20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf
PDF 62 MB Posted
- Attached to
- Asset Protection - Miscellaneous Metals
- Solicitation number
- 967-0213-26
- Issued by
- Tehama County, California
About this file
This is a technical drawing set for the Solano County Asset Protection Project, a multi-prime competitive sealed bid procurement involving miscellaneous metals fabrication and installation work. The project encompasses flood protection infrastructure across multiple County facilities in Fairfield, California, including the Hall of Justice, Solano Justice Center, and related emergency services facilities located at Union Avenue, Clay Street, Delaware Street, and Texas Street properties. The scope of work is limited exclusively to miscellaneous metals required to support barrier walls, berms, stormwater management infrastructure, flood gates, underground utility reconfiguration, and pump systems designed to protect County assets from seasonal flooding. A mandatory pre-bid conference is scheduled for February 19, 2026, at 10:00 a.m. at the County Administration Center. Sealed bids are due by 2:00 p.m. on March 9, 2026, submitted through the Solano County OpenGov E-Procurement Portal. The contract requires substantial completion within 231 calendar days from the Notice to Proceed, with liquidated damages of $2,000 per day for delays beyond the completion deadline.
The project is federally funded through FEMA and California Governor's Office of Emergency Services (Cal OES) grants, requiring compliance with Davis-Bacon Act prevailing wage determinations, federal procurement standards under Title 2 CFR 200, Byrd Anti-Lobbying provisions, and CEQA environmental requirements. Bidders must be licensed California contractors and must submit a bid bond equal to 10 percent of the total bid amount, non-collusion declarations, and worker's compensation certifications. The successful contractor must provide performance and payment bonds each equal to 100 percent of the contract amount, plus a one-year warranty bond equal to 10 percent of the final contract amount. Comprehensive insurance coverage is required, including workers' compensation and commercial general liability insurance naming the County as additional insured. The project schedule indicates design completion by February 27, 2026, with construction phases extending through November 2026 and final closeout by January 12, 2027. The total contract value for the miscellaneous metals portion is not disclosed in the available procurement documents.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .