2024.07.23 Appendix B.1 - Region 1 Southeast_DRAFT.pdf

PDF 158 KB Posted

Attached to
Non-Temporary Storage Contract (NTSC) RFI
Solicitation number
TRANSCOM24R012
Issued by

About this file

This document is an Appendix B.1 to a draft Performance Work Statement for a Non-Temporary Storage Contract (NTSC) for the Southeast Region. It specifies the proximity and capacity requirements for the contractor's storage facilities. The contractor must maintain storage facilities within 100 miles of major installations in the Southeast region, with a total storage capacity of up to 35 million gross pounds of household goods annually for each major installation. The government may direct changes to the location and capacity requirements during contract performance. The document is part of a larger Request for Information related to the NTSC, which seeks information from storage warehouse providers to assist in defining the government's storage requirements for household goods belonging to DoD Service Members, DoD Civilians, and U.S. Coast Guard Members.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HTC711-XX-R-R0XX

Appendix B.1 (Southeast Region)

B1-1

Region 1 (Southeast) Major Installations Proximity Requirements

B1.1. The Contractor shall maintain storage facilities within 100 miles of each of the major installations listed below in Region 1:

• Camp Lejeune/MCAS Cherry Point, North Carolina

• Maxwell AFB, Alabama

• Eglin AFB, Florida

• FLC Jacksonville, Florida

• MacDill/Partick AFB, Florida

• Ft. Moore, Georgia

• Ft. Stewart, Georgia

• Ft. Liberty, North Carolina

• Shaw AFB, South Carolina

B1.2. The Contractor shall maintain regional support storage facilities, in addition to the location requirements identified in B1.1, to provide the requisite storage capacity for shipments from the outlying areas.

B1.3. The Contractor shall maintain storage facilities with capacity up to 35 million gross pounds of HHG annually for each of the major installations identified in B1.1.

B1.4. All storage facilities shall also comply with all requirements identified in the Performance Work Statement.

B1.5. The Government may direct changes to the location and proximity requirements identified in paragraph B1.1. and the capacity requirements identified in Paragraph B1.3. during contract performance to be mutually agreed upon by the Government and the Contractor in advance.

File details come from the government source that posted it. Updated .