About this file
This document is a Scope of Work (SOW) for a Planning Level Mammal Survey issued by the Tennessee Army National Guard (TNARNG) for the Volunteer Training Site (VTS) located in Milan, Tennessee. The project aims to conduct a comprehensive scientific survey of mammal species and communities across the 18,581-acre training site, excluding bat species which are being surveyed under a separate project. The survey's key objectives include identifying all mammal species utilizing various habitat types, comparing results with previous surveys to track changes in species and communities, and providing recommendations for managing species of federal and state interest. The contract has a 24-month period of service, with multiple deliverables including a project work plan, monthly progress reports, a draft biological survey report, and a final biological survey report.
The contractor will be responsible for performing the survey using scientifically defensible methods, obtaining necessary permits, and coordinating site access with TNARNG personnel. The site encompasses diverse habitats including 9,888 acres of forestland, 7,311 acres of grassland/pasture/crops, 617 acres of forested wetland, and 398 acres of infrastructure. Payment will be made incrementally based on project milestones, with 50% allocated for field work/surveys, 10% for the draft report, and 20% for the final report. The survey must identify any rare, threatened, or endangered species, document special mammal habitats, and provide GPS-mapped observations with detailed habitat information. All collected data and reports must be submitted in both hardcopy and electronic formats, with specific requirements for GIS file compatibility and metadata.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
PLANNING LEVEL MAMMAL SURVEY
of
VOLUNTEER TRAINING SITE – MILAN
TENNESSEE ARMY NATIONAL GUARD
1.0 INTRODUCTION / BACKGROUND
The Tennessee Army National Guard (TNARNG), as an agent of the National Guard Bureau (NGB), is responsible for the prudent management of natural resources on all of its properties.
The largest of these properties, the Volunteer Training Sites (VTS), are managed, in accordance with the Sikes Act and Sikes Act Improvement Amendments, through Integrated Natural Resource Management Plans (INRMP) which guide all activities that may impact natural resources. Up to date baseline survey information on flora, fauna, and abiotic characteristics of the training sites is essential to informed natural resources management. AR 200-1 and National Guard Bureau (NGB) policy require surveys for different species groups on a set interval to develop baseline data, and allow comparison for change in species and communities over time.
The INRMPs which guide management on VTS-Milan lack adequate detailed information about the mammalian communities that inhabit the site and may be impacted by TNARNG activities.
To fill this data-gap the TNARNG requires a comprehensive survey of the mammal species that utilize the training site for part or all the year. They must be comparable to past survey data and identify changes in these communities. Bat species are being covered under a separate project and do not need to be surveyed. Of particular concern are any species which may be state or federally protected and any indicator species which could be utilized to monitor environmental conditions on VTS-Milan.
2.0 OBJECTIVE
The objective of this Scope of Work (SOW) is to provide an in-depth investigative survey to accurately reflect the mammal species and communities that inhabit VTS-Milan, and to determine if any are considered rare, threatened, or endangered (RTE) by the Federal or State governments. Bats are surveyed under a different project and do not need to be surveyed as part of this contract.
The following are the specific objectives of this statement of work:
1. A scientific survey of all mammal species and their communities utilizing the various habitat types of VTS-Milan.
2. Comparison of results with those of previous surveys to identify any change in species and/or communities, suggest possible reasons for change, and make management recommendations to benefit them.
3. Recommendations for management to support species of interest of both federal and state governments that are utilizing the site.
TNARNG Volunteer Training Sites Herpetofauna Survey Scope of Work
Tennessee Army National Guard
4. Identification of special mammal habitats on site and recommendations for their management and improvement;
5. Documentation of all mammalian species found on site.
6. Documentation of any mammalian RTE species, marking and mapping (GIS) of the point of observation/collection, and any relevant habitat information collected.
3.0 SITE
VTS – Milan (Carroll and Gibson Counties, TN): VTS-M is an 18,581-acre training site in west Tennessee, approximately 20 miles north of Jackson, and immediately adjacent to the town of Milan. The site is bounded on the east by state highway 220, and the town of Milan and Hope Hill Cemetery Rd. on the west. It consists of approximately 9,888 acres of forestland (6,919 ac.
hardwood, 2,056 ac. mixed hardwood/conifer, and 913 ac. pine), 7,311 ac. maintained in open grassland/pasture/crops, 617 ac. forested wetland, and 398 ac. buildings, parking, and other infrastructure. Approximately 7,000 ac. of the open land was historically used for ammunition storage and is covered with parallel rows of ammunition bunkers and associated roads. There is an off-limits area comprised of a 905-ac. duded impact area, which is primarily open ground.
There are streams which include: Halls Branch, Johns Creek, Wolf, Dry, and Clear Creeks.
Surrounding lands consist primarily of farmland and forest to the south and east, suburban settlement to the west, and the industrial/manufacturing area of Milan Army Ammunition Plant (MAAP) to the north.
4.0 MAJOR REQUIREMENTS
The following tasks must be completed for the Contractor to successfully accomplish the work under this delivery order:
4.1 Task 1: Project Start-Up Meeting
The Contractor will attend a kick-off meeting with TNARNG representatives at the Headquarters in Milan, Tennessee. At this meeting, the Contractor will be furnished with the most recent environmental information and maps available for the training site. The meeting will also afford the contractor the opportunity to meet the site staff they will coordinate access with, receive an initial safety briefing, learn the specific coordination and access requirements for VTS-Milan, and become familiar with the down range areas and their unique conditions. The TNARNG Point of Contact (POC) will be responsible for copying documents in cases where the original cannot be distributed to the Contractor for use during the execution of this SOW. This information will include the following:
• Data from past surveys that included any mammal information;
• Maps identifying vegetation community types and other environmental characteristics integral to the definition of habitat types; and,
• Current aerial photography.
Whenever possible, this information will be provided to the Contractor in electronic format. The Contractor will be responsible for reviewing all provided data.
Scope of Work
Deliverables: Meeting minutes.
Performance Period: Meeting within one month following Notice to Proceed; minutes within two weeks following meeting.
4.2 Task 2: Submission of Project Work Plan
The Contractor will submit for review by the TNARNG POC a Project Work Plan detailing the scheduled stages of the project and the proposed methodologies to be used in each phase. The work plan will be completed and approved by the TNARNG POC within one month following the start-up meeting and prior to the initiation of any fieldwork.
The methodology should follow accepted and scientifically defensible standards for mammal surveys, and be comparable to the methods of previous surveys. The goal of this project is a comprehensive planning level survey of these species’ groups on VTS-Milan, therefore, the methodology should address the full range of habitat, life history, and seasonality and should not be restricted to a single survey method.
The Contractor will identify habitat types of interest located on the training site. The site should be subdivided according to these major habitat types and each habitat type adequately sampled across the physical range of the site. “Training Areas” do not necessarily subdivide the site along ecological boundaries but may be utilized if the resulting breakdown is effective. Sampling locations will be identified in the work plan.
Sample points, sighting locations, and special concern habitats will be recorded via GPS with sub-meter accuracy in the UTM WGS 1984 projection. Files will be compliant with current Corps of Engineers Spatial Data Standards (SDS/FIE). The Contractor must coordinate with the TNARNG GIS office to develop the appropriate data collection format and standards for this project prior to beginning any field work. The approved data collection format will be included in the work plan.
The Contractor is responsible for contacting the U.S. Fish and Wildlife Service, the Tennessee Natural Heritage Inventory Program, to determine what, if any, threatened or endangered species or other species of special concern could potentially be using the training site. These species of interest, if any, and the habitat(s) to be searched for them will be identified in the Project Work Plan.
The Contractor is also responsible for obtaining any permits and authorizations that may be required to complete this contract. Copies of all permits will be provided to the TNARNG POC within 30 days of issuance.
Deliverable: Project Work Plan detailing survey methodology, sample locations, and species of special concern.
Performance Period: Three months following Notice to Proceed.
Scope of Work
4.3 Task 3: Mammal Survey Field Work
The Contractor will sample the different habitats of the training site according to the Project Work Plan and in appropriate seasons for mammal trapping. Training Site access and scheduling of training activities shall be taken into account in planning the sampling schedule.
Access to the site will be provided as necessary to accomplish field work; however, the Contractor must understand that military training activities will receive first priority with regard to scheduling access to Training Areas. It is the Contractor’s responsibility to coordinate with the training site on-site POCs to schedule access VTS-Milan.
If field work is to impact or disturb any agricultural activities, it is the responsibility of the contractor to notify the Natural Resource Manager prior to any disturbance. The Natural Resource Manager will notify the contractor of any areas that might be closed off and available for re-entry due to agricultural practices.
Species identification will be performed by personnel professionally trained in mammal identification.
Sampling should be non-destructive (catch and release) as much as possible. Any specimens collected will be provided to a local institution of higher education for archiving and/or educational use, as TNARNG does not have the facilities for storing such collections. Any endangered species collected will be dispersed according to U.S. Fish and Wildlife instruction.
Sample points, sighting locations, and special concern habitats will be recorded via GPS in the UTM WGS 1984 projection utilizing equipment with sub-meter accuracy capabilities following the format determined in consultation with the TNARNG GIS office. Files will be compliant with the current Corps of Engineers Spatial Data Standards (SDS/FIE). Metadata for the GIS files will be complete. Species lists will be recorded in a database format that is compatible with ESRI ArcGIS 10.4.1. All files will be delivered in an editable format; “read-only” files are not acceptable.
The Contractor will make monthly progress reports to the TNARNG POC throughout the execution of this contract. Format of these reports is at the discretion of the TNARNG POC.
Deliverables: Field work and monthly status reports on project progress.
Performance Period: Complete by Twenty-one (21) months from notice to proceed.
4.4 Task 4: Preparation and Submission of draft Biological Survey Report Results of the survey will be submitted to the TNARNG POC. The report will include summary of survey methodology, species list by habitat, discussion of significant finds, map and coordinate table of sample locations, GIS shapefile of sample locations, map and GIS shapefile of species of special concern habitats (if any), and recommendations for management or further study. Field notes, all raw data tables, and field forms will be included as appendices in the report. The Contractor should review previous surveys conducted at the VTS, make comparisons, and report if there have been any community or population shifts. Should a community or population shift be noted, possible reasons and management
Scope of Work recommendations should be given. For the purpose of creating maps for the reports, the Contractor can obtain any applicable raw GIS data from the TNARNG GIS Office.
The draft report will be reviewed by TNARNG to ensure all needed information is included. Draft report is due twenty-two months from notice to proceed. Two hard copies and one electronic copy (via DoD SAFE) of the report should be submitted. All GIS files should be submitted for review at the same time as the draft report. The State POC will return comments within one month of receipt of draft report
Deliverable: Draft Biological Survey Report detailing survey findings and GIS data.
Performance Period: Twenty-two months from Notice to Proceed (due two months prior to end of contract).
4.5 Task 5: Preparation and Submission of final Biological Survey Report
The Contractor will prepare the final survey report incorporating the State POC’s comments. Three hard-copies and three electronic copies (2 on CD/DVD and 1 via DoD SAFE) of the final report will be submitted to the State.
All data collected in the course of the project including field forms, raw data tables, spreadsheets, databases, and GIS files will be provided to the TN Military Department in electronic form and included on the submitted CD/DVDs. All GIS data and metadata will be in editable files that can be effectively incorporated into the TNARNG GIS system. Read-only files are not acceptable.
Publication of results from this project is possible with written permission and cooperation from the TN Military Department, Environmental Office. Any manuscript must be reviewed and approved by the State prior to submission for publication.
Deliverable: Final Biological Survey Report.
Performance Period: One month following return of TNARNG comments on draft report (due within 24 months of Notice to Proceed).
5.0 GOVERNMENT FURNISHED INFORMATION OR MATERIAL
The TNARNG shall furnish access to all requested data relevant to this project. This will include topographic maps and environmental data about the site. The TNARNG will provide access to the installation for the necessary field work; however, the Contractor must schedule their access to VTS-Milan through the respective training site POC.
6.0 CONTRACTOR REQUIREMENTS AND RESPONSIBILITIES
The contract work shall be performed by or under the direct supervision of personnel who are professionally qualified in mammal identification.
Scope of Work
The contractor shall obtain all permits and authorizations that may be required to complete this contract. Copies of permits will be furnished to the TNARNG POC within 30 days of issuance.
The Contractor shall furnish, except as noted, all labor, materials, equipment, tools, transportation, communications, and supplies required to complete the work in accordance with project specifications, terms of the contract, and this Scope of Work.
The TNARNG POC will serve as the liaison with the training site personnel concerning scheduling of meetings at the facilities. However, it is the Contractor’s responsibility to coordinate all other access to the facility through the training site POCs. Access will be provided as necessary to accomplish field work; however, the Contractor must understand that military training activities shall receive first priority with regard to scheduling access to training areas.
All information and data provided by TNARNG to the Contractor is for the purpose of fulfilling this contract. This information is to be protected by the Contractor; it is not to be distributed or utilized for any other purpose under penalty of law.
Upon completion of the Project, the Contractor shall protect and/or return all maps, photographs, specimen materials, studies, surveys, inventories, evaluations, plans, and project reports obtained or collected during the course of the Contract work in accordance with all regulations, laws and statutes. Copies of reports and applicable related materials will be furnished to the TNARNG upon completion of the Contract.
Any specimens collected will be provided to a local institution of higher education for archiving and/or educational use. Any endangered species collected will be dispersed according to U.S.
Fish and Wildlife Service instruction.
Publication of results from this project is possible only with written permission and cooperation from the TNARNG Environmental Office. Any manuscript must be approved by the TNARNG POC and the TNARNG Public Affairs Office prior to submission for publication.
7.0 DELIVERABLES
All maps, historic documents and other items borrowed from the TNARNG or other contractors under contract to the TNARNG are the property of the TNARNG and shall be returned to the TNARNG upon completion of this Contract.
The deliverables due in fulfillment of this Contract are summarized below. Payment will be made following receipt of deliverables according to the following approximate schedule (payment will not be delayed if a deliverable is provided ahead of schedule):
Scope of Work
Time from Notice to Proceed
Deliverable Payment
1 month Kick-off Meeting 0
1.5 month Kick-off meeting Minutes 10%
3 month Project Work Plan 10%
Throughout Copies of all permits and authorizations obtained during the course of the contract work
0%
Throughout Minutes and records of meetings, consultations, and conferences
0%
Throughout Monthly progress reports 0%
Complete by 21 months
Field Work/Surveys 50%, Increments possible.
22 months Draft Biological Survey Report And, complete survey results in electronic database
10%
24 Months Final Biological Survey Report (3 hardcopies; 3 electronic (2 on CD/DVD and 1 via DoD SAFE)) And all data in electronic form
20%
8.0 MEETINGS AND REVIEWS
Consultations and meetings will be conducted as necessary. At a minimum, this will include:
1. Start-up meeting – on-site, in-person.
2. Review of Project Work Plan – may be conducted in person or via phone/email.
3. Monthly progress report reviews – may be conducted in person or via phone/email.
4. Draft plan review – may be conducted in person or via phone/email.
5. Review of Final Report in person or via phone/e-mail.
9.0 POINTS OF CONTACT
The VTS-Milan on-site POC for this project is CPT Brown at (731) 222-5304 (andrew.j.brown50.mil@army.mil). All visits to Milan by the Contractor should be coordinated through CPT Brown and the RFMSS Scheduler SSG Dustin Wallace (615) 426-5935 (dustin.b.wallace2.mil@army.mil).
The TNARNG Natural Resources POC is Jenna Cox, (615) 636-4924 (jenna.e.cox2.nfg@army.mil); or Brian Knapp, (615) 339-5814 (brian.e.knapp.nfg@army.mil).
mailto:andrew.j.brown50.mil@army.mil mailto:dustin.b.wallace2.mil@army.mil mailto:jenna.e.cox2.nfg@army.mil mailto:brian.e.knapp.nfg@army.mil
Scope of Work
The TNARNG GIS POC is James “Dave” Meadows at (615) 313-0837 (james.d.meadows.nfg@mail.mil). GIS/GPS requirements must be coordinated in advance through Mr.
Meadows.
All material submissions are to be sent to Jenna Cox, the TNARNG POC, at the following address:
Attn: Jenna Cox
P.O. Box 509 Milan, TN 38358
No TNARNG personnel, other than the Contracting Officer, shall have the authority to change or alter these requirements. The Technical Representative shall clarify technical points or supply relevant technical information, but no requirements in this statement of work or the scope of work may be altered as a sole result of such verbal clarification.
10.0 PERIOD OF SERVICE
The Period of service for this contract shall be twenty-four (24) months from notice to proceed.
- END OF SCOPE OF WORK -