20250819_AF 66_EEPZ245434.xlsx

XLSX spreadsheet 86 KB Posted

Attached to
EEPZ245434 - B730 Renovate SAPR Space
Solicitation number
EEPZ245434
Issued by

About this file

This document is an Air Force Form 66 (Substitute) Schedule of Material Submittals for Project EEPZ245434, a renovation of SAPR Space in Building 730, dated 17-Jul-24. The comprehensive submittal schedule covers multiple project disciplines including general, environmental, architectural, civil, mechanical, electrical, special systems, and miscellaneous categories, detailing 60 specific material and documentation requirements contractors must provide for approval.

Key submission items include work/construction plans, demolition plans, as-built drawings, environmental reports (hazardous waste, green procurement, storm water pollution prevention), interior construction materials (doors, studs, wallboard, ceiling systems), mechanical systems (HVAC, ductwork), electrical components (conduits, junction boxes, lighting fixtures), and fire protection systems (sprinklers, heat/smoke detectors). The document also includes a detailed HAZMAT Tracking Sheet for contractors to document all hazardous materials used during the project, requiring manufacturers' safety data sheets and specific usage documentation. The project is associated with the Department of the Air Force Air Education and Training Command and involves renovating space to accommodate Sexual Assault Prevention and Response (SAPR) and Integrated Prevention Workforce (IPW) offices.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General

Project No:Project Title:Date:
EEPZ245434RENOVATE SAPR SPACE, B73017-Jul-24
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
1Work/Construction PlanBASICX
2Phasing PlanBASICX
3Demolition PlanBASICX
4As-Built DrawingsBASICX
5Progress ScheduleBASICX
6Guarantees and WarrantiesBASICX
7Superintendent's Qualifications and ExperienceBASICX

AF Form 66 (Substitute) GENERAL Page&Pof&N

SCHEDULE OF MATERIAL SUBMITTALS

Environmental

Project No:Project Title:Date:
EEPZ245434RENOVATE SAPR SPACE, B73017-Jul-24
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
8Appropriate SDSBASICX
9Green Procurment ReportBASICX
10Hazardous waste reportBASICX
11Hazardous Material Report (AF Form 3000)BASICX
12Air Emission Source Specifications for equipment removedBASICX
13Recycled Material Report/Construction Debris reportBASICX
14Storm Water Pollution Prevention Plan with Best Management Practices IdentifiedBASICX
15Weekly Inspection Reports for ProjectsBASICX
16State Licenses for workers and supervisorsBASICX
17State license for the firmBASICX
1810 Day Notification (Demolition and Asbestos)BASICX
19Work PlanBASICX
20Copy of ACM DisposalManifestBASICX

AF Form 66 (Substitute) Environmental Page&Pof &N

SCHEDULE OF MATERIAL SUBMITTALS

Architectural

Project No:Project Title:Date:
EEPZ245434RENOVATE SAPR SPACE, B73017-Jul-24
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
21Interior Man DoorsBASICX
1. DoorframesBASICXXX
2. DoorsBASICXXXX
3. HardwareBASICXXXX
4. KickplatesBASICXXXX
22Galvanized Steel StudsBASICXXXX
23Galvanized Steel Bracing StripsBASICXXXX
24Gypsum WallboardBASICXXX
25Gypsum TapeBASICXXX
26Gypsum PlasterBASICXX
27Hard Surface Transition StripsBASICXXXX
28Rubber Cove BaseBASICXXXXX
29Suspended CeilingBASICX
1. Ceiling GridBASICXXXX
2. Ceiling TilesBASICXXXX
3. Acoustical Ceiling TilesBASICXXXXX
4. Seismic ClipsBASICXXXX
30Rasied FloorBASICX
1. Floor SystemBASICXXXX
2. Floor PanelBASICXXXXX
31Door TrimBASICXXXXX
32Interior Wall Primer/PaintBASICXXXX
33Interior Door/Trim Primer/PaintBASICXXXX
34Photoluminescent Exit SignsBASICXX

AF Form 66 (Substitute) Architectural Page&Pof&N

Civil

Project No:Project Title:Date:
EEPZ245434RENOVATE SAPR SPACE, B73017-Jul-24
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
NONE

AF Form 66 (Substitute) CIVIL Page&Pof &N

Mechanical

Project No:Project Title:Date:
EEPZ245434RENOVATE SAPR SPACE, B73017-Jul-24
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
35HVAC TAB ReportBASICXXXX
36Duct InsulationBASICXXXX
37Metal DuctworkBASICXXXXXX
38DampersBASICXXXXX
39DiffusersBASICXXXXXX

AF Form 66 (Substitute) Mechanical Page&Pof&N

Electrical

Project No:Project Title:Date:
EEPZ245434RENOVATE SAPR SPACE, B73017-Jul-24
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
40ConduitBASICX
41Conduit CouplingsBASICX
42Junction BoxesBASICXXX
43Outlet BoxesXXX
44Electric Metallic TubingBASICX
45Light SwitchesBASICXXXXX
46ReceptaclesBASICXXX
47Faceplates/Cover PlatesBASICXXXX
48Cable SupportsBASICX
49JacksBASICXXXX
50Interior LED FixturesBASICXXXXX
51Fixture WhipsBASICXXX
52Seismic Wire Support For Light FixturesBASICXXXX
53Occupancy SensorBASICXXXXX
54Electrical Identification/Nameplates/MarkersBASICX

AF Form 66 (Substitute) Electrical Page&Pof &N

Special Systems

Project No:Project Title:Date:
EEPZ245434RENOVATE SAPR SPACE, B73017-Jul-24
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
55Wet-Sprinkler SystemBASICXXX
1. TeesBASICXXX
2. CouplingsBASICXXX
3. CrossesBASICXXX
4. CapsBASICXXX
5. Sprinkler Heads, PendentsBASICXXX
6. Sprinkler Heads, Concealed CoverplatesBASICXXX
7. PipingBASICXXX
8. HangersBASICXXX
56Heat/Smoke DetectorsBASICXXXXX
57Strobes and Horns, ADABASICXXXXX
58Preliminary Testing ReportsBASICX
59Acceptance Testing ReportsBASICXX
60Copper CapsBASICXXXX

AF Form 66 (Substitute) Special Systems Page&Pof &N

Other&Misc

Project No:Project Title:Date:
EEPZ245434RENOVATE SAPR SPACE, B73017-Jul-24
LINE NO.ITEM DESCRIPTIONSPEC REFNUMBER OF COPIES REQUIREDDATE KTR REQUIRES APPROVALDATE RECEIVED KTRDATE TO CIVIL ENGDATE RECEIVED FROM CEDATE CONTRACTOR NOTIFIED APR DISAPRCONTRACT RESUBMIT DUECONTRACT RESUBMITTAL RECEIVEDFINAL APPROVAL RCVD KTR NOTIFIED
Certificate of ComplianceShop DrawingsSamplesColor SelctionManufacturer's RecommendationsManufacturer's WarrantyCatalog DataOperating InstructionsOther
GENERAL
NONE

AF Form 66 (Substitute) Other and Misc Page&Pof &N

HAZMAT Tracking Sheet

Contractor Hazardous Materials Usage Tracking Form
Return this form to Contracting/Project Manager with Manufacturers original SDS
EEPZ245434RENOVATE SAPR SPACE, B730Contract #
Start Date:End Date:Cotractor:
Product Name as seen on SDS
Process (How is material used)Part #ManufacturerType of
ContainerSize of ContainerTotal

Quantity

UsedEESOH MSN
1
Process:
2
Process:
3
Process:
4
Process:
5
Process:
6
Process:
7
Process:
8
Process:
9
Process:
10
Process:
11
Process:
12
Process:
13
Process:
14
Process:
15
Process:
16
Process:
17
Process:
18
Process:
19
Process:
20
Process:
21
Process:
22
Process:
23
Process:
24
Process:
25
Process:
26
Process:
27
Process:
28
Process:

Example and Instructions

WORKSHEET INSTRUCTIONS
BLOCKDESCRIPTIONINFORMATION REQUIRED
AProject NumberProject number or Opportunity number assigned to the project by Civil Engineering.
BProject TitleThe title of the project.
CContract NumberThe contract number or delivery order assigned by contracting.
DProduct NameThe name of the product as listed on the SDS.
EProcessA Brief description of the work performed with each material.
FPart #The part number as listed on the SDS.
GManufacturerThe name of the Manufacturer of the product (not the distributor)
HType of ContainerThe type of container that the product comes in. Example: can, barrel, bottle, container, cylinder, drum, etc…
ISize of ContainerSize as listed on container. Example: oz, lbs, Liter, Quart, Gallon, etc…
JTotal Quantity UsedThis will be the amount that you anticipate using for the first submission. At the conclusion of the project you will need to provide a final list with updated quantities.
KEESOH MSNThis is the Material Stock Number assigned for EESOH-MIS tracking. (The Air Force Hazardous Materials Manager will provide this number)

NOTE: Complete the HAZMAT Tracking Sheet located on the first TAB of this Excel spreadsheet with all hazardous materials to be used during the duration of the construction project. Once completed, save the sheet as a .pdf file and submit to the contracting officer with an AF Form 3000 Submittal form. This data will need to be submitted prior to construction start. When construction is complete, you will submit a final revised report with updated quanties.

image1.emf

File details come from the government source that posted it. Updated .