriate. He shall provide results to the Project Coordinator upon request.
7. The Contractor shall be responsible to ensure that all work is installed in a neat and workmanlike manner. Any work deemed unacceptable by the Owner or
PA/E shall be corrected at the Contractor’s expense in a timely manner.
D. DEPARTMENT OF EDUCATION (DOE)
1. The Florida State Department of Education (DOE) establishes and interprets (in accordance with Florida Statutes), rules, regulations, codes and procedures to be adhered to in planning for and in construction contracts for the school Districts of Florida.
E. RULE - STATE REQUIREMENTS FOR EDUCATIONAL FACILITIES (SREF)
1. The Rule promulgated by DOE - Administrative Rule Chapter SREF which, together with Federal Laws and Florida Statutes govern matters under this contract.
F. SUBSTANTIAL COMPLETION
1. The date of substantial completion of the work or designated portion thereof
(under this contract) is the date certified by the Project Architect/Engineer that the work is sufficiently complete, in accordance with the contract documents, so the Owner can occupy or utilize the work thereof for the use for which it was intended.
G. CLOSEOUT DOCUMENTS
1. "Closeout Documents" are those items that must be properly executed and delivered to the Owner's Representative via the PA/E in "one package" before final payment is made.
H. PUNCH LIST
1. A list prepared at the inspection scheduled to establish substantial completion which shall have each page signed by a designee of the Contractor, of the PA/E, of the representative of the Owner and the school Principal (or Facility Director) listing items of work identified as being still incomplete or requiring correction.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
The PA/E shall have the authority to determine whether an item shall be included on the punch list. Copies of the signed punch list shall be distributed immediately after signatures to all those signing with the original and one copy transmitted to the designee of the Owner's Representative. The original shall be filed by the
Owner's Representative as an official public document. For this project, filing with the Secretary to the School Board shall be considered as being filed as a public document.
I. CHANGE ORDER
1. A change to the terms of the contract requirements agreed to and signed by the
Contractor, the Owner and the PA/E. Such instrument, used in conjunction with an additional Contractor’s Agreement, shall be used when the parties agree to the change in the contract sum, contract time, quality or in quantity of work.
J. CONSTRUCTION CHANGE DIRECTIVE
1. A change to the terms of the contract requirements to which the Contractor does not agree, signed by the Owner and the PA/E and used in conjunction with an additional Contractor’s Agreement. The Contractor must proceed with all due haste to do such work but retains his rights for later negotiation or litigation as to charges for such work or for time extensions.
K. CONTRACTOR’S AGREEMENT
1. The written authority between the School Board and the Contractor defines the responsibilities of each party in relation to the scope of work involved in the project which includes but is not limited to, specifications, purchase order, bid documents and plans and the contract.
L. SUBCONTRACTOR
1. A person, firm or entity that has a direct contract with the Contractor to perform a portion of the work at the site or to fabricate work elsewhere for this project.
M. PROJECT COORDINATOR
1. The person responsible for the administration of the contract on the School
Board's behalf. He will assume the responsibility of the PA/E when a PA/E is not utilized on a project.
1.8 TERMINATION OR SUSPENSION OF CONTRACT
A. In addition, the Board may terminate the contract if the Contractor:
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
1. Refuses or fails to supply enough properly skilled workmen and supervisors.
2. Fails to make payment to Subcontractors for materials or labor in accordance with the respective agreements between the Contractor and the Subcontractor;
3. Disregards laws, ordinances, or rules, regulations or orders of a public authority having jurisdiction.
4. Otherwise, is guilty of breach of the provision of the contract documents.
5. Fails to provide supervision of Employees and Subcontractors.
B. When any of the above reasons exist, the Owner, upon certification by the PA/E that said reasons exist without prejudice to any other rights or remedies of the Owner and after giving the Contractor and the Contractor’s Surety written notice that such reasons exist, terminate employment of the Contractor if the Contractor fails within ten (10) days of the receipt of the written notice to initiate timely corrective actions acceptable to the
Owner to ensure that deficiencies are corrected, the Owner may, subject to any prior rights of the Surety (if any):
1. Take possession of the site and of all materials, equipment, tools and construction equipment and machinery thereon owned by the Contractor.
2. Accept assignment of subcontracts; and
3. Finish the work by whatever reasonable method the Owner may deem expedient.
C. When the Owner terminates the Contractor for one of the reasons stated in subparagraphs above, the Contractor shall not be entitled to receive further payment until the work is finished.
D. If the unpaid balance of the contract sum exceeds the costs of finishing the work, including compensation for the PA/E’s services and expenses made necessary thereby, such excesses shall be paid to the Contractor. If such costs exceed the unpaid to the
Contractor or Owner as the case may be, shall be certified by the PA/E, upon application and this obligation for payment shall survive termination of the contract.
E. SUSPENSION BY THE OWNER FOR CONVENIENCE: The Owner may, without cause, order the Contractor in writing to suspend, delay or interrupt the work in whole or in part for such period as the Owner may determine.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
F. NO DAMAGE FOR DELAY: If the Contractor is delayed at any time in the progress of the work by any act, or neglect of Owner or by any Contractor employed by Owner, or by changes ordered in the scope of the work, or by fire, adverse weather conditions not reasonably anticipated, or any other causes beyond the control of the Contractor, then the required completion date or duration set forth in the progress scheduled shall be extended by the amount of time that the Contractor shall have been delayed thereby.
However, to the fullest extent permitted by law, the Owner, Owner’s Agents, or employees shall not be held responsible for any loss or damage sustained by the
Contractor, or additional costs incurred by the Contractor through delay caused by
Owner, Owner’s Agents, or employees, or any other Contractor or Subcontractor, or by abnormal weather conditions or by any other cause and Contractor agrees that the sole right and remedy therefore shall be an extension of time. The Contractor shall make any claim for extension of time in writing to the Owner, for approval by the
Owner, within seven (7) days after commencement of the delay. The Contractor’s failure to give such written notice to the Owner shall deprive the Contractor of his right to claim an extension of time and any damages or additional costs incurred by
Contractor resulting from such delay. In the case of a continuing cause of delay, only one claim shall be necessary. The giving of such notice shall not in itself establish the validity of the cause of delay or of the extension of time for completion.
G. If the Contractor has furnished Bonds and if the Contractor’s Surety is directed to complete the work, then all payments made after termination of the Contractor shall be made to the Surety until (or jointly to the Surety and the Contractors if the Surety so directs) the work is finished and the contract sum has been expended. The Surety shall then be responsible for all of the obligations and duties of the contract to fulfill all of the obligations of the contract in exchange of the balance of the contract sum yet unpaid by the Owner. Surety may not assign those obligations without the written consent of the Owner. The Surety shall be responsible for the payment of all costs relating to the termination of the employment of the Contractor, including compensation for the PA/E’s additional services and expenses made necessary by these matters. The amount to be paid to the Surety or Owner, as the case shall be certified by the PA/E, upon application and this obligation for payment shall survive termination of the employment of the Contractor.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
H. Before the Owner shall be obligated to make any payments to the Surety, all such
Subcontractors and suppliers shall be paid currently in proportion to the sum previously paid by the Owner to the Contractor.
I. If the Surety has failed to pay a Subcontractor or supplier, the Owner may withhold a sum equal to twice the amount claimed by the Subcontractor or supplier and shall not be obligated to pay the Surety such sum in order to properly protect the Subcontractor or supplier until the Surety has presented evidence satisfactory to the Owner that (a) the Surety has contracted with another party to complete or correct or replace the work by such Subcontractor or supplier, or (b) taken definitive steps to bring the matter to a fair resolution. Definitive steps may be interpreted to mean either a lawsuit has been filed or binding arbitration proceedings between the Contractor (or Surety if applicable) and the Subcontractor have been initiated and a hearing scheduled. The Owner shall have no obligation to fund the Surety's responsibilities to pay Subcontractors or suppliers fair and proportionate shares of sums previously paid by the Owner to the
Contractor.
J. If the Surety fails within ten (10) days to initiate and to continue to proceed with a diligent and full faith effort assuring and manning of the job, the payment of obligations, the resolution of disputes, the providing of substitute Subcontractors where necessary, as approved by the PA/E and the Owner's Representative and the general overall effective pursuit of the work toward a satisfactory completion, the Owner may, at his option, stop the Surety from proceeding, declare the Surety in default and in breach of contract and undertake the completion of the work by other means. In such event, the
Surety shall be liable for all costs in excess of the current contract sum including but not limited to additional services of the PA/E, legal services, court costs and interest upon such additional costs from the time demanded until the time paid and any penalty a Court assesses.
1.9 INDEMNIFICATION
A. To the fullest extent permitted by law the Contractor shall indemnify and hold harmless the Owner, the PA/E and agents and employees of any of them from and against claims, damages, losses and expenses, including but not limited to attorney’s fees, arising out of or resulting from performance of the work, provided that such claim, damage, loss of expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than the work itself)
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016 including loss of use resulting there from, but only to the extent caused in whole or in part by negligent acts or omissions of the Contractor, by a Subcontractor, or by anyone directly or indirectly employed by them or anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder.
B. Such an obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this paragraph.
C. The Contractor agrees that one (1) percent of the bid amount shall be the specific consideration for paragraph A above.
D. In claims against any person or entity indemnified under this paragraph an employee of the Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the Indemnification obligation under this paragraph shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or/for the Contractor or a Subcontractor under workers' or workmen’s' compensation acts, disability benefit acts or other employee benefit acts.
E. The obligations of the Contractor under this paragraph shall not extend to the liability of the PA/E, the PA/E's consultants and agents and employees of any of them arising out of:
1. The preparation or approval by the PA/E of maps, drawings, opinions, reports, surveys, Change Orders, Construction Change Directives, Field Orders, design or specifications, or
2. The giving of or the failure to give directions of instructions by the PA/E, the
PA/E's consultants and agents and employees of any of them provided such giving or failure to give is the primary cause of the injury or damage.
F. In consideration of the terms of this contract and the terms set forth herein, exchanged each with the other and acknowledged by execution of this contract via the proposal and acceptance by insurance of the Contractor’s Agreement, both the Owner and the
Contractor have agreed to the terms of Indemnification set forth herein this paragraph.
The Contractor’s Surety (if any) is similarly bound to the terms of this paragraph.
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
1.10 INSTRUCTION TO BIDDERS
To receive full consideration, all bids must be executed and submitted in strict accordance with these “instructions to Bidders.”
A. CONTRACT DOCUMENTS
1. CONTRACT DOCUMENTS (including bidding documents) may be examined as indicated in the public announcement at the specified location. Bidders are encouraged to pick up one (1) complete set of contract documents as soon as possible and prior to pre-bid conference.
2. All CONTRACT DOCUMENTS must be returned to the source from which they were obtained and shall remain the property of the School Board.
3. Refund of any deposit, if required, less the cost of replacement of any damaged or missing items, may be obtained upon return of the documents, in a usable and legible condition, to the School Board. Deposits will be returned in a timely manner after bid opening.
4. Those Bidders not returning documents in the manner described above shall forfeit their deposit, if any.
5. Additional copies of the CONTRACT DOCUMENTS (including the bidding documents) may be purchased from the School Board, at the cost of reproduction and handling. A refund shall not be made for the return of purchased CONTRACT DOCUMENTS.
A. BIDDER'S PRESENTATION
1. Each Bidder, by submitting his bid, represents all of the following:
a. That the Bidder has thoroughly examined all of the contract documents and is aware that his work may be shown on any one or more of the sheets comprising the set of Drawings or as called for in the
Specifications and that the bid proposal shall include all work shown, or specifically called for, or, as may be reasonably implied as necessary to execute and complete this contract;
b. The Bidder has made a complete examination of the site of the project and familiarized himself with all of the conditions under which he is obliged to operate in the performance of the contract; the Bidder shall completely familiarize himself with the site of work and local conditions that may, in any manner, affect the work to be done;
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016
c. The bid is based upon all materials, equipment described in the Drawings and Specifications or as may be reasonably implied and;
d. The Bidder is familiar with all Federal, State and Local regulations having jurisdiction over the construction of the project and these rules and regulations shall apply to the contract throughout and shall form a part of these Specifications the same as if rewritten in full here. Upon request, Contractor shall provide Owner such documentation as may be required to verify compliance with State and Federal laws, rules and regulations as may be applicable to the service to be performed by the Contractor.
B. INTERPRETATION OF CONTRACT DOCUMENTS
1. The PA/E shall be the interpreter of the intent of the contract documents (i.e., plans and specifications that have been prepared).
2. Any interpretation or correction shall be issued to all Bidders in addendum form by the PA/E and distributed through the Purchasing Department and only such written interpretation shall be binding. No Bidder shall rely upon nor shall the
Owner be obligated by any interpretation or correction given by any other method. Such an addendum shall become part of the contract documents when the contract is executed.
3. All Bidders requiring further information or requesting interpretation of the contract documents regarding any ambiguity, inconsistency or error therein shall make a request to the PA/E.
D. SUBSTITUTIONS
1. Throughout the contract documents certain items of material, equipment, processes or systems have been specified by trade names and/or model numbers in order to establish a quantity and performance level as a uniform basis for bidding. If a Bidder proposed to substitute materials or manufacturer's equipment in lieu of those specified, they shall submit a written request including all necessary documentation for evaluation of the proposed substitutions to the
PA/E for approval no later than ten (10) days prior to the date for receipt of bids.
2. Acceptance of such proposed substitution shall be at the discretion of the PA/E, with the approval of the School Board designee and any and all decisions shall be final. Should the proposed substitution be accepted, it shall be incorporated into the contract documents by form of an addendum issued to all holders (of the
Water Intrusion Repairs & Instruction PCS Project No.: 453787
Issued: 5/2016 documents) of record.
3. The PA/E shall have no authority to allow later substitutions during the construction phase without written approval of the…