2024.07.23 Appendix B.5 - Region 5 Central (North)_DRAFT.pdf
PDF 159 KB Posted
- Attached to
- Non-Temporary Storage Contract (NTSC) RFI
- Solicitation number
- TRANSCOM24R012
About this file
This document is an appendix to a Request for Information (RFI) for a Non-Temporary Storage Contract (NTSC) for the storage of household goods (HHG) belonging to Department of Defense Service Members, DoD Civilians, and U.S. Coast Guard Members.
The appendix outlines the proximity and capacity requirements for storage facilities in Region 5 (Central [North]). Specifically, the contractor must maintain storage facilities within 100 miles of the major installations listed, with a total storage capacity of up to 17 million gross pounds of HHG annually for each major installation. The contractor must also maintain additional regional support storage facilities to provide the required storage capacity for shipments from outlying areas. All storage facilities must comply with the Performance Work Statement requirements. The government may direct changes to the location, proximity, and capacity requirements during contract performance, to be mutually agreed upon.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HTC711-XX-R-R0XX
Appendix B.5 (North Central Region)
B5-1
Region 5 (Central [North]) Major Installations Proximity Requirements
B5.1. The Contractor shall maintain storage facilities within 100 miles of each of the major installations listed below in Region 5:
• Davis-Monthan AFB/Luke AFB, Arizona
• USAF Academy, Colorado
• Ft. Riley/Ft. Leavenworth, Kansas
• Minot AFB, North Dakota
• Ellsworth AFB, South Dakota
• Hill AFB, Utah
B5.2. The Contractor shall maintain regional support storage facilities, in addition to the location requirements identified in B5.1, to provide the requisite storage capacity for shipments from the outlying areas.
B5.3. The Contractor shall maintain storage facilities with capacity up to 17 million gross pounds of HHG annually for each of the major installations identified in B5.1.
B5.4. All storage facilities shall also comply with all requirements identified in the Performance Work Statement.
B5.5. The Government may direct changes to the location and proximity requirements identified in paragraph B5.1. and the capacity requirements identified in Paragraph B5.3 during contract performance to be mutually agreed upon by the Government and the Contractor in advance.
File details come from the government source that posted it. Updated .