2025_10_15_FVSU_Bldgs_Boilers_BidSet_NBP.pdf

PDF 5 MB Posted

Attached to
FVSU Boiler Replacement-Bond, Troup, Peabody
Solicitation number
PE-53300-RFP-2026-000000056
Issued by
Paulding County, Georgia

About this file

This is a bid set document for Fort Valley State University (FVSU), located at 1005 State University Drive in Fort Valley, Georgia 31030, prepared by NBP Engineers, Inc. The project involves the replacement of boilers and related HVAC, plumbing, and electrical systems in three university buildings: Horace Mann Bond Building, Troup Administration Building, and Peabody Trades Building. The scope of work includes demolition of existing gas-fired boilers, water heaters, expansion tanks, and associated piping, along with installation of new condensing hot water boilers, heating water pumps with variable frequency drives (VFDs), air separators, expansion tanks, unit heaters, and supporting infrastructure. The project also requires new gas piping connections, electrical power distribution for boiler controls and HVAC equipment, and updates to the building automation system. The document includes detailed mechanical, plumbing, and electrical drawings with specifications for equipment schedules, including three new boilers (BLR-B-1, BLR-P-1, and BLR-T-1) with capacities ranging from 999 to 1250 MBH input, four heating water pumps with 1.5 to 3 horsepower ratings, and associated controls and monitoring systems.

The bid set, dated October 15, 2025, with an expiration date of June 30, 2026, includes comprehensive design documentation prepared under COA #PEF000774. Equipment specifications detail boiler operating pressures of 45 to 120 PSI, heating water flow rates of 45 to 120 GPM, and electrical ratings of 120/1-phase to support boiler operations and controls. The project requires coordination of new mechanical, plumbing, and electrical work with existing building systems, including protection and preservation of existing HVAC equipment, chilled water systems, and infrastructure that will remain in service. The design incorporates direct digital control (DDC) panels with building automation capabilities, pressure sensors, flow monitoring stations, and temperature controls for optimized system operation. Contractors are required to review architectural and engineering drawings in their entirety prior to bid submission and notify the architect of any conflicts or discrepancies between utility locations, pipe sizing, or system configurations indicated in the design documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF

DRAWINGS

PROJECT CONSULTANTS

NBP ENGINEERS, INC.

MACON, GEORGIA316 CORPORATE PARKWAY

NBP

ENGINEERS

CONSULTANTS

478-745-1691 www.nbpengineers.com

SHEET NO. TITLE

M001 ABBREVIATIONS, LEGENDS, & SCHEDULE - HVAC

M501 DETAILS - HVAC

E001

1005 State University Drive; Fort Valley, Georgia 31030

Fort Valley State University

MP202

MB201 HORACE MANN BOND BUILDING - PARTIAL GROUND FLOOR PLAN - DEMOLITION & NEW WORK - HVAC

MT203

MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC

TROUP ADMINISTRATION BUILDING - PARTIAL FIRST FLOOR PLAN -

EB201

EP202

ET203

DEMOLITION & NEW WORK - HVAC POWER

HORACE MANN BOND BUILDING - PARTIAL GROUND FLOOR PLAN -

MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC POWER

TROUP ADMINISTRATION BUILDING - PARTIAL FIRST FLOOR PLAN -

PEABODY TRADES BUILDING - PARTIAL FIRST FLOOR PLAN - DEMOLITION & NEW WORK - HVAC

DEMOLITION & NEW WORK - HVAC POWER

PEABODY TRADES BUILDING - PARTIAL FIRST FLOOR PLAN -

P001

PB201

PP202

PT203

LEGEND, SCHEDULE, NOTES, & DETAILS - PLUMBING

DEMOLITION & NEW WORK - PLUMBING

HORACE MANN BOND BUILDING - PARTIAL GROUND FLOOR PLAN -

DEMOLITION & NEW WORK - PLUMBING

PEABODY TRADES BUILDING - PARTIAL FIRST FLOOR PLAN -

MECHANICAL ROOM - DEMOLITION & NEW WORK - PLUMBING

TROUP ADMINISTRATION BUILDING - PARTIAL FIRST FLOOR PLAN -

PEABODY & TROUP BUILDINGS - FLOW DIAGRAM - HVAC

HORACE MANN BOND BUILIDING - FLOW DIAGRAM - HVACM401

M402

LEGEND - ELECTRICAL

Project No.: FVSUB 102025

10.15.2025 BID SET

Bond, Troup, Peabody Boiler Replacement

P:\25076\25076m001.dgn

DATE PLOTTED

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076m001.dgn

AS SHOWN

WSH

LTF

WSH

25076

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

P ro je c t

N o

F

V S

U B

B o n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

ID

S E

T

A COMPRESSED AIR

AAV AUTOMATIC AIR VENT

AF AIR FOIL

-AFF ABOVE FINISHED FLOOR

AV ACID VENT

AVD AUTOMATIC VOLUME DAMPER

AW ACID WASTE

-AC ABOVE CEILING

AH- AIR HANDLING UNIT

BBD BOILER BLOW DOWN

BE BOTTOM ELEVATION

BOL BOTTOM OF LINE (UNINSULATED)

BOD BOTTOM OF DUCT

BP- BOOSTER PUMP

BTUH BRITISH THERMAL UNIT PER HOUR

-BF BELOW FLOOR

BFP BACK FLOW PREVENTOR

C CONDUIT

CC COOLING COIL

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CR CONDENSER WATER RETURN

CS CONDENSER WATER SUPPLY

CW DOMESTIC COLD WATER

CAB CABINET FAN

CF CENTRIFICAL FAN

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CHEMICAL FEED TANK

CH CABINET HEATER

CHR CHILLER

CL CENTER LINE

CO CLEANOUT

CP CHILLER PUMP

CPHB CHROME PLATED HOSE BIBB

CT COOLING TOWER

CU COPPER

CV- CONVECTOR

Cv VALVE COEFFICIENT

D DRAIN

DDC DIRECT DIGITAL CONTROL

DHW DOMESTIC HOT WATER

DN DOWN

DP DIFFERENTIAL PRESSURE

DS DOWN SPOUT

DSO DOWN SPOUT OVER FLOW

DX DIRECT EXCHANGE

EAD EXHAUST AIR DAMPER

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB

EWB ENTERING WET BULB

ESP END SUCTION PUMP

ESP EXTERNAL STATIC PRESSURE

ELL ELBOW

ET EXPANSION TANK

EQT EQUIPMENT TRAP SET

EWT ENTERING WATER TEMPERATURE

EX EXPANSION TANK LINE

EXT EXTERNAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

F&BP FACE & BYPASS

FC FAN COIL UNIT

BPD BYPASS DAMPER

EAL EXHAUST AIR LOUVER

ECH ELECTRIC CABINET HEATER

ABBREVIATIONS

FD FLOOR DRAIN

FF FOULING FACTOR

FF- FLY FAN

FF FINISHED FLOOR

FF FINAL FILTER

FFM FIRE FLOW METER

FLEX FLEXIBLE

FM FIRE MAIN

FMS FLOW METER STATION

FOF FUEL OIL FLOW

FOR FUEL OIL RETURN

FOV FUEL OIL VENT

FOP FUEL OIL PUMP

FP FIRE PUMP

FP- FAN POWERED

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRT FLOW RATE TRANSMITTER

FT FEET

G LOW PRESSURE GAS

GA GAUGE

GPM GALLONS PER MINUTE

GT GREASE TRAP

GTH GRAND TOTAL HEAT

H HEIGHT

HC HEATING COIL

HB HOSE BIBB

HBT HORIZONTAL BLOW THROUGH

HD HUB DRAIN

HDT HORIZONTAL DRAW THROUGH

HP HORSEPOWER/HIGH PRESSURE

HPA HIGH PRESSURE AIR

HPG HIGH PRESSURE GAS

HPS HIGH PRESSURE STEAM

HPWS HEAT PUMP WATER SUPPLY

HPWR HEAT PUMP WATER RETURN

HSC HORIZONTAL SPLIT CASE

HWG HOT WATER GENERATOR

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

ILC IN-LINE CENTRIFICAL

IT INTERVAL TIMER

IN INCHES

INV INVERT

JB JUNCTION BOX

L LENGTH

LR LONG RADIUS

LAT LEAVING AIR TEMPERATURE

LCP LOCAL CONTROL PANEL

LDB LEAVING DRY BULB

LN LIQUID NITROGEN

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM

MAV MANUAL AIR VENT

MVD MANUAL VOLUME DAMPER

MAX MAXIMUM

MBH ONE THOUSAND BTUH PER HOUR

MCC MOTOR CONTROL CENTER

MIN MINIMUM

MH MAN HOLE

MP SUMP (MUD) PUMP

MPS MEDIUM PRESSURE STEAM

MPR MEDIUM PRESSURE RETURN

MTS MEDIUM TEMPERATURE SUPPLY

MTR MEDIUM TEMPERATURE RETURN

MUA MAKE-UP AIR

MUW MAKE-UP WATER

MZ MULTIZONE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTSIDE AIR DAMPER

ODT OUTDOOR TEMPERATURE

PC PUMP CONDENSATE

PD PRESSURE DROP

PRV PRESSURE REDUCING VALVE

PWF PROPELLER WALL FAN

R REFRIGERANT

RA RETURN AIR

RAD RETURN AIR DAMPER

RAS RELIEF AIR SUPPLY

RP RECIRCULATING PUMP

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

RD ROOF DRAIN

RV RELIEF VALVE

SR SHORT RADIUS

OAL OUTSIDE AIR LOUVER

SAN SANITARY SEWER

SC SILL COCK

SCD SMOKE DAMPER

SD STORM DRAIN

SD SMOKE DETECTOR

SF SQUARE FEET

SDO STORM DRAIN OVERFLOW

SHC SENSIBLE HEAT CAPACITY

SP STAND PIPE

SP SUMP PUMP

SPS STATIC PRESSURE SENSOR

STA STATION

TR TEMPERED WATER RETURN

UG UNDERGROUND

VAC VACUUM PIPING

VDT VERTICAL DRAW THROUGH

VTR VENT THROUGH ROOF

WB WET BULB

O2 OXYGEN

?F DEGREES FAHRENHEIT

?C DEGREES CENTIGRADE

WM WATER METER

WL WATER LINE

WH WATER HEATER

WG WATER GAUGE

W WIDTH

W WASTE

VT VERTICAL TURBINE

VFD VARIABLE FREQUENCY DRIVE

VB VACUUM BREAKER

VAV VARIABLE AIR VOLUME

V VENT

UC UNDERCUT (DOOR - 3/4")

V- VALVE

TOS TOP OF STRUCTURE

TB THRUST BLOCK

T TEMPERED WATER

STR STRAINER

SP STATIC PRESSURE

SP SPRINKLER PIPE

SG SPECIALTY GAS

EUH ELECTRIC UNIT HEATER

RECIRCULATING

DHR DOMESTIC HOT WATER

TRANSMITTER

DPT DIFFERENTIAL PRESSURE

PER MINUTE

SCIM STANDARD CUBIC INCHES

TEMPERATURE

SST SATURATED SUCTION

(UNINSULATED)

TE TOP ELEVATION

(TOWER) PUMP

TP CONDENSER WATER

FSD FIRE/SMOKE DAMPER

EA EXHAUST AIR

MA MIXED AIR

AE ADJUSTABLE AIR EXTRACTOR

RAO RETURN AIR OPENING

AD AREA DRAIN/ACCESS DOOR

SINGLE LINE DUCT LEGEND

DUCT (SUPPLY, RETURN & EXHAUST)

SUPPLY DUCT UP

SUPPLY DUCT DOWN

RETURN OR EXHAUST DUCT UP

RETURN OR EXHAUST DUCT DOWN

DUCT RISE

DUCT DOWN

VOLUME DAMPER (MANUAL UNLESS INDICATED A.V.D.)

TRANSITION

DUCT TAKE-OFF (SEE SPEC. PERTAINING TO DEFLECTROLS)

TRANSITION (FLAT ON TOP)

TRANSITION (FLAT ON BOTTOM)

TRANSITION (TOP OR BOTTOM ONLY)

SUPPLY CEILING DIFFUSER

RETURN OR EXHAUST CEILING GRILLE

SIDEWALL SUPPLY

SIDEWALL RETURN

FLEXIBLE CONNECTION (DUCT)

RELIEF AIR SUPPLY TO TOILET

DUCT SPLIT WITH SPLITTER DAMPER

FLEX. DUCT WITH SCREW ON COLLAR, TAKE-OFF

DUCT WITH DUCT LINER

SQUARE ELBOW WITH TURNING VANES

RADIUS ELBOW (SEE SPECS. PERTAINING TO TURNING VANES)

AUTOMATIC VOLUME DAMPER

DN

R

12\10 SPLIT

OR

OR

SCD

FOB

T OR B

RAS

AVD

FD/SCD

FD

SMOKE CONTROL DAMPER

COMBINATION FIRE/SMOKE CONTROL DAMPER

FIRE DAMPER (FD)

FIRE DAMPER

SPS

SD

COMBINATION STARTER

STARTER

PIPE SLEEVE

CONCENTRIC REDUCER

PIPE ANCHOR

HVAC LEGEND

BALL VALVE WITH

3/4" HOSE END

BALANCE VALVE

THREADED & FLANGED

GLOBE VALVE

CHECK VALVE

3-WAY MIXING VALVE

BALL VALVE

BUTTERFLY VALVE

SOLENOID VALVE

CONTROL VALVE

PLAN VIEW

2-WAY MOTORIZED VALVE

RELIEF VALVE

FLANGED UNION

BRANCH OUT TOP

STRAINER

BRANCH OUT BOTTOM

ELBOW DOWN

ELBOW UP

TEE OUT TOP

BLIND FLANGE

PIPE CAP

AUTOMATIC AIR VENTAAV

FLEX. PIPE CONN.

BACKFLOW PREVENTER

THERMOMETER

TEE OUT BOTTOM

MANUAL AIR VENT

PIPE TEST PLUG

HEATING WATER FLOW

COLD WATER DOMESTIC

NATURAL GAS

CONDENSER WATER FLOW

DRAIN

HEATING WATER RETURN

HOT WATER DOMESTIC

G

D

DUCT SIZE FIRST DIMENSION

IS SIDE SHOWN

24\12

DOOR GRILLE

REFERS TO DETAIL OR

PLAN ON SHEET M-1.THERMOSTAT

INTERVAL TIMER

T

I.T.

1\M-4

DUCT/PLENUM w/LINER

FIRE DAMPER

ELBOW WITH

TURNING VANES

FLEX. DUCT CONN.

TURNING VANES

ELBOW WITHOUT

ADJUSTABLE AIR

EXTRACTOR

INSULATED FLEX. DUCT

INSULATED FLEX. DUCT

c

ECCENTRIC REDUCER

HWS

HWR

SCHS

SCHR

CONDENSER WATER RETURN

CS

CR

STATIC PRESSURE SENSOR

SMOKE DETECTOR

POINT OF CONNECTION

DUCT SPLIT

THREADED & FLANGED

THREADED & FLANGED

UNION

GAUGE TAPPING

GAUGE WITH TAPPING

THREADED & FLANGED

THREADED & FLANGED

PIPE SOCKET WELL

FLOW INDICATOR BALANCER

M

T G THERMOSTAT w/GROUND

ANNULAR ELEMENT FLOW STATION

M

DAMPER - BLADE VIEW DAMPER - END VIEW

xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)

DOUBLE WALL INSULATED

ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}

CHILLED WATER FLOW

CHILLED WATER RETURN

CHS

CHR

WATER SUPPLY

SECONDARY CHILLED

WATER RETURN

SECONDARY CHILLED

CV

CVA

CONSTANT VOLUME

ADJUSTABLE

CONSTANT VOLUME

CFM

PRESSURE SENSOR

SUMMER WINTER

DESIGN CONDITIONS

OUTSIDE

INSIDE

95 F DB / 76 F WB 20 F DB

75 F DB / 55% RH 72 F DB

M001

SCHEDULE - HVAC

LEGENDS, &

ABBREVIATIONS,

MARK SERVICE

TYPE

PUMP

GPM APPROX.

FT.H O

MAX. MIN.

EFF.%

REMARKS

2 B&G(EA.) HP

MANUFACTURERS

PUMP SCHEDULE

PATTERSON TACO

MARK REMARKS

CONDENSING HOT WATER BOILER SCHEDULE

MBH

INPUT

BOILER

MBH

OUTPUT OPERATING

PRESSURE

GPM VOLT/PHASE

(PSI)

EFF. %

RPM

HP-T-2

HP-T-1

HP-P-2

HP-P-1

TROUP HW

TROUP HW

PEABODY HW

PEABODY HW

VIL

VIL

VIL

VIL

1.5

1.5

1.5x1.5x7C

1.5x1.5x7C

2x2x9.5C

2x2x9.5C

1.5x1.5x7.25

1.5x1.5x7.25

2x2x9.5

2x2x9.5

1.5x1.5x7.25

1.5x1.5x7.25

1.5x1.5x9

1.5x1.5x9

BLR-T-1

BLR-P-1

BLR-B-1

96.4

96..4

96.4

120/1

120/1

120/1

UNIT HEATER SCHEDULE

MARK GPM REMARKSTYPE

MBH

CAP.

CFM

NOM.

EAT EWT

P.D.

MAX.

UH-T-1

UH-B-1

HORIZONTAL

HORIZONTAL

1.7

1.7

0.5

0.5

TYPE CFM

S.P.

IN W.G.

MARK

MAX. MAX.

RPM O.V.

MOTOR

HP

REMARKS

FAN SCHEDULE

MIN.

FAN DIA.

(IN)

SF-P-1

DRIVE

TYPE

(FPM)

‚PWF DIRECT 250 0.25 20 698 1 1 1

P:\25076\25076mb201.dgn

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076mb201.dgn

AS SHOWN

WSH

LTF

WSH

25076

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T

01 1A

VAULT

MECHANICAL

01 1

MECHANICAL

ELEVATOR

TOILET

MEN'S

TOILET

WOMEN'S

EQUIPMENT

ELEVATOR

KITCHEN

LOUNGE

C O

R R

ID

O R

C O

R R

ID

O R

CORRIDOR

JAN.

STORAGE

01 1A

VAULT

MECHANICAL

01 1

MECHANICAL

ELEVATOR

TOILET

MEN'S

TOILET

WOMEN'S

EQUIPMENT

ELEVATOR

KITCHEN

LOUNGE

C O

R R

ID

O R

C O

R R

ID

O R

CORRIDOR

JAN.

STORAGE

T

BLB

BHB

BACKBOARD

TELEPHONE

PRESSURE REGULATOR

EXISTING GAS

G

HDB

4"HWR/S UP

2"

EXISTING ACP TO REMAIN

HWP-1 TO REMAIN

EXISTING HW PUMP

HWP-2 TO REMAIN

EXISTING HW PUMP

TO CHW

TO REMAIN

EXPANSION TANK

EXISTING CHW

PAD TO REMAIN

EXISTING CONCRETE

TO REMAIN

EXISTING HWP-1 VFD

TO REMAIN

EXISTING HWP-2 VFD

(BOND)

WH-2

MB201

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

NEW WORK - HVAC

DEMOLITION &

GROUND FLOOR PLAN -

BUILDING - PARTIAL

HORACE MANN BOND

PARTIAL GROUND FLOOR PLAN - NEW WORK - HVAC

HORACE MANN BOND BUILDING -

PARTIAL GROUND FLOOR PLAN - DEMOLITION - HVAC

HORACE MANN BOND BUILDING -

WH

T

BLB

BHB

BACKBOARD

TELEPHONE

BE REMOVED

BOILER TO

EXISTING

PRESSURE REGULATOR

EXISTING GAS

G

HDB

4"HWR/S UP

2"

2"

2"

EXISTING ACP TO REMAIN

HWP-1 TO REMAIN

EXISTING HW PUMP

HWP-2 TO REMAIN

EXISTING HW PUMP

MUW

WH FLUE

EXISTING

REMOVE

TO DOM. CW

TO CHW

TO REMAIN

EXPANSION TANK

EXISTING CHW

FEEDER

BYPASS CHEMICAL

REMOVE EXISTING

HW EXPANSION TANK

REMOVE EXISTING

PAD TO REMAIN

EXISTING CONCRETE

TO REMAIN

EXISTING HWP-1 VFD

TO REMAIN

EXISTING HWP-2 VFD

TO BE REMOVED

AIR SEPARATOR

EXISTING

GAS FIRED WATER HEATER

REMOVE EXISTING

8"{ BOILER FLUE

EXPANSION TANK

NEW HW

AIR SEPARATOR

NEW TANGENTIAL

2"

HWS

H W

S H

W R

HWR

HWS

BLR-B-1

H W

R

4"

2"

4"

NEW HW MUW

MUW

NEW CHW

FLUE CAP ON ROOF

EXISTING FLUE TO NEW

NEW 8"{ FLUE UP THRU

CW

TO DOM.

NOTES:(THIS SHEET ONLY)

BUTTERFLY VALVE AT PUMP DISCHARGE.

PROVIDE NEW FLEXIBLE PIPE CONNECTOR, CHECK VALVE, AND

BUTTERFLY VALVE AND FLEXIBLE PIPE CONNECTION IN VERTICAL.

ON INLET SIDE OF EXISTING PUMP. PROVIDE NEW

EXTEND HWR PIPING DOWN TO EXISTING SUCTION DIFFUSER2

4"

4"

4" 4"

ON ROOF

FLUE & FLUE CAP

REMOVE EXISTING

NEW

P:\25076\25076mp202.dgn

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076mp202.dgn

AS SHOWN

WSH

LTF

WSH

25076

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T

1B

1H

XT

AHU-1LDP

MDP

T

EXISTING

SD

2ND FLOOR TO 46/16

32/24 UP THRU

44/16 OPEN END w/ƒ" HARDWARE CLOTH w/BAL. DAMPER; COVER

EXISTING 60/18 OPENING

48/24 UP

AAVVENT

|400

EXISTING

F A

C P

FD

FD

FD

BD

C H

R

C H S

CP-PB-1

LEEVE SEALS

EXISTING PIPE

MAKE-UP

CW

EXISTING

PURGER

INLINE AIR

EXISTING

CHEMICAL FEEDER

EXISTING BYPASS

PLENUM

w/SHEETMETAL

INTAKE LOUVER

EXISTING 48/18 OA

AIR LOUVER TO REMAIN

EXISTING COMBUSTION

H W

R

H W

S

1B

1H

SCALE:

= 1'-0

4 0 2 4 8

XT

AHU-1LDP

MDP

T

EXISTING

SD

2ND FLOOR TO 46/16

32/24 UP THRU

44/16 OPEN END w/ƒ" HARDWARE CLOTH w/BAL. DAMPER; COVER

EXISTING 60/18 OPENING

48/24 UP

AAVVENT

|400

EXISTING

F A

C P

FD

FD

FD

BD

C H

R

C H S

CP-PB-1

LEEVE SEALS

EXISTING PIPE

MAKE-UP

CW

EXISTING

PURGER

INLINE AIR

EXISTING

CHEMICAL FEEDER

EXISTING BYPASS

PLENUM

w/SHEETMETAL

INTAKE LOUVER

EXISTING 48/18 OA

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

MP202

SCALE:

= 1'-0

4 0 2 4 8

PARTIAL FIRST FLOOR PLAN - DEMOLITION - HVAC

PEABODY TRADES BUILDING -

PARTIAL FIRST FLOOR PLAN - NEW WORK - HVAC

PEABODY TRADES BUILDING -

& NEW WORK - HVAC

DEMOLITION

FIRST FLOOR PLAN -

BUILDING - PARTIAL

PEABODY TRADES

J

EXISTING

REMOVE

BOILER

MUW

BOILER FLUE

REMOVE EXISTING

EXPANSION TANK

REMOVE EXISTING

STARTER & DISCONNECT

REMOVE EXISTING

AIR LOUVER TO REMAIN

EXISTING COMBUSTION

CONTROLS

REMOVE BOILER

CONCRETE PAD

CORRESPONDING

HW PUMP &

REMOVE EXISTING

H W

R

H W

S

CONCRETE PAD

REMOVE EXISTING

NEW

NEW

NEW

NEW

HP-P-1

HP-P-2

CHEMICAL FEEDER

NEW BYPASS

T

HP-P-2 VFD

HP-P-1 VFD

NEW

UH-P-1

NEW

ACP-P-1

M U

W

AIR SEPARATOR

NEW TANGENTIAL

EXPANSION TANK

NEW HW

BLR-P-1

CONCRETE PAD (TYPICAL)

3"3"

3"

6"{

NEW SF-P-1

NOTES:(THIS SHEET ONLY)

NEW FLUE CAP ON ROOF.

8"{ BOILER FLUE UP THRU EXISTING ROOF OPENING TO

6"{ COMBUSTION AIR INLET. TERMINATE WITH SCREENED OPENING.2

3"

3"

3"

NEW

SCALE:

= 1'-0

4 0 2 4 8

UH-2

UH-1

10/6

12/10 UP w/FD

10/10

50/30

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

SD

EXISTING

TO CHILLER

4" BELOW GRADE

TO CHILLER

4" BELOW GRADE

HP-1

1•"

2•"

EXISTING 50/22 SA

1 "

1•"

T

FACP

LDP LA

HA

MSG

RISERS UP

2•" HWR/S

3" CHR/S UP

AFMS TO REMAIN

EXISTING CONCRETE PAD

2•"

FILTER

COOLING COIL

FAN

AH-1

12/6

50/22

MAX OA AVD

60"x72" PLENUM

DN

CP-1

CP-2

4"

4" 4"

STARTERS

MUW

AIR PURGER

INLINE

36/30

FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - HVAC

TROUP ADMINISTRATION BUILDING -

SCALE:

= 1'-0

4 0 2 4 8

FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK - HVAC

TROUP ADMINISTRATION BUILDING -

NOTES:(THIS SHEET ONLY)

CHEMICAL FEEDER

EXISTING CH BYPASS

EXISTING

EXPANSION TANK

EXISTING CHW

CONCRETE PAD

EXISTING

EXISTING

EXISTING AFMS

OA AVD

EXISTING MIN.

AH-1-VFD

EXISTING

EXISTING

EXISTING

AH-1-ACP

EXISTING

EXISTING

MT203

NEW WORK - HVAC

ROOM - DEMOLITION &

PLAN - MECHANICAL

BUILDING - FIRST FLOOR

TROUP ADMINISTRATION

BLR-1

EXISTING

REMOVE

EXISTING

REMOVE

ROOM CONTROL PANEL

REMOVE EXISTING BOILER

EXPANSION TANK

REMOVE EXISTING

CHEMICAL FEEDER

HW BYPASS

REMOVE EXISTING

REMOVE EXISTING

TO REMAIN

CONCRETE PAD

EXISTING

HWR

HWS

HWS

HWR

H W

S

GAS FIRED WATER HEATER

REMOVE EXISTING

& REFRIGERATED DRYER

AIR COMPRESSOR

EXISTING CONTROL

REMOVE

& FLUE CAP ON ROOF

REMOVE EXISTING FLUE

CONCRETE PAD (TYPICAL)

AIR SEPARATOR

NEW TANGENTIAL

UH-T-1NEW

BLR-T-1

NEW

T

TO NEW FLUE CAP ON ROOF.

ROUTE NEW 8"{ BOILER FLUE UP THRU EXISTING CHASE

3"

HWR

H W

R

H W

S

3"3" HP-T-1

NEW

NEW

HP-T-2

CHEMICAL FEEDER

NEW BYPASS

NEW

1•"

EXPANSION TANK

NEW

3"

2•"

NEW

HP-T-1 VFD

NEW

HP-T-2 VFD

3" 3"

ACP-T-1

P:\25076\25076mt203.dgn

DATE PLOTTED

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076mt203.dgn

AS SHOWN

WSH

LTF

WSH

25076

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T

UH-2

10/6

12/10 UP w/FD

10/10

50/30

SD

EXISTING

TO CHILLER

4" BELOW GRADE

TO CHILLER

4" BELOW GRADE

EXISTING 50/22 SA

1•"

T

FACP

LDP LA

HA

MSG

RISERS UP

2•" HWR/S

3" CHR/S UP

AFMS TO REMAIN

EXISTING CONCRETE PAD

2•"

AH-1

12/6

50/22

MAX OA AVD

60"x72" PLENUM

DN

CP-1

CP-2

4"

4" 4"

STARTERS

MUW

AIR PURGER

INLINE

36/30

CHEMICAL FEEDER

EXISTING CH BYPASS

EXISTING

EXPANSION TANK

EXISTING CHW

CONCRETE PAD

EXISTING

EXISTING

EXISTING AFMS

OA AVD

EXISTING MIN.

AH-1-VFD

EXISTING

EXISTING

EXISTING

AH-1-ACP

EXISTING

EXISTING

TO REMAIN

CONCRETE PAD

EXISTING

HWR

HWS

(TROUP)

WH-1

P:\25076\25076m401.dgn

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076m401.dgn

AS SHOWN

WSH

LTF

WSH

25076

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T

NOT TO SCALE

VFD

VSD

VFD

VSD

TT

TT

TT

DP

AI

AI

AI

AI

FM

AI

AI DI AO DO

AI DI AO DO

VLV

AI AO

SOFTWAREINPUTSOUTPUTS

ACP

DDC PANEL

INPUT/OUTPUT

SUMMARIES

NOTES:

1. FAILURE MODES:

2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF

ELECTRIC POWER TO THE DDC PANEL.

L - LAST COMMAND

O - OPEN OR ON

C - CLOSE OR OFF

TAG

LOW WATER LEVEL

POINT DESCRIPTION

BOILER

TT-1

TT-2

HWR - (SYSTEM)

HWS - (SYSTEM)

DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP

FM-1 HEATING WATER FLOW METER

BYPASS VALVE

HP-1

HP-2

DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT.LOGS

S Y

S T

M

G R

A P

H

IC

D

IS

P L

A Y

S T

A R

T

S T

O P

E N

A B

L E

D

IS

A B

L E

O P

E N

C L

O S

E

S T

A R

T

S T

O P

A

K E

U P

S E

T P

O

IN

T

J

U S

T

D

C

N T

R O

L

D

IF

F E

R E

N T

IA

L

P

R E S

S U

R E

P R

E S

S U

R E

S

W

IT

C H

A U

X

IL

IA

Y

N T

A C

T

A L

A

N T

A C

T

T E

M P

E R

A T

U R

E

H

IG

H

L

W

L

IM

IT

R U

N

T A

L

IZ

A T

IO

N

P R

O P

O R

T

IO

N A

L

P R

O P

IN

T E

G R

A L

T

IM

E

S

C H

E D

U L

E

S

S

O P

T

IM

A R

T

S T

O P

D A

Y

N

IG

T B

A C

K

D E

M A

IT

C Y

C L

E

R E S

T

IM

IZ

A T

IO

N

E C

O N

O M

IZ

E R

N O

T E S

C U

R R

E

L A

Y

S P

E E

D

IN

D

IC

A T

IO

N

S P

E

N T

R O

L

P O

S

IT

IO

N

IN

D

IC

A T

IO

N

O P

E R

A T

A T

U S

D

IF

F

P

R E S

S U

R E

K W

P R

E S

S U

R E

W A

T

F

O W

S T

E

O W

S T

A T

U S

D R

IV

E

S

T A

T U

S

T R

E

G

F A

IL

U

D E (S

T E S

A

N D

L

O

O

TEMPORARY BOILER

BLIND FLANGE FOR

TEMPORARY BOILER

BLIND FLANGE FOR

HWS

HWR HWR

HWS

BLR-1

NEW

BOILER

CONTROL

DRAIN w/HOSE END

CONNECTION (TYP) CONCRETE PAD

GAUGE

PRESSURE

AIR RELEASE TANK

ROUTE TO

FLOOR DRAIN

MIN. ACCEPTANCE VOLUME.

BLADDER

PURGE

VALVE

CHEMICAL FEED TANK

1"

1"

PUMP GAUGE (TYP)

1" TO DOMESTIC

WATER

MAKE-UP WATER STATION

ROUTE TO DRAIN

A.A.V.

BYPASS VALVE

CV= 15.0

TO HEATING

EQUIPMENT

COILS

TO HEATING

EQUIPMENT

COILS

VLV-1

DP-1

4"

4"

4"

4"

4"

4"

4"

4"

4"

4"

4" 4"

4"

4"

EXISTING

HP-2

EXISTING

HP-1

4" 4"

EXPANSION TANK, SET 35 PSIG

INITIAL FILL PRESSURE. 23 GAL.

60 GAL. MIN. TANK VOLUME

HEATING SYSTEM PUMP-VFD CONTROL (EXISTING)

HEATING SYSTEM PUMP-VFD CONTROL (EXISTING)

BLR-B-1

HORACE MANN BOND BUILIDING - FLOW DIAGRAM - HVAC

FLOW DIAGRAM - HVAC

BOND BUILIDING -

HORACE MANN

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

BOILER SYSTEM

HORACE MANN BOND BUILDING

M401

P:\25076\25076m402.dgn

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076m402.dgn

AS SHOWN

WSH

LTF

WSH

25076

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T

NOT TO SCALE

VFD

VSD

VFD

VSD

TT

TT

TT

DP

AI

AI

AI

AI

FM

AI

AI DI AO DO

AI DI AO DO

VLV

AI AO

SOFTWAREINPUTSOUTPUTS

ACP

DDC PANEL

INPUT/OUTPUT

SUMMARIES

NOTES:

1. FAILURE MODES:

2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF

ELECTRIC POWER TO THE DDC PANEL.

L - LAST COMMAND

O - OPEN OR ON

C - CLOSE OR OFF

TAG

LOW WATER LEVEL

POINT DESCRIPTION

BOILER

TT-1

TT-2

HWR - (SYSTEM)

HWS - (SYSTEM)

DIFFERENTIAL PRESSURE SENSOR-BUILDING LOOP

FM-1 HEATING WATER FLOW METER

BYPASS VALVE

DIGITAL ANALOG DIGITAL ANALOG ALARM DDC ENERGY MGMT.LOGS

S Y

S T

A P

IC

IS

P L

A Y

S T

A R

T

S T

O P

E N

A B

L E

D

IS

A B

L E

O P

E N

C L

O S

E

S T

A R

T

S T

K E

U P

S E

T P

O

J

U S

T

D

N T

R O

L

D

IF

F E

R E

N T

IA

L

P

R E S

S U

R E

P R

E S

S U

R E

S

W

IT

C H

A U

X

IL

IA

Y

N T

A C

T

A L

A

N T

A C

T

T E

M P

E R

A T

U R

E

H

IG

H

L

W

IT

R

T A

L

IZ

A T

IO

N

P R

O P

O R

T

IO

N A

L

P R

O P

IN

T E

G R

A L

T

IM

E

S

C H

E D

U L

E

S

S

O P

T

IM

A R

T

S T

O P

D A

Y

N

IG

T B

A C

K

D E

M A

IT

C Y

C L

E

R E S

T

IM

IZ

A T

IO

N

E C

O N

O M

IZ

E R

N O

T E S

C U

R R

E

L A

Y

S P

E E

D

IN

D

IC

A T

IO

N

S P

E

N T

R O

L

P O

S

IT

IO

N

IN

D

IC

A T

IO

N

O P

E R

A T

A T

U S

D

IF

F

P

R E S

S U

R E

K W

P R

E S

S U

R E

W A

T

O W

S T

E

O W

S T

A T

U S

D R

IV

E

S

T A

T U

S

T R

E

G

F A

IL

U

D E (S

T E S

A

N D

L

O

O

TEMPORARY BOILER

BLIND FLANGE FOR

TEMPORARY BOILER

BLIND FLANGE FOR

HWS

HWR HWR

HWS

BOILER

CONTROL

DRAIN w/HOSE END

CONNECTION (TYP) CONCRETE PAD

GAUGE

PRESSURE

AIR RELEASE TANK

ROUTE TO

FLOOR DRAIN

MIN. ACCEPTANCE VOLUME.

BLADDER

PURGE

VALVE

CHEMICAL FEED TANK

1"

1"

PUMP GAUGE (TYP)

1" TO DOMESTIC

WATER

MAKE-UP WATER STATION

ROUTE TO DRAIN

A.A.V.

BYPASS VALVE

CV= 15.0

TO HEATING

EQUIPMENT

COILS

TO HEATING

EQUIPMENT

COILS

VLV-1

DP-1

3"

3"

3"

3"

3"

3"

3"

3"

3"

3"

3" 3"

3"

3"

3" 3"

HEATING SYSTEM PUMP-VFD CONTROL (EXISTING)

HEATING SYSTEM PUMP-VFD CONTROL (EXISTING)

BLR-P-1/BLR-T-1

HP-P-1/HP-T-1

HP-P-2/HP-T-2

BLR-T-1

BLR-P-1

NEW

HP-P-1

HP-T-1

NEW

NEW

EXPANSION TANK, SET 30 PSIG

INITIAL FILL PRESSURE. 17 GAL.

50 GAL. MIN. TANK VOLUME

HP-P-2

HP-T-2

FLOW DIAGRAM - HVAC

BUILDINGS -

PEABODY & TROUP

PEABODY & TROUP BUILDINGS - FLOW DIAGRAM - HVAC

BOILER SYSTEM

PEABODY & TROUP BUILDINGS

M402

P:\25076\25076m501.dgn

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076m501.dgn

AS SHOWN

WSH

LTF

WSH

25076

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T

M501

BACKFLOW PREVENTER

1"1"

MAKE - UP WATER STATION

GAUGE COCK

ƒ"

PRESSURE REDUCING

VALVE. SET AT

1"

AIR GAP DRAIN

FITTING

1" ROUTE TO WALL, DOWN TO FLOOR, AND ALONG FLOOR

TO FLOOR DRAIN. SECURE TO FLOOR WITH STRAP TYPE

CLAMPS SAME MATERIAL AS PIPE.

PSI.

GAUGE

GATE VALVE

GATE VALVE

TO FILL POINT

OF SYSTEM

BALL VALVE

QUICK FILL

CONNECTION

TO DOMESTIC COLD

WATER SUPPLY

MAINS

BRANCH

TYPICAL DRAIN VALVE CONNECTION

ELEVATION

THREADED PIPING

ELEVATION

WELDED PIPING

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

ƒ" GATE VALVE

ADAPTER TO ƒ" HOSE THREAD

PROVIDE HOSE CAP NUT

NOTES:

DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.

2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS

AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.

REDUCER

‚" COPPER TUBING

•" GATE VALVE

•" 4" NIPPLE

CIRCULATING WATER PIPING

NOTES:

1.

2.

VENT ALL HIGH POINTS AS INDICATED ABOVE.

IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.

ELEVATION TYPICAL AIR VENT

TO SYSTEM

B -ƒ" TO DISCHARGE OF PUMP.

C -ƒ" TO SUCTION OF PUMP.

F - RISER CLAMP. WELD TO 2X3/4 " FLAT

OFFSET BRACKET TO WALL.

A - CHEMICAL FEEDER TANK.

D -ƒ" TO FLOOR DRAIN.

4"MIN.

WELD

BALL VALVES

E -‚" BALL VALVE FOR VENT.

BY-PASS CHEMICAL FEEDER

WALL

AS SYSTEM PIPE.

MANUAL AIR VENT

TERMINATE DRAIN WITH HOSE END

CONNECTION 18" ABOVE FLOOR.

WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE

CEILING. LOCATE VALVE AND TERMINATE DRAIN

HERE, UNLESS NOTED OTHERWISE AND POSITION

VALVE FOR VERTICAL DOWN DISCHARGE.

•" PIPE SAME MATERIAL

2•"

VERTICAL

PIPE

SUPPORT

WELDED PIPETHREADED / BRAISED

PIPING

BALL VALVE (EXPOSED) OR

GATE VALVE (CONCEALED)

ARRANGEMENT FOR LOCATIONS

WITH LIMITED CLEARANCE

6"MAX.

SERVICE TEE

ECCENTRIC REDUCER

•" STREET ELL.

AUTOMATIC AIR VENT

MAINS

•"X2" NIPPLE

„"MPT X ‚" FLARE ELL.

‚" COPPER TO FLOOR

DRAIN OR OUTSIDE

AS SHOWN.

AUTOMATIC AIR VENT

CONTROL VALVE

2" DIRT LEG

BALANCE VALVE

GATE VALVE

TEST PLUG (TYP.)

UNIONS

FLOOR & CEILING PLATES

UNIT HEATER PIPING

INSTALLATION NOTES

PROVIDE FOR EXPANSION IN RUNOUT.

LUBRICATE AS RECOMMENDED BY THE MANUFACTURER.

CLEAN CONSTRUCTION DIRT FROM UNIT COIL AND CASING.

ADJUST SUPPORT RODS SO THAT UNIT DOES NOT REST ON PIPING.

CHECK UNIT FOR LEAKS AND PLACE IN SERVICE.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

1 1.

HWS HWR

H W

S

H W

R

DO NOT ALLOW PIPING TO EXTEND BELOW CASING.

INSTALL IN STRICT COMPLIANCE WITH MANUFACTURERS

INSTALLATION INSTRUCTIONS.

SUSPEND THE UNIT HEATER DEAD LEVEL BOTH VERTICALLY

AND HORIZONTALLY.

SUSPEND THE UNIT HEATER SO THAT IT MAY BE EASILY

DISCONNECTED AND REMOVED FOR SERVICE.

CHECK PROPELLER BLADES FOR BALANCE BY RUNNING FAN AND

CHECKING VIBRATION.

ADJUST PIPE HANGERS SO THAT PIPING DOES NOT REST ON

UNIT HEATER.

ANGLE EQUIPMENT SUPPORT

SPANNING STRUCTURAL MEMBERS

HANGER ROD - SEE SPECIFICATIONS

SECTION OF RIGID INSULATION

SPECIFIED INSULATION

PIPE

• ROUND BEARING PLATE

PLATE WASHER

CUT ROD ABOVE ANGLE LEG

1" MIN.

TRAPEZE HANGER

LONG LEG VERTICAL

SEE SPECIFICATIONS

DOUBLE HEX NUTS

TRAPEZE PIPE HANGER

TEST PLUG

STRAINER

CIRCUIT SETTER

CHECK VALVE

PIPES SUPPORT

PRESSURE GAUGE

GAUGE COCK

VERTICAL IN-LINE PUMP DETAIL

VERTICAL INLINE PUMP

NOT TO SCALE

ƒ" GATE VALVE W/

HOSE END ADAPTER (TYPICAL)

BALL OR BUTTERFLY VALVE

BUTTERFLY VALVE

IN CEILING AREAS

•"{ ALL THREAD HANGER RODS

NOT TO SCALE

NOT TO SCALE

E

FA

C B

D ƒ" GATE VALVE w/HOSE

END ADAPTER (TYPICAL)

TYPICAL PIPE OUT BOTTOM OF HYDRONIC MAINS

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

NOT TO SCALE NOT TO SCALE

DETAILS - HVAC

P001

PLUMBING

NOTES, & DETAILS -

LEGEND, SCHEDULE,

ROOF DRAIN

CHECK VALVE

INCREASER

FLOOR DRAIN (FD)

CLEANOUT (CO) VENT THRU ROOF

SOIL , WASTE

VENT

G

GATE VALVE

GLOBE VALVE

UNION

HUB DRAIN

VALVE IN VALVE BOX

HIGH PRESSURE GAS

BELOW FLOOR

ABOVE CEILING

NOT TO SCALE

HPG

NTS

THRUST BLOCK

SD

EXISTING TO REMAIN

EXISTING TO BE REMOVED

LEGEND

BALL VALVE

SDO STORM DRAIN OVERFLOW

D CONDENSATE DRAIN

T

THERMOMETER

AQUASTAT

LIMIT OF DEMOLITION

BUILDING STORM DRAIN

N.F.W.H. NON-FREEZE WALL HYDRANT

ABOVE FINISHED GRADE

TEST PLUG

STRAINER

BALANCER (CIRCUIT SETTER)

FLOW INDICATOR

PRESSURE REDUCING VALVE

HOSE BIBB (HB)

SILL COCK (SC)

NEW TO EXISTING

POINT OF CONNECTION

HOSE BIBB

CHROME PLATED

COLD WATER

HOT WATER (120 )

HOT WATER RETURN

BF

AC

AFG

VTR

CPHB

WH'A' WATER HAMMER

ARRESTER; TYPE 'A'

GAS VALVE

BE BOTTOM ELEVATION

MPG MEDIUM PRESSURE GAS 2 PSI

GAS (LOW PRESSURE) 7"-11" WC

FIXTURES.

SEE ARCHITECTURAL PLANS FOR EXACT LOCATION OF ALL PLUMBING

ALL WATER PIPING SHALL BE RUN ABOVE CEILING UNLESS OTHERWISE

NOTED.

ALL VENTS THRU ROOF (VTR) SHALL BE OFFSET A MINIMUM OF 15'-0"

FROM ALL OUTSIDE INTAKES.

-5 PROVIDE HANGER ON ALL HORIZONTAL WATER PIPING INSIDE CHASES

COORDINATE PLUMBING PIPING WITH AIR CONDITIONING DUCTS, EQUIPMENT

AND ELECTRICAL CONDUIT.

GENERAL NOTES:

WITHIN 6" OF SPECIFIED WATER HAMMER ARRESTOR.

NOTE TO CONTRACTOR:

PROVIDE ACCESS TO THE CONCEALED UTILITY.

WORK OR CONNECTION, WITH THE EXCEPTION OF EXCAVATION OR OTHER WORK TO

PRIOR TO PURCHASING ANY MATERIALS OR PERFORMING ANY WORK, EXTENSION OF

TO CODE AND AS SHOWN. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES

NEW PIPES BEING ROUTED TO EXISTING UTILITIES CAN BE INSTALLED CONFORMING

FLUID BEING HANDLED AND INVERTS OF ALL EXISTING UTILITIES AND CONFIRM THAT

WHERE CONNECTING TO A UTILITY OR SERVICE, VERIFY LOCATION, SIZES, MATERIALS,

FIXTURES OR PERFORMING ANY WORK.

DEVIATIONS OR INCONSISTENCIES PRIOR TO PURCHASING OF ANY MATERIALS OR

OF ANY DEVIATIONS NOTED. THIS REVIEW IS INTENDED TO CONFIRM ANY

SCALE PLANS AND ELEVATIONS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT

SCHEDULE, PLUMBING FIXTURE SPECIFICATIONS, ARCHITECTURAL SMALL AND LARGE

THE PLUMBING SMALL AND LARGE SCALE PLANS, PLUMBING RISERS, PLUMBING

AS PART OF CONSTRUCTION QUALITY CONTROL, THE CONTRACTOR SHALL REVIEW

NOTE TO CONTRACTOR:

5"

WALL

WALL

1\4 OF PIPE SIZE

EXTENSION SPLIT PIPE CLAMP HANGER

NOT TO SCALE

NOM. SIZE THRU ƒ" 1

MAXIMUM PIPE\TUBING SUPPORT SPACING, FEET

1‚ 1• 2 2• 3 4 5 6 8 10 12 14 16 18 20 24

PIPE

TUBING

7 FT.

5 FT.

7 7 9

6 7 8 8 9

10 12 14 16 17 19 22 23 25 27 28 30 32

10 12 13 14 16

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

HANGER ROD

HANGER ROD

BAND

TRAPEZE HANGER FOR UP TO 1000 POUND UNIFORM LOAD

1" MAXIMUM

1-†" 12 GAUGE CHANNEL

OR 2" x 2" x ‚" ANGLE

INSULATION

WELD

SADDLE

•" DIAMETER HANGER RODS WITH

36" MAX. SPACING ON EACH CHANNEL

1 1

ADJUSTABLE ROLLER

HANGER TYPE 43

ADJUSTABLE CLEVIS

HANGER TYPE 1

INSULATION SHIELD

AT HANGER

INSULATION (VAPOR

BARRIER TYPE RE-

QUIRED FOR LOW

TEMPERATURE PIPE)

PROVIDE INSULATION

SHIELD AND INSERT

FOR ALL PIPING

8" MAXIMUM

PROVIDE HIGH COMPRESSIVE

STRENGTH INSULATION. INSERT

BLOCKS UNDER INSULATION

SHIELD

PIPE HANGERS DETAIL

NOT TO SCALE

THERMOMETER

DRAIN VALVE

CHECK VALVE

THERMOMETER WELL

TR

T

T R

VALVE

CHECK

VALVE

CHECK

CONCRETE PAD

SPECIFICATIONS)

(REFER TO

WATER HEATER

VALVE

CHECK

PUMP

CIRCULATOR

AQUASTAT

NOT TO SCALE

(TYP.)

TEST PLUG

(WATER HEATER ONLY)NOTES:

PIPE FULL SIZE TO FLOOR DRAIN.

ASME PRESSURE/TEMPERATURE RELIEF VALVE.

THERMOMETER

2.1 GALLON THERMAL EXPANSION TANK; REFER

DRAIN VALVE

REFER TO SPECIFICATION FOR SPACING.

EXTENSION SPLIT PIPE CLAMP HANGER.(TYPICAL)

THERMOMETER WELL

T

THERMOSTATIC MIXING VALVE; SEE DETAIL.

VALVE

CHECK

VALVE

CHECK

CONCRETE PAD

SPECIFICATIONS)

(REFER TO

WATER HEATER

5 PIPE PER MANUFACTURER'S RECOMMENDATIONS.

NOT TO SCALE

(TYP.)

TEST PLUG

INLETS ƒ"; OUTLET ƒ".

TO SPECIFICATIONS.

(WATER HEATER ONLY)NOTES:

PIPE FULL SIZE TO FLOOR DRAIN.

ASME PRESSURE/TEMPERATURE RELIEF VALVE.

2.1 GALLON THERMAL EXPANSION TANK; REFER

REFER TO SPECIFICATION FOR SPACING.

EXTENSION SPLIT PIPE CLAMP HANGER.(TYPICAL)

THERMOSTATIC MIXING VALVE; SEE DETAIL.

5 PIPE PER MANUFACTURER'S RECOMMENDATIONS.

INLETS ƒ"; OUTLET ƒ".

TO SPECIFICATIONS.

TO THE BUILDING

HOT WATER SUPPLY

TO THE BUILDING

HOT WATER SUPPLY

WATER HEATER (WH-2 BOND) PIPING SCHEMATIC

WATER HEATER (WH-1 TROUP) PIPING SCHEMATIC

P:\25076\25076p001.dgn

DATE PLOTTED

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076p001.dgn

AS SHOWN

25076

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

WHD

WHD

WHD

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

P:\25076\25076pb201.dgn

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076pb201.dgn

AS SHOWN

25076

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

WHD

WHD

WHD

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T

01 1A

VAULT

MECHANICAL

01 1

MECHANICAL

ELEVATOR

TOILET

MEN'S

TOILET

WOMEN'S

EQUIPMENT

ELEVATOR

KITCHEN

LOUNGE

C O

R R

ID

O R

C O

R R

ID

O R

CORRIDOR

JAN.

STORAGE

01 1A

VAULT

MECHANICAL

01 1

MECHANICAL

ELEVATOR

TOILET

MEN'S

TOILET

WOMEN'S

EQUIPMENT

ELEVATOR

KITCHEN

LOUNGE

C O

R R

ID

O R

C O

R R

ID

O R

CORRIDOR

JAN.

STORAGE

T

BLB

BHB

HDB

G

EXISTING 2" GAS COCK BELOW GRADE

2" MED. PRESS. GAS CONNECTED TO

PRESSURE REGULATOR

EXISTING GAS

G

3"G

G

G G

PAD TO REMAIN

EXISTING CONCRETE

BACKBOARD

TELEPHONE

EXISTING ACP TO REMAIN

HWP-1 TO REMAIN

EXISTING HW PUMP

TO REMAIN

EXPANSION TANK

EXISTING CHW

TO REMAIN

EXISTING HWP-1 VFD

TO REMAIN

EXISTING HWP-2 VFD

4"HWR/S UP

HWP-2 TO REMAIN

EXISTING HW PUMP

PB201

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

T

BLB

BHB

HDB

G

EXISTING 2" GAS COCK BELOW GRADE

2" MED. PRESS. GAS CONNECTED TO

PRESSURE REGULATOR

EXISTING GAS

G

3"G

G

G G

2" GAS COCK

EXISTING BOILER PAD

1"G ON FLOOR AGAINST

G

1"G-UP ON WALL

G

G

PLUMBING

NEW WORK -

DEMOLITION &

GROUND FLOOR PLAN -

BUILDING - PARTIAL

HORACE MANN BOND

PARTIAL GROUND FLOOR PLAN - DEMOLITION - PLUMBING

HORACE MANN BOND BUILDING -

PARTIAL GROUND FLOOR PLAN - NEW WORK - PLUMBING

HORACE MANN BOND BUILDING -

WH

PAD TO REMAIN

EXISTING CONCRETE

BACKBOARD

TELEPHONE

EXISTING ACP TO REMAIN

HWP-1 TO REMAIN

EXISTING HW PUMP

TO REMAIN

EXPANSION TANK

EXISTING CHW

TO REMAIN

EXISTING HWP-1 VFD

TO REMAIN

EXISTING HWP-2 VFD

FEEDER

BYPASS CHEMICAL

REMOVE EXISTING

4"HWR/S UP

HWP-2 TO REMAIN

EXISTING HW PUMP

GAS PIPING

REMOVE EXISTING

GAS PIPING

REMOVE EXISTING

GAS PIPING

REMOVE EXISTING

WATER HEATER

GAS FIRED

REMOVE EXISTING

EX 3"G

EX 3"G

EX 3"G

EX 3"G

(BOND)

WH-2

NOTES:(THIS SHEET ONLY)

1 CONNECT NEW 3" GAS TO EXISTING 3" GAS COMING OUT OF THE TRENCH.

BOILER CONNECTION. CONNECT 3" GAS TO BOILER.

ROUTE NEW 3" GAS ACROSS THE EXISTING CONCRETE PAD TO THE NEW

WATER DISTRIBUTION PIPING.

HEATER AND THERMOSTATIC MIXING VALVE TO EXISTING HOT AND COLD

INSTALL NEW ELECTRIC WATER HEATER (WH-2 BOND). CONNECT NEW WATER

P:\25076\25076pp202.dgn

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076pp202.dgn

AS SHOWN

25076

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

WHD

WHD

WHD

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T

1B

1H

AHU-1LDP

MDP

T

EXISTING

F A

C P

CP-PB-1

EXISTING

1"

G

EXISTING DRIP LEG

EX 2"G

EX 2"G

1B

1H

SCALE:

= 1'-0

4 0 2 4 8

AHU-1LDP

MDP

T

EXISTING

F A

C P

CP-PB-1

EXISTING

PP202

SCALE:

= 1'-0

4 0 2 4 8 ƒ"

VALVE

CHECK

ƒ"

1"

PARTIAL FIRST FLOOR PLAN - DEMOLITION - PLUMBING

PEABODY TRADES BUILDING -

PARTIAL FIRST FLOOR PLAN - NEW WORK - PLUMBING

PEABODY TRADES BUILDING -

PLUMBING

& NEW WORK -

DEMOLITION

FIRST FLOOR PLAN -

BUILDING - PARTIAL

PEABODY TRADES

J

PAD TO BE REMOVED

EXISTING CONCRETE

TO BE REMOVED.

EXISTING BOILER

DISCONNECT TO BE REMOVED

EXISTING STARTER &

TO BE REMOVED

EXPANSION TANK

TO BE REMOVED

& CONCRETE PAD

EXISTING HW PUMP1

1"

1" 1" ƒ"

NOTES:(THIS SHEET ONLY)

1 REMOVE ALL EXISTING CPVC WATER PIPING IN BOILER ROOM.

REMOVE EXISTING WALL HYDRANT. 2

NEW PIPING THROUGH MECHANICAL ROOM.

CONNECT NEW 1" COLD WATER PIPING TO EXISTING MAIN. ROUTE4

PROVIDE NEW 1" COLD WATER FOR HVAC MAKE UP WATER STATION.5

PROVIDE NEW ƒ" NON-FREEZE WALL HYDRANT.

1"

G

REMOVE EXISTING GAS PIPING TO BOILER. EXISTING MAIN AND DRIP LEG IS TO REMAIN.

EXISTING DRIP LEG

EX 2"G

EX 2"G

7 CONNECT NEW 2" GAS TO EXISTING MAIN ROUTED ALONG WALL.

8 CONNECT NEW 2" GAS TO BOILER.

P:\25076\25076pt203.dgn

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076pt203.dgn

AS SHOWN

25076

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

WHD

WHD

WHD

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T

T

FACP

LDP LA

HA

MSG

2•"

G G

2•"

T

FACP

LDP LA

HA

MSG

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

PT203

NEW WORK - PLUMBING

DEMOLITION &

MECHANICAL ROOM -

FLOOR PLAN -

BUILDING - PARTIAL FIRST

TROUP ADMINISTRATION

PARTIAL FIRST FLOOR PLAN - MECHANICAL ROOM - NEW WORK - PLUMBING

TROUP ADMINISTRATION BUILDING -

PARTIAL FIRST FLOOR PLAN - MECHANICAL ROOM - DEMOLITION - PLUMBING

TROUP ADMINISTRATION BUILDING -

2•" ƒ"

G

G G

G

2•"

GAS FIRED WATER HEATER

REMOVE EXISTING

EXISTING

REMOVE

HP-1

BLR-1

EXISTING

REMOVE

NEW 8"{ BOILER FLUE UP

TO BE REMOVED

CONTROL PANEL

EXISTING BOILER

TO BE REMOVED

EXPANSION TANK

FEEDER TO BE REMOVED

BYPASS CHEMICAL

TO BE REMOVED

UNIT HEATER

TO BE REMOVED

AIR COMPRESSOR

(TROUP)

WH-1

NOTES:(THIS SHEET ONLY)

WATER DISTRIBUTION PIPING.

HEATER AND THERMOSTATIC MIXING VALVE TO EXISTING HOT AND COLD

INSTALL NEW ELECTRIC WATER HEATER (WH-2 BOND). CONNECT NEW WATER

REMOVE EXISTING GAS PIPING AS SHOWN TO BOILER AND WATER HEATER.

2•"G

G

CONNECT NEW 2•" GAS TO EXISTING 2•" GAS.

CONNECT 2•" GAS TO BOILER.

ROUTE NEW 2•" GAS TO THE NEW BOILER CONNECTION.

E001

PE

EWC

WP

F

T

M

JJ J

UI

CEILING MOUNTED FIXTURE

WALL MOUNTED FIXTURE

EXIT LIGHT (ARROWS AS SHOWN)

ELECTRICAL LEGEND

LIGHTING CONTROL

CEILING MOUNTED COMBINATION INFRARED/

EXTERIOR TYPE PHOTO ELECTRIC SWITCH

INFRARED OCCUPANCY SENSOR

WALL MOUNTED SWITCH

DIMMER SWITCH

THREE WAY SWITCH

SINGLE POLE SWITCH

RECEPTACLES

DUPLEX - NORMAL

GFI DUPLEX - NORMAL

FLOOR OUTLET DUPLEX - NORMAL

CEILING OUTLET DUPLEX - NORMAL

SPECIAL - TYPE NOTED OR SHOWN

CIRCUITS

HOMERUN- ONE ARROW PER CIRCUIT

CONNECTION TO EQUIPMENT

CAP

CONDUIT DOWN

CONDUIT UP

GENERAL EQUIPMENT

TRANSFORMER

DISCONNECT SWITCH: "F" IF FUSED

FRAME AMPS/POLES/NEMA TYPE

FUSE PER MANUFACTURERS RECOMMENDATIONS

ENCLOSED CIRCUIT BREAKER

MANUAL STARTER AND MOTOR RATED SWITCH

JUNCTION BOX - WALL/CEILING/FLOOR

SURGE SUPPRESSOR

BACKBOARD

FIRE PROTECTION EQUIPMENT

COMMUNICATIONS

F

VISUAL ALARM: CEILING/WALL

MANUAL PULL STATION

FIRE ALARM ANNUNCIATOR

FIRE ALARM PANEL

DUCT MOUNTED SMOKE DETECTOR

SMOKE DETECTOR: CEILING / WALL

HEAT DETECTOR: CEILING / WALL

WATER FLOW SWITCH

WATER TAMPER SWITCH

L

D

I

LOW VOLTAGE SWITCH

CEILING SPECIAL - TYPE NOTED OR SHOWN

WEATHER PROOF OUTLET (GFCI)

ELECTRIC WATER COOLER OUTLET (GFCI)

FACP

FAA

C

WF

VS

LED ON "NORMAL" POWER

WALL/CEILING RACEWAY

AUTO SHUT OFF

ULTRASONIC OCCUPANCY SENSOR AND RELAY - VACANCY

H HORIZONTALLY MOUNTED DUPLEX RECEPTACLE

K KEYED SWITCH

USB

TV TV DUPLEX

J-HOOK

R RELAY

S

TV

S

B

VOICE OUTLET, QUANTITY OF JACKS AS NOTED

DATA OUTLET, QUANTITY OF JACKS AS NOTED

FLOOR VOICE OUTLET, QUANTITY OF JACKS

AS NOTED

FLOOR DATA OUTLET, QUANTITY OF JACKS

AS NOTED

FLOOR COMBINATION VOICE/DATA OUTLET,

QUANTITY OF JACKS AS NOTED

BOX, STUB-UP, AND MODULAR PLATE W/ BLANKS

TELEVISION OUTLET

SPEAKER: CEILING/WALL

FIBER OUTLET

COMBINATION VOICE/DATA OUTLET, QUANTITY

OF VOICE/DATA JACKS AS NOTED

THREE WAY DIMMER SWITCH

FOUR WAY DIMMER SWITCH

DUPLEX WITH INTEGRAL USB

D4

D3

C

CEILING/WALL MOUNTED CAMERA LOCATION

AC ABOVE COUNTER COORDINATE WITH ARCHITECT

C

AUDIO/VISUAL ALARM: CEILING/WALL

SPEAKER/STROBE ALARM: CEILING/WALL

QUADRUPLEX - NORMAL

GFI QUADRUPLEX - NORMAL

FLOOR OUTLET QUADRUPLEX - NORMAL

DP INTERIOR DIMMING PHOTOCELL

LIGHTING FIXTURES (SYMBOLS VARY BASED ON FIXTURES TYPE)

CONDUIT CONCEALED IN CEILING OR WALL

CONDUIT IN GROUND, SLAB, OR UNDER FLOOR

CONDUIT EXPOSED

FLEXIBLE CONDUIT

SURFACE MOUNTED PANELBOARD

RECESSED PANELBOARD

L4 FOUR WAY LOW VOLTAGE SWITCH L2 TWO WAY LOW VOLTAGE SWITCH

ELECTRICAL

LEGEND -

P:\25076\25076e001.dgn

DATE PLOTTED

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076e001.dgn

AS SHOWN

TWT

TWT

25076

BCO

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

P:\25076\25076eb201.dgn

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076eb201.dgn

AS SHOWN

TWT

TWT

25076

BCO

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T

01 1A

VAULT

MECHANICAL

01 1

MECHANICAL

ELEVATOR

TOILET

MEN'S

TOILET

WOMEN'S

EQUIPMENT

ELEVATOR

KITCHEN

LOUNGE

C O

R R

ID

O R

C O

R R

ID

O R

CORRIDOR

JAN.

STORAGE

01 1A

VAULT

MECHANICAL

01 1

MECHANICAL

ELEVATOR

TOILET

MEN'S

TOILET

WOMEN'S

EQUIPMENT

ELEVATOR

KITCHEN

LOUNGE

C O

R R

ID

O R

C O

R R

ID

O R

CORRIDOR

JAN.

STORAGE

T

BLB

BHB

HDB

HWP-1 TO REMAIN

EXISTING HW PUMP

BACKBOARD

TELEPHONE

TO REMAIN

EXISTING HWP-1 VFD

TO REMAIN

EXISTING HWP-2 VFD

PAD TO REMAIN

EXISTING CONCRETE

EXISTING ACP TO REMAIN

PRESSURE REGULATOR

EXISTING GAS

G

HWP-2 TO REMAIN

EXISTING HW PUMP

BLR-B-1

NEW

(BOND)

WH-2

1 POST BID ADDENDUM #1 10/04/2024

EB201

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

T

BLB

BHB

HDB

PARTIAL GROUND FLOOR PLAN - DEMOLITION - HVAC POWER

HORACE MANN BOND BUILDING -

PARTIAL GROUND FLOOR PLAN - NEW WORK - HVAC POWER

HORACE MANN BOND BUILDING -

HVAC POWER

NEW WORK -

DEMOLITION &

GROUND FLOOR PLAN -

BUILDING - PARTIAL

HORACE MANN BOND

HWP-1 TO REMAIN

EXISTING HW PUMP

BACKBOARD

TELEPHONE

TO REMAIN

EXISTING HWP-1 VFD

TO REMAIN

EXISTING HWP-2 VFD

FEEDER

BYPASS CHEMICAL

REMOVE EXISTING

BE REMOVED

BOILER TO

EXISTING

PAD TO REMAIN

EXISTING CONCRETE

EXISTING ACP TO REMAIN

PRESSURE REGULATOR

EXISTING GAS

G

WH

GAS FIRED WATER HEATER

REMOVE EXISTING

HWP-2 TO REMAIN

EXISTING HW PUMP

GENERAL NOTES:(THIS SHEET ONLY)

CONDITIONS AT THE SITE MAY VARY.

NEITHER THE OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT" DOCUMENTS AND ACTUAL

DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED USING "AS-DESIGN" DOCUMENTS.

DEMOLITION/NEW WORK.

WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED TO COMPLETE THE

THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION/NEW WORK AND IN NO

COORDINATE DEMOLITION WORK WITH NEW WORK.

OR NEAR AREA REQUIRING WORK.

PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS, COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO

SURROUNDINGS.

BOXES. WHERE CONDUIT IN SLAB IS ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH EXISTING

TERMINATION. THERE SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK COVER FOR ANY ABANDONED

REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO LONGER BE IN USE TO THE POINT OF LAST

CIRCUITS ARE BEING REPLACED.

REUSE HOMERUN CONDUITS WHEREVER POSSIBLE. REPLACE BRANCH CIRCUIT CONDUCTORS WHERE ENTIRE

A

B

C

D

E

F

NOTES:(THIS SHEET ONLY)

EXISTING CONDUCTORS. CONDUITS CAN BE REUSED IF THEY ARE STILL VIABLE.

REMOVE ALL ELECTRICAL ASSOCIATED WITH BOILER BEING REMOVED. REMOVE ALL

ARE STILL VIABLE.

REMOVED. REMOVE ALL EXISTING CONDUCTORS. CONDUITS CAN BE REUSED IF THEY

REMOVE ALL ELECTRICAL ASSOCIATED WITH THE BYPASS CHEMICAL FEEDER BEING

ARE STILL VIABLE.

REMOVED. REMOVE ALL EXISTING CONDUCTORS. CONDUITS CAN BE REUSED IF THEY

REMOVE ALL ELECTRICAL ASSOCIATED WITH THE GAS FIRED WATER HEATER BEING

FINAL CONNECTIONS.

A NEW 30A/3P NON-FUSED DISCONNECT ADJACENT TO WATER HEATER. MAKE ALL

RATING. PROVIDE NEW 4#12 AWG COPPER CONDUCTORS IN ƒINCH CONDUIT. PROVIDE

WITH AVAILABLE SPACE. NEW CIRCUIT BREAKER SHALL MATCH EXISTING PANEL AIC

PROVIDE NEW 20A/3P CIRCUIT BREAKER IN NEAREST 480Y/277 VOLT PANELBOARD

PROVIDE 480 VOLT, 3 PHASE CIRCUIT TO NEW 9 KW ELECTRIC WATER HEATER.

ADJACENT TO BOILER. MAKE ALL FINAL CONNECTIONS.

20A/1P CIRCUIT BREAKER. PROVIDE NEW 30A/2P LOCKABLE NON-FUSED DISCONNECT

CONDUIT AS REQUIRED. PROVIDE NEW 3#12 AWG COPPER CONDUCTORS TO EXISTING

PROVIDE 120 VOLT POWER TO NEW GAS BOILER CONTROLS. EXTEND EXISTING

P:\25076\25076ep202.dgn

DGN FILE

15-OCT-2025

SEAL

SCALE:

FILE PATH:

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\25076\25076ep202.dgn

AS SHOWN

TWT

TWT

25076

BCO

F o rt V a ll e y

S ta te

U n iv e rs it y

10.15.2025

EXPIRES: 06.30.2026

COA#PEF000774

NBP ENGINEERS, INC.

P ro je c t

N o

F

V S

U B n d T ro u p P e a b o d y

B o il e r

R e p la c e m e n t

S ta te

U n iv e rs it y

D ri v e F o rt V a ll e y G e o rg ia

T

1B

1H

XT

AHU-1LDP

MDP

T

EXISTING

EXISTING

F A

C P

CP-PB-1

EXISTING

CHEMICAL FEEDER

EXISTING BYPASS

INTAKE LOUVER

EXISTING 48/18 OA

EXISTING 60/18 OPENING

NEW

NEW

NEW

NEW

HP-P-1

HP-P-2

HP-P-2 VFD

HP-P-1 VFD

NEW

UH-P-1

NEW

ACP-P-1

BLR-P-1

NEW SF-P-1

NEW

1B

1H

SCALE:

= 1'-0

4 0 2 4 8

XT

AHU-1LDP

MDP

T

EXISTING

EXISTING

F A

C P

CP-PB-1

EXISTING

CHEMICAL FEEDER

EXISTING BYPASS

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

EP202

SCALE:

= 1'-0

4 0 2 4 8

PARTIAL FIRST FLOOR PLAN - DEMOLITION - HVAC POWER

PEABODY TRADES BUILDING -

PARTIAL FIRST FLOOR PLAN - NEW WORK - HVAC POWER

PEABODY TRADES BUILDING -

HVAC POWER

& NEW WORK -

DEMOLITION

FIRST FLOOR PLAN -

BUILDING - PARTIAL

PEABODY TRADES

ID-15

INTAKE LOUVER

EXISTING 48/18 OA

EXISTING 60/18 OPENING

CONTROLS

REMOVE BOILER

BOILER

EXISTING

REMOVE

STARTER & DISCONNECT

REMOVE EXISTING

CONCRETE PAD

CORRESPONDING

HW PUMP &

REMOVE EXISTING

J

GENERAL NOTES:(THIS SHEET ONLY)

CONDITIONS AT THE SITE MAY VARY.

NEITHER THE OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT" DOCUMENTS AND ACTUAL

DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE BEEN PREPARED USING "AS-DESIGN" DOCUMENTS.

DEMOLITION/NEW WORK.

WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED TO COMPLETE THE

THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL SCOPE OF DEMOLITION/NEW WORK AND IN NO

COORDINATE DEMOLITION WORK WITH NEW WORK.

OR NEAR AREA REQUIRING WORK.

PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS, COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO

SURROUNDINGS.

BOXES. WHERE CONDUIT IN SLAB IS ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH EXISTING

TERMINATION. THERE SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK COVER FOR ANY ABANDONED

REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO LONGER BE IN USE TO THE POINT OF LAST

CIRCUITS ARE BEING REPLACED.

REUSE HOMERUN CONDUITS WHEREVER POSSIBLE. REPLACE BRANCH CIRCUIT CONDUCTORS WHERE ENTIRE

A

B

C

D

E

F

NOTES:(THIS SHEET ONLY)

EXISTING CONDUCTORS. CONDUITS CAN BE REUSED IF THEY ARE STILL VIABLE.

REMOVE ALL ELECTRICAL ASSOCIATED WITH BOILER BEING REMOVED. REMOVE ALL

THEY ARE STILL VIABLE.

REMOVED. REMOVE ALL EXISTING CONDUCTORS. CONDUITS CAN BE REUSED IF

REMOVE ALL ELECTRICAL ASSOCIATED WITH THE HEATING WATER PUMP BEING

ALL FINAL CONNECTIONS TO PUMP.

SHALL MATCH EXISTING PANEL AIC RATING. WIRE THROUGH VFD SHOWN AND MAKE

480Y/277 VOLT PANELBOARD WITH AVAILABLE SPACE. NEW CIRCUIT BREAKER

ROUTE NEW 4#12 AWG COPPER CONDUCTORS INƒINCH CONDUIT TO NEAREST

PROVIDE NEW 30A/3P FUSED DISCONNECT ON THE LINE SIDE OF THE NEW VFD.

PROVIDE 480 VOLT, 3 PHASE POWER TO NEW 1.5 HP HEATING WATER PUMP HP-P-1.

PUMP.

PANEL AIC RATING. WIRE THROUGH VFD SHOWN AND MAKE ALL FINAL CONNECTIONS TO

PANELBOARD WITH AVAILABLE SPACE. NEW CIRCUIT BREAKER SHALL MATCH EXISTING

NEW 4#12 AWG COPPER CONDUCTORS IN ƒINCH CONDUIT TO NEAREST 480Y/277 VOLT

PROVIDE NEW 30A/3P FUSED DISCONNECT ON THE LINE SIDE OF THE NEW VFD. ROUTE

PROVIDE 480 VOLT, 3 PHASE POWER TO NEW 1.5 HP HEATING WATER PUMP HP-P-2.

SWITCH AS THE LOCAL DISCONNECTING MEANS. MAKE ALL FINAL CONNECTIONS.

CIRCUIT BREAKER SHALL MATCH EXISTING PANEL AIC RATING. PROVIDE MOTOR RATED

CIRCUIT BREAKER IN NEAREST 208Y/120 VOLT PANELBOARD WITH AVAILABLE SPACE. NEW

PROVIDE 120 VOLT POWER TO NEW HYDRONIC UNIT HEATER UH-P-1. PROVIDE NEW 20A/1P

MAKE ALL FINAL CONNECTIONS.

BREAKER. PROVIDE NEW 30A/2P LOCKABLE NON-FUSED DISCONNECT ADJACENT TO BOILER.

AS REQUIRED. PROVIDE NEW 3#12 AWG COPPER CONDUCTORS TO EXISTING 20A/1P CIRCUIT

PROVIDE 120 VOLT POWER TO NEW GAS BOILER CONTROLS. EXTEND EXISTING CONDUIT

INCH CONDUIT BACK TO NEAREST DATA ROOM. MAKE ALL FINAL CONNECTIONS.

UTP DATA CABLE AND RJ45 DATA JACK ADJACENT TO ACP. ROUTE DATA CABLE IN ONE

208Y/120 VOLT PANELBOARD WITH AVAILABLE SPACE. PROVIDE CAT 6 UTP PLENUM RATED

COPPER CONDUCTORS IN ƒINCH CONDUIT. PROVIDE NEW 20A/1P CIRCUIT BREAKER IN NEAREST

PROVIDE 120 VOLT POWER TO NEW BUILDING AUTOMATION PANEL.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .