20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf
PDF 96 MB Posted
- Attached to
- Asset Protection - Miscellaneous Metals
- Solicitation number
- 967-0213-26
- Issued by
- Tehama County, California
About this file
This is an Approved IFC (Issued for Construction) Drawing Set document prepared for Solano County's Asset Protection Project, specifically addressing the miscellaneous metals work component of a multi-prime flood protection infrastructure initiative. The project encompasses protection measures for multiple County facilities located at Union Avenue, Clay Street, Delaware Street, and Texas Street properties in Fairfield, California, including the Hall of Justice and Solano Justice Center. The scope of work is limited exclusively to miscellaneous metals fabrication and installation required to support the overall Asset Protection Project, which integrates with barrier walls, berms, stormwater management infrastructure, flood gates, underground utility reconfiguration, and pump systems designed to protect County assets from seasonal flooding. A mandatory pre-bid conference is scheduled for February 19, 2026, at 10:00 a.m. at the County Administration Center, with sealed bids due by 2:00 p.m. on March 9, 2026, submitted through the Solano County OpenGov E-Procurement Portal. The contract requires substantial completion within 231 calendar days from the Notice to Proceed, with liquidated damages of $2,000 per day assessed for delays beyond the completion deadline.
The project is federally funded through FEMA and California Governor's Office of Emergency Services (Cal OES) grants, requiring compliance with Davis-Bacon Act prevailing wage determinations, federal procurement standards under Title 2 CFR 200, Byrd Anti-Lobbying provisions, and CEQA environmental requirements. Qualified bidders must be licensed California contractors and are required to submit bid bonds equal to 10 percent of the total bid amount, non-collusion declarations, and worker's compensation certifications. The successful contractor must provide performance and payment bonds each equal to 100 percent of the contract amount, plus a one-year warranty bond equal to 10 percent of the final contract amount, and must maintain comprehensive insurance coverage including workers' compensation and commercial general liability insurance naming the County as additional insured. No specific set-asides for disadvantaged business enterprises are noted in the procurement documents, although federal procurement standards require affirmative steps to include such firms where applicable. The total contract value or budget range for the miscellaneous metals portion is not disclosed in the available procurement documents.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .