This is a bid set document for Fort Valley State University (FVSU), located at 1005 State University Drive in Fort Valley, Georgia 31030, prepared by NBP Engineers, Inc. The project involves the replacement of boilers and related HVAC, plumbing, and electrical systems in three university buildings: Horace Mann Bond Building, Troup Administration Building, and Peabody Trades Building. The scope of work includes demolition of existing gas-fired boilers, water heaters, expansion tanks, and associated piping, along with installation of new condensing hot water boilers, heating water pumps with variable frequency drives (VFDs), air separators, expansion tanks, unit heaters, and supporting infrastructure. The project also requires new gas piping connections, electrical power distribution for boiler controls and HVAC equipment, and updates to the building automation system. The document includes detailed mechanical, plumbing, and electrical drawings with specifications for equipment schedules, including three new boilers (BLR-B-1, BLR-P-1, and BLR-T-1) with capacities ranging from 999 to 1250 MBH input, four heating water pumps with 1.5 to 3 horsepower ratings, and associated controls and monitoring systems.
The bid set, dated October 15, 2025, with an expiration date of June 30, 2026, includes comprehensive design documentation prepared under COA #PEF000774. Equipment specifications detail boiler operating pressures of 45 to 120 PSI, heating water flow rates of 45 to 120 GPM, and electrical ratings of 120/1-phase to support boiler operations and controls. The project requires coordination of new mechanical, plumbing, and electrical work with existing building systems, including protection and preservation of existing HVAC equipment, chilled water systems, and infrastructure that will remain in service. The design incorporates direct digital control (DDC) panels with building automation capabilities, pressure sensors, flow monitoring stations, and temperature controls for optimized system operation. Contractors are required to review architectural and engineering drawings in their entirety prior to bid submission and notify the architect of any conflicts or discrepancies between utility locations, pipe sizing, or system configurations indicated in the design documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
SHEET NO. TITLE
M001 ABBREVIATIONS, LEGENDS, & SCHEDULE - HVAC
M501 DETAILS - HVAC
E001
1005 State University Drive; Fort Valley, Georgia 31030
Fort Valley State University
MP202
MB201 HORACE MANN BOND BUILDING - PARTIAL GROUND FLOOR PLAN - DEMOLITION & NEW WORK - HVAC
MT203
MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC
TROUP ADMINISTRATION BUILDING - PARTIAL FIRST FLOOR PLAN -
EB201
EP202
ET203
DEMOLITION & NEW WORK - HVAC POWER
HORACE MANN BOND BUILDING - PARTIAL GROUND FLOOR PLAN -
MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC POWER
TROUP ADMINISTRATION BUILDING - PARTIAL FIRST FLOOR PLAN -
PEABODY TRADES BUILDING - PARTIAL FIRST FLOOR PLAN - DEMOLITION & NEW WORK - HVAC
DEMOLITION & NEW WORK - HVAC POWER
PEABODY TRADES BUILDING - PARTIAL FIRST FLOOR PLAN -
P001
PB201
PP202
PT203
LEGEND, SCHEDULE, NOTES, & DETAILS - PLUMBING
DEMOLITION & NEW WORK - PLUMBING
HORACE MANN BOND BUILDING - PARTIAL GROUND FLOOR PLAN -
DEMOLITION & NEW WORK - PLUMBING
PEABODY TRADES BUILDING - PARTIAL FIRST FLOOR PLAN -
MECHANICAL ROOM - DEMOLITION & NEW WORK - PLUMBING
TROUP ADMINISTRATION BUILDING - PARTIAL FIRST FLOOR PLAN -
PEABODY & TROUP BUILDINGS - FLOW DIAGRAM - HVAC
HORACE MANN BOND BUILIDING - FLOW DIAGRAM - HVACM401
M402
LEGEND - ELECTRICAL
Project No.: FVSUB 102025
10.15.2025 BID SET
Bond, Troup, Peabody Boiler Replacement
P:\25076\25076m001.dgn
DATE PLOTTED
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076m001.dgn
AS SHOWN
WSH
LTF
WSH
25076
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
P ro je c t
N o
F
V S
U B
B o n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
ID
S E
T
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
?F DEGREES FAHRENHEIT
?C DEGREES CENTIGRADE
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
SINGLE LINE DUCT LEGEND
DUCT (SUPPLY, RETURN & EXHAUST)
SUPPLY DUCT UP
SUPPLY DUCT DOWN
RETURN OR EXHAUST DUCT UP
RETURN OR EXHAUST DUCT DOWN
DUCT RISE
DUCT DOWN
VOLUME DAMPER (MANUAL UNLESS INDICATED A.V.D.)
TRANSITION
DUCT TAKE-OFF (SEE SPEC. PERTAINING TO DEFLECTROLS)
TRANSITION (FLAT ON TOP)
TRANSITION (FLAT ON BOTTOM)
TRANSITION (TOP OR BOTTOM ONLY)
SUPPLY CEILING DIFFUSER
RETURN OR EXHAUST CEILING GRILLE
SIDEWALL SUPPLY
SIDEWALL RETURN
FLEXIBLE CONNECTION (DUCT)
RELIEF AIR SUPPLY TO TOILET
DUCT SPLIT WITH SPLITTER DAMPER
FLEX. DUCT WITH SCREW ON COLLAR, TAKE-OFF
DUCT WITH DUCT LINER
SQUARE ELBOW WITH TURNING VANES
RADIUS ELBOW (SEE SPECS. PERTAINING TO TURNING VANES)
AUTOMATIC VOLUME DAMPER
DN
R
12\10 SPLIT
OR
OR
SCD
FOB
T OR B
RAS
AVD
FD/SCD
FD
SMOKE CONTROL DAMPER
COMBINATION FIRE/SMOKE CONTROL DAMPER
FIRE DAMPER (FD)
FIRE DAMPER
SPS
SD
COMBINATION STARTER
STARTER
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALL VALVE WITH
3/4" HOSE END
BALANCE VALVE
THREADED & FLANGED
GLOBE VALVE
CHECK VALVE
3-WAY MIXING VALVE
BALL VALVE
BUTTERFLY VALVE
SOLENOID VALVE
CONTROL VALVE
PLAN VIEW
2-WAY MOTORIZED VALVE
RELIEF VALVE
FLANGED UNION
BRANCH OUT TOP
STRAINER
BRANCH OUT BOTTOM
ELBOW DOWN
ELBOW UP
TEE OUT TOP
BLIND FLANGE
PIPE CAP
AUTOMATIC AIR VENTAAV
FLEX. PIPE CONN.
BACKFLOW PREVENTER
THERMOMETER
TEE OUT BOTTOM
MANUAL AIR VENT
PIPE TEST PLUG
HEATING WATER FLOW
COLD WATER DOMESTIC
NATURAL GAS
CONDENSER WATER FLOW
DRAIN
HEATING WATER RETURN
HOT WATER DOMESTIC
G
D
DUCT SIZE FIRST DIMENSION
IS SIDE SHOWN
24\12
DOOR GRILLE
REFERS TO DETAIL OR
PLAN ON SHEET M-1.THERMOSTAT
INTERVAL TIMER
T
I.T.
1\M-4
DUCT/PLENUM w/LINER
FIRE DAMPER
ELBOW WITH
TURNING VANES
FLEX. DUCT CONN.
TURNING VANES
ELBOW WITHOUT
ADJUSTABLE AIR
EXTRACTOR
INSULATED FLEX. DUCT
INSULATED FLEX. DUCT
c
ECCENTRIC REDUCER
HWS
HWR
SCHS
SCHR
CONDENSER WATER RETURN
CS
CR
STATIC PRESSURE SENSOR
SMOKE DETECTOR
POINT OF CONNECTION
DUCT SPLIT
THREADED & FLANGED
THREADED & FLANGED
UNION
GAUGE TAPPING
GAUGE WITH TAPPING
THREADED & FLANGED
THREADED & FLANGED
PIPE SOCKET WELL
FLOW INDICATOR BALANCER
M
T G THERMOSTAT w/GROUND
ANNULAR ELEMENT FLOW STATION
M
DAMPER - BLADE VIEW DAMPER - END VIEW
xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)
DOUBLE WALL INSULATED
ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}
CHILLED WATER FLOW
CHILLED WATER RETURN
CHS
CHR
WATER SUPPLY
SECONDARY CHILLED
WATER RETURN
SECONDARY CHILLED
CV
CVA
CONSTANT VOLUME
ADJUSTABLE
CONSTANT VOLUME
CFM
PRESSURE SENSOR
SUMMER WINTER
DESIGN CONDITIONS
OUTSIDE
INSIDE
95 F DB / 76 F WB 20 F DB
75 F DB / 55% RH 72 F DB
M001
SCHEDULE - HVAC
LEGENDS, &
ABBREVIATIONS,
MARK SERVICE
TYPE
PUMP
GPM APPROX.
FT.H O
MAX. MIN.
EFF.%
REMARKS
2 B&G(EA.) HP
MANUFACTURERS
PUMP SCHEDULE
PATTERSON TACO
MARK REMARKS
CONDENSING HOT WATER BOILER SCHEDULE
MBH
INPUT
BOILER
MBH
OUTPUT OPERATING
PRESSURE
GPM VOLT/PHASE
(PSI)
EFF. %
RPM
HP-T-2
HP-T-1
HP-P-2
HP-P-1
TROUP HW
TROUP HW
PEABODY HW
PEABODY HW
VIL
VIL
VIL
VIL
1.5
1.5
1.5x1.5x7C
1.5x1.5x7C
2x2x9.5C
2x2x9.5C
1.5x1.5x7.25
1.5x1.5x7.25
2x2x9.5
2x2x9.5
1.5x1.5x7.25
1.5x1.5x7.25
1.5x1.5x9
1.5x1.5x9
BLR-T-1
BLR-P-1
BLR-B-1
96.4
96..4
96.4
120/1
120/1
120/1
UNIT HEATER SCHEDULE
MARK GPM REMARKSTYPE
MBH
CAP.
CFM
NOM.
EAT EWT
P.D.
MAX.
UH-T-1
UH-B-1
HORIZONTAL
HORIZONTAL
1.7
1.7
0.5
0.5
TYPE CFM
S.P.
IN W.G.
MARK
MAX. MAX.
RPM O.V.
MOTOR
HP
REMARKS
FAN SCHEDULE
MIN.
FAN DIA.
(IN)
SF-P-1
DRIVE
TYPE
(FPM)
‚PWF DIRECT 250 0.25 20 698 1 1 1
P:\25076\25076mb201.dgn
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076mb201.dgn
AS SHOWN
WSH
LTF
WSH
25076
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T
01 1A
VAULT
MECHANICAL
01 1
MECHANICAL
ELEVATOR
TOILET
MEN'S
TOILET
WOMEN'S
EQUIPMENT
ELEVATOR
KITCHEN
LOUNGE
C O
R R
ID
O R
C O
R R
ID
O R
CORRIDOR
JAN.
STORAGE
01 1A
VAULT
MECHANICAL
01 1
MECHANICAL
ELEVATOR
TOILET
MEN'S
TOILET
WOMEN'S
EQUIPMENT
ELEVATOR
KITCHEN
LOUNGE
C O
R R
ID
O R
C O
R R
ID
O R
CORRIDOR
JAN.
STORAGE
T
BLB
BHB
BACKBOARD
TELEPHONE
PRESSURE REGULATOR
EXISTING GAS
G
HDB
4"HWR/S UP
2"
EXISTING ACP TO REMAIN
HWP-1 TO REMAIN
EXISTING HW PUMP
HWP-2 TO REMAIN
EXISTING HW PUMP
TO CHW
TO REMAIN
EXPANSION TANK
EXISTING CHW
PAD TO REMAIN
EXISTING CONCRETE
TO REMAIN
EXISTING HWP-1 VFD
TO REMAIN
EXISTING HWP-2 VFD
(BOND)
WH-2
MB201
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
NEW WORK - HVAC
DEMOLITION &
GROUND FLOOR PLAN -
BUILDING - PARTIAL
HORACE MANN BOND
PARTIAL GROUND FLOOR PLAN - NEW WORK - HVAC
HORACE MANN BOND BUILDING -
PARTIAL GROUND FLOOR PLAN - DEMOLITION - HVAC
HORACE MANN BOND BUILDING -
WH
T
BLB
BHB
BACKBOARD
TELEPHONE
BE REMOVED
BOILER TO
EXISTING
PRESSURE REGULATOR
EXISTING GAS
G
HDB
4"HWR/S UP
2"
2"
2"
EXISTING ACP TO REMAIN
HWP-1 TO REMAIN
EXISTING HW PUMP
HWP-2 TO REMAIN
EXISTING HW PUMP
MUW
WH FLUE
EXISTING
REMOVE
TO DOM. CW
TO CHW
TO REMAIN
EXPANSION TANK
EXISTING CHW
FEEDER
BYPASS CHEMICAL
REMOVE EXISTING
HW EXPANSION TANK
REMOVE EXISTING
PAD TO REMAIN
EXISTING CONCRETE
TO REMAIN
EXISTING HWP-1 VFD
TO REMAIN
EXISTING HWP-2 VFD
TO BE REMOVED
AIR SEPARATOR
EXISTING
GAS FIRED WATER HEATER
REMOVE EXISTING
8"{ BOILER FLUE
EXPANSION TANK
NEW HW
AIR SEPARATOR
NEW TANGENTIAL
2"
HWS
H W
S H
W R
HWR
HWS
BLR-B-1
H W
R
4"
2"
4"
NEW HW MUW
MUW
NEW CHW
FLUE CAP ON ROOF
EXISTING FLUE TO NEW
NEW 8"{ FLUE UP THRU
CW
TO DOM.
NOTES:(THIS SHEET ONLY)
BUTTERFLY VALVE AT PUMP DISCHARGE.
PROVIDE NEW FLEXIBLE PIPE CONNECTOR, CHECK VALVE, AND
BUTTERFLY VALVE AND FLEXIBLE PIPE CONNECTION IN VERTICAL.
ON INLET SIDE OF EXISTING PUMP. PROVIDE NEW
EXTEND HWR PIPING DOWN TO EXISTING SUCTION DIFFUSER2
4"
4"
4" 4"
ON ROOF
FLUE & FLUE CAP
REMOVE EXISTING
NEW
P:\25076\25076mp202.dgn
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076mp202.dgn
AS SHOWN
WSH
LTF
WSH
25076
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T
1B
1H
XT
AHU-1LDP
MDP
T
EXISTING
SD
2ND FLOOR TO 46/16
32/24 UP THRU
44/16 OPEN END w/ƒ" HARDWARE CLOTH w/BAL. DAMPER; COVER
EXISTING 60/18 OPENING
48/24 UP
AAVVENT
|400
EXISTING
F A
C P
FD
FD
FD
BD
C H
R
C H S
CP-PB-1
LEEVE SEALS
EXISTING PIPE
MAKE-UP
CW
EXISTING
PURGER
INLINE AIR
EXISTING
CHEMICAL FEEDER
EXISTING BYPASS
PLENUM
w/SHEETMETAL
INTAKE LOUVER
EXISTING 48/18 OA
AIR LOUVER TO REMAIN
EXISTING COMBUSTION
H W
R
H W
S
1B
1H
SCALE:
= 1'-0
4 0 2 4 8
XT
AHU-1LDP
MDP
T
EXISTING
SD
2ND FLOOR TO 46/16
32/24 UP THRU
44/16 OPEN END w/ƒ" HARDWARE CLOTH w/BAL. DAMPER; COVER
EXISTING 60/18 OPENING
48/24 UP
AAVVENT
|400
EXISTING
F A
C P
FD
FD
FD
BD
C H
R
C H S
CP-PB-1
LEEVE SEALS
EXISTING PIPE
MAKE-UP
CW
EXISTING
PURGER
INLINE AIR
EXISTING
CHEMICAL FEEDER
EXISTING BYPASS
PLENUM
w/SHEETMETAL
INTAKE LOUVER
EXISTING 48/18 OA
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
MP202
SCALE:
= 1'-0
4 0 2 4 8
PARTIAL FIRST FLOOR PLAN - DEMOLITION - HVAC
PEABODY TRADES BUILDING -
PARTIAL FIRST FLOOR PLAN - NEW WORK - HVAC
PEABODY TRADES BUILDING -
& NEW WORK - HVAC
DEMOLITION
FIRST FLOOR PLAN -
BUILDING - PARTIAL
PEABODY TRADES
J
EXISTING
REMOVE
BOILER
MUW
BOILER FLUE
REMOVE EXISTING
EXPANSION TANK
REMOVE EXISTING
STARTER & DISCONNECT
REMOVE EXISTING
AIR LOUVER TO REMAIN
EXISTING COMBUSTION
CONTROLS
REMOVE BOILER
CONCRETE PAD
CORRESPONDING
HW PUMP &
REMOVE EXISTING
H W
R
H W
S
CONCRETE PAD
REMOVE EXISTING
NEW
NEW
NEW
NEW
HP-P-1
HP-P-2
CHEMICAL FEEDER
NEW BYPASS
T
HP-P-2 VFD
HP-P-1 VFD
NEW
UH-P-1
NEW
ACP-P-1
M U
W
AIR SEPARATOR
NEW TANGENTIAL
EXPANSION TANK
NEW HW
BLR-P-1
CONCRETE PAD (TYPICAL)
3"3"
3"
6"{
NEW SF-P-1
NOTES:(THIS SHEET ONLY)
NEW FLUE CAP ON ROOF.
8"{ BOILER FLUE UP THRU EXISTING ROOF OPENING TO
6"{ COMBUSTION AIR INLET. TERMINATE WITH SCREENED OPENING.2
3"
3"
3"
NEW
SCALE:
= 1'-0
4 0 2 4 8
UH-2
UH-1
10/6
12/10 UP w/FD
10/10
50/30
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
SD
EXISTING
TO CHILLER
4" BELOW GRADE
TO CHILLER
4" BELOW GRADE
HP-1
1•"
2•"
EXISTING 50/22 SA
1 "
1•"
T
FACP
LDP LA
HA
MSG
RISERS UP
2•" HWR/S
3" CHR/S UP
AFMS TO REMAIN
EXISTING CONCRETE PAD
2•"
FILTER
COOLING COIL
FAN
AH-1
12/6
50/22
MAX OA AVD
60"x72" PLENUM
DN
CP-1
CP-2
4"
4" 4"
STARTERS
MUW
AIR PURGER
INLINE
36/30
FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - HVAC
TROUP ADMINISTRATION BUILDING -
SCALE:
= 1'-0
4 0 2 4 8
FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK - HVAC
TROUP ADMINISTRATION BUILDING -
NOTES:(THIS SHEET ONLY)
CHEMICAL FEEDER
EXISTING CH BYPASS
EXISTING
EXPANSION TANK
EXISTING CHW
CONCRETE PAD
EXISTING
EXISTING
EXISTING AFMS
OA AVD
EXISTING MIN.
AH-1-VFD
EXISTING
EXISTING
EXISTING
AH-1-ACP
EXISTING
EXISTING
MT203
NEW WORK - HVAC
ROOM - DEMOLITION &
PLAN - MECHANICAL
BUILDING - FIRST FLOOR
TROUP ADMINISTRATION
BLR-1
EXISTING
REMOVE
EXISTING
REMOVE
ROOM CONTROL PANEL
REMOVE EXISTING BOILER
EXPANSION TANK
REMOVE EXISTING
CHEMICAL FEEDER
HW BYPASS
REMOVE EXISTING
REMOVE EXISTING
TO REMAIN
CONCRETE PAD
EXISTING
HWR
HWS
HWS
HWR
H W
S
GAS FIRED WATER HEATER
REMOVE EXISTING
& REFRIGERATED DRYER
AIR COMPRESSOR
EXISTING CONTROL
REMOVE
& FLUE CAP ON ROOF
REMOVE EXISTING FLUE
CONCRETE PAD (TYPICAL)
AIR SEPARATOR
NEW TANGENTIAL
UH-T-1NEW
BLR-T-1
NEW
T
TO NEW FLUE CAP ON ROOF.
ROUTE NEW 8"{ BOILER FLUE UP THRU EXISTING CHASE
3"
HWR
H W
R
H W
S
3"3" HP-T-1
NEW
NEW
HP-T-2
CHEMICAL FEEDER
NEW BYPASS
NEW
1•"
EXPANSION TANK
NEW
3"
2•"
NEW
HP-T-1 VFD
NEW
HP-T-2 VFD
3" 3"
ACP-T-1
P:\25076\25076mt203.dgn
DATE PLOTTED
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076mt203.dgn
AS SHOWN
WSH
LTF
WSH
25076
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T
UH-2
10/6
12/10 UP w/FD
10/10
50/30
SD
EXISTING
TO CHILLER
4" BELOW GRADE
TO CHILLER
4" BELOW GRADE
EXISTING 50/22 SA
1•"
T
FACP
LDP LA
HA
MSG
RISERS UP
2•" HWR/S
3" CHR/S UP
AFMS TO REMAIN
EXISTING CONCRETE PAD
2•"
AH-1
12/6
50/22
MAX OA AVD
60"x72" PLENUM
DN
CP-1
CP-2
4"
4" 4"
STARTERS
MUW
AIR PURGER
INLINE
36/30
CHEMICAL FEEDER
EXISTING CH BYPASS
EXISTING
EXPANSION TANK
EXISTING CHW
CONCRETE PAD
EXISTING
EXISTING
EXISTING AFMS
OA AVD
EXISTING MIN.
AH-1-VFD
EXISTING
EXISTING
EXISTING
AH-1-ACP
EXISTING
EXISTING
TO REMAIN
CONCRETE PAD
EXISTING
HWR
HWS
(TROUP)
WH-1
P:\25076\25076m401.dgn
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076m401.dgn
AS SHOWN
WSH
LTF
WSH
25076
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T
NOT TO SCALE
VFD
VSD
VFD
VSD
TT
TT
TT
DP
AI
AI
AI
AI
FM
AI
AI DI AO DO
AI DI AO DO
VLV
AI AO
SOFTWAREINPUTSOUTPUTS
ACP
DDC PANEL
INPUT/OUTPUT
SUMMARIES
NOTES:
1. FAILURE MODES:
2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF
ELECTRIC POWER TO THE DDC PANEL.
L - LAST COMMAND
O - OPEN OR ON
C - CLOSE OR OFF
TAG
LOW WATER LEVEL
POINT DESCRIPTION
BOILER
TT-1
TT-2
HWR - (SYSTEM)
HWS - (SYSTEM)
DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP
FM-1 HEATING WATER FLOW METER
BYPASS VALVE
HP-1
HP-2
DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT.LOGS
S Y
S T
M
G R
A P
H
IC
D
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
O P
A
K E
U P
S E
T P
O
IN
T
J
U S
T
D
C
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
Y
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
H
IG
H
L
W
L
IM
IT
R U
N
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
A R
T
S T
O P
D A
Y
N
IG
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
N O
T E S
C U
R R
E
L A
Y
S P
E E
D
IN
D
IC
A T
IO
N
S P
E
N T
R O
L
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
O P
E R
A T
A T
U S
D
IF
F
P
R E S
S U
R E
K W
P R
E S
S U
R E
W A
T
F
O W
S T
E
O W
S T
A T
U S
D R
IV
E
S
T A
T U
S
T R
E
G
F A
IL
U
D E (S
T E S
A
N D
L
O
O
TEMPORARY BOILER
BLIND FLANGE FOR
TEMPORARY BOILER
BLIND FLANGE FOR
HWS
HWR HWR
HWS
BLR-1
NEW
BOILER
CONTROL
DRAIN w/HOSE END
CONNECTION (TYP) CONCRETE PAD
GAUGE
PRESSURE
AIR RELEASE TANK
ROUTE TO
FLOOR DRAIN
MIN. ACCEPTANCE VOLUME.
BLADDER
PURGE
VALVE
CHEMICAL FEED TANK
1"
1"
PUMP GAUGE (TYP)
1" TO DOMESTIC
WATER
MAKE-UP WATER STATION
ROUTE TO DRAIN
A.A.V.
BYPASS VALVE
CV= 15.0
TO HEATING
EQUIPMENT
COILS
TO HEATING
EQUIPMENT
COILS
VLV-1
DP-1
4"
4"
4"
4"
4"
4"
4"
4"
4"
4"
4" 4"
4"
4"
EXISTING
HP-2
EXISTING
HP-1
4" 4"
EXPANSION TANK, SET 35 PSIG
INITIAL FILL PRESSURE. 23 GAL.
60 GAL. MIN. TANK VOLUME
HEATING SYSTEM PUMP-VFD CONTROL (EXISTING)
HEATING SYSTEM PUMP-VFD CONTROL (EXISTING)
BLR-B-1
HORACE MANN BOND BUILIDING - FLOW DIAGRAM - HVAC
FLOW DIAGRAM - HVAC
BOND BUILIDING -
HORACE MANN
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
BOILER SYSTEM
HORACE MANN BOND BUILDING
M401
P:\25076\25076m402.dgn
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076m402.dgn
AS SHOWN
WSH
LTF
WSH
25076
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T
NOT TO SCALE
VFD
VSD
VFD
VSD
TT
TT
TT
DP
AI
AI
AI
AI
FM
AI
AI DI AO DO
AI DI AO DO
VLV
AI AO
SOFTWAREINPUTSOUTPUTS
ACP
DDC PANEL
INPUT/OUTPUT
SUMMARIES
NOTES:
1. FAILURE MODES:
2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF
ELECTRIC POWER TO THE DDC PANEL.
L - LAST COMMAND
O - OPEN OR ON
C - CLOSE OR OFF
TAG
LOW WATER LEVEL
POINT DESCRIPTION
BOILER
TT-1
TT-2
HWR - (SYSTEM)
HWS - (SYSTEM)
DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP
FM-1 HEATING WATER FLOW METER
BYPASS VALVE
DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT.LOGS
S Y
S T
A P
IC
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
K E
U P
S E
T P
O
J
U S
T
D
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
Y
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
H
IG
H
L
W
IT
R
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
A R
T
S T
O P
D A
Y
N
IG
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
N O
T E S
C U
R R
E
L A
Y
S P
E E
D
IN
D
IC
A T
IO
N
S P
E
N T
R O
L
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
O P
E R
A T
A T
U S
D
IF
F
P
R E S
S U
R E
K W
P R
E S
S U
R E
W A
T
O W
S T
E
O W
S T
A T
U S
D R
IV
E
S
T A
T U
S
T R
E
G
F A
IL
U
D E (S
T E S
A
N D
L
O
O
TEMPORARY BOILER
BLIND FLANGE FOR
TEMPORARY BOILER
BLIND FLANGE FOR
HWS
HWR HWR
HWS
BOILER
CONTROL
DRAIN w/HOSE END
CONNECTION (TYP) CONCRETE PAD
GAUGE
PRESSURE
AIR RELEASE TANK
ROUTE TO
FLOOR DRAIN
MIN. ACCEPTANCE VOLUME.
BLADDER
PURGE
VALVE
CHEMICAL FEED TANK
1"
1"
PUMP GAUGE (TYP)
1" TO DOMESTIC
WATER
MAKE-UP WATER STATION
ROUTE TO DRAIN
A.A.V.
BYPASS VALVE
CV= 15.0
TO HEATING
EQUIPMENT
COILS
TO HEATING
EQUIPMENT
COILS
VLV-1
DP-1
3"
3"
3"
3"
3"
3"
3"
3"
3"
3"
3" 3"
3"
3"
3" 3"
HEATING SYSTEM PUMP-VFD CONTROL (EXISTING)
HEATING SYSTEM PUMP-VFD CONTROL (EXISTING)
BLR-P-1/BLR-T-1
HP-P-1/HP-T-1
HP-P-2/HP-T-2
BLR-T-1
BLR-P-1
NEW
HP-P-1
HP-T-1
NEW
NEW
EXPANSION TANK, SET 30 PSIG
INITIAL FILL PRESSURE. 17 GAL.
50 GAL. MIN. TANK VOLUME
HP-P-2
HP-T-2
FLOW DIAGRAM - HVAC
BUILDINGS -
PEABODY & TROUP
PEABODY & TROUP BUILDINGS - FLOW DIAGRAM - HVAC
BOILER SYSTEM
PEABODY & TROUP BUILDINGS
M402
P:\25076\25076m501.dgn
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076m501.dgn
AS SHOWN
WSH
LTF
WSH
25076
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T
M501
BACKFLOW PREVENTER
1"1"
MAKE - UP WATER STATION
GAUGE COCK
ƒ"
PRESSURE REDUCING
VALVE. SET AT
1"
AIR GAP DRAIN
FITTING
1" ROUTE TO WALL, DOWN TO FLOOR, AND ALONG FLOOR
TO FLOOR DRAIN. SECURE TO FLOOR WITH STRAP TYPE
CLAMPS SAME MATERIAL AS PIPE.
PSI.
GAUGE
GATE VALVE
GATE VALVE
TO FILL POINT
OF SYSTEM
BALL VALVE
QUICK FILL
CONNECTION
TO DOMESTIC COLD
WATER SUPPLY
MAINS
BRANCH
TYPICAL DRAIN VALVE CONNECTION
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
ƒ" GATE VALVE
ADAPTER TO ƒ" HOSE THREAD
PROVIDE HOSE CAP NUT
NOTES:
DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.
2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
REDUCER
‚" COPPER TUBING
•" GATE VALVE
•" 4" NIPPLE
CIRCULATING WATER PIPING
NOTES:
1.
2.
VENT ALL HIGH POINTS AS INDICATED ABOVE.
IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
ELEVATION TYPICAL AIR VENT
TO SYSTEM
B -ƒ" TO DISCHARGE OF PUMP.
C -ƒ" TO SUCTION OF PUMP.
F - RISER CLAMP. WELD TO 2X3/4 " FLAT
OFFSET BRACKET TO WALL.
A - CHEMICAL FEEDER TANK.
D -ƒ" TO FLOOR DRAIN.
4"MIN.
WELD
BALL VALVES
E -‚" BALL VALVE FOR VENT.
BY-PASS CHEMICAL FEEDER
WALL
AS SYSTEM PIPE.
MANUAL AIR VENT
TERMINATE DRAIN WITH HOSE END
CONNECTION 18" ABOVE FLOOR.
WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE
CEILING. LOCATE VALVE AND TERMINATE DRAIN
HERE, UNLESS NOTED OTHERWISE AND POSITION
VALVE FOR VERTICAL DOWN DISCHARGE.
•" PIPE SAME MATERIAL
2•"
VERTICAL
PIPE
SUPPORT
WELDED PIPETHREADED / BRAISED
PIPING
BALL VALVE (EXPOSED) OR
GATE VALVE (CONCEALED)
ARRANGEMENT FOR LOCATIONS
WITH LIMITED CLEARANCE
6"MAX.
SERVICE TEE
ECCENTRIC REDUCER
•" STREET ELL.
AUTOMATIC AIR VENT
MAINS
•"X2" NIPPLE
„"MPT X ‚" FLARE ELL.
‚" COPPER TO FLOOR
DRAIN OR OUTSIDE
AS SHOWN.
AUTOMATIC AIR VENT
CONTROL VALVE
2" DIRT LEG
BALANCE VALVE
GATE VALVE
TEST PLUG (TYP.)
UNIONS
FLOOR & CEILING PLATES
UNIT HEATER PIPING
INSTALLATION NOTES
PROVIDE FOR EXPANSION IN RUNOUT.
LUBRICATE AS RECOMMENDED BY THE MANUFACTURER.
CLEAN CONSTRUCTION DIRT FROM UNIT COIL AND CASING.
ADJUST SUPPORT RODS SO THAT UNIT DOES NOT REST ON PIPING.
CHECK UNIT FOR LEAKS AND PLACE IN SERVICE.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1 1.
HWS HWR
H W
S
H W
R
DO NOT ALLOW PIPING TO EXTEND BELOW CASING.
INSTALL IN STRICT COMPLIANCE WITH MANUFACTURERS
INSTALLATION INSTRUCTIONS.
SUSPEND THE UNIT HEATER DEAD LEVEL BOTH VERTICALLY
AND HORIZONTALLY.
SUSPEND THE UNIT HEATER SO THAT IT MAY BE EASILY
DISCONNECTED AND REMOVED FOR SERVICE.
CHECK PROPELLER BLADES FOR BALANCE BY RUNNING FAN AND
CHECKING VIBRATION.
ADJUST PIPE HANGERS SO THAT PIPING DOES NOT REST ON
UNIT HEATER.
ANGLE EQUIPMENT SUPPORT
SPANNING STRUCTURAL MEMBERS
HANGER ROD - SEE SPECIFICATIONS
SECTION OF RIGID INSULATION
SPECIFIED INSULATION
PIPE
• ROUND BEARING PLATE
PLATE WASHER
CUT ROD ABOVE ANGLE LEG
1" MIN.
TRAPEZE HANGER
LONG LEG VERTICAL
SEE SPECIFICATIONS
DOUBLE HEX NUTS
TRAPEZE PIPE HANGER
TEST PLUG
STRAINER
CIRCUIT SETTER
CHECK VALVE
PIPES SUPPORT
PRESSURE GAUGE
GAUGE COCK
VERTICAL IN-LINE PUMP DETAIL
VERTICAL INLINE PUMP
NOT TO SCALE
ƒ" GATE VALVE W/
HOSE END ADAPTER (TYPICAL)
BALL OR BUTTERFLY VALVE
BUTTERFLY VALVE
IN CEILING AREAS
•"{ ALL THREAD HANGER RODS
NOT TO SCALE
NOT TO SCALE
E
FA
C B
D ƒ" GATE VALVE w/HOSE
END ADAPTER (TYPICAL)
TYPICAL PIPE OUT BOTTOM OF HYDRONIC MAINS
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE NOT TO SCALE
DETAILS - HVAC
P001
PLUMBING
NOTES, & DETAILS -
LEGEND, SCHEDULE,
ROOF DRAIN
CHECK VALVE
INCREASER
FLOOR DRAIN (FD)
CLEANOUT (CO) VENT THRU ROOF
SOIL , WASTE
VENT
G
GATE VALVE
GLOBE VALVE
UNION
HUB DRAIN
VALVE IN VALVE BOX
HIGH PRESSURE GAS
BELOW FLOOR
ABOVE CEILING
NOT TO SCALE
HPG
NTS
THRUST BLOCK
SD
EXISTING TO REMAIN
EXISTING TO BE REMOVED
LEGEND
BALL VALVE
SDO STORM DRAIN OVERFLOW
D CONDENSATE DRAIN
T
THERMOMETER
AQUASTAT
LIMIT OF DEMOLITION
BUILDING STORM DRAIN
N.F.W.H. NON-FREEZE WALL HYDRANT
ABOVE FINISHED GRADE
TEST PLUG
STRAINER
BALANCER (CIRCUIT SETTER)
FLOW INDICATOR
PRESSURE REDUCING VALVE
HOSE BIBB (HB)
SILL COCK (SC)
NEW TO EXISTING
POINT OF CONNECTION
HOSE BIBB
CHROME PLATED
COLD WATER
HOT WATER (120 )
HOT WATER RETURN
BF
AC
AFG
VTR
CPHB
WH'A' WATER HAMMER
ARRESTER; TYPE 'A'
GAS VALVE
BE BOTTOM ELEVATION
MPG MEDIUM PRESSURE GAS 2 PSI
GAS (LOW PRESSURE) 7"-11" WC
FIXTURES.
SEE ARCHITECTURAL PLANS FOR EXACT LOCATION OF ALL PLUMBING
ALL WATER PIPING SHALL BE RUN ABOVE CEILING UNLESS OTHERWISE
NOTED.
ALL VENTS THRU ROOF (VTR) SHALL BE OFFSET A MINIMUM OF 15'-0"
FROM ALL OUTSIDE INTAKES.
-5 PROVIDE HANGER ON ALL HORIZONTAL WATER PIPING INSIDE CHASES
COORDINATE PLUMBING PIPING WITH AIR CONDITIONING DUCTS, EQUIPMENT
AND ELECTRICAL CONDUIT.
GENERAL NOTES:
WITHIN 6" OF SPECIFIED WATER HAMMER ARRESTOR.
NOTE TO CONTRACTOR:
PROVIDE ACCESS TO THE CONCEALED UTILITY.
WORK OR CONNECTION, WITH THE EXCEPTION OF EXCAVATION OR OTHER WORK TO
PRIOR TO PURCHASING ANY MATERIALS OR PERFORMING ANY WORK, EXTENSION OF
TO CODE AND AS SHOWN. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES
NEW PIPES BEING ROUTED TO EXISTING UTILITIES CAN BE INSTALLED CONFORMING
FLUID BEING HANDLED AND INVERTS OF ALL EXISTING UTILITIES AND CONFIRM THAT
WHERE CONNECTING TO A UTILITY OR SERVICE, VERIFY LOCATION, SIZES, MATERIALS,
FIXTURES OR PERFORMING ANY WORK.
DEVIATIONS OR INCONSISTENCIES PRIOR TO PURCHASING OF ANY MATERIALS OR
OF ANY DEVIATIONS NOTED. THIS REVIEW IS INTENDED TO CONFIRM ANY
SCALE PLANS AND ELEVATIONS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT
SCHEDULE, PLUMBING FIXTURE SPECIFICATIONS, ARCHITECTURAL SMALL AND LARGE
THE PLUMBING SMALL AND LARGE SCALE PLANS, PLUMBING RISERS, PLUMBING
AS PART OF CONSTRUCTION QUALITY CONTROL, THE CONTRACTOR SHALL REVIEW
NOTE TO CONTRACTOR:
5"
WALL
WALL
1\4 OF PIPE SIZE
EXTENSION SPLIT PIPE CLAMP HANGER
NOT TO SCALE
NOM. SIZE THRU ƒ" 1
MAXIMUM PIPE\TUBING SUPPORT SPACING, FEET
1‚ 1• 2 2• 3 4 5 6 8 10 12 14 16 18 20 24
PIPE
TUBING
7 FT.
5 FT.
7 7 9
6 7 8 8 9
10 12 14 16 17 19 22 23 25 27 28 30 32
10 12 13 14 16
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
HANGER ROD
HANGER ROD
BAND
TRAPEZE HANGER FOR UP TO 1000 POUND UNIFORM LOAD
1" MAXIMUM
1-†" 12 GAUGE CHANNEL
OR 2" x 2" x ‚" ANGLE
INSULATION
WELD
SADDLE
•" DIAMETER HANGER RODS WITH
36" MAX. SPACING ON EACH CHANNEL
1 1
ADJUSTABLE ROLLER
HANGER TYPE 43
ADJUSTABLE CLEVIS
HANGER TYPE 1
INSULATION SHIELD
AT HANGER
INSULATION (VAPOR
BARRIER TYPE RE-
QUIRED FOR LOW
TEMPERATURE PIPE)
PROVIDE INSULATION
SHIELD AND INSERT
FOR ALL PIPING
8" MAXIMUM
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION. INSERT
BLOCKS UNDER INSULATION
SHIELD
PIPE HANGERS DETAIL
NOT TO SCALE
THERMOMETER
DRAIN VALVE
CHECK VALVE
THERMOMETER WELL
TR
T
T R
VALVE
CHECK
VALVE
CHECK
CONCRETE PAD
SPECIFICATIONS)
(REFER TO
WATER HEATER
VALVE
CHECK
PUMP
CIRCULATOR
AQUASTAT
NOT TO SCALE
(TYP.)
TEST PLUG
(WATER HEATER ONLY)NOTES:
PIPE FULL SIZE TO FLOOR DRAIN.
ASME PRESSURE/TEMPERATURE RELIEF VALVE.
THERMOMETER
2.1 GALLON THERMAL EXPANSION TANK; REFER
DRAIN VALVE
REFER TO SPECIFICATION FOR SPACING.
EXTENSION SPLIT PIPE CLAMP HANGER.(TYPICAL)
THERMOMETER WELL
T
THERMOSTATIC MIXING VALVE; SEE DETAIL.
VALVE
CHECK
VALVE
CHECK
CONCRETE PAD
SPECIFICATIONS)
(REFER TO
WATER HEATER
5 PIPE PER MANUFACTURER'S RECOMMENDATIONS.
NOT TO SCALE
(TYP.)
TEST PLUG
INLETS ƒ"; OUTLET ƒ".
TO SPECIFICATIONS.
(WATER HEATER ONLY)NOTES:
PIPE FULL SIZE TO FLOOR DRAIN.
ASME PRESSURE/TEMPERATURE RELIEF VALVE.
2.1 GALLON THERMAL EXPANSION TANK; REFER
REFER TO SPECIFICATION FOR SPACING.
EXTENSION SPLIT PIPE CLAMP HANGER.(TYPICAL)
THERMOSTATIC MIXING VALVE; SEE DETAIL.
5 PIPE PER MANUFACTURER'S RECOMMENDATIONS.
INLETS ƒ"; OUTLET ƒ".
TO SPECIFICATIONS.
TO THE BUILDING
HOT WATER SUPPLY
TO THE BUILDING
HOT WATER SUPPLY
WATER HEATER (WH-2 BOND) PIPING SCHEMATIC
WATER HEATER (WH-1 TROUP) PIPING SCHEMATIC
P:\25076\25076p001.dgn
DATE PLOTTED
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076p001.dgn
AS SHOWN
25076
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
WHD
WHD
WHD
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
P:\25076\25076pb201.dgn
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076pb201.dgn
AS SHOWN
25076
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
WHD
WHD
WHD
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T
01 1A
VAULT
MECHANICAL
01 1
MECHANICAL
ELEVATOR
TOILET
MEN'S
TOILET
WOMEN'S
EQUIPMENT
ELEVATOR
KITCHEN
LOUNGE
C O
R R
ID
O R
C O
R R
ID
O R
CORRIDOR
JAN.
STORAGE
01 1A
VAULT
MECHANICAL
01 1
MECHANICAL
ELEVATOR
TOILET
MEN'S
TOILET
WOMEN'S
EQUIPMENT
ELEVATOR
KITCHEN
LOUNGE
C O
R R
ID
O R
C O
R R
ID
O R
CORRIDOR
JAN.
STORAGE
T
BLB
BHB
HDB
G
EXISTING 2" GAS COCK BELOW GRADE
2" MED. PRESS. GAS CONNECTED TO
PRESSURE REGULATOR
EXISTING GAS
G
3"G
G
G G
PAD TO REMAIN
EXISTING CONCRETE
BACKBOARD
TELEPHONE
EXISTING ACP TO REMAIN
HWP-1 TO REMAIN
EXISTING HW PUMP
TO REMAIN
EXPANSION TANK
EXISTING CHW
TO REMAIN
EXISTING HWP-1 VFD
TO REMAIN
EXISTING HWP-2 VFD
4"HWR/S UP
HWP-2 TO REMAIN
EXISTING HW PUMP
PB201
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
T
BLB
BHB
HDB
G
EXISTING 2" GAS COCK BELOW GRADE
2" MED. PRESS. GAS CONNECTED TO
PRESSURE REGULATOR
EXISTING GAS
G
3"G
G
G G
2" GAS COCK
EXISTING BOILER PAD
1"G ON FLOOR AGAINST
G
1"G-UP ON WALL
G
G
PLUMBING
NEW WORK -
DEMOLITION &
GROUND FLOOR PLAN -
BUILDING - PARTIAL
HORACE MANN BOND
PARTIAL GROUND FLOOR PLAN - DEMOLITION - PLUMBING
HORACE MANN BOND BUILDING -
PARTIAL GROUND FLOOR PLAN - NEW WORK - PLUMBING
HORACE MANN BOND BUILDING -
WH
PAD TO REMAIN
EXISTING CONCRETE
BACKBOARD
TELEPHONE
EXISTING ACP TO REMAIN
HWP-1 TO REMAIN
EXISTING HW PUMP
TO REMAIN
EXPANSION TANK
EXISTING CHW
TO REMAIN
EXISTING HWP-1 VFD
TO REMAIN
EXISTING HWP-2 VFD
FEEDER
BYPASS CHEMICAL
REMOVE EXISTING
4"HWR/S UP
HWP-2 TO REMAIN
EXISTING HW PUMP
GAS PIPING
REMOVE EXISTING
GAS PIPING
REMOVE EXISTING
GAS PIPING
REMOVE EXISTING
WATER HEATER
GAS FIRED
REMOVE EXISTING
EX 3"G
EX 3"G
EX 3"G
EX 3"G
(BOND)
WH-2
NOTES:(THIS SHEET ONLY)
1 CONNECT NEW 3" GAS TO EXISTING 3" GAS COMING OUT OF THE TRENCH.
BOILER CONNECTION. CONNECT 3" GAS TO BOILER.
ROUTE NEW 3" GAS ACROSS THE EXISTING CONCRETE PAD TO THE NEW
WATER DISTRIBUTION PIPING.
HEATER AND THERMOSTATIC MIXING VALVE TO EXISTING HOT AND COLD
INSTALL NEW ELECTRIC WATER HEATER (WH-2 BOND). CONNECT NEW WATER
P:\25076\25076pp202.dgn
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076pp202.dgn
AS SHOWN
25076
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
WHD
WHD
WHD
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T
1B
1H
AHU-1LDP
MDP
T
EXISTING
F A
C P
CP-PB-1
EXISTING
1"
G
EXISTING DRIP LEG
EX 2"G
EX 2"G
1B
1H
SCALE:
= 1'-0
4 0 2 4 8
AHU-1LDP
MDP
T
EXISTING
F A
C P
CP-PB-1
EXISTING
PP202
SCALE:
= 1'-0
4 0 2 4 8 ƒ"
VALVE
CHECK
ƒ"
1"
PARTIAL FIRST FLOOR PLAN - DEMOLITION - PLUMBING
PEABODY TRADES BUILDING -
PARTIAL FIRST FLOOR PLAN - NEW WORK - PLUMBING
PEABODY TRADES BUILDING -
PLUMBING
& NEW WORK -
DEMOLITION
FIRST FLOOR PLAN -
BUILDING - PARTIAL
PEABODY TRADES
J
PAD TO BE REMOVED
EXISTING CONCRETE
TO BE REMOVED.
EXISTING BOILER
DISCONNECT TO BE REMOVED
EXISTING STARTER &
TO BE REMOVED
EXPANSION TANK
TO BE REMOVED
& CONCRETE PAD
EXISTING HW PUMP1
1"
1" 1" ƒ"
NOTES:(THIS SHEET ONLY)
1 REMOVE ALL EXISTING CPVC WATER PIPING IN BOILER ROOM.
REMOVE EXISTING WALL HYDRANT. 2
NEW PIPING THROUGH MECHANICAL ROOM.
CONNECT NEW 1" COLD WATER PIPING TO EXISTING MAIN. ROUTE4
PROVIDE NEW 1" COLD WATER FOR HVAC MAKE UP WATER STATION.5
PROVIDE NEW ƒ" NON-FREEZE WALL HYDRANT.
1"
G
REMOVE EXISTING GAS PIPING TO BOILER. EXISTING MAIN AND DRIP LEG IS TO REMAIN.
EXISTING DRIP LEG
EX 2"G
EX 2"G
7 CONNECT NEW 2" GAS TO EXISTING MAIN ROUTED ALONG WALL.
8 CONNECT NEW 2" GAS TO BOILER.
P:\25076\25076pt203.dgn
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076pt203.dgn
AS SHOWN
25076
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
WHD
WHD
WHD
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T
T
FACP
LDP LA
HA
MSG
2•"
G G
2•"
T
FACP
LDP LA
HA
MSG
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
PT203
NEW WORK - PLUMBING
DEMOLITION &
MECHANICAL ROOM -
FLOOR PLAN -
BUILDING - PARTIAL FIRST
TROUP ADMINISTRATION
PARTIAL FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK - PLUMBING
TROUP ADMINISTRATION BUILDING -
PARTIAL FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - PLUMBING
TROUP ADMINISTRATION BUILDING -
2•" ƒ"
G
G G
G
2•"
GAS FIRED WATER HEATER
REMOVE EXISTING
EXISTING
REMOVE
HP-1
BLR-1
EXISTING
REMOVE
NEW 8"{ BOILER FLUE UP
TO BE REMOVED
CONTROL PANEL
EXISTING BOILER
TO BE REMOVED
EXPANSION TANK
FEEDER TO BE REMOVED
BYPASS CHEMICAL
TO BE REMOVED
UNIT HEATER
TO BE REMOVED
AIR COMPRESSOR
(TROUP)
WH-1
NOTES:(THIS SHEET ONLY)
WATER DISTRIBUTION PIPING.
HEATER AND THERMOSTATIC MIXING VALVE TO EXISTING HOT AND COLD
INSTALL NEW ELECTRIC WATER HEATER (WH-2 BOND). CONNECT NEW WATER
REMOVE EXISTING GAS PIPING AS SHOWN TO BOILER AND WATER HEATER.
2•"G
G
CONNECT NEW 2•" GAS TO EXISTING 2•" GAS.
CONNECT 2•" GAS TO BOILER.
ROUTE NEW 2•" GAS TO THE NEW BOILER CONNECTION.
E001
PE
EWC
WP
F
T
M
JJ J
UI
CEILING MOUNTED FIXTURE
WALL MOUNTED FIXTURE
EXIT LIGHT (ARROWS AS SHOWN)
ELECTRICAL LEGEND
LIGHTING CONTROL
CEILING MOUNTED COMBINATION INFRARED/
EXTERIOR TYPE PHOTO ELECTRIC SWITCH
INFRARED OCCUPANCY SENSOR
WALL MOUNTED SWITCH
DIMMER SWITCH
THREE WAY SWITCH
SINGLE POLE SWITCH
RECEPTACLES
DUPLEX - NORMAL
GFI DUPLEX - NORMAL
FLOOR OUTLET DUPLEX - NORMAL
CEILING OUTLET DUPLEX - NORMAL
SPECIAL - TYPE NOTED OR SHOWN
CIRCUITS
HOMERUN- ONE ARROW PER CIRCUIT
CONNECTION TO EQUIPMENT
CAP
CONDUIT DOWN
CONDUIT UP
GENERAL EQUIPMENT
TRANSFORMER
DISCONNECT SWITCH: "F" IF FUSED
FRAME AMPS/POLES/NEMA TYPE
FUSE PER MANUFACTURERS RECOMMENDATIONS
ENCLOSED CIRCUIT BREAKER
MANUAL STARTER AND MOTOR RATED SWITCH
JUNCTION BOX - WALL/CEILING/FLOOR
SURGE SUPPRESSOR
BACKBOARD
FIRE PROTECTION EQUIPMENT
COMMUNICATIONS
F
VISUAL ALARM: CEILING/WALL
MANUAL PULL STATION
FIRE ALARM ANNUNCIATOR
FIRE ALARM PANEL
DUCT MOUNTED SMOKE DETECTOR
SMOKE DETECTOR: CEILING / WALL
HEAT DETECTOR: CEILING / WALL
WATER FLOW SWITCH
WATER TAMPER SWITCH
L
D
I
LOW VOLTAGE SWITCH
CEILING SPECIAL - TYPE NOTED OR SHOWN
WEATHER PROOF OUTLET (GFCI)
ELECTRIC WATER COOLER OUTLET (GFCI)
FACP
FAA
C
WF
VS
LED ON "NORMAL" POWER
WALL/CEILING RACEWAY
AUTO SHUT OFF
ULTRASONIC OCCUPANCY SENSOR AND RELAY - VACANCY
H HORIZONTALLY MOUNTED DUPLEX RECEPTACLE
K KEYED SWITCH
USB
TV TV DUPLEX
J-HOOK
R RELAY
S
TV
S
B
VOICE OUTLET, QUANTITY OF JACKS AS NOTED
DATA OUTLET, QUANTITY OF JACKS AS NOTED
FLOOR VOICE OUTLET, QUANTITY OF JACKS
AS NOTED
FLOOR DATA OUTLET, QUANTITY OF JACKS
AS NOTED
FLOOR COMBINATION VOICE/DATA OUTLET,
QUANTITY OF JACKS AS NOTED
BOX, STUB-UP, AND MODULAR PLATE W/ BLANKS
TELEVISION OUTLET
SPEAKER: CEILING/WALL
FIBER OUTLET
COMBINATION VOICE/DATA OUTLET, QUANTITY
OF VOICE/DATA JACKS AS NOTED
THREE WAY DIMMER SWITCH
FOUR WAY DIMMER SWITCH
DUPLEX WITH INTEGRAL USB
D4
D3
C
CEILING/WALL MOUNTED CAMERA LOCATION
AC ABOVE COUNTER COORDINATE WITH ARCHITECT
C
AUDIO/VISUAL ALARM: CEILING/WALL
SPEAKER/STROBE ALARM: CEILING/WALL
QUADRUPLEX - NORMAL
GFI QUADRUPLEX - NORMAL
FLOOR OUTLET QUADRUPLEX - NORMAL
DP INTERIOR DIMMING PHOTOCELL
LIGHTING FIXTURES (SYMBOLS VARY BASED ON FIXTURES TYPE)
CONDUIT CONCEALED IN CEILING OR WALL
CONDUIT IN GROUND, SLAB, OR UNDER FLOOR
CONDUIT EXPOSED
FLEXIBLE CONDUIT
SURFACE MOUNTED PANELBOARD
RECESSED PANELBOARD
L4 FOUR WAY LOW VOLTAGE SWITCH L2 TWO WAY LOW VOLTAGE SWITCH
ELECTRICAL
LEGEND -
P:\25076\25076e001.dgn
DATE PLOTTED
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076e001.dgn
AS SHOWN
TWT
TWT
25076
BCO
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
P:\25076\25076eb201.dgn
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076eb201.dgn
AS SHOWN
TWT
TWT
25076
BCO
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T
01 1A
VAULT
MECHANICAL
01 1
MECHANICAL
ELEVATOR
TOILET
MEN'S
TOILET
WOMEN'S
EQUIPMENT
ELEVATOR
KITCHEN
LOUNGE
C O
R R
ID
O R
C O
R R
ID
O R
CORRIDOR
JAN.
STORAGE
01 1A
VAULT
MECHANICAL
01 1
MECHANICAL
ELEVATOR
TOILET
MEN'S
TOILET
WOMEN'S
EQUIPMENT
ELEVATOR
KITCHEN
LOUNGE
C O
R R
ID
O R
C O
R R
ID
O R
CORRIDOR
JAN.
STORAGE
T
BLB
BHB
HDB
HWP-1 TO REMAIN
EXISTING HW PUMP
BACKBOARD
TELEPHONE
TO REMAIN
EXISTING HWP-1 VFD
TO REMAIN
EXISTING HWP-2 VFD
PAD TO REMAIN
EXISTING CONCRETE
EXISTING ACP TO REMAIN
PRESSURE REGULATOR
EXISTING GAS
G
HWP-2 TO REMAIN
EXISTING HW PUMP
BLR-B-1
NEW
(BOND)
WH-2
1 POST BID ADDENDUM #1 10/04/2024
EB201
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
T
BLB
BHB
HDB
PARTIAL GROUND FLOOR PLAN - DEMOLITION - HVAC POWER
HORACE MANN BOND BUILDING -
PARTIAL GROUND FLOOR PLAN - NEW WORK - HVAC POWER
HORACE MANN BOND BUILDING -
HVAC POWER
NEW WORK -
DEMOLITION &
GROUND FLOOR PLAN -
BUILDING - PARTIAL
HORACE MANN BOND
HWP-1 TO REMAIN
EXISTING HW PUMP
BACKBOARD
TELEPHONE
TO REMAIN
EXISTING HWP-1 VFD
TO REMAIN
EXISTING HWP-2 VFD
FEEDER
BYPASS CHEMICAL
REMOVE EXISTING
BE REMOVED
BOILER TO
EXISTING
PAD TO REMAIN
EXISTING CONCRETE
EXISTING ACP TO REMAIN
PRESSURE REGULATOR
EXISTING GAS
G
WH
GAS FIRED WATER HEATER
REMOVE EXISTING
HWP-2 TO REMAIN
EXISTING HW PUMP
GENERAL NOTES:(THIS SHEET ONLY)
CONDITIONS AT THE SITE MAY VARY.
NEITHER THE OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT" DOCUMENTS AND ACTUAL
DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED USING "AS-DESIGN" DOCUMENTS.
DEMOLITION/NEW WORK.
WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED TO COMPLETE THE
THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION/NEW WORK AND IN NO
COORDINATE DEMOLITION WORK WITH NEW WORK.
OR NEAR AREA REQUIRING WORK.
PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS, COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO
SURROUNDINGS.
BOXES. WHERE CONDUIT IN SLAB IS ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH EXISTING
TERMINATION. THERE SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK COVER FOR ANY ABANDONED
REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO LONGER BE IN USE TO THE POINT OF LAST
CIRCUITS ARE BEING REPLACED.
REUSE HOMERUN CONDUITS WHEREVER POSSIBLE. REPLACE BRANCH CIRCUIT CONDUCTORS WHERE ENTIRE
A
B
C
D
E
F
NOTES:(THIS SHEET ONLY)
EXISTING CONDUCTORS. CONDUITS CAN BE REUSED IF THEY ARE STILL VIABLE.
REMOVE ALL ELECTRICAL ASSOCIATED WITH BOILER BEING REMOVED. REMOVE ALL
ARE STILL VIABLE.
REMOVED. REMOVE ALL EXISTING CONDUCTORS. CONDUITS CAN BE REUSED IF THEY
REMOVE ALL ELECTRICAL ASSOCIATED WITH THE BYPASS CHEMICAL FEEDER BEING
ARE STILL VIABLE.
REMOVED. REMOVE ALL EXISTING CONDUCTORS. CONDUITS CAN BE REUSED IF THEY
REMOVE ALL ELECTRICAL ASSOCIATED WITH THE GAS FIRED WATER HEATER BEING
FINAL CONNECTIONS.
A NEW 30A/3P NON-FUSED DISCONNECT ADJACENT TO WATER HEATER. MAKE ALL
RATING. PROVIDE NEW 4#12 AWG COPPER CONDUCTORS IN ƒINCH CONDUIT. PROVIDE
WITH AVAILABLE SPACE. NEW CIRCUIT BREAKER SHALL MATCH EXISTING PANEL AIC
PROVIDE NEW 20A/3P CIRCUIT BREAKER IN NEAREST 480Y/277 VOLT PANELBOARD
PROVIDE 480 VOLT, 3 PHASE CIRCUIT TO NEW 9 KW ELECTRIC WATER HEATER.
ADJACENT TO BOILER. MAKE ALL FINAL CONNECTIONS.
20A/1P CIRCUIT BREAKER. PROVIDE NEW 30A/2P LOCKABLE NON-FUSED DISCONNECT
CONDUIT AS REQUIRED. PROVIDE NEW 3#12 AWG COPPER CONDUCTORS TO EXISTING
PROVIDE 120 VOLT POWER TO NEW GAS BOILER CONTROLS. EXTEND EXISTING
P:\25076\25076ep202.dgn
DGN FILE
15-OCT-2025
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\25076\25076ep202.dgn
AS SHOWN
TWT
TWT
25076
BCO
F o rt V a ll e y
S ta te
U n iv e rs it y
10.15.2025
EXPIRES: 06.30.2026
COA#PEF000774
NBP ENGINEERS, INC.
P ro je c t
N o
F
V S
U B n d T ro u p P e a b o d y
B o il e r
R e p la c e m e n t
S ta te
U n iv e rs it y
D ri v e F o rt V a ll e y G e o rg ia
T
1B
1H
XT
AHU-1LDP
MDP
T
EXISTING
EXISTING
F A
C P
CP-PB-1
EXISTING
CHEMICAL FEEDER
EXISTING BYPASS
INTAKE LOUVER
EXISTING 48/18 OA
EXISTING 60/18 OPENING
NEW
NEW
NEW
NEW
HP-P-1
HP-P-2
HP-P-2 VFD
HP-P-1 VFD
NEW
UH-P-1
NEW
ACP-P-1
BLR-P-1
NEW SF-P-1
NEW
1B
1H
SCALE:
= 1'-0
4 0 2 4 8
XT
AHU-1LDP
MDP
T
EXISTING
EXISTING
F A
C P
CP-PB-1
EXISTING
CHEMICAL FEEDER
EXISTING BYPASS
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
EP202
SCALE:
= 1'-0
4 0 2 4 8
PARTIAL FIRST FLOOR PLAN - DEMOLITION - HVAC POWER
PEABODY TRADES BUILDING -
PARTIAL FIRST FLOOR PLAN - NEW WORK - HVAC POWER
PEABODY TRADES BUILDING -
HVAC POWER
& NEW WORK -
DEMOLITION
FIRST FLOOR PLAN -
BUILDING - PARTIAL
PEABODY TRADES
ID-15
INTAKE LOUVER
EXISTING 48/18 OA
EXISTING 60/18 OPENING
CONTROLS
REMOVE BOILER
BOILER
EXISTING
REMOVE
STARTER & DISCONNECT
REMOVE EXISTING
CONCRETE PAD
CORRESPONDING
HW PUMP &
REMOVE EXISTING
J
GENERAL NOTES:(THIS SHEET ONLY)
CONDITIONS AT THE SITE MAY VARY.
NEITHER THE OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT" DOCUMENTS AND ACTUAL
DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED USING "AS-DESIGN" DOCUMENTS.
DEMOLITION/NEW WORK.
WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED TO COMPLETE THE
THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION/NEW WORK AND IN NO
COORDINATE DEMOLITION WORK WITH NEW WORK.
OR NEAR AREA REQUIRING WORK.
PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS, COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO
SURROUNDINGS.
BOXES. WHERE CONDUIT IN SLAB IS ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH EXISTING
TERMINATION. THERE SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK COVER FOR ANY ABANDONED
REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO LONGER BE IN USE TO THE POINT OF LAST
CIRCUITS ARE BEING REPLACED.
REUSE HOMERUN CONDUITS WHEREVER POSSIBLE. REPLACE BRANCH CIRCUIT CONDUCTORS WHERE ENTIRE
A
B
C
D
E
F
NOTES:(THIS SHEET ONLY)
EXISTING CONDUCTORS. CONDUITS CAN BE REUSED IF THEY ARE STILL VIABLE.
REMOVE ALL ELECTRICAL ASSOCIATED WITH BOILER BEING REMOVED. REMOVE ALL
THEY ARE STILL VIABLE.
REMOVED. REMOVE ALL EXISTING CONDUCTORS. CONDUITS CAN BE REUSED IF
REMOVE ALL ELECTRICAL ASSOCIATED WITH THE HEATING WATER PUMP BEING
ALL FINAL CONNECTIONS TO PUMP.
SHALL MATCH EXISTING PANEL AIC RATING. WIRE THROUGH VFD SHOWN AND MAKE
480Y/277 VOLT PANELBOARD WITH AVAILABLE SPACE. NEW CIRCUIT BREAKER
ROUTE NEW 4#12 AWG COPPER CONDUCTORS INƒINCH CONDUIT TO NEAREST
PROVIDE NEW 30A/3P FUSED DISCONNECT ON THE LINE SIDE OF THE NEW VFD.
PROVIDE 480 VOLT, 3 PHASE POWER TO NEW 1.5 HP HEATING WATER PUMP HP-P-1.
PUMP.
PANEL AIC RATING. WIRE THROUGH VFD SHOWN AND MAKE ALL FINAL CONNECTIONS TO
PANELBOARD WITH AVAILABLE SPACE. NEW CIRCUIT BREAKER SHALL MATCH EXISTING
NEW 4#12 AWG COPPER CONDUCTORS IN ƒINCH CONDUIT TO NEAREST 480Y/277 VOLT
PROVIDE NEW 30A/3P FUSED DISCONNECT ON THE LINE SIDE OF THE NEW VFD. ROUTE
PROVIDE 480 VOLT, 3 PHASE POWER TO NEW 1.5 HP HEATING WATER PUMP HP-P-2.
SWITCH AS THE LOCAL DISCONNECTING MEANS. MAKE ALL FINAL CONNECTIONS.
CIRCUIT BREAKER SHALL MATCH EXISTING PANEL AIC RATING. PROVIDE MOTOR RATED
CIRCUIT BREAKER IN NEAREST 208Y/120 VOLT PANELBOARD WITH AVAILABLE SPACE. NEW
PROVIDE 120 VOLT POWER TO NEW HYDRONIC UNIT HEATER UH-P-1. PROVIDE NEW 20A/1P
MAKE ALL FINAL CONNECTIONS.
BREAKER. PROVIDE NEW 30A/2P LOCKABLE NON-FUSED DISCONNECT ADJACENT TO BOILER.
AS REQUIRED. PROVIDE NEW 3#12 AWG COPPER CONDUCTORS TO EXISTING 20A/1P CIRCUIT
PROVIDE 120 VOLT POWER TO NEW GAS BOILER CONTROLS. EXTEND EXISTING CONDUIT
INCH CONDUIT BACK TO NEAREST DATA ROOM. MAKE ALL FINAL CONNECTIONS.
UTP DATA CABLE AND RJ45 DATA JACK ADJACENT TO ACP. ROUTE DATA CABLE IN ONE
208Y/120 VOLT PANELBOARD WITH AVAILABLE SPACE. PROVIDE CAT 6 UTP PLENUM RATED
COPPER CONDUCTORS IN ƒINCH CONDUIT. PROVIDE NEW 20A/1P CIRCUIT BREAKER IN NEAREST
PROVIDE 120 VOLT POWER TO NEW BUILDING AUTOMATION PANEL.