2025_2026_Emergency_Line_Clearance_Pricing_Schedule.xlsx
XLSX spreadsheet 40 KB Posted
- Attached to
- 2025 & 2026 Emergency Line Clearance
- Solicitation number
- PR8325
- Issued by
- Florida
About this file
The file is a pricing schedule spreadsheet for the 2025 & 2026 Emergency Line Clearance contract issued by Orlando Utilities Commission (OUC) in Florida, covering storm restoration tree and vegetation line clearance services for transmission and distribution rights of way. The document provides detailed hourly labor and equipment rates for various job classifications and equipment types, with provisions for multiple suppliers and the ability to accommodate regional and union-specific rate variations. The contract spans two years (2025-2026), with OUC reserving the right to award contracts to multiple suppliers.
The pricing schedule includes comprehensive rate tables for labor classifications such as supervisors, mobile mechanics, safety coordinators, foremen, climbers, trimmers, and equipment operators, with separate rate columns for standard time (ST), overtime (OT), and double time (DT). The document allows for up to 10 different regional or union areas to specify their unique labor and equipment rates, providing flexibility for different workforce configurations. A sample storm response pricing sheet is included, demonstrating how vendors should calculate weekly costs for a 7-day operational period, with detailed breakdowns of labor and equipment expenses. The pricing schedule is designed to support emergency line clearance services, with rates that remain firm throughout the contract period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_B_2025_2026_Annual_Emergency_Line_Clearance_Pricing_Schedule_RFP_8325.xlsx | XLSX spreadsheet | |
| 8325_Pre-Proposal_Conference_Power_Point.ppt | PPT presentation | |
| Attachment_B-1_Final.pdf | ||
| Exceptions_Page_for_Emergency_contracts_4.17.25.doc | DOC document | |
| proc_dispute_disclosure_form_1.pdf | ||
| 2025_Bidders_Information_&_Qualifications_021225.xlsx | XLSX spreadsheet | |
| RFP_8325_Emergency_Line_Clearance_FINAL.pdf | ||
| proc_public_entity_crimes_form_2.pdf | ||
| Pre-Response_Meeting_Information.pdf | ||
| Sample_Contract_5-14-25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2025 Time & Material
| Price Cost Schedule - ATTACHMENT B |
| 2025 |
| NOTE: OUC reserves the right to award the contract to multiple Suppliers. |
| ALL the below rates shall remain firm. Please state below when ST/OT/DT rates apply. |
| Standard Time (ST) when does it apply: |
| Overtime (OT) when does it apply: |
| Double Time (DT) when does it apply: |
| 1. 2025 Hourly Labor Rates | |||
| HOURLY RATES | OT HOURLY RATES | DT HOURLY RATES | |
| POSITION | |||
| Supervisor | |||
| Mobile Mechanics | |||
| Onsite Safety Coordinators | |||
| General Foreman | |||
| Crew Foreman | |||
| Climber | |||
| Trimmer | |||
| Grounds Person | |||
| Equipment Operator | |||
| 2. 2025 Hourly Equipment Rates | |||
| HOURLY RATES | |||
| EQUIPMENT | |||
| Aerial Lift 70’-75’ 2WD | |||
| Aerial Lift 70’-75’ 4WD | |||
| Aerial Lift 50’-60’ 2WD | |||
| Aerial Lift 50’-60’ 4WD | |||
| Backyard Bucket and Trailer 40’ Reach | |||
| Squirt Boom Bucket 37’-45’ Bucket Reach | |||
| Manual Crew Truck | |||
| Jarraff – Minimum Cutting Height 75’ | |||
| Fecon – Tracked Skidsteer | |||
| Disc Brush Chipper – 12” Cutter Head | |||
| Lg. Disc Brush Chipper – 19” Cutter Head | |||
| Tractor 4x4, with transporter | |||
| Mower Bat Wing - Minimum Width 15’ | |||
| Brown Tree Cutter – Minimum Width 5’ | |||
| Chain Saw – Small 14” bar | |||
| Chain Saw – Medium 20-24” bar | |||
| Chain Saw – Large 28” bar | |||
| Pole Saw | |||
| Dump Truck | |||
| Prentice Loader | |||
| Pickup Truck Vehicle 4WD – 1/2 ton | |||
| Pickup Truck Vehicle 4WD – 3/4 ton | |||
| OTHER EQUIPMENT |
| Note: If any crew rates differ from those listed above, whether due to union agreements or regional variations, please enter the applicable labor and equipment rates |
| below in Section 3 and 4. Be sure to specify the relevant area names so OUC can identify which workgroup these rates apply to. |
| Please state when ST/OT/DT rates apply for each area, if they vary from above, in the section below Section 4. |
| At the time OUC requests any crew(s)/equipment and Supplier agrees to send said crew(s)/equipment, the Supplier will identify (prior to OUC incurring any costs) the applicable |
| rate corresponding to the applicable crew(s)/equipment agreed upon. |
| 3. 2025 Unionized or Regional Hourly Labor Rates | Area 1 | Area 2 | Area 3 | Area 4 | Area 5 | Area 6 | Area 7 | Area 8 | Area 9 | Area 10 |
| Enter Name of Union or Regional Area in each column with hourly labor rates for ST, OT, and DT | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name |
| Labor Classification - Standard Time | ST | ST | ST | ST | ST | ST | ST | ST | ST | ST |
| Supervisor | ||||||||||
| Mobile Mechanics | ||||||||||
| Onsite Safety Coordinators | ||||||||||
| General Foreman | ||||||||||
| Crew Foreman | ||||||||||
| Climber | ||||||||||
| Trimmer | ||||||||||
| Grounds Person | ||||||||||
| Equipment Operator | ||||||||||
| Labor Classification - Overtime | OT | OT | OT | OT | OT | OT | OT | OT | OT | OT |
| Supervisor | ||||||||||
| Mobile Mechanics | ||||||||||
| Onsite Safety Coordinators | ||||||||||
| General Foreman | ||||||||||
| Crew Foreman | ||||||||||
| Climber | ||||||||||
| Trimmer | ||||||||||
| Grounds Person | ||||||||||
| Equipment Operator | ||||||||||
| Labor Classification - Double Time | DT | DT | DT | DT | DT | DT | DT | DT | DT | DT |
| Supervisor | ||||||||||
| Mobile Mechanics | ||||||||||
| Onsite Safety Coordinators | ||||||||||
| General Foreman | ||||||||||
| Crew Foreman | ||||||||||
| Climber | ||||||||||
| Trimmer | ||||||||||
| Grounds Person | ||||||||||
| Equipment Operator | ||||||||||
| 4. 2025 Hourly Equipment Rates |
| EQUIPMENT | Area 1 | Area 2 | Area 3 | Area 4 | Area 5 | Area 6 | Area 7 | Area 8 | Area 9 | Area 10 |
| Aerial Lift 70’-75’ 2WD | ||||||||||
| Aerial Lift 70’-75’ 4WD | ||||||||||
| Aerial Lift 50’-60’ 2WD | ||||||||||
| Aerial Lift 50’-60’ 4WD | ||||||||||
| Backyard Bucket and Trailer 40’ Reach | ||||||||||
| Squirt Boom Bucket 37’-45’ Bucket Reach | ||||||||||
| Manual Crew Truck | ||||||||||
| Jarraff – Minimum Cutting Height 75’ | ||||||||||
| Fecon – Tracked Skidsteer | ||||||||||
| Disc Brush Chipper – 12” Cutter Head | ||||||||||
| Lg. Disc Brush Chipper – 19” Cutter Head | ||||||||||
| Tractor 4x4, with transporter | ||||||||||
| Mower Bat Wing - Minimum Width 15’ | ||||||||||
| Brown Tree Cutter – Minimum Width 5’ | ||||||||||
| Chain Saw – Small 14” bar | ||||||||||
| Chain Saw – Medium 20-24” bar | ||||||||||
| Chain Saw – Large 28” bar | ||||||||||
| Pole Saw | ||||||||||
| Dump Truck | ||||||||||
| Prentice Loader | ||||||||||
| Pickup Truck Vehicle 4WD – 1/2 ton | ||||||||||
| Pickup Truck Vehicle 4WD – 3/4 ton | ||||||||||
| OTHER EQUIPMENT |
| Area 1 Standard Time (ST) when does it apply: |
| Area 1 Overtime (OT) when does it apply: |
| Area 1 Double Time (DT) when does it apply: |
| Area 2 Standard Time (ST) when does it apply: |
| Area 2 Overtime (OT) when does it apply: |
| Area 2 Double Time (DT) when does it apply: |
| Area 3 Standard Time (ST) when does it apply: |
| Area 3 Overtime (OT) when does it apply: |
| Area 3 Double Time (DT) when does it apply: |
| Area 4 Standard Time (ST) when does it apply: |
| Area 4 Overtime (OT) when does it apply: |
| Area 4 Double Time (DT) when does it apply: |
| Area 5 Standard Time (ST) when does it apply: |
| Area 5 Overtime (OT) when does it apply: |
| Area 5 Double Time (DT) when does it apply: |
| Area 6 Standard Time (ST) when does it apply: |
| Area 6 Overtime (OT) when does it apply: |
| Area 6 Double Time (DT) when does it apply: |
| Area 7 Standard Time (ST) when does it apply: |
| Area 7 Overtime (OT) when does it apply: |
| Area 7 Double Time (DT) when does it apply: |
| Area 8 Standard Time (ST) when does it apply: |
| Area 8 Overtime (OT) when does it apply: |
| Area 8 Double Time (DT) when does it apply: |
| Area 9 Standard Time (ST) when does it apply: |
| Area 9 Overtime (OT) when does it apply: |
| Area 9 Double Time (DT) when does it apply: |
| Area 10 Standard Time (ST) when does it apply: |
| Area 10 Overtime (OT) when does it apply: |
| Area 10 Double Time (DT) when does it apply: |
2026 Time & Material
| Price Cost Schedule - ATTACHMENT B |
| 2026 |
| NOTE: OUC reserves the right to award the contract to multiple Suppliers. |
| ALL the below rates shall remain firm. Please state below when ST/OT/DT rates apply. |
| Standard Time (ST) when does it apply: |
| Overtime (OT) when does it apply: |
| Double Time (DT) when does it apply: |
| 1. 2026 Hourly Labor Rates | |||
| HOURLY RATES | OT HOURLY RATES | DT HOURLY RATES | |
| POSITION | |||
| Supervisor | |||
| Mobile Mechanics | |||
| Onsite Safety Coordinators | |||
| General Foreman | |||
| Crew Foreman | |||
| Climber | |||
| Trimmer | |||
| Grounds Person | |||
| Equipment Operator | |||
| 2. 2026 Hourly Equipment Rates | |||
| HOURLY RATES | |||
| EQUIPMENT | |||
| Aerial Lift 70’-75’ 2WD | |||
| Aerial Lift 70’-75’ 4WD | |||
| Aerial Lift 50’-60’ 2WD | |||
| Aerial Lift 50’-60’ 4WD | |||
| Backyard Bucket and Trailer 40’ Reach | |||
| Squirt Boom Bucket 37’-45’ Bucket Reach | |||
| Manual Crew Truck | |||
| Jarraff – Minimum Cutting Height 75’ | |||
| Fecon – Tracked Skidsteer | |||
| Disc Brush Chipper – 12” Cutter Head | |||
| Lg. Disc Brush Chipper – 19” Cutter Head | |||
| Tractor 4x4, with transporter | |||
| Mower Bat Wing - Minimum Width 15’ | |||
| Brown Tree Cutter – Minimum Width 5’ | |||
| Chain Saw – Small 14” bar | |||
| Chain Saw – Medium 20-24” bar | |||
| Chain Saw – Large 28” bar | |||
| Pole Saw | |||
| Dump Truck | |||
| Prentice Loader | |||
| Pickup Truck Vehicle 4WD – 1/2 ton | |||
| Pickup Truck Vehicle 4WD – 3/4 ton | |||
| OTHER EQUIPMENT |
| Note: If any crew rates differ from those listed above, whether due to union agreements or regional variations, |
| please enter the applicable labor and equipment rates in Section 3 and 4. Be sure to specify the relevant areas so OUC can identify which workgroup these rates apply to. |
| Please state when ST/OT/DT rates apply for each area if they vary from above. |
| 3. 2026 Unionized or Regional Hourly Labor Rates | Area 1 | Area 2 | Area 3 | Area 4 | Area 5 | Area 6 | Area 7 | Area 8 | Area 9 | Area 10 |
| Enter Name of Union or Regional Area in each column with hourly labor rates for ST, OT, and DT | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name | Enter Name |
| Labor Classification - Standard Time | ST | ST | ST | ST | ST | ST | ST | ST | ST | ST |
| Supervisor | ||||||||||
| Mobile Mechanics | ||||||||||
| Onsite Safety Coordinators | ||||||||||
| General Foreman | ||||||||||
| Crew Foreman | ||||||||||
| Climber | ||||||||||
| Trimmer | ||||||||||
| Grounds Person | ||||||||||
| Equipment Operator | ||||||||||
| Labor Classification - Overtime | OT | OT | OT | OT | OT | OT | OT | OT | OT | OT |
| Supervisor | ||||||||||
| Mobile Mechanics | ||||||||||
| Onsite Safety Coordinators | ||||||||||
| General Foreman | ||||||||||
| Crew Foreman | ||||||||||
| Climber | ||||||||||
| Trimmer | ||||||||||
| Grounds Person | ||||||||||
| Equipment Operator | ||||||||||
| Labor Classification - Double Time | DT | DT | DT | DT | DT | DT | DT | DT | DT | DT |
| Supervisor | ||||||||||
| Mobile Mechanics | ||||||||||
| Onsite Safety Coordinators | ||||||||||
| General Foreman | ||||||||||
| Crew Foreman | ||||||||||
| Climber | ||||||||||
| Trimmer | ||||||||||
| Grounds Person | ||||||||||
| Equipment Operator | ||||||||||
| 4. 2026 Hourly Equipment Rates |
| EQUIPMENT | Area 1 | Area 2 | Area 3 | Area 4 | Area 5 | Area 6 | Area 7 | Area 8 | Area 9 | Area 10 |
| Aerial Lift 70’-75’ 2WD | ||||||||||
| Aerial Lift 70’-75’ 4WD | ||||||||||
| Aerial Lift 50’-60’ 2WD | ||||||||||
| Aerial Lift 50’-60’ 4WD | ||||||||||
| Backyard Bucket and Trailer 40’ Reach | ||||||||||
| Squirt Boom Bucket 37’-45’ Bucket Reach | ||||||||||
| Manual Crew Truck | ||||||||||
| Jarraff – Minimum Cutting Height 75’ | ||||||||||
| Fecon – Tracked Skidsteer | ||||||||||
| Disc Brush Chipper – 12” Cutter Head | ||||||||||
| Lg. Disc Brush Chipper – 19” Cutter Head | ||||||||||
| Tractor 4x4, with transporter | ||||||||||
| Mower Bat Wing - Minimum Width 15’ | ||||||||||
| Brown Tree Cutter – Minimum Width 5’ | ||||||||||
| Chain Saw – Small 14” bar | ||||||||||
| Chain Saw – Medium 20-24” bar | ||||||||||
| Chain Saw – Large 28” bar | ||||||||||
| Pole Saw | ||||||||||
| Dump Truck | ||||||||||
| Prentice Loader | ||||||||||
| Pickup Truck Vehicle 4WD – 1/2 ton | ||||||||||
| Pickup Truck Vehicle 4WD – 3/4 ton | ||||||||||
| OTHER EQUIPMENT |
| Area 1 Standard Time (ST) when does it apply: |
| Area 1 Overtime (OT) when does it apply: |
| Area 1 Double Time (DT) when does it apply: |
| Area 2 Standard Time (ST) when does it apply: |
| Area 2 Overtime (OT) when does it apply: |
| Area 2 Double Time (DT) when does it apply: |
| Area 3 Standard Time (ST) when does it apply: |
| Area 3 Overtime (OT) when does it apply: |
| Area 3 Double Time (DT) when does it apply: |
| Area 4 Standard Time (ST) when does it apply: |
| Area 4 Overtime (OT) when does it apply: |
| Area 4 Double Time (DT) when does it apply: |
| Area 5 Standard Time (ST) when does it apply: |
| Area 5 Overtime (OT) when does it apply: |
| Area 5 Double Time (DT) when does it apply: |
| Area 6 Standard Time (ST) when does it apply: |
| Area 6 Overtime (OT) when does it apply: |
| Area 6 Double Time (DT) when does it apply: |
| Area 7 Standard Time (ST) when does it apply: |
| Area 7 Overtime (OT) when does it apply: |
| Area 7 Double Time (DT) when does it apply: |
| Area 8 Standard Time (ST) when does it apply: |
| Area 8 Overtime (OT) when does it apply: |
| Area 8 Double Time (DT) when does it apply: |
| Area 9 Standard Time (ST) when does it apply: |
| Area 9 Overtime (OT) when does it apply: |
| Area 9 Double Time (DT) when does it apply: |
| Area 10 Standard Time (ST) when does it apply: |
| Area 10 Overtime (OT) when does it apply: |
| Area 10 Double Time (DT) when does it apply: |
Fill in Sample Pricing
| THIS PAGE IS A SAMPLE OF A STORM ZULU ONLY | ||||||||||||||
| INCLUDE THIS PAGE IN PROPOSAL, IN EXCEL FORMAT - fill out in accordance with your 2025 Time and Material Rates | ||||||||||||||
| 3 Overhead Crews- 7 Day Storm- Operational Period 6am-10pm | ||||||||||||||
| Monday | Tuesday | Wednesday | Thursday | Friday | Saturday | Sunday | Total Hours | Daily Cost | ||||||
| ST Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $ - 0 | Crew Structure | # of employees | Hourly rate ST | Hourly rate OT | Hourly Rate DT |
| OT Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $ - 0 | General Foreman | 1 | $ - 0 | $ - 0 | $ - 0 |
| DT Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $ - 0 | Crew Foreman | 3 | $ - 0 | $ - 0 | $ - 0 |
| Total Labor Costs For Week | $ - 0 | Trimmer | 3 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| Ground Person | 3 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| On-Site Safety Coordinator | 1 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Mobile Mechanic | 1 | $ - 0 | $ - 0 | $ - 0 | ||||||||||
| Crew Hourly Rate/hr | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Equipment Type | # of equip | Hourly Rate | Hours/day | # of days | Total | |||||||||
| Aerial Lift Under 60' - 2WD | 1 | 16 | 7 | $ - 0 | ||||||||||
| Aerial Lift Under 60' - 4WD | 1 | 16 | 7 | $ - 0 | ||||||||||
| Manual Crew Truck | 1 | 16 | 7 | $ - 0 | ||||||||||
| Pickup Truck 4WD 1/2 ton | 1 | 16 | 7 | $ - 0 | ||||||||||
| Chain Saw - Small 14" bar | 3 | 16 | 7 | $ - 0 | ||||||||||
| Chain Saw - Medium 20-24" bar | 3 | 16 | 7 | $ - 0 | ||||||||||
| Chain Saw - Large 28" bar | 3 | 16 | 7 | $ - 0 | ||||||||||
| Total Equipment Costs for Week | $ - 0 | |||||||||||||
| Total Weekly Costs | $ - 0 |