This document is Addendum #1 for Request for Bid (RFB) #13-25 issued by the Morris County Park Commission for the installation of IP-based CCTV cameras at three park locations. The bid opening is scheduled for 2:00 p.m. on Tuesday, April 15, 2025. The addendum addresses several bidder questions, including clarifications about Public Works Contractor Registration, system compatibility requirements, and documentation requirements. The Park Commission is seeking a comprehensive CCTV system installation that maintains 100% feature compatibility with existing Hanwha CCTV systems, and bidders are allowed to propose alternative solutions with detailed explanations.
The addendum provides critical guidance for potential bidders, including mandatory documentation requirements such as Stockholder Disclosure Certification, Non-Collusion Affidavit, and Business Registration Certificates. Bidders must submit three references for similar projects and complete a detailed questionnaire. The solicitation requires Public Works Contractor Registration Certificates for both the primary bidder and any subcontractors. Site visits are permitted without appointment, though access is restricted to areas open to the general public. The contract term is anticipated to be one year, with potential for two additional one-year renewals, subject to Park Commission discretion and fund availability.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Morris County Park Commission 300 Mendham Road
P.O. Box 1295 Morristown, New Jersey 07962-1295
ADDENDUM #1
To: All Bidders
From: Mark Demareski, Qualified Purchasing Agent
Date: April 4, 2025
Re: REQUEST FOR BID #13-25
INSTALLATION OF IP BASED CCTV CAMERAS TO EXISTING
SURVEILLANCE SYSTEMS AT THREE PARK COMMISSION LOCATIONS
The Bid Opening time is to 2:00 p.m. on Tuesday April 15, 2025
Question: 1) I see on page 8 that we are required to register with the Public Works Contractor Registration?
Answer: 1) Your company needs to be registered and have from your company a PW Contractor Registration Certificate to be submitted with your bid.
Question: 2) Would you accept another similar CCTV system?
Answer: 2) The MCPC is looking to have 100% feature compatibility and for the benefit of servicing the entire CCTV equipment at each location it would impractical to allow “or equivalent”.
The Morris County Park Commission is open to other solutions that meet the expectations set forth in the RFB. Provide a description of an equivalent on page Exception to Specifications and attach any other information as an attachment. (See attached Exceptions to Specifications)
Question: 3) On pages 5 & 6 it states that a Consent of Surety and a Bid Bond should be submitted with the bid. However, on page 28 (Bid Document Checklist) they are not checked off as a requirement.
Answer: 3) See attached updated Bid Document Checklist
ADDENDUM #1 - Continued
Question: 4) I do not see where it states that three references were required yet on page 28 it shows that they are required. Usually, a form is with the bid to record the information for the references.
Answer: 4) See attached updated Bid Document Checklist and Bidder Questionnaire
Question: 5) How are we to determine the proper mounts and accessories needed for proper installation?
Are you able to send us pictures of the proposed camera locations? Or can site visits be arranged?
Answer: 5) Pictures will not be provided. Sites may be visited without appointment but access to these locations are dependent as to where the general public is allowed.
Question: 6) My question would then be how are we to determine the miscellaneous materials needed for proper install (i.e. Conduit, specific mount selection, etc.)? Can photos be provided of the intended camera locations? Approximately how far is each cable run? Which (if any) proposed camera locations do not currently have a camera there now?
Answer: 6) Pictures will not be provided. Sites may be visited without appointment but access to these locations are dependent as to where the general public is allowed. All locations have existing Hanwha CCTV systems but all cameras quoted for this bid will be new.
Bidders are requested to confirm receipt of the facsimile transmission of this addendum and to return a signed copy of this Addendum with their proposal. FAILURE TO INCLUDE A COPY
OF THIS SIGNATURE ACKNOWLEDGEMENT PAGE SHALL BE DEEMED A FATAL
DEFECT AND YOUR RFB WILL BE REJECTED.
SIGNATURE: The undersigned hereby acknowledges and has submitted the above listed addendum.
Name of Firm:
Signature:
Printed Name and Title:
Date:
MORRIS COUNTY PARK COMMISSION
BID DOCUMENT CHECKLIST
CONTRACT #13-25
INSTALLATION OF IP BASED CCTV CAMERAS TO EXISTING SURVEILLANCE SYSTEMS
AT THREE PARK COMMISSION LOCATIONS
Required With Bid
Read, Signed & Submitted
Bidder’s Initial
A. FAILURE TO SUBMIT ANY OF THESE ITEMS IS MANDATORY CAUSE FOR
REJECTION OF BID
Stockholder Disclosure Certification Non-Collusion Affidavit Required Evidence EEO/Affirmative Action Compliance Notice Acknowledgement of Receipt of Addenda (To be Completed if Addenda are Issued) Bid Guarantee (bid bond or certified/cashier’s check) (with Power of Attorney for full amount of Bid Bond) Consent of Surety (Certificate from Surety company) Disclosure of Investment Activities in Iran Certification of Non-Involvement in Prohibiting Activities in Russia or Belarus A listing of Subcontractors Performance Bond Payment Bond Maintenance Bond
B. MANDATORY ITEM(S), REQUIRED NO LATER THAN TIME PERIOD INDICATED
Business Registration Certificate – Bidder, (Preferred with response, but effective at contract award) Business Registration Certificate – Designated Subcontractor(s), (Preferred with response, but effective at contract award) Public Works Contractor Registration Certificate(s) for the Bidder and Designated Subcontractors (Preferred with response, but effective at contract award)
(3) References for similar Projects/Bidder Questionnaire
D. READ ONLY
Americans With Disability Act of 1990 Language
E. OTHER ITEM(S)
License(s) or Certification(s) Required by the Specifications W9
This checklist is provided for bidder’s use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications.
Name of Bidder: Date:
By Authorized Representative:
Signature:
Print Name & Title:
BIDDER QUESTIONAIRE
CONTRACT #13-25
INSTALLATION OF IP BASED CCTV CAMERAS TO EXISTING SURVEILLANCE
SYSTEMS AT THREE PARK COMMISSION LOCATIONS
MORRIS COUNTY PARK COMMISSION
List three (3) completed CONTRACT exemplary of those described within the specifications.
CONTRACT #1
Company Name:
Address:
Type:
Contract Amount:
Date Started and Ended or Ongoing:
Reference:
(Name and Title)
(Email and Phone Number)
CONTRACT #2
Company Name:
Address:
Type:
Contract Amount:
Date Started and Ended or Ongoing:
Reference:
(Name and Title)
(Email and Phone Number)
BIDDER QUESTIONNAIRE - (Continued)
CONTRACT #3
Company Name:
Address:
Type:
Contract Amount:
Date Started and Ended or Ongoing:
Reference:
(Name and Title)
(Email and Phone Number)
1. Have you ever done business under a different name: YES _______ NO _______ (If yes, provide letter with detailed summary)
2. Where you ever been asked to vacate a premise prior to the service term expiration? YES _______ NO _______ (If yes, provide letter with detailed summary)
3. Have you ever worked for the Morris County Park Commission or County of Morris?
YES _______ NO _______ (If yes, provide letter with detailed summary)
4. Have you ever worked as a Contractor for any other Commission or County agency previously?
YES _______ NO _______ (If yes, provide letter with detailed summary)
Name of Company: _____________________________________ Date: __________________
By Authorized Representative:
Signature: _____________________________________ Print Name: _____________________________________
MORRIS COUNTY PARK COMMISSION
EXCEPTIONS TO SPECIFICATIONS
CONTRACT #13-25
INSTALLATION OF IP BASED CCTV CAMERAS TO EXISTING SURVEILLANCE
SYSTEMS AT THREE PARK COMMISSION LOCATIONS
None
Exceptions as listed below:
Name of Bidder: Date:
By Authorized Representative:
Signature:
Print Name & Title:
| 2025-04-04 RFB 13-25 CCTV Surveillance System Checklist Questionaire and Exceptions |
| EXCEPTIONS TO SPECIFICATIONS |
2025-04-04 RFB 13-25 CCTV Surveillance System Three (3) Locations- Addendum #1