This document is a Statement of Work (SOW) for a federal contract opportunity to provide Protective Force Officers (PFOs) and a Site Account Manager (SAM) to supplement the National Renewable Energy Laboratory's (NREL) workforce.

The key objectives are to provide PFO placements to conduct security patrols, respond to emergencies, and provide other security and emergency preparedness services at NREL's campuses and sites. The Subcontractor must provide a dedicated onsite SAM to manage the PFO placements, training, scheduling, and operations. The Subcontractor is also responsible for providing vehicles, equipment, and uniforms for the PFO placements. The SOW details the specific duties and qualifications for the PFOs and SAM, as well as deliverables such as incident reports, weekly activity reports, and monthly schedules. The contract will include weekly review meetings between the Subcontractor's SAM and NREL's Technical Monitor.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RG II-001, Exhibit A (09/30/2020) Page 1 of 9

APPENDIX A

STATEMENT OF WORK

"Laboratory Protective Workforce Supplementation"

August 30, 2024

1.0 BACKGROUND

The National Renewable Energy Laboratory (NREL) is a national laboratory owned by the U.S. Department of Energy (DOE). NREL is the only federal laboratory dedicated to research, development, commercialization, and deployment of renewable energy and energy efficiency technologies. NREL is managed and operated for DOE’s Office of Energy Efficiency and Renewable Energy by The Alliance for Sustainable Energy (Alliance), the “M&O Contractor”.

NREL’s Office Laboratory Protection (LP) Operations group is responsible for ensuring the safety and security of NREL’s various sites and campuses. NREL locations include South Table Mountain (STM) Campus (which includes Building 16, South Table Energy Park (STEP), and Golden Warehouse) in Lakewood and Golden, Colorado as well as Flatirons Campus (FC) in Arvada, Colorado.

2.0 OBJECTIVE

The objective of this work effort is to supplement NREL’s PFO workforce resources as needed to effectively fulfil patrol requirements.

A Protective Force Officer (PFO) is the most visible contributor within the NREL Community to detecting, deterring, and denying threats and hazards in support of a safe and supportive work environment. This position is located within NREL LP. NREL campuses and sites are free-flow with staff and visitors regularly checking in at the gates and buildings. Though non-armed, PFOs utilize de-escalation tactics to mitigate threats and ensure safety. PFOs respond to emergencies and incidents, and using a customer service approach, see them through to recovery and reconstitution of normal operations. PFOs are an integral part of the NREL campus providing security and emergency preparedness protection services in accordance with applicable laws, regulations, Department of Energy (DOE) Orders, and contractual requirements.

A Site Account Manager (SAM) will train the Subcontractor’s PFO and PFSS Placements as required by and agreed-upon with NREL’s Technical Monitor (TM)/Protective Force Group Manager (PFGM) to a level of training to meet the needs of and support the existing Laboratory Protection group. The SAM will work with the Laboratory Protections, Protective Force Group Manager (PFGM) on all aspects associated with contract services. They will be responsible for maintaining and scheduling their contract security staff in support of Laboratory Protection department needs.

https://www.nrel.gov/ https://www.nrel.gov/ http://www.allianceforsustainableenergy.org/

RG II-001, Exhibit A (09/30/2020) Page 2 of 9

3.0 SCOPE OF WORK

To meet the objective, the scope of the work the Subcontractor shall perform will fall within the following areas:

3.1 The Subcontractor shall be responsible for providing PFO placements at NREL Sites as directed by the NREL Technical Monitor (TM).

3.1.1 PFO Placements shall be provided for all shift schedules, as requested by the NREL TM, including:

• Day Shift: 07:00 to 15:30

• Swing Shift: 15:00 to 23:30

• Night Shift: 23:00 to 07:30

3.1.2 PFO Placements must meet all qualifications and requirements listed in Appendix B.

3.1.3 PFO Placements shall report directly to the Site Account Manager (SAM).

3.1.4 PFO Placements shall provide security and emergency preparedness protection services on a day-to-day basis.

3.2 The Subcontractor shall be responsible for providing a dedicated Site Account Manager (SAM). The SAM will be provided a cubicle in the NREL LP office for their use in fulfilling their duties. This position will be responsible for:

3.2.1 managing the Subcontractor’s PFO Placements;

3.2.2 training the Subcontractor’s PFO Placements in a required and agreed level of training to meet the needs of and support NREL’s Laboratory Protection group;

3.2.3 coordinate with the NREL TM on all matters related to this Subcontract;

3.2.4 attending weekly planning meetings with the NREL TM for planning;

3.2.5 maintaining and scheduling the Subcontractor’s PFO Placements in support of Laboratory Protection department needs and confirming PFO Placement availability; and

3.2.6 ensuring sufficient back-up resources are available in the event of a PFO or PFSS Placement’s no-show.

3.3 The Subcontractor shall be responsible for providing vehicles for patrol and response to emergency and non-emergency events or requests for the Subcontractor’s personnel supplying security services to NREL’s STM campus. The Subcontractor will be responsible for maintaining those vehicles and supplying interim/temporary vehicles in the event any dedicated vehicles are out of commission.

3.4 The Subcontractor shall be responsible for providing uniforms and equipment for the

Subcontractor’s personnel in the performance of their duties. A list of required uniforms and prohibited equipment can be found at Appendix E.

RG II-001, Exhibit A (09/30/2020) Page 3 of 9

3.5 The Subcontractor shall be responsible for providing security services for responding to Emergency Notification Events in support of in-house (NREL) security personnel.

This includes following Emergency Notification System (ENS) sheets and Standard Operating Procedures (SOPs) to facilitate notification and internal/external responses.

3.6 In addition to regular shift scheduling, the Subcontractor shall also be responsible for providing additional PFO Placements for special events or circumstances that are defined approximately 14 days in advance.

3.7 The Subcontractor shall be responsible for ensuring that all PFO and SAM

Placements meet all requirements established in Appendix B (for PFOs and Appendix D (for SAMs). The Subcontractor shall be responsible for providing documentation verifying that the Subcontractor’s Placements meet all requirements prior to the Placement beginning work in support of this Subcontract and as-requested by the NREL TM.

3.8 The NREL TM or designated delegates/representatives reserve the right to dismiss

Subcontractor staff from their shift and from the site for any reason and will be required to document rationale for dismissal.

3.9 If any Subcontractor employee is involved in an accident or incident while on premise and is suspected of being under the influence of drugs, alcohol, or controlled substances NREL reserves the right to conduct a field test or send the individual for testing.

3.10 The Subcontractor shall be responsible for complying with any additional requirements as established by NREL via written amendment to this Subcontract.

4.0 TASKS

4.1 The Subcontractor shall provide PFO placements at NREL Sites as directed by the NREL Technical Monitor (TM).

4.1.1 PFO Placements shall conduct security patrols and emergency response operations in accordance with applicable laws, regulations, and Department of Energy Orders by:

• Conducting vehicle and foot patrol of NREL premises regularly to observe, report on, and maintain safety and establish a supportive presence;

• Understanding and enforcing NREL policies and procedures, Department of Energy Orders, and maintaining training and qualifications required for duty;

• Control access to NREL grounds through entrance gates, badge checks, vehicle searches, and hosting visitors and foreign nationals;

• Ensuring facilities are secure utilizing key and equipment control (locks, doors, windows, controlled access areas, etc);

RG II-001, Exhibit A (09/30/2020) Page 4 of 9

• Responding to alarms and emergencies by investigating and assessing the situation, then providing appropriate support and solutions to each situation;

• Minimize impact, promptly report, and respond to security and emergency incidents in an efficient and professional manner;

• Submitting reports of incidents, observations, shift reports, and daily activities;

• Uphold and honor the NREL mission statement as well as the Laboratory Protection mission statement;

• Performing as a member of a team, with diversity, inclusivity and respect at the forefront; and

• Providing support and assistance in a professional manner to NREL Community, guests and visitors, as well as outside federal and state response agencies, communicating routinely and effectively.

4.1.2 Each PFO Placement shall call out to the NREL Central Monitoring Station

(CMS), documenting any observations, notable occurrences, incidents, or other notable events which take place during the shift and/or actions taken.

4.2 The Subcontractor shall provide an onsite Site Account Manager (SAM) for the duration of the Subcontract.

4.2.1 The SAM shall be responsible for overseeing Subcontractor’s schedule, training, and operations to adequately meet the requirements of the Subcontract.

4.2.2 The SAM shall be responsible for providing a written schedule of coverage as requested by NREL’s Protective Force Group Manager. The schedule of coverage will be for one (1) month at a time and delivered to the PFGM no later than the 20th of the previous month.

4.2.3 The SAM shall be responsible for managing all Human Resources matters involving the Subcontractor’s personnel in accordance with the Subcontractor’s Human Resources policies and procedures and in accordance with any additional NREL requirements.

4.2.4 The SAM shall replace any PFO Placement proposed for scheduling who is deemed not acceptable by the Protective Force Group Manager of NREL’s Laboratory Protection department. The NREL PFGM will provide documentation of rational for deeming an individual not acceptable.

4.2.5 The SAM shall participate in weekly meetings with the NREL TM to discuss

Placement Plan of the Week and any other topics planned. The NREL TM shall provide the SAM a list of planned topics and the SAM shall provide the NREL TM a list of planned discussion topics as well as a copy of the Weekly Activity Report no later than Close of Business (COB) on the Wednesday prior to the meeting.

RG II-001, Exhibit A (09/30/2020) Page 5 of 9

4.3 The Subcontractor shall be responsible for providing vehicles for patrol and response to emergency and non-emergency events or requests for the Subcontractor’s personnel supplying security services to NREL’s STM campus. The Subcontractor will be responsible for maintaining those vehicles and supplying interim/temporary vehicles in the event any dedicated vehicles are out of commission. Those vehicles must be registered with NREL Lab Protection. Subcontractor’s placements are prohibited from using personal vehicles to conduct patrol or other official duties in support of this Subcontract.

4.4 The Subcontractor shall provide equipment for all Subcontractor Placements at

NREL. A list of required equipment can be found at Appendix E.

4.5 NREL shall provide uniforms for all Subcontractor Placements at NREL. A list of required uniforms can be found at Appendix E.

4.6 The Subcontractor shall be responsible for responding to Emergency Notification

Events in support of in-house (NREL) security personnel. NREL follows Emergency Notification System (ENS) sheets and Standard Operating Procedures (SOPs) to facilitate notification and internal/external responses.

4.7 In addition to regular shift scheduling, the Subcontractor shall also be responsible for providing additional PFO Placements for special events or circumstances as defined approximately 14 days in advance by the NREL TM.

4.8 The Subcontractor shall be responsible for providing documentation verifying that the Subcontractor’s Placements meet all requirements prior to the Placement beginning work in support of this Subcontract and as-requested by the NREL TM.

5.0 REVIEW MEETINGS AND TRAVEL REQUIREMENTS

Review meetings will be conducted once per week starting immediately after the award of the subcontract. These meetings will be held every Friday morning starting at 08:00.

These meetings will be held every week for the duration of the subcontract. The meeting time and day may be adjusted by mutual agreement between NREL’s Protective Force Group Manager (PFGM)/Technical Monitor (TM) and the contract Site Account Manager (SAM). These meetings will be in person or set up in advance over the Teams. A meeting agenda will be required by COB on the Wednesday prior to the meeting with the topics for discussion. The SAM will provide the TM their topics for discussion and the TM will provide the SAM their topics for discussion.

6.0 DELIVERABLES

The Subcontractor shall provide the following deliverables by the due date as indicated:

RG II-001, Exhibit A (09/30/2020) Page 6 of 9

Deliverable No.

Associated Task(s) No.

Deliverable Description Due Date

6.1 4.1, 4.2, and 4.8

Certification that all proposed placements meet the requirements established in Appendices B, C, and D

No later than 5 days before first scheduled shift

6.2 4.3 List of Weekly Meeting Discussion Topics

No later than COB on the Wednesday prior to the SAM/NREL TM weekly meeting

6.3 4.4 Registration, Insurance, and other NREL Fleet Manager Requirements Information for Subcontractor Vehicles

No later than 7 days before first scheduled shift

6.4 4.8 Personnel Certification and other Documentation

As-Requested by NREL TM to ensure/verify compliance with Appendices B, C, and D

6.5 4.3.2 Monthly Placement Schedules

No later than the 20th of the month preceding the scheduled dates

6.6 4.1.1 and 4.2.1

Incident Reports By the end of the shift during which the incident took place.

Ongoing throughout Subcontract Performance.

6.7 4.3.5 Weekly Activity Report No later than COB on the Wednesday prior to the SAM/NREL TM weekly meeting

Weekly Activity Report: The SAM shall provide to NREL in electronic format a brief (no more than 5-pages) description of observations, notable occurrences, incidents, or other notable events which took place during the prior week and/or actions taken, or other items of interest to NREL. This report will be a standing discussion topic at all Weekly Review Meetings.

Incident Report: The subcontractor shall provide to NREL in electronic format, i.e., a brief (1-2 page) description of actions or events. This shall include significant technical developments, key decisions resulting from a meeting or review, or other items of interest to NREL. Guidance for writing Incident Reports to be provided at time of award.

RG II-001, Exhibit A (09/30/2020) Page 7 of 9

Monthly Schedule: The subcontractor shall provide a written schedule of coverage as requested by NREL’s Protective Force Group Manager. The schedule of coverage will be for one (1) month at a time and delivered to the PFGM no later than the 20th of the previous month. The SAM shall replace any PFO Placement proposed for scheduling who is deemed not acceptable by the Protective Force Group Manager of NREL’s Laboratory Protection department. The NREL PFGM will provide documentation of rational for deeming an individual not acceptable.

Weekly Meeting Discussion Topics: The subcontractor shall provide a written list of discussion topics for the weekly meeting between the SAM and NREL TM no later than the Close of Business (COB) each Wednesday prior to the weekly meeting.

DELIVERY OF COMPUTER SOFTWARE CODE (AS APPLICABLE)

All object, source, or other code (including all applicable data sets) developed under this subcontract effort shall be provided to the technical monitor as a condition of final payment, in accordance with the subcontract. It is expected that all delivered source code shall be original and the subcontractor shall provide a written certification to the Technical Monitor that all source, or other code developed and delivered under this subcontract does not contain any open source code - as a condition of final payment in accordance with the subcontract. The subcontractor’s (including all lower tier subcontractors, as applicable) certification shall specify that “All source, or other software code developed and/or delivered under this Subcontract No.__________ is original and does not contain any 3rd party or other open source software.”

7.0 ELECTRONIC REPORTING REQUIREMENTS FOR SUBCONTRACT REPORT

DELIVERABLES

It is NREL’s intention to publish subcontract report deliverables containing publicly available information (e.g. non-confidential, non-protected, non-proprietary information) for distribution on the internet.

The subcontractor shall provide the final approved version of report deliverables in accordance with the electronic reporting requirements described below.

The technical monitor may specifically direct the subcontractor to provide reports in one or more of the file format standards provided below:

7.1 The subcontractor shall submit all report deliverables (including status, annual, or final reports) as electronic files in Adobe .pdf format, preferably with all graphics and images embedded within the document.

7.2 All final approved version submissions shall be delivered to NREL via e-mail to the

NREL Technical Monitor.

7.3 If it is not possible to include all of the graphics and images (figures, illustrations, and photographs) in the same file as the text, NREL will accept the text in Adobe .pdf formats and the graphics and images as separate electronic graphic or image files*.

RG II-001, Exhibit A (09/30/2020) Page 8 of 9

The accepted standard for page layout and graphics is the Adobe Creative Suite of programs.

*The acceptable graphic or image file formats are: .eps, .tif, .gif, .jpg, .wmf, .emf, .pct, .png, .bmp, .psd, .ai, .fh, .qif, .fpx, cdr. The preferred resolution for graphics or images is 300 dpi. Include all fonts used in creating the file.

7.4 For animation, video, or multi-media elements, CD-ROM, DVR and thumb drive are acceptable technical deliverable media.

7.5 For all calculations in support of subcontract reports that are conducted in ASPEN+, an electronic copy of INPUT, REPORT and BACKUP (if Model Manager is used) must be submitted with all reports. Additionally, if costing or sizing calculations are conducted in a spreadsheet [no process calculations (heat and material balances) in spreadsheet format are permitted], a copy of the fully documented MS Excel file shall be supplied.

7.6 A fully executed model release shall be supplied to NREL with all photographs and images, regardless of whether such photographs or images are delivered to NREL electronically or in hard copy. Such model release shall certify that the Alliance for Sustainable Energy, LLC, Management and Operating Contractor for the National Renewable Energy Laboratory for the U.S. Department of Energy is granted a non-exclusive, paid-up, irrevocable, worldwide license to publish such photographs in any medium or reproduce such photographs or allow others to do so for United States Government purposes. Model releases are required in all situations in which a reasonable person would respond in the affirmative to the question – could someone, other than the model himself/herself, recognize the person in this photograph or image? All model releases shall be provided to the subcontract associate as a condition of final payment, in accordance with the subcontract. To obtain a Subcontractor Model Release form, please contact images@nrel.gov.

8.0 ACKNOWLEDGEMENTS IN SUBCONTRACTOR PUBLICATIONS

In any scientific or technical report or article, conference paper, journal article, etc. based on or containing data first produced in the performance of this subcontract and published in academic, technical or professional journals, symposia proceedings or similar works, the subcontractor shall use this acknowledgement stating, “This [article, conference paper, journal article, etc.] was developed based upon funding from the Alliance for Sustainable Energy, LLC, Managing and Operating Contractor for the National Renewable Energy Laboratory for the U.S. Department of Energy.”

9.0 COPYRIGHT PERMISSION/AUTHORIZATIONS

The subcontractor is responsible for obtaining copyright permissions and/or authorizations for all information and/or data, as applicable that is incorporated into all final technical reports. Electronic copies of these copyright permissions and/or authorizations shall be provided to the at the email address provided below. The subcontractor shall also provide a written certification to the Technical Monitor as to such permissions and/or authorizations as a condition of final payment. The subcontractor’s (including all lower tier subcontractors, as applicable) certification shall specify that “I have obtained all necessary and legally required copyright permissions and/or authorizations for any and all information, data, graphs, images, etc., as applicable, that is incorporated into the final mailto:images@nrel.gov

RG II-001, Exhibit A (09/30/2020) Page 9 of 9

Technical Report titled __________________________, delivered under this Subcontract No.__________. Copies of these permissions and/or authorizations are attached.”

10.0 DELIVERABLE ADDRESS:

The subcontractor shall clearly label all deliverables to include:

• The subcontractor’s name

• NREL’s subcontract number

• NREL Technical Monitor’s name

• Deliverable date, and

• Deliverable description.

Electronic deliverables shall be sent via email to the Technical Monitor as follows:

***, Technical Monitor e-mail: ***

• One (1) master electronic version, including graphics mailto:timothy.powell@nrel.gov

Appendix B – Requirements for PFO Placements

Proposed individuals for PFO Placement at NREL must complete, obtain, maintain and be able to demonstrate via documentation provided to the NREL Technical Monitor (TM) by the Subcontractor’s Site Account Manager (SAM) no later than 5 days prior to the individual’s first shift:

• CUI//NOFORN: Eligibility requirements: This position will require access to Controlled Unclassified Information and only applicants that are US Citizens at the time of application will be considered in accordance with DOE O 471.7, Controlled Unclassified Information.

• Medical evaluation and certification, as well as behavioral health screen, in accordance with the requirements of 10 CFR Part 1046 and maintain active certifications as established by 10 CFR Part 1046.

• Pre-placement screening (background investigation, which may include Social Security trace, Sex Offender, Federal & State Criminal, Motor Vehicle Record, Education Verification, and drug screen). The pre-placement drug screen will test for marijuana use. If a proposed PFO Placement tests positive for marijuana use on the pre-placement drug test that individual will not be approved for or permitted to support this Subcontract.

• Ability to meet and pass the criteria of E-Verify. NREL uses E-Verify to achieve a lawful workforce.

• Proof of a valid and current Colorado operator’s license for a motor vehicle. Must be verified annually.

• Red Cross Training (First Aid/AED/CPR). Refresher training and re-certification is required every 2 years, and

• other federal trainings as may be incorporated into this document by written modification.

Proposed individuals for PFO Placement at NREL must meet the following basic and required qualifications prior to the date of the individual’s first shift:

• High School Diploma or equivalent and 1 or more years of experience or equivalent related security education/experience. Or, related Associate’s Degree or certification program of comparable scope or equivalent related security education/experience.

• Intermediate skills in applicable software packages and office equipment. (Microsoft Office products: Outlook, Word, SharePoint, PowerPoint, Excel).

• Attend and complete an NREL-led Orientation covering topics including but not limited to:

o NREL specific training and any certifications in Chemical Safety and NFPA 704

Placarding. Must maintain this training on a yearly basis.

Proposed individuals for PFO Placement at NREL must complete, obtain, maintain and be able to demonstrate via documentation provided to the NREL Technical Monitor (TM) by the Subcontractor’s Site Account Manager (SAM) no later than 30 - 60 days following to the individual’s first shift:

• Current emergency response training (ERT/ENS) must be completed through FEMA Emergency Management Institute online training. Must maintain this training on a yearly basis.

• FEMA IS-100C and IS-700B certification.

• Initiating incident command (FEMA/NIMS) training

No later than 3 months after start of work:

• NREL’s Fire Control Panel (FACP) Training

No later than 6 months after start of work:

• Ability to obtain and maintain a credential in accordance with the requirements of Homeland Security Presidential Directive 12 (HSPD-12), including an additional National Agency Checks with Indices background investigation and fingerprinting. Must be renewed every 5 years.

• HSPD-12 Position of Public Trust: Must be able to obtain and maintain an HSPD- 12 Position of Public Trust credential for a position as required by Homeland Security Presidential Directive 12, which includes a favorable background investigation of the appropriate tier.

Beginning June 2025:

• at least one officer per shift must have a TSSDI, or Q clearance.

Appendix D – Requirements for SAM Placement

Proposed individuals for SAM Placement at NREL must complete, obtain, maintain, and be able to demonstrate via documentation provided to the NREL Technical Monitor (TM) by the Subcontractor’s Site Account Manager (SAM) no later than 5 days prior to the individual’s first shift:

• CUI//NOFORN: Eligibility requirements: This position will require access to Controlled Unclassified Information and only applicants that are US Citizens at the time of application will be considered in accordance with DOE O 471.7, Controlled Unclassified Information.

• Medical evaluation and certification, as well as behavioral health screen, in accordance with the requirements of 10 CFR Part 1046 and maintain active certifications as established by 10 CFR Part 1046.

• Pre-placement screening (background investigation, which may include Social Security trace, Sex Offender, Federal & State Criminal, Motor Vehicle Record, Education Verification, and drug screen). The pre-placement drug screen will test for marijuana use. If a proposed SAM Placement tests positive for marijuana use on the pre-placement drug test that individual will not be approved for or permitted to support this Subcontract.

• Ability to meet and pass the criteria of E-Verify. NREL uses E-Verify to achieve a lawful workforce.

• Proof of a valid and current Colorado operator’s license for a motor vehicle. Must be verified annually.

• Red Cross Training (First Aid/AED/CPR). Refresher training and re-certification is required every 2 years, and

• other federal trainings as may be incorporated into this document by written modification.

Proposed individuals for SAM Placement at NREL must meet the following basic and required qualifications prior to the date of the individual’s first workday supporting the Subcontract:

• High School Diploma or equivalent and 1 or more years of experience or equivalent related security education/experience. Or, related Associate’s Degree or certification program of comparable scope or equivalent related security education/experience.

• Attend and complete an NREL-led Orientation covering topics including but not limited to:

o NREL specific training and any certifications in Chemical Safety and NFPA 704

Placarding. Must maintain this training on a yearly basis.

• Certification and/or degree in specified field is required.

• Prior supervisory experience.

• Prior experience in a security-related field such as criminal justice, military, homeland security, corrections, security, EMS, or behavioral health.

• Intermediate skills in applicable software packages and office equipment. (Microsoft Office products: Outlook, Word, SharePoint, PowerPoint, Excel).

• Ability to monitor CCTV and electronic surveillance systems.

Proposed individuals for SAM Placement at NREL must complete, obtain, maintain and be able to demonstrate via documentation provided to the NREL Technical Monitor (TM) no later than 30 - 60 days following to the individual’s first shift:

• Current emergency response training (ERT/ENS) must be completed through FEMA Emergency Management Institute online training. Must maintain this training on a yearly basis.

• FEMA IS-100C and IS-700B certification.

• Initiating incident command (FEMA/NIMS) training

No later than 3 months after start of work:

• NREL’s Fire Control Panel (FACP) Training

No later than 6 months after start of work:

• Ability to obtain and maintain a credential in accordance with the requirements of Homeland Security Presidential Directive 12 (HSPD-12), including an additional National Agency Checks with Indices background investigation and fingerprinting. Must be renewed every 5 years.

• HSPD-12 Position of Public Trust: Must be able to obtain and maintain an HSPD- 12 Position of Public Trust credential for a position as required by Homeland Security Presidential Directive 12, which includes a favorable background investigation of the appropriate tier.

Beginning June 2025:

• at least one officer per shift must have a TSSDI, or Q clearance.

Appendix E – Required Equipment for On-Site Security Contractors

Contract Security Patrol Officers needed equipment:

NREL provided uniforms to consist of the following:

1. NREL Branded Winter long sleeve shirts

2. NREL Branded Summer short sleeve shirts

3. NREL Branded Ball Cap

4. NREL Branded Winter hat (beanie)

5. NREL Branded Winter jacket

6. NREL Branded Mid weight jacket

Subcontractor provided equipment to consist of the following:

1. Uniform pants

2. Belt

3. Vehicle search gloves (HexBlu) is a quality glove

4. High visibility reflective vest for traffic control or emergency response.

5. Radio pouch

6. Flashlight

7. Key carrier

8. Pocket notebook for incident reporting (collect facts, names, responders, etc.)

Vehicle Equipment needed for each patrol vehicle:

1. Medical response bag consisting of the following supplies:

3 Face Shields 1 Burn Sheet (60”x90”) 1 Emergency Blanket (54”x80”) 1 Multi Trauma dressing (12”x30”) 2 Reflective Emergency Blankets (space blankets) 10 2”x2” gauze pads 10 4”x4” gauze pads 10 3”x4” gauze pads 8 Roller Bandages 2 Triangular Bandages 2 Trauma Bandages 2 Elastic Bandage Rolls 1 Roll Adhesive Tape 10 antiseptic wipes Multiple Adhesive Bandages (Band aids) Latex Gloves (1 pair each – S,M,L, XL) 1 Pocket Resuscitator 1 “Stop the Bleed” kits 1 Pair Scissors 2 Instant Cold Packs NREL work related injury cards

2. Resupply of used equipment will be the responsibility of the SAM.

3. Portable vehicle battery jump/air compressor unit.

4. Amber light bar or visor lights

5. Portable spotlight for patrol vehicles, for site patrol.

6. Flashlight

7. Siren/PA capability system

8. Alley lights on light bar

9. Hard wired A-pillar mounted spotlights

10. Reflective Decals for safety

11. Vehicles clearly marked as security vehicles

Security Equipment that is not allowed for use at NREL facilities:

1. No fire arms

2. No knifes over a 3” blade

3. No hand cuffs or cuff zip ties

4. No OC capsicum or Tear Gas, or any other chemical agent self defense spray or dispensing agents and/or containers.

5. No batons, ASPs, or Coga defense items allowed

6. No assault or defensive weapons of any type

Exhibit 1 - Statement of Work PFO Workforce Contractor - 8-29-24
1.0 BACKGROUND
2.0 OBJECTIVE
3.0 SCOPE OF WORK
3.1 The Subcontractor shall be responsible for providing PFO placements at NREL Sites as directed by the NREL Technical Monitor (TM).
3.1.1 PFO Placements shall be provided for all shift schedules, as requested by the NREL TM, including:
3.1.2 PFO Placements must meet all qualifications and requirements listed in Appendix B.
3.1.3 PFO Placements shall report directly to the Site Account Manager (SAM).
3.1.4 PFO Placements shall provide security and emergency preparedness protection services on a day-to-day basis.
3.2 The Subcontractor shall be responsible for providing a dedicated Site Account Manager (SAM). The SAM will be provided a cubicle in the NREL LP office for their use in fulfilling their duties. This position will be responsible for:
3.2.1 managing the Subcontractor’s PFO Placements;
3.2.2 training the Subcontractor’s PFO Placements in a required and agreed level of training to meet the needs of and support NREL’s Laboratory Protection group;
3.2.3 coordinate with the NREL TM on all matters related to this Subcontract;
3.2.4 attending weekly planning meetings with the NREL TM for planning;
3.2.5 maintaining and scheduling the Subcontractor’s PFO Placements in support of Laboratory Protection department needs and confirming PFO Placement availability; and
3.2.6 ensuring sufficient back-up resources are available in the event of a PFO or PFSS Placement’s no-show.
3.3 The Subcontractor shall be responsible for providing vehicles for patrol and response to emergency and non-emergency events or requests for the Subcontractor’s personnel supplying security services to NREL’s STM campus. The Subcontractor will be r...
3.4 The Subcontractor shall be responsible for providing uniforms and equipment for the Subcontractor’s personnel in the performance of their duties. A list of required uniforms and prohibited equipment can be found at Appendix E.
3.5 The Subcontractor shall be responsible for providing security services for responding to Emergency Notification Events in support of in-house (NREL) security personnel. This includes following Emergency Notification System (ENS) sheets and Standar...
3.6 In addition to regular shift scheduling, the Subcontractor shall also be responsible for providing additional PFO Placements for special events or circumstances that are defined approximately 14 days in advance.
3.7 The Subcontractor shall be responsible for ensuring that all PFO and SAM Placements meet all requirements established in Appendix B (for PFOs and Appendix D (for SAMs). The Subcontractor shall be responsible for providing documentation verifying t...
3.8 The NREL TM or designated delegates/representatives reserve the right to dismiss Subcontractor staff from their shift and from the site for any reason and will be required to document rationale for dismissal.
3.9 If any Subcontractor employee is involved in an accident or incident while on premise and is suspected of being under the influence of drugs, alcohol, or controlled substances NREL reserves the right to conduct a field test or send the individual ...
3.10 The Subcontractor shall be responsible for complying with any additional requirements as established by NREL via written amendment to this Subcontract.
4.0 TASKS
4.1 The Subcontractor shall provide PFO placements at NREL Sites as directed by the NREL Technical Monitor (TM).
4.1.1 PFO Placements shall conduct security patrols and emergency response operations in accordance with applicable laws, regulations, and Department of Energy Orders by:
4.1.2 Each PFO Placement shall call out to the NREL Central Monitoring Station (CMS), documenting any observations, notable occurrences, incidents, or other notable events which take place during the shift and/or actions taken.
4.2 The Subcontractor shall provide an onsite Site Account Manager (SAM) for the duration of the Subcontract.
4.2.1 The SAM shall be responsible for overseeing Subcontractor’s schedule, training, and operations to adequately meet the requirements of the Subcontract.
4.2.2 The SAM shall be responsible for providing a written schedule of coverage as requested by NREL’s Protective Force Group Manager. The schedule of coverage will be for one (1) month at a time and delivered to the PFGM no later than the 20th of the...
4.2.3 The SAM shall be responsible for managing all Human Resources matters involving the Subcontractor’s personnel in accordance with the Subcontractor’s Human Resources policies and procedures and in accordance with any additional NREL requirements.
4.2.4 The SAM shall replace any PFO Placement proposed for scheduling who is deemed not acceptable by the Protective Force Group Manager of NREL’s Laboratory Protection department. The NREL PFGM will provide documentation of rational for deeming an in...
4.2.5 The SAM shall participate in weekly meetings with the NREL TM to discuss Placement Plan of the Week and any other topics planned. The NREL TM shall provide the SAM a list of planned topics and the SAM shall provide the NREL TM a list of planned ...
4.3 The Subcontractor shall be responsible for providing vehicles for patrol and response to emergency and non-emergency events or requests for the Subcontractor’s personnel supplying security services to NREL’s STM campus. The Subcontractor will be r...
4.4 The Subcontractor shall provide equipment for all Subcontractor Placements at NREL. A list of required equipment can be found at Appendix E.
4.5 NREL shall provide uniforms for all Subcontractor Placements at NREL. A list of required uniforms can be found at Appendix E.
4.6 The Subcontractor shall be responsible for responding to Emergency Notification Events in support of in-house (NREL) security personnel. NREL follows Emergency Notification System (ENS) sheets and Standard Operating Procedures (SOPs) to facilitate...
4.7 In addition to regular shift scheduling, the Subcontractor shall also be responsible for providing additional PFO Placements for special events or circumstances as defined approximately 14 days in advance by the NREL TM.
4.8 The Subcontractor shall be responsible for providing documentation verifying that the Subcontractor’s Placements meet all requirements prior to the Placement beginning work in support of this Subcontract and as-requested by the NREL TM.
5.0 REVIEW MEETINGS AND TRAVEL REQUIREMENTS
6.0 DELIVERABLES
Weekly Activity Report: The SAM shall provide to NREL in electronic format a brief (no more than 5-pages) description of observations, notable occurrences, incidents, or other notable events which took place during the prior week and/or actions taken,...
Incident Report: The subcontractor shall provide to NREL in electronic format, i.e., a brief (1-2 page) description of actions or events. This shall include significant technical developments, key decisions resulting from a meeting or review, or other...
Monthly Schedule: The subcontractor shall provide a written schedule of coverage as requested by NREL’s Protective Force Group Manager. The schedule of coverage will be for one (1) month at a time and delivered to the PFGM no later than the 20th of th...
Weekly Meeting Discussion Topics: The subcontractor shall provide a written list of discussion topics for the weekly meeting between the SAM and NREL TM no later than the Close of Business (COB) each Wednesday prior to the weekly meeting.
7.0 ELECTRONIC REPORTING REQUIREMENTS FOR SUBCONTRACT REPORT DELIVERABLES
7.1 The subcontractor shall submit all report deliverables (including status, annual, or final reports) as electronic files in Adobe .pdf format, preferably with all graphics and images embedded within the document.
7.2 All final approved version submissions shall be delivered to NREL via e-mail to the NREL Technical Monitor.
7.3 If it is not possible to include all of the graphics and images (figures, illustrations, and photographs) in the same file as the text, NREL will accept the text in Adobe .pdf formats and the graphics and images as separate electronic graphic or ...
7.4 For animation, video, or multi-media elements, CD-ROM, DVR and thumb drive are acceptable technical deliverable media.
7.5 For all calculations in support of subcontract reports that are conducted in ASPEN+, an electronic copy of INPUT, REPORT and BACKUP (if Model Manager is used) must be submitted with all reports. Additionally, if costing or sizing calculations are ...
7.6 A fully executed model release shall be supplied to NREL with all photographs and images, regardless of whether such photographs or images are delivered to NREL electronically or in hard copy. Such model release shall certify that the Alliance for...
8.0 ACKNOWLEDGEMENTS IN SUBCONTRACTOR PUBLICATIONS
9.0 COPYRIGHT PERMISSION/AUTHORIZATIONS
10.0 Deliverable Address:
Exhibit 3 - PFO Personnel Requirements
Exhibit 5 - SAM Personnel Requirements
Exhibit 6 - Equipment Requirements - V2