2025-02-14 Phase 5 Plans.pdf
PDF 9 MB Posted
- Attached to
- Water Main Extension - Phase 5
- Solicitation number
- ITB 2024-011
- Issued by
- Clarendon County, South Carolina
About this file
This document is a comprehensive set of engineering plans for the Clarendon County Water and Sewer Department's Rural Water System Improvements - Phase 5 project in South Carolina. The project, funded by SCIIP Grant #A-23-C042, involves the installation of approximately 13 miles of water mains across various roads and subdivisions in Clarendon County, including lines on MW Rickenbaker Road, Sam Nexsen Road, Steven Road, Cottage Drive, Greenall Road, and other local streets. The plans, dated October 1, 2024 and revised on December 6, 2024, detail water main extensions using various pipe sizes (primarily 6", 8", and 15" water mains) with associated valves, fire hydrants, and service connections.
The project will replace existing water infrastructure and extend water service to rural areas, with a focus on improving water system reliability and accessibility. The engineering plans include detailed route maps, property index tables, erosion control measures, and technical installation details. The project utilizes right-of-way ranging from 15' to 37.5' across different segments, and incorporates careful consideration of wetland areas and environmental controls. Funding is provided through the South Carolina Infrastructure Investment Program (SCIIP) grant, indicating a state-level commitment to rural water system improvements. The plans demonstrate a comprehensive approach to infrastructure development, including detailed mapping, property identification, and adherence to engineering and environmental standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarendon County Engineering
411 SUNSET DR. - MANNING, S.C. 29102
(803) 433-3256 FAX: (803) 435-2208
RURAL WATER SYSTEM
IMPROVEMENTS - PHASE 5
FOR
CLARENDON COUNTY
SOUTH CAROLINA
CLARENDON COUNTY WATER AND SEWER DEPT.
October 1, 2024
SCIIP GRANT #A-23-C042 FUNDED
Revised: December 6, 2024
C
A
R
O
L
I
N
A
NO.
ENGINEER
REGISTERED
PROFESSIONAL
M
M
T
I
O
N
S
A
M
I
A
L
L
W
U
T
H
S
O
160-02-01-001-00
160-02-01-015-00160-02-01-014-00
160-02-01-009-00
160-02-01-012-00
160-02-01-013-00
160-02-04-002-00
147-00-03020-00
160-02-02-001-00
160-02-01-018-00
160-02-01-019-00
160-02-01-024-00
160-02-01-023-00
160-02-01-022-00
160-02-01-021-00
160-02-01-020-00
160-02-01-016-00
160-02-01-011-00
160-03-00-019-00
147-00-03-019-00
147-00-03-019-00
160-03-00-018-00
160-03-00-020-00
160-03-00-006-00
160-03-00-007-00
160-03-00-008-00
160-03-00-009-00
160-03-00-010-00
160-03-00-011-001
160-03-00-014
160-03-00-013-00
160-03-00-014-00
160-03-00-015-00
160-03-00-016-00
160-03-00-022-00
147-00-03-019-00
160-03-00-033-00
160-03-00-034-00
160-03-00-035-00
160-03-00-032-00
160-03-00-031-00
160-03-00-030-00
160-03-00-036-00
160-03-00-038-00
160-03-00-024-00
160-03-00-039-00
160-03-00-025-00
160-03-00-026-00
160-03-00-028-00
160-03-00-029-00
160-03-00-021-00
160-03-00-040-00
160-03-00-027-00
160-03-00-023-00
' R
/W
' R
/W
' R
/W
' R
/W
W
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
R
W
33' R
/W
33' R/W
R
W
R
W
161-00-01-011-00
161-00-02-004-00
161-00-02-008-00
161-00-01-011-00
H
O
M
E
N
A
R
R A
D
A
N E
TO: 161-00-01-008-00
AND 161-00-01-009-00
161-00-01-006-00
161-00-01-005-00
161-00-01-006
161-00-02-022-00
161-00-02-021-00
161-00-01-017-00
161-00-01-002-00
161-00-01-003-00
161-00-02-021-00
161-00-02-020-00
161-00-02-023-00
161-00-02-001-00
146-00-00-003-00
146-00-00-0148-00
R
O
D
H
U
S
E
M A
T C
H
L
I N
E
M A
T C
H
L
I N
E
M A
T C
H
L I N
E
M
A
T
C
M A
T C
H
L
I N
E
M
A
T
MATCH LINE 9+00
MATCH LINE 18+00
MATCH LINE 27+00
MATCH LINE 36+00
MATCH LINE 45+00
M
A
T
C
H
L
IN
E
M
ATC
H
LIN
E 63+00
MATCH LINE
72+00
MATCH LINE
81+00
MATCH LIN
E
90+00
MATCH LIN
E
99+00
MATCH LIN
E
108+00
MATCH LIN
E
117+00
M
A
T
C
H
L
IN
E
M
A
T
C
H
L
IN
E
M
A
T
N
E
M
A
T
N
E
M
A
T
N
E
M A
T C
H
L I N
E
M
A
T
M
A
T
M
A
T
M
A
T
M
A
T
M
A
T
C
H
L
IN
E
M
A
T
M
A
T
M
A
T
MATCH LINE 36+40
146-00-00-018-00
146-00-00-015-00
146-00-00-021-00
146-00-00-003-00
146-00-00-0017-00
SANTEE ELEC.COOP.
4567 MW RICKENBAKER
QUACK N BUSH LLC
4654 MW RICKENBAKER
QUACK N BUSH LLC
146-00-00-015-00
QUACK N BUSH LLC
4654 MW RICKENBAKER
146-00-00-018-00
QUACK N BUSH LLC
146-00-00-018-00
QUACK N BUSH LLC
M
A
T
MATCH LINE 26+40
MATCH LINE 8+70
MATCH LINE 17+50
MATCH LINE 26+50
M
A
T
C
H
L
IN
E
159-10-00-001-00
159-10-00-001-00
159-0
9-0
3-0
159-0
9-0
3-0
159-0
9-0
3-0
159-0
9-0
3-0
159-0
9-0
3-0
159-0
9-0
3-0
159-0
9-0
3-0
159-0
9-0
3-0
159-0
9-0
3-0
160-0
0-0
1-0
160-0
0-0
1-0
160-0
0-0
1-0
-0
-0
-0
160-00-01-010
160-00-01-010
160-00-02-034
160-00-01-046
160-00-01-045
160-00-01-032
160-00-01-009
160-00-02-033
160-00-01-047
147-00-03-015
147-00-03-015
160-00-02-016
160-00-02-022
060-00-02-019
160-00-01-029
160-00-01-030
160-00-02-028
160-00-02-008
160-00-02-030
160-00-02-015
160-00-02-032
147-0
0-0
3-0
160-0
0-0
2-0
147-0
0-0
4-0
147-0
0-0
4-0
147-00-04-003
147-00-03-009
147-00-03-023
147-0
0-0
3-0
147-00-04-005
147-0
0-0
4-0
147-00-03-022
-0
-0
-0
148-00-00-001
-0
-0
-0
147-12-00-002
147-00-03-008
147-00-03-008
147-00-02-107
147-00-02-106
147-0
0-0
3-0
147-0
0-0
3-0
147-0
0-0
3-0
147-0
0-0
3-0
147-0
0-0
2-1
147-0
0-0
3-0
147-0
0-0
3-0
147-00-03-003
146-00-00-021-00
160-0
0-0
1-0
160-00-01-006
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-1
-1
-0
-0
-0
-0
-1
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
160-00-01-007
-0
-0
-0
160-0
6-0
1-0
07 1
-0
-0
-0
-0
-0
-0
-0
-0
-0
160-0
6-0
1-0
-0
-0
-0
-0
-0
-0
160-0
6-0
1-0
160-0
6-0
2-0
160-0
6-0
1-0
160-0
6-0
2-0
-0
-0
-0
160-06-02-012
160-06-02-010
160-06-02-006
160-0
6-0
2-0
160-06-02-008
160-11-02-003
-1
-0
-0
R
C P1
P
160-02-01-002
160-02-01-003
160-02-01-004
160-02-01-005
160-02-01-006
160-02-01-007
160-03-00-001
-0
-0
-0
-0
-0
-0
160-02-03-002
160-02-03-003
160-07-01-001
160-07-01-002
-0
-0
-0
160-0
7-0
1-0
160-07-01-009
160-07-01-008
160-0
7-0
1-0
160-0
7-0
1-0
160-07-01-005
160-0
7-0
1-0
160-07-01-011
160-07-01-012
160-07-01-013
160-0
7-0
1-0
160-0
7-0
1-0
160-0
7-0
1-0
160-0
7-0
1-0
160-0
7-0
1-0
160-07-01-024
148-00-00-025
148-00-00-001
148-1
0-0
0-0
148-1
0-0
0-0
148-10-00-002
148-1
0-0
0-0
148-1
0-0
0-0
148-1
0-0
0-0
148-1
0-0
0-0
148-1
0-0
0-0
-1
-0
-0
148-1
0-0
0-0
148-1
0-0
0-0
148-1
0-0
0-0
148-1
0-0
0-0
148-1
0-0
0-0
148-1
0-0
0-0
148-1
0-0
0-0
148-1
0-0
0-0
148-00-00-004
-0
-0
-0
148-0
0-0
0-0
-0
-0
-0
4 1
-0
-0
-0
148-0
0-0
0-0
18 148-00-00-019
-0
-0
-0
R
W
-1
-0
-0
148-14-01-004
-1
-0
-0
148-14-01-019
-1
-0
-0
-1
-0
-0
-1
-0
-0
-1
-0
-0
-1
-0
-0
-1
-0
-0
-1
-0
-0
-1
-0
-0
148-00-00-026
147-12-00-002
148-1
0-0
0-0
148-10-00-023
148-09-00-029
148-09-00-037
147-12-00-003
148-09-00-018
148-09-00-037
148-0
9-0
0-0
148-09-00-043
148-09-00-002
148-0
9-0
0-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
148-09-00-015
-0
-0
-0
M
A
T
148-09-00-021
-1
-0
-0
148-09-00-020
M
A
T
MATCH LINE 4+35
147-00-02-107
147-12-00-002
147-00-02-003
147-12-00-001
147-05-01-009
147-0
5-0
1-0
147-0
5-0
1-0
147-0
5-0
1-0
147-0
5-0
1-0
-0
-0
-0
-0
-0
-0
147-0
5-0
1-0
147-0
5-0
2-0
-0
-0
-0
147-0
5-0
2-0
147-0
5-0
2-0
147-0
5-0
2-0
147-0
5-0
2-0
147-0
5-0
2-0
147-0
5-0
2-0
-0
-0
-0
147-0
5-0
2-0
147-05-02-017
147-05-02-021
M
A
T
M
A
T
146-00-00-003-00
146-00-00-018-00
146-00-00-003-00
146-00-00-0148-00
R
C P
R
C P
R
C P
R
C P
R
C
P
R
C P
R
C
P
R
C
P
R
C P
M
A
T
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LA
Y
O U
T A
N D
N O
TE
S
SILT FENCE:
LAND GRADING:
DESCRIPTION
TOPSOILING:
MULCHING:
EROSION CONTROL BLANKET
TEMPORARY SEEDING:
PERMANENT SEEDING:
SYMBOL
SYMBOL LEGEND
SEDIMENT TUBE:
POWER POLE
MAILBOX
PEDASTAL
FIRE HYDRANT ASSEMBLY
VALVE AND BOX (V&B)
WATER MAIN (NUMBER IS SIZE)
UNDERGROUND UTILITY
ABBREVIATIONS
GENERAL PLAN NOTES:
FABRIC INLET PROTECTION:
SEDIMENT TUBE INLET PROTECTION:
2" FLUSHING HYDRANT, POST STYLE
DESCRIPTION
SYMBOL
C
K E
N B
A K
E R
SAM NEXSEN
G
R
E
E
N
A
C
O
T
T
A
G
C
K
E
N
B
A
K
E
R
S T
E V
J
O
Y
D
R
R
V
I S
Y O
ALTERNATE BID SHEETS
la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M
IN
P
O P
E R
TY
IN
D E
X
TABLE 1 TABLE 2
THESE TABLES PROVIDE PROPERTY OWNERSHIP DATA
FOR TAX MAP NUMBERS SHOWN ON THE WATER PLANS.
NOT ALL PROPERTIES WILL BE CONNECTED TO THE SYSTEM.
C P r o j e c t s E n g
W a t e r
P h a s e
P h a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D o
F p c re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
R O
P E
R
TY
IN
D
E X
TABLE 3 TABLE 4
THESE TABLES PROVIDE PROPERTY OWNERSHIP DATA
FOR TAX MAP NUMBERS SHOWN ON THE WATER PLANS.
NOT ALL PROPERTIES WILL BE CONNECTED TO THE SYSTEM.
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
" R
C P
M
A
T
M
A
T
R
C
P
R
C P
R
C
P
M
A
T
M
A
T
24" R
CP
R
C P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
5.
A
R
S
C
K
E
N
B
A
K
C
K
E
N
B
A
K
C
K
E
N
B
A
K
S
S
R
W
R
W
R
W
R
W
R
W
R
W
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
M
A
T
R
C
P
M
A
T
M
A T
C H
L
IN
E
R
C
P
R
C
P
R
C
P
R
C
P
M
A T
C H
L
IN
E
M
A
T
R
C
P
R
C
P
R
C
P
R
C
P
146-00-00-021-00
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
R
O
G
E
S
R
W
R
W
R
W
R
W
R
W
R
W
C
K
E
N
B
A
K
T
L A
T
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
M
A
T
146-00-00-021-00
146-00-00-003-00
" R
C P
R
C P
M
A
T
M A
T C
H L
IN
E
146-00-00-018-00
146-00-00-015-00
QUACK N BUSH LLC
4654 MW RICKENBAKER
QUACK N BUSH LLC
" R
C P
R
C P
R
C
P
R
C
P
R
C
P
M
A T
C H
L
IN
E
M A
T C
H L
IN
E
146-00-00-0017-00
SANTEE ELEC.COOP.
4567 MW RICKENBAKER
146-00-00-015-00
QUACK N BUSH LLC
4654 MW RICKENBAKER
146-00-00-018-00
QUACK N BUSH LLC
R C
P
R
C
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.0
W
W
R
W
R
W
R
W
R
W
SAM NEXSEN RD
C
K
E
N
B
A
K
S
O
W
J A
K
B
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
C H
L
IN
E
M
A
T
N
E
146-00-00-018-00
QUACK N BUSH LLC
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
M
A
T
N
E
M
A
T
N
E
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
M
A
T
N
E
M
A
T
N
E
R
C
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.0
BLANEY LANE
R
W
R
W
R
W
R
W
R
W
R
W
C
K
E
N
B
A
K
S
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
N
E
M
A
T
N
E
R
C
P
R
C
P
R
C
P
147-00-03-003
M
A
T
N
E
M
A
T
N
E
R
C
P
R
C
P
P
M
A
T
N
E
M
A
T
P
P
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.0
G
R
E E
N
A L L
R
D
C
K
E
N
B
A
K
S
C
K
E
N
B
A
K
S
C
K
E
N
B
A
K
F
R
W
R
W
R
W
R
W
R
W
R
W
A
T
L
W
E
T
L A
N
D
A
R
E
A
W
E T
L A
E A
T
L A
T
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
M
A
T
N
E
P
P
P
M
A
T
N
E
M
A
T
N
E
P
P
18" R
CP
-0
-0
-0
M
A
T
N
E
M
A
T
N
E
P
R
C
P
R
C
P
-0
-0
-0
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.0
C
K
E
N
B
A
K
C
K
E
N
B
A
K
C
O
T
T
A
C
K
E
N
B
A
K
S
S T
E V
G
R
E
E
N
A
R
/W
R
/W
R
W
R
W
W
W
R
W
R
W
W
E
T
L
A
E
T
L A
T
W E
T L A
N D
F E
A T
U R
E
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
N
E
P
R
C
P
R
C
P
M A
T C
H
L I N
E
R
C
P
15" RCP
R
C P
R
C P
-0
-0
-0
R
C
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
A N
D
.0
LINE 5.01
LINE 5.02
R
W
R
W
L
A
R
I
O
R
J
O
Y
C
K
E
N
B
A
K
S
C
K
E
N
B
A
K
S
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
R
W
R
W
M A
T C
H
L I N
E
M
A
T
15" RCP
15" RCP
R
C P
-0
-0
-0
-0
-0
-0
-0
-0
-0
R
C
P
M
A
T
M
A
T
R
C
P
R
C
P
R
C
P
R
C
P
R
C
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
C
K
E
N
B
A
K
C
K
E
N
B
A
K
M
A
X
W
E
L L
D
R
W
A
T
E
R
G
A
R
W
R
W
R
W
R
W
W
E
T
L
A
E
T
L A
T
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
M
A
T
P
P
P
M
A
T
M
A
T
L
P
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.0
H
A
M
M
O
A
D
F
O
W
L
A
D
W
W
W
W
C
K
E
N
B
A
K
S
W
E T
L A
N D
A R
E
T
L A
T
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
P
159-10-00-001-00
159-10-00-001-00
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
L
A
R
I
O
N
C
A
O
P
E
R
C
A
O
P
E
R
C
K
E
N
B
A
K
W
W
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
L
P
R
C
P
M
A
T
P
P
I N
L
E
T
S
R
C
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
H
A
M
M
O
H
A
M
M
O
A
D
S
W
W
R
W
R
W
R
W
R
W
R
W
R
T
L A
T
W
E T
L A
E A
W
E T
L A
E A
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
N
E
P
P
" R
C P
15" RCP
M
A
T
N
E
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.0
C
K
E
N
B
A
K
E
R
F
O
W
L
FOWLER RD
W
W
W
W
R
W
R
W
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
R
W
M
A
T
15" RCP
15" RCP
R
C P
-0
-0
-0
R
C
P
R
C
P
M
A
T
M
A
T
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
R
W
R
W
W
W
C
K
E
N
B
A
K
E
R
S
W
A
T
E
R
G
A
S
W
A
T
E
R
G
A
S
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
M
A
T
R
C P
P
P
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E S
.0
5, .0
A N
D
.0
W
W
W
W
R
W
R
W
R
W
R
W
R
W
R
W
W
A
T
E
R
G
A
S
S
A
C
K
E
R
M
C A
B
N E
S
W
E
T
L
A
E
T
L A
T
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
M A
T C
H L
IN
E
160-00-01-007
M A
T C
H L
IN
E
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E S
.0
A
N D
.0
A C
K E
R M
A N
A
C
K
E
R
M
S
K
I
M
B
E
N
E
K
I M
B
E
T
L A
T
W
ETLAND
AREA
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
M
A
T
-0
-0
-0
P
M
A
T
M
A
T
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
E
X
I S
T
I
W
M
E X
IS
T
IN
G
W
M
L
IZ
Z
IE
C R
E E
K R
O A
D
R
N
E
NOTE:
LINES 5.09, 5.10, 5.11 SHOWN IN QUAIL
RIDGE SUBDIVISION ARE TO REPLACE
EXISTING MAINS. INSTALL NEW MAINS
AND ONCE OPERATION APPROVAL IS
RECEIVED FROM SCDES, RECONNECT
EACH SERVICE TO THE NEW MAINS WITH
NEW SERVICE CONNECTION AS SHOWN
ON DETAIL SHEET D-1. ALL EXISTING
MAINS AND PRESSURE REDUCING VALVE
ARE TO BE ABANDONED IN PLACE.
QUAIL RIDGE
SUBDIVIISON
HUDSON RD
H
U
D
S
J
O
Y
A
V
I S
P
I
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p c
ALTERNATE BID SHEET
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
M
A
T
MATCH LINE 26+40
R
C P
15" R C
P
R
C P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
J
O
Y
A
D
HUDSON ROAD
H U
D S
O N
R O
A D
NOTE:
LINES 5.09, 5.10, 5.11 SHOWN IN QUAIL
RIDGE SUBDIVISION ARE TO REPLACE
EXISTING MAINS. INSTALL NEW MAINS
AND ONCE OPERATION APPROVAL IS
RECEIVED FROM SCDES, RECONNECT
EACH SERVICE TO THE NEW MAINS WITH
NEW SERVICE CONNECTION AS SHOWN
ON DETAIL SHEET D-1. ALL EXISTING
MAINS ARE TO BE ABANDONED IN PLACE.
T
L A
T
W
E
T
L
A
E
A
L
O
C
A
S
H
O
U
L
D
A
Y
F
R
T
L
A
N
D
S
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p c
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
MATCH LINE 26+40
15" R C
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
NOTE:
LINES 5.09, 5.10, 5.11 SHOWN IN QUAIL
RIDGE SUBDIVISION ARE TO REPLACE
EXISTING MAINS. INSTALL NEW MAINS
AND ONCE OPERATION APPROVAL IS
RECEIVED FROM SCDES, RECONNECT
EACH SERVICE TO THE NEW MAINS WITH
NEW SERVICE CONNECTION AS SHOWN
ON DETAIL SHEET D-1. ALL EXISTING
MAINS ARE TO BE ABANDONED IN PLACE.
T
L A
T
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p c
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
-0
P
P
-0
-0
-0
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.1
L
I Z
Z
E
A
D
R
N
E
D
O
V
N
E
R
N
E
NOTE:
LINES 5.09, 5.10, 5.11 SHOWN IN QUAIL
RIDGE SUBDIVISION ARE TO REPLACE
EXISTING MAINS. INSTALL NEW MAINS
AND ONCE OPERATION APPROVAL IS
RECEIVED FROM SCDES, RECONNECT
EACH SERVICE TO THE NEW MAINS WITH
NEW SERVICE CONNECTION AS SHOWN
ON DETAIL SHEET D-1. ALL EXISTING
MAINS AND PRESSURE REDUCING VALVE
ARE TO BE ABANDONED IN PLACE.
L
A
K
E
M
A
R
I
O
N
Q U
A
IL
R
ID
G E
S U
B D
IV
IS
IO
T
L A
T
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p c
-0
-0
-0
160-07-01-011
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
D
E
N
W
O
N
E
C
L
U
B
H
O
U
L
I Z
Z
E
D
O
N
E
NOTE:
LINES 5.09, 5.10, 5.11 SHOWN IN QUAIL
RIDGE SUBDIVISION ARE TO REPLACE
EXISTING MAINS. INSTALL NEW MAINS
AND ONCE OPERATION APPROVAL IS
RECEIVED FROM SCDES, RECONNECT
EACH SERVICE TO THE NEW MAINS WITH
NEW SERVICE CONNECTION AS SHOWN
ON DETAIL SHEET D-1. ALL EXISTING
MAINS ARE TO BE ABANDONED IN PLACE.
Q
U
A
D
G
E
S
U
B
D
I
V
I
S
I
O
N
Q
U
A
D
G
E
S
U
B
D
I
V
I
S
I
O
N
L
A
R
I
O
N
L
A
R
I
O
T
L A
T
W
E
T
L
A
N
D
S
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p c
R
W
R
W
R
W
R
W
M
A
T
N
E
MATCH LIN
E 8+70
18" R
CP
R
C P
R
C P
R
C P
C
M P
R
W
R
W
R
W
MATCH LIN
E 8+70
MATCH LIN
E 17+50
R
C P
R
C P
18" R
C P
R
C P
R
W
R
W
MATCH LIN
E 17+50
M
A T
C H
L
IN
E
-0
-0
-0
R
W
18" R
CP
18" R C
P
R
C P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.1
F
A
L
C
N
E
S T
E V
S
S T
E V
S T
E V
S
S
T
L A
T
W
E
T
L
A
A
T
U
R
E
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
W
W
W
W
W
W
M
A T
C H
L
IN
E
M
A
T
W
W
W
W
M
A
T
P
P
W
W
R
C
P
P
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
A N
D
.1
LINE 5.12 AND 5.13
LINE 5.12
LINE 5.12
F
I
T
C
U
D
I
S
T
E
V
S
L
I
A
N
E
S
U
R
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
W
W
W
W
W
W
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
S
T
E
V
C
U
D
I
P
A
V
I
V
E
PRIVATE
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
37.5' R /W
33' R/W
M A
T C
H
L I N
E
M
A T
N
E
-0
-0
-0
33' R/W
R
C P
R
C P
15" R
CP
15" R
CP
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.1
A N
D
.1
F
I
T
F
A
L
C
N
E
STEVEN R
D
S-1 4-5
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
P
M
A
T
-0
-0
-0
-0
-0
-0
M
A
T
M
A
T
M A
T C
H
LIN
E 4+35 C la re nd o n C o un ty E ng in ee ri ng
S
U N
S E
T D
R
M A
N N
IN
G
, S .C
. 2
(8
3-
F A
X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
, 5 .1
8, A
N D
.1
C
O
T
T
A
S
P E
N N
Y
L A
N E
C
O
T
T
A
C
O
T
T
A
T
L A
T
W
E
T
L
A
E
A
W
E
T
L
A
E
A
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
148-09-00-021
148-09-00-020
M
A
T
M A
T C
H
LIN
E 4+35
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.1 8, .1
A
N D
.2
C
O
T
T
A
P
E
N
Y
N
T
L A
T
W
E
T
L
A
E
A
W
E
T
L
A
E
A
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
T
M
A
T
R
C P
M
A
T
M
A
T
R
C P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.2
G
R
E
E
N
A
L L
G
R
E
E
N
A
L L
C
A
B
I
N
S
O
N
C
A
B
I
N
S
O
N
C
K
E
N
B
A
K
E
R
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
M
A
T
M A
T C
H
L
I N
E
M
A
T
" R
C P
R
C P
146-00-00-003-00
146-00-00-018-00
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.2
A N
D
.2
SAM NEXSEN RD
S-3
G
R
E
E
N
A
A
D
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
146-00-00-0148-00
A
T C
H
L
I N
E
M A
T C
H
L
I N
E
146-00-00-003-00
R
C P
R
C P
146-00-00-003-00
M A
T C
H
L
I N
E
M A
T C
H
L I N
E
146-00-00-0148-00
R
C P
R
C P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.2
SAM NEXSEN RD
S-344
J
O
Y
SAM NEXSEN RD
S-344
33' R/W
33' R/W
33' R/W
33' R/W
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
161-00-01-005-00
161-00-01-006
161-00-02-022-00
161-00-02-021-00
161-00-01-017-00
M
A
T
M A
T C
H
L I N
E
R
C P
161-00-02-021-00
161-00-01-002-00
161-00-01-003-00
161-00-02-021-00
161-00-02-020-00
161-00-02-001-00
R
O
U
S
E
M A
T C
H
L I N
E
M
A
T
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.2
S A
M
N
E X
S E
N
R
O
A D
S
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
161-00-02-004-00
-0
-0
-0
-0
H
O
A
R
R A
D
N E
TO: 161-00-01-008-00
AND 161-00-01-009-00
M A
T C
H
L I N
E
M
A
T
-0
-0
-0
-0
161-00-02-004-00
161-00-02-008-00
M
A
T
R
C
P
C la re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
W A
TE
R
M A
IN
P
LA
N
LI
N
E
.2
E
X
I
S
T
I
T
I
N
E X
R
W
R
W
W
W
SAM NEXSEN RD
S
S
X
S
R
U
S
S
E
C O
M M
U N
I T
Y
D
R
S
S
S
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
COMPACTED BACKFILL
TO 95% MAX PROCTOR DENSITY
MIN. 2" THICK ASPHALT PATCH
8" STABILIZED AGGREGATE BASE COURSE
ASPHALT AND BASE MATERIALS
AND INSTALLATION TO CONFORM
TO SCDOT STANDARD SPECIFICATIONS
AND TO SCDOT ENCROACHMENT
PERMIT REQUIREMENTS.
COMPACTED IN 6" LAYERS
M I N
C O V E R
TELESCOPING VALVE BOX
VALVE AS SPECIFIED
6" PIPE TO WATER MAIN TEE
CONCRETE THRUST BLOCK (SIZE AS TEE)
PROVIDE 24" DIA X 4" CONC. COLLAR OUTSIDE R/W
BOX COVER MARKED "WATER"
FINISHED GRADE
ANCHOR TO CONCRETE
FIRE HYDRANT AS SPECIFIED
THRUST BLOCK AREA IN SQ.FT. ON UNDISTURBED SOIL
BLOCK BEARING AREA REQUIRED FOR 1000 PSF SOIL
ADJUSTED AREA = CHART AREA X (1000 / SOIL BEARING STRENGTH)
VERIFY SOIL STRENGTH AND BLOCK DIMENSIONS WITH ENGINEER
TYPICAL SOILD BEARING STRENGTHS
COARSE AND FINE COMPACTED SAND 4,000 PSF
MEDIUM CLAY 2,000 PSF
SOFT CLAY 1,000 PSF
CUT LINES TO BE STRAIGHT
COMPACTED BACKFILL 42" COVER
GRANULAR SOIL BEDDING UP TO CROWN
WATER MAIN
FINISHED GRADE
SHAPED TRENCH OR STONE BEDDING BELOW MAIN
WATER - SEWER MAIN SEPARATION DETAIL
NOT TO SCALE
EXISTING GRADE
CROSSING
PARALLEL
SEPARATE WATER AND SEWER MAINS
AS SHOWN.
WHERE POSSIBLE, LOCATE WATER MAIN
ABOVE SEWER MAIN..
LOCATE A FULL LENGTH OF PIPE ON
EACH NEW MAIN CENTERED AT
CROSSING POINT SO THAT JOINTS
ARE AS FAR AS POSSIBLE FROM THE
POINT OF CROSSING.
PROVIDE ADEQUATE STRUCTURAL
SUPPORT AT CROSSING POINT FOR
UPPER MAIN AS APPROVED BY
THE ENGINEER.
NO WATER MAIN SHALL PASS THROUGH
OR COME INTO CONTACT WITH ANY
PART OF A SEWER MANHOLE.
1.
2.
3.
4.
5.
PROVIDE ONE JOINT OF DUCTILE IRON SEWER
MAIN PIPING CENTERED ON THE WATER MAIN
AT ALL CROSSING OF WATER AND SEWER MAINS.
6.
TELESCOPING VALVE BOX
VALVE AS SPECIFIED
WATER MAIN
CONCRETE THRUST BLOCK (SIZE AS TEE)
PROVIDE 24" DIA X 4" CONC. COLLAR AS SPECIFIED
BOX COVER MARKED "WATER"
FINISHED GRADE
ANCHOR TO CONCRETE
CONCRETE THRUST BLOCK - FORM AND
4 EA. - #3 REBAR
(1 EA. CORNER)
SQUARE MARKER
WITH BEVELED CORNERS
CAST IN CONC. &
PAINTED BLACK
18"
NOTES:
1. VALVE MARKERS SHALL BE
PLACED AT R/W.
2. LETTERS "MV" SHALL FACE
TOWARDS VALVE.
3. MARKER SHALL HAVE BRASS
OR BRONZE EMBED ON TOP
OR SIDE.
4. CONTRACTOR SHALL STAMP
DISTANCE TO CENTER OF
VALVE INTO EMBED.
5. BLOW-OFF ASSEMBLY SHALL
INCLUDE 1 EA. MARKER W/
"BO" OR "MV" CAST.
VALVE MARKER DETAIL
NOT TO SCALE
VALVE AND BOX DETAIL
NOT TO SCALE
WATER SERVICE DETAIL
NOT TO SCALE
NOT TO SCALE
THRUST BLOCK DETAILS
FIRE HYDRANT DETAIL
NOT TO SCALE
ASPHALT PAVEMENT CUT DETAIL
NOT TO SCALE
NOT TO SCALE
WATERMAIN BEDDING DETAIL
42" MIN. COVER
FINISHED GRADE
STEEL CASING PIPE
STEEL CASING PIPE
CENTERED RESTRAINED
STAINLESS STEEL
CASING SPACER
CASING END SEAL
CARRIER PIPE
NOT TO SCALE
JACK AND BORE CASING DETAIL
PIPE SIZE 11 1/4° BEND 22 1/2° BEND 45° BEND 90° BEND TEE*
3" 10' 20'
40'
6" 15' 25' 60'
8" 15' 35' 75'
10" 18' 40' 90'
12" 20' 45' 100'
DEAD END
R
E
S
T
R
A
I
N
E
D
L
E
N
G
T
H
RESTRAINED
LENGTH
J
O
I
Y
P
R
E
S
T
R
A
I
N
E
D
UNRESTRAINED
JOINT
BEND
BEND ANGLE
L E
N G
T H
R E
S T
R A
I N
E D
RUN
BRANCH
TEE
L E
N G
T H
R E
S T
R A
I N
E D
DEAD END
* BRANCH LENGTH
NOT TO SCALE
FITTINGS RESTRAINED JOINT LENGTHS
10'
10'
10'
12'
15'
8'
8'
8'
10'
10'
15'
20'
30'
40'
45'
W A
TE
R
M A
IN
D
E
TA
IL
S
J
O
I
Y
P
R
E
S
T
R
A
I
N
E
D
J
O
I
R
E
S
T
R
A
I
N
E
D
P
I
P
E
L
I
N
E
D
E
L
V
E
AIR RELEASE VALVE DETAIL
NOT TO SCALE
MIN. 4" THICK
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
E R
O S
IO
N
C O
N
TR
O L
P
LA
N N
O
TE
S A
N D
D E
TA
IL
S
SILT FENCE:
LAND GRADING:
TOPSOILING:
MULCHING:
ECB OR TRM
TEMPORARY SEEDING:
PERMANENT SEEDING:
EROSION CONTROL SYMBOL LEGEND
TEMPORARY SEEDING NOTES:
1. FOR AUGUST 15 TO APRIL 15 APPLY MINIMUM 1.5 LB OF RYE (GRAIN)
PER 1,000 SQ. FT. FOR APRIL 15 TO AUGUST 15 APPLY MINIMUM OF 1.2
LB OF GERMAN MILLET PER 1,000 SQ. FT. APPROVED ALTERNATE OR
MIXES MAY BE USED.
2. FOLLOW RECOMMENDATIONS OF SOIL TEST OR APPLY 70 LBS OF
AGRICULTURAL LIMESTONE AND 25 LBS OF 10-10-10 FERTILIZER PER
1,000 SQ.FT.
3. PREPARE SEEDBED, PLANT AND MULCH AS DIRECTED BELOW.
4. IF NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15,
OVERSEED WITH 1 LB PER 1,000 SQ.FT. ANNUAL LESPEDEZA IN LATE
FEBRUARY OR EARLY MARCH.
5. REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY.
6. VERIFY ALL PLANTING DETAILS WITH SEED SUPPLIER.
PERMANENT SEEDING NOTES:
1. ALL UNPAVED (NO STONE SURFACE) DISTURBED AREAS (AND LAWN
TO BE REESTABLISHED) OUTSIDE PLANTING BED IS TO BE SEEDED
WITH 0.3 LB/1,000 SQ.FT. OF BERMUDAGRASS MARCH 15 - JUNE 30 OR
1.5 LB /1,000 SQ.FT. OF TALL FESCUE AUG 15 - NOV 30. APPROVED
ALTERNATES OR MIXES MAY BE USED.
2. FOLLOW RECOMMENDATIONS OF SOIL TEST OR APPLY 70 LBS OF
AGRICULTURAL LIMESTONE AND 25 LBS OF 10-10-10 FERTILIZER PER
1,000 SQ.FT.
3. PREPARE SEEDBED, PLANT AND MULCH AS DIRECTED BELOW.
4. REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY.
5. VERIFY ALL PLANTING DETAILS WITH SEED SUPPLIER.
SEEDBED PREPARATION NOTES:
1. REMOVE ANY UNDESIRABLE GROUNDCOVER INCLUDING ANY
TEMPORARY SEEDING FOR PERMANENT SEEDING INSTALLATION.
2. RIP THE AREA TO A MINIMUM DEPTH OF 4". ADD TOPSOIL IF
REQUIRED FOR POOR SOIL AREAS.
3. REMOVE ALL LOOSE ROCKS, ROOTS, ETC. LEAVING SURFACE
SMOOTH AND UNIFORM CONFORMING TO GRADES SHOWN ON
GRADING PLAN.
4. APPLY SEED, LIME, FERTILIZER AND MIX WITH THE SOIL AS
RECOMMENDED BY NURSERY OR SUPPLIER.
5. MULCH IMMEDIATELY AFTER SEEDING WITH 100 LBS PER 1,000
SQ.FT. OF STRAW OR APPROVED EQUAL. ANCHOR STRAW BY
TACKING WITH ASPHALT, NETTING OR BY USE OF A MULCH
ANCHORING TOOL.
1. Notify SCDHEC Regional Office 48 hours prior to land disturbing activities.
2. Coordinate trenching activity and erosion control measures with engineer prior to beginning work.
3. Place silt fence and other controls as shown or specified.
4. Close and stabilize all trenches as soon as possible after pipe installation.
5. Provide temporary grassing if required as specified.
6. Provide permanent stabilization as shown and specified.
7. Remove temporary sediment and control measures only after entire area draining to the structure is stabilized and approved by Engineer.
8. Maintain all sediment and erosion control structures for the extent of the project.
CONSTRUCTION SEQUENCE
DISTURBED AREA CALCULATION:
6' WIDTH AVERAGE X 69,000' = 414,000 SF = 9.5 ACRES
SEDIMENT TUBE:
SEEDING NOTES
1. Implement erosion control features shown prior to construction work on site. If necessary, slopes, which exceed eight (8) vertical feet should be stabilized with synthetic or vegetative mats, in addition to hydroseeding. It may be necessary to install temporary slope drains during construction. Temporary berms may be needed until the slope is brought to grade.
2. Stabilization measures shall be initiated as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than fourteen (14) days after work has ceased, except as stated below.
a. Where stabilization by the 14th day is precluded by snow cover or frozen ground conditions stabilization measures must be initiated as soon as practicable.
b. Where construction activity on a portion of the Site is temporarily ceased, and earth-disturbing activities will be resumed within 14 days, temporary stabilization measures do not have to be initiated on that portion of the Site.
3. All sediment and erosion control devices shall be inspected once every calendar week. If periodic inspection or other information indicates that a BMP has been inappropriately or incorrectly installed, the
Permittee must address the necessary replacement or modification required to correc the BMP within 48 hours of identification.
4. Provide silt fence and/or other control devices, as may be required, to control soil erosion during utility construction. All disturbed areas shall be cleaned, graded, and stabilized with grassing immediately after the utility installation. Fill, cover, and temporary seeding at the end of each day are recommended. If water is encountered while trenching, the water should be filtered to remove any sediments before being pumped back into any waters of the State.
5. All erosion control devices shall be properly maintained during all phases of construction until the completion of all construction activities and all disturbed areas have been stabilized. Additional control devices may be required during construction in order to control erosion and/or offsite sedimentation. All temporary control devices shall be removed once construction is complete and the site is stabilized.
6. The contractor must take necessary action to minimize the tracking of mud onto paved roadway(s) from construction areas and the generation of dust. The contractor shall daily remove mud/soil from pavement, as may be required.
7. Note on subdivisions not included.
8. Temporary diversion berms and/or ditches will be provided as needed during construction to protect work areas from upslope runoff and/or to divert sediment-laden water to appropriate traps or stable outlets.
9. All waters of the State (WoS), including wetlands, are to be flagged or otherwise clearly marked in the field. A double row of silt fence is to be installed in all areas where a 50-foot buffer can't be maintained between the disturbed area and all WoS. A 10-foot buffer should be maintained between the last row of silt fence and all WoS.
10. Litter, construction debris, oils, fuels, and building products with significant potential for impact (such as stockpiles of freshly treated lumber) and construction chemicals that could be exposed to storm water must be prevented from becoming a pollutant source in storm water discharges.
11. A copy of the SWPPP, inspections records, and rainfall data must be retained at the construction site or a nearby location easily accessible during normal business hours, from the date of commencement of construction activities to the date that final stabilizaiton is reached.
12. Initiate stabilization measures on any exposed steep slope (3H:1V or greater) where land-disturbing activities have permanently or temprarily ceased, and will not resume for a period of 7 calendar days.
13. Minimize soil compaction and unless infeasible, preserve topsoil.
14. Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge.
15. MinimIze the dischage of pollutants from dewatering of trenches and excavated areas. These discharges are to be routed through appropriate BMP's (sediment basin, filter bag, etc.).
16. The following discharges from sites are prohibited: (1) Wastewater from washout of concrete, unless managed by an appropriate control: (2) Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds and other construction materials; (3) Fuels, oils or other pollutants used in vehicle and equipment operation and maintenance; and (4) Soaps or solvents unsed in vehicle and equipment washing.
17. After construction activities begin, inspections must be conducted at a minimum of at least once every calendar week and must be conducted until final stabilization is reached on all areas of the construction site.
18. If existing BMP's need to be modified or if additional BMP's are necessary to comply with the requirements of this permit and/or SC's Water Quality Standards, implementation must be completed before the next storm event whenever practicable. If implementation before the next storm event is impracticable, the situation must be documented in the SWPPP and alternative BMP's must be implemented as soon as reasonably possible.
19. A Pre-Construction conference must be held for each construction site with an approved On-Site
SWPPP prior to the implementation of construction activities. For non-linear projects that disturb 10 acres or more this conference must be held on-site unless SCDHEC has approved otherwise.
20. Provide sanitary facilities for workers on the site.
21. Redistribute sediment collected on site prior to grassing or dispose of in other approved method only.
EROSION CONTROL NOTES:
SILT FENCE - POST REQUIREMENTS
1. Silt Fence posts shall be 48-inch long steel posts that meet, at a minimum, the following physical characteristics.
--Composed of a high strength steel with a minimum yield strength of 50,000 psi.
--Include a standard "T" section with a nominal face width of 1.38-inches and a nominal
"T" length of 1.48-inches.
--Weigh 1.25 pounds per foot (± 8%)
2. Posts shall be equipped with projections to aid in fastening of filter fabric.
3. Steel posts may need to have a metal soil stabilization plate welded near the bottom when installed along steep slopes or installed in loose soils. The plate should have a minimum cross section of 17-square inches and be composed of 15 gauge steel, at a minimum. The metal soil stabilization plate should be completely buried.
4. Install posts to a minimum of 24-inches. A minimum height of 1- to 2- inches above the fabric shall be maintained, and a maximum height of 3 feet shall be maintained above the ground.
5. Post spacing shall be at a maximum of 6-feet on center.
SILT FENCE - FABRIC REQUIREMENTS
1. Silt fence must be composed of woven geotextile filter fabric that consists of the following requirements:
- Composed of fibers consisting of long chain synthetic polymers of at least 85% by weight of polyolefins, polyesters, or polyamides that are formed into a network such that the filaments or yarns retain dimensional stability relative to each other;
- Free of any treatment or coating which might adversely alter its physical properties after installation;
- Free of any defects or flaws that significantly affect its physical and/or filtering properties; and,
- Have a minimum width of 36-inches.
2. Use only fabric appearing on SC DOT's Qualified Products Listing (QPL), Approval Sheet #34, meeting the requirements of the most current edition of the SC DOT Standard Specifications for Highway Construction.
3. 12-inches of the fabric should be placed within excavated trench and toed in when the trench is backfilled.
4. Filter Fabric shall be purchased in continuous rolls and cut to the length of the barrier to avoid joints.
5. Filter Fabric shall be installed at a minimum of 24-inches above the ground.
1. Regular inspections of silt fence shall be conducted once every calendar week and, as recommended, within 24-hours after each rainfall even that produces
1/2-inch or more of precipitation.
2. Attention to sediment accumulations along the silt fence is extremely important.
Accumulated sediment should be continually monitored and removed when necessary. Remove accumulated sediment when it reaches 1/3 the height of the silt fence.
5. Removed sediment shall be placed in stockpile storage areas or spread thinly across disturbed area. Stabilize the removed sediment after it is relocated.
6. Check for areas where stormwater runoff has eroded a channel beneath the silt fence, or where the fence has sagged or collapsed due to runoff overtopping the silt fence. Install checks/tie-backs and/or reinstall silt fence, as necessary.
7. Check for tears within the silt fence, areas where silt fence has begun to decompose, and for any other circumstance that may render the silt fence ineffective. Removed damaged silt fence and reinstall new silt fence immediately.
8. Silt fence should be removed within 30 days after final stabilization is achieved and once it is removed, the resulting disturbed area shall be permanently stabilized.
SILT FENCE - INSPECTION & MAINTENANCE
FILTER FABRIC
BACKFILL TRENCH WITH
COMPACTED EARTH
COMPACTED
EARTH
FILTER FABRIC
6"
6"
24-IN.
(MINIMUM)
BURY FABRIC
USE EITHER FLAT-BOTTOM
OR V-BOTTOM TRENCH
SEE DETAILS
FLAT-BOTTOM TRENCH DETAIL
V-SHAPED TRENCH DETAIL
SILT FENCE INSTALLATION DETAILS
FILTER
FABRIC
BURY FILTER FABRIC
AT LEAST 12-INCHES
1.25 LB./LINEAR FT. STEEL POSTS
HEAVY DUTY PLASTIC TIE
FOR STEEL POSTS
(RESTRICT TO TOP
8-INCHES OF FABRIC)
1. Do not place silt fence across channels or in other areas subject to concentrated flows. Silt fence should not be used as a velocity control
BMP. Concentrated flows are any flows greater than 0.5 cfs.
2. Maximum sheet or overland flow path length to the silt fence shall be
100-feet.
3. Maximum slope steepness (normal [perpendicular] to the fence line) shall be 2:1.
4. Silt fence joints, when necessary, shall be completed by one of the following options:
- Wrap each fabric together at a support post with both ends fastened to the post, with a 1-foot minimum overlap;
- Overlap silt fence by installing 3-feet passed the support post to which the new silt fence roll is attached. Attach old roll to new roll with heavy-duty plastic ties; or,
- Overlap entire width of each silt fence roll from one support post to the next support post.
5. Attach filter fabric to the steel posts using heavy-duty plastic ties that are evenly spaced within the top 8-inches of the fabric.
6. Install the silt fence perpendicular to the direction of the stormwater flow and place the silt fence the proper distance from the toe of steep slopes to provide sediment storage and access for maintenance and cleanout.
7. Install Silt Fence Checks (Tie-Backs) every 50-100 feet, dependent on slope, along silt fence that is installed with slope and where concentrated flows are expected or are documented along the proposed/installed silt fence.
HEAVY DUTY PLASTIC TIES
SILT FENCE GENERAL NOTES:
18"-24"
COMPACTED
EARTH
FILTER FABRIC
HEAVY DUTY PLASTIC TIES
18"-24"
24-IN.
(MINIMUM)
6"
FABRIC INLET PROTECTION:
SEDIMENT TUBE INLET PROTECTION:
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p re nd o n
C o un ty
E ng in ee ri ng
S U
N S
E T
D R
M
A N
N
IN
G , S
.C . 2
(8
3-
F
A X
3)
-2
C la re nd o n
C o un ty
P H
A S
E
W A
TE
R
M A
IN
S
W at er a nd S ew er
D ep ar tm en t
E R
O S
IO
N
C O
N
TR
O L
D E
TA
IL
S
2-FT. MAX. SPACING
2-IN. X 2-IN. WOOD POSTS
FABRIC POST INSTALLATION DETAIL
SEDIMENT TUBE INSTALLATION
DETAIL
1.25 LB./LINEAR FT.
STEEL POSTS
OR
18-IN. MIN.
SEDIMENT TUBE BURIAL DETAIL
24-IN. MIN.
18-IN. TO 24-IN. DIA.
8-IN. MIN.
2" x 2" wood stakes or
1.25 #/ft Steel Post
END VIEW OF DITCH
FLOW
TOP VIEW
OF DITCH
Stakes
Placed at
2'
Minimum
Spacing
M i n i m u m
2.0' Spacing (Typical)
Continuous Along Tube i n i m u m
L e n g t h
Sediment tube length selected should minimize the number of sediment tubes needed to span the width of the drainage conveyance.
If the ditch check length (perpendicular to the water flow) is 15 feet, then one 15 foot sediment tube is preferred compared to two overlapping 10 foot sediment tubes.
Sediment tubes for ditch checks should remain in place until fully established vegetation and root systems have completely developed and can survive on their own.
SEDIMENT TUBE DETAILS
INLET TUBES
GUTTER
PIPE
TOP VIEW
A
A
WEIGHTED INLET
TUBE
SEDIMENT TUBE
OR SILT FENCE
(OPTIONAL)
SECTION A-A
P
A
V
E
M
E
N
T
WEIGHTED INLET
TUBE
NOT TO SCALE
NOT TO SCALE
SEDIMENT TUBE NOTES:
MAXIMUM SEDIMENT TUB SPACINGSLOPE
4%
SEDIMENT TUBE SPACING
3%
2%
LESS THAN 2%
50-FEET
40-FEET
30-FEET
25-FEET
5%
6%
GREATER THAN 6%
150-FEET
100-FEET
75-FEET
TYPE A SEDIMENT TUBE INLET PROTECTION
NOT TO SCALE
STAPLES
BERM
OVERLAP
MIN. 4"
BE INSTALLED VERTICALLY
MATS/BLANKETS SHOULD
O
P
E
DOWNSLOPE.
12"
12"
ANCHORING DETAIL
4FT.
6"
EROSION CONTROL MATTING TYPICAL INSTALLATION
NOT TO SCALE
SLOPE INSTALLATION
CHANNEL INSTALLATION
1 1/2"
1 1/2"
2-IN. X 2-IN. WOOD POSTS
1.25 LB./LINEAR FT.
STEEL POSTS
OR
FOLD FABRIC TO OVERLAP
1 FOOT AND SECURE
TO POSTS WITH HEAVY DUTY
ATTACH FILTER FABRIC TO
POSTS WITH HEAVY DUTY PLASTIC TIES
FILTER FABRIC INSTALLATION
DETAIL
ALONG TOP 8-INCHES OF FABRIC.
PLASTIC TIES
TYPE A FILTER FABRIC INLET PROTECTION
NOT TO SCALE
EROSION CONTROL BLANKETS OR MATTING NOTES:
CURB
C P r o j e c t s E n g
W a t e r
P h a s e
P a s e
U p d a t e
P h a s e
P l a n s d w g
P
M
D
F p
File details come from the government source that posted it. Updated .