About this file
This is an IFC (Issued for Construction) drawing set for the Asset Protection Project prepared by Solano County, California, depicting architectural and engineering design specifications for miscellaneous metals fabrication and installation across multiple County facilities located at Union Avenue, Clay Street, Delaware Street, and Texas Street in Fairfield, California. The drawing set represents the approved design phase for miscellaneous metals components that support the overall Asset Protection Project's flood protection infrastructure, including barrier walls, flood gates, and related metal structural elements. The design was completed and approved by the Building Division on December 8, 2025, in preparation for the competitive sealed bid procurement scheduled for miscellaneous metals work. Sealed bids are due by 2:00 p.m. on March 9, 2026, with a mandatory pre-bid conference scheduled for February 19, 2026, at 10:00 a.m. at the County Administration Center. The successful contractor must achieve substantial completion within 231 calendar days from the Notice to Proceed, with liquidated damages of $2,000 per day for delays beyond the deadline.
The project is federally funded through FEMA and California Governor's Office of Emergency Services (Cal OES) grants, requiring compliance with Davis-Bacon Act prevailing wage determinations and federal procurement standards under Title 2 CFR 200. Bidders must submit a bid bond equal to 10 percent of the total bid amount and must be licensed California contractors. The successful contractor must provide performance and payment bonds each equal to 100 percent of the contract amount, plus a one-year warranty bond equal to 10 percent of the final contract amount. The contractor must maintain comprehensive insurance coverage, including workers' compensation and commercial general liability insurance naming the County as additional insured. The overall Asset Protection Project schedule indicates construction phases extending through November 2026 with final closeout by January 12, 2027; however, the specific contract value for the miscellaneous metals portion is not disclosed in the available procurement documents.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .