This document is an Addendum to Invitation to Bid 2022200045 for Kitchen Improvements at the Whiteaker Head Start Facility in Eugene, Oregon. The City of Eugene is managing the project, which involves modifying walls, foundation, and exterior, as well as constructing a walk-in cooler/freezer. The addendum provides a list of attendees from the mandatory pre-bid conference, responses to questions asked during the conference, and revisions to the bid form and equipment specifications. The project is intended to start as soon as possible.
The addendum outlines pricing details, including an alternate bid item for transporting the cooler to the site. It also notes that the contract is subject to the Davis-Bacon Act and requires payment of prevailing wages. Bidders must meet minimum experience requirements and have a current Oregon Contractor Board registration. Subcontractors must also be eligible for public works contracts and have filed the required bonds.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: May 5, 2023 To: All Potential Bidders From: Noel Dietz, Purchasing Analyst Subject: Invitation to Bid 2022200045 Kitchen Improvements at Whiteaker Head Start Facility
ADDENDUM NO. 1
The solicitation referenced above is updated & amended as follows:
1. List of attendees present during mandatory pre-bid conference held on April 24, 2023. The sign-in sheet is attached to this Addendum.
Contact Person Business Name Email Noel Dietz City of Eugene, Purchasing ndietz@eugene-or.gov
Kate Wilson City of Eugene, Project Manager
Mickey Hornbeck McClain Construction mickey@mcclainconstruct.com
Chris Vejnoska Richards Remodeling chris@richardsremodeling.com
Aucensio First Cascade Decoration Not provided.
Rico Ramos McKenzie Commercial rramos@mccmail.gbiz
2. Responses to questions received at the pre-bid conference are provided below.
Does the project include the cooler, ceiling fan, steam kettle, and grease traps? If not, which elements are included?
The City of Eugene has purchased the cooler, and it is in storage at the City of Eugene. The exhaust fan is included in the project. The steam kettle and grease interceptor are not. If the steam kettle or grease interceptor are damaged by the contractor, the contractor will be responsible for replacement.
Is relocation for the water heater part of the scope?
The contractor may choose to move the water heater during construction. If the water heater is moved during construction, it will need to be put back in the same spot.
Who will be responsible for transporting the cooler from it’s current location to the project site?
The City would like contractors to include relocation as an alternate bid. The cooler is currently being stored less than one mile from the Whiteaker School.
Is dry rot repair a budget item/additive alternate?
We have no way of knowing if there is dry rot and we do not know the components of the existing roof assembly. The only thing happening at the existing roof is replacement of the exhaust fan. Any dry rot repair will be addressed via change order.
What is the project timing?
The City anticipates that the project will begin as soon as possible.
Where are the access and staging?
The access point will be from Jackson Street. Staging location will be dependent on project start date.
mailto:ndietz@eugene-or.gov mailto:mickey@mcclainconstruct.com mailto:chris@richardsremodeling.com mailto:rramos@mccmail.gbiz
If the mechanicals units intended locations are on the existing adjacent roof, is there a structural design for it?
There are two units that will either sit on a concrete slab or racks on a wall. They do not go on the adjacent roof. Please see Revised Drawing A-2, attached, which includes information about the concrete slab and wood fence/gates infrastructure needed for the units.
3. The equipment report for the cooler included in Division 11 4000 of the specifications had a font error that rendered it illegible. The corrected version is attached to this Addendum.
4. Section VI. FORMS TO SUBMIT WITH BID, STANDARD BID FORM, pages 15-17, is removed and replaces with the STANDARD BID FORM - REVISED, attached to this Addendum.
All other specifications, terms and conditions remain unchanged.
Box #: 2
Box Description: 11' - 2" x 13' - 6" x 8' - 6 sloped down to 8' - 0" rectangular outdoor freezer/cooler
- 10' - 4" ID x 4' - 0" ID x 7' - 7" ID freezer (no floor)
- 10' - 4" ID x 8' - 3" ID x 7' - 7" ID cooler (no floor) *Box to sit on an Insulated Slab*
System Name: Freezer
System Summary: (1) RFO250L4SDA-NT w/ (1) RL6E066DDARE - 7418 BTU/H Capacity @ 9.9º F TD @ 14.7 hour runtime @ 95ºF ambient / -10ºF room temp. / 452ft altitude
Load Summary:
(BTU/H)
Surfaces 1,246
Infiltration 4,430
Product 87
Misc. 293
Total 6,056
20.58%
73.16%
1.43%
4.83%
Holding Temp. (º F): -10
RH %: 90%
Ambient Temp. @ Chamber (º F): 95
Ambient Temp. @ Cond. Unit (º F): 100Altitude (Ft.): 452
Imperial Brown (Portland Division) - 198 SE 223rd Ave. - Gresham, OR 97030
Phone: (800) 238.4093 - Fax: (503) 665.2929
Internet: imperialbrown.com
CCB #0091759
Box Load Calculation
Product Weight (lbs.) 312
Pull Down Time (Hours) 24
Entering Temp. (º F) 0
Final Temp. (º F) -10
Freezing Point (º F) 29
Specific Heat - Above 0.90
Specific Heat - Below 0.40
Latent Heat of Fusion 115.00
Respiration Load 0.00
Heat of Respiration 0.00
Motor HP Equivalence 0.03
Lighting Watts / Ft.² 0.37
Occupancy 0.01
Forklift 0.00
Misc. BTUH 0.00 times ASHRAE's recommended infiltration load2.50
Product Data Misc. Data
22-IB-73619
Quote/Order #
ASHRAE recommended values for holding load only
4/7/2022 2:15:38 PMPrinted On: Page 1 of 6
Refrigerant
R448a
Physical Data
Model #
ZF08K4E
Compressor
HP
2.5
Liquid
3/8"
Connections
Suction
7/8"
Receiver
Capacity (90%)
14.3
Net Weight
(lbs.)
Sound
Data
Volts
208-230
Power Supply
Phase
Hz
Electrical Data
Air Def.
20.4
MCA
Elec. Def.
Air Def.
MOP
Elec. Def.
MCA = Minimum Circuit Ampacity
MOP = Maximum Overcurrent Protection
Notes
Capacity (BTUH) @ Designated Saturated Suction Temperatures
Altitude
(Feet)
Ambient
Temp (ºF)
+40º F
+35º F
+30º F
+25º F
+20º F
+15º F
+10º F
+5º F
+0º F
11,840
-5º F
10,611
-10º F
9,381
-15º F
8,303
-20º F
7,301
-25º F
6,393
-30º F
5,551
-35º F
4,828
-40º F
4,104
RFO250L4SDA-NT
Air Cooled / Scroll
Imperial Brown (Portland Division) - 198 SE 223rd Ave. - Gresham, OR 97030
Phone: (800) 238.4093 - Fax: (503) 665.2929
Internet: imperialbrown.com
CCB #0091759
RLA
14.7
Compressor
LRA
4/7/2022 2:15:38 PMPrinted On: Page 2 of 6
RL6E066DDARE
Next-gen All-temp
Imperial Brown (Portland Division) - 198 SE 223rd Ave. - Gresham, OR 97030
Phone: (800) 238.4093 - Fax: (503) 665.2929
Internet: imperialbrown.com
CCB #0091759
Defrost
Type
Electric
Physical and Electrical Data
Air
Flow
Capacity
(BTUH)
7,463
Net Weight
(lbs.)
Volts
208-230
Power Supply
Phase
Hz
Front and Right Views
Altitude
(Feet)
Fans
Qty
Motor Type
EC2
Heaters
Amps
9.8
Watts
Inlet
3/8"
Connections
Outlet
7/8"
Drain
3/4"
Amps
1.0
4/7/2022 2:15:38 PMPrinted On: Page 3 of 6
Box #: 2
Box Description: 11' - 2" x 13' - 6" x 8' - 6 sloped down to 8' - 0" rectangular outdoor freezer/cooler
- 10' - 4" ID x 4' - 0" ID x 7' - 7" ID freezer (no floor)
- 10' - 4" ID x 8' - 3" ID x 7' - 7" ID cooler (no floor) *Box to sit on an Insulated Slab*
System Name: System #2
System Summary: (1) RFO100M4SDA-NT w/ (1) RL6A073ADARE - 8724 BTU/H Capacity @ 10.5º F TD @ 14.8 hour runtime @ 95ºF ambient / 35ºF room temp. / 452ft altitude
Load Summary:
(BTU/H)
Surfaces 1,624
Infiltration 5,478
Product 472
Misc. 496
Total 8,071
20.12%
67.88%
5.85%
6.15%
Holding Temp. (º F): 35
RH %: 90%
Ambient Temp. @ Chamber (º F): 95
Ambient Temp. @ Cond. Unit (º F): 100Altitude (Ft.): 452
Imperial Brown (Portland Division) - 198 SE 223rd Ave. - Gresham, OR 97030
Phone: (800) 238.4093 - Fax: (503) 665.2929
Internet: imperialbrown.com
CCB #0091759
Box Load Calculation
Product Weight (lbs.) 1,343
Pull Down Time (Hours) 24
Entering Temp. (º F) 40
Final Temp. (º F) 35
Freezing Point (º F) 29
Specific Heat - Above 0.90
Specific Heat - Below 0.40
Latent Heat of Fusion 115.00
Respiration Load 0.00
Heat of Respiration 0.00
Motor HP Equivalence 0.04
Lighting Watts / Ft.² 0.37
Occupancy 0.03
Forklift 0.00
Misc. BTUH 0.00 times ASHRAE's recommended infiltration load2.25
Product Data Misc. Data
22-IB-73619
Quote/Order #
ASHRAE recommended values for holding load only
4/7/2022 2:15:38 PMPrinted On: Page 4 of 6
Refrigerant
R448a
Physical Data
Model #
ZB08KAE
Compressor
HP
Liquid
3/8"
Connections
Suction
5/8"
Receiver
Capacity (90%)
6.1
Net Weight
(lbs.)
Sound
Data
Volts
208-230
Power Supply
Phase
Hz
Electrical Data
Air Def.
MCA
Elec. Def.
19.7
Air Def.
MOP
Elec. Def.
MCA = Minimum Circuit Ampacity
MOP = Maximum Overcurrent Protection
Notes
Capacity (BTUH) @ Designated Saturated Suction Temperatures
Altitude
(Feet)
Ambient
Temp (ºF)
+40º F
+35º F
10,630
+30º F
9,542
+25º F
8,530
+20º F
7,594
+15º F
6,812
+10º F
6,029
+5º F
5,247
+0º F
4,464
-5º F
-10º F
-15º F
-20º F
-25º F
-30º F
-35º F
-40º F
RFO100M4SDA-NT
Air Cooled / Scroll
Imperial Brown (Portland Division) - 198 SE 223rd Ave. - Gresham, OR 97030
Phone: (800) 238.4093 - Fax: (503) 665.2929
Internet: imperialbrown.com
CCB #0091759
RLA
7.2
Compressor
LRA
46.7
4/7/2022 2:15:38 PMPrinted On: Page 5 of 6
RL6A073ADARE
Next-gen All-temp
Imperial Brown (Portland Division) - 198 SE 223rd Ave. - Gresham, OR 97030
Phone: (800) 238.4093 - Fax: (503) 665.2929
Internet: imperialbrown.com
CCB #0091759
Defrost
Type
Air
Physical and Electrical Data
Air
Flow
Capacity
(BTUH)
8,346
Net Weight
(lbs.)
Volts
Power Supply
Phase
Hz
Front and Right Views
Altitude
(Feet)
Fans
Qty
Motor Type
EC2
Heaters
Amps
Watts
Inlet
3/8"
Connections
Outlet
5/8"
Drain
3/4"
Amps
1.6
4/7/2022 2:15:39 PMPrinted On: Page 6 of 6
8'2' 4'0'
1/4" = 1'-0"1 FLOOR PLAN
NEW STAINLESS STEEL COUNTER -
2' X 10' W/ (1) SHELF BELOW
NEW EXHAUST FAN AT CEILING - MATCH OR
EXCEED CAPACITY OF (E) FAN
WALK-IN
FREEZER
WALK-IN
COOLER
(E) GREASE INTERCEPTOR TO REMAIN
RBA #:
SET ISSUE
P.I.C:
PM / PA:
DATE
REV. DATE
REVISIONS TO THIS SHEET
PROJECT TRACKING
John Rowell
Lorri Nelson
STAMP
Owner
Project Name
Project Address
Whiteaker Walk-in Cooler / Freezer
21 N. Grand St.
Euegen, OR
BID / PERMIT SET 2023-05-04
X
S
H E
E T
A-2
SITE PLANS
FLOOR PLAN
16'4' 8'0'
1/8" = 1'-0"2 EXISTING COURTYARD PLAN
EXISTING GREASE INTERCEPTOR
16'4' 8'0'
1/8" = 1'-0"3 NEW COURTYARD PLAN
245 SF
(E) PERVIOUS SURFACE
1,105 SF
(E) IMPERVIOUS SURFACE -
ASPHALT TO BE REMOVED
(E) AREA DRAIN TO REMAIN
691 SF
PERVIOUS SURFACE
4" MIN. THICKNESS OF PLAYGROUND CHIPS -
TOP OF CHIPS TO BE LEVEL WITH TOP OF ADJACENT PAVED
SURFACES
163 SF
IMPERVIOUS SURFACE - BUILDING
465 SF
IMPERVIOUS SURFACE - NEW CONCRETE SLAB ON GRADE
KITCHEN
STORAGE
WALK-IN
(DS) DOWNSPOUT FROM COVERED WALKWAY -
REROUTE UNDERGROUND LINE TO EXISTING AREA
DRAIN
(E) 4" UNDERGROUND STORMWATER LINE TO BE
REMOVED
NEW 4" UNDERGROUND STORMWATER LINE
KITCHEN
STORAGE
EXISTING COVERED WALKWAY
TOP OF SLAB ELEVATION TO MATCH EXISTING AT ALL
EDGES - SLOPE TO (E) AREA DRAIN MIN. 2%
SLOPE
2% M
AX,
TYP.
SLOPE
S L
O P
E
A-3
CUT NEW OPENING IN WALL FOR DOOR -
SEE DETAILS
A-3
A-3
PHOTO -
EXISTING
WALL
2" 13'-6"
A-3
A-3
A-3
(E) 8" CMU WALL WITH BRICK VENEER
WALK-IN COOLER / FREEZER -
MODULAR UNIT
" 3
WH
A-3
(E) 4" UNDERGROUND STORMWATER LINE -
REPLACE WITH NEW 4" LINE - CONNECT TO
DOWNSPOUTS - INCLUDE CLEANOUT, TYP.
(E) 6" UNDERGROUND STORMWATER LINE TO REMAIN
WOOD FENCE AND GATES
MECH. UNITS
EXISTING GREASE INTERCEPTOR TO REMAIN
1/2" = 1'-0"4 EQUIPMENT ENCLOSURE
/2
/2
/2
ADJUST-A-GATE STEEL FRAME KIT (BLACK)
EAST ELEVATION NORTH ELEVATION
PLAN
SIMPSON POST
BASE Model
#FPBB44 (BLACK)
SLOPED SLAB EDGE AT COOLER/FREEZER
EXPANSION JOINT
4" CONC. SLAB ON GRADE W/ 4"
3/4- COMPACTED BASE
MECH. UNITS FOR COOLER/FREEZER
4X4 FENCE POST, TYP.
ALL WOOD TO BE TK CEDAR W/ PPG
PROLUX LOG & SIDING FINISH -
CEDAR COLOR
1" X 5 1/2" BOARDS
LATCH AND PADLOCK ON INSIDE OF GATES
2X4 NAILER BOARD
TALL HEAVY DUTY
CANE BOLT
(INSIDE GATES)
4X4 FENCE POST
BLACK METAL
POST CAP
S L
O P
E
PAIR OF GATES
T Y
P
8'-6"
3" 8'-0" 3"
ADD-01
ADD-01 2023-05-04
ADD-01
ADD-01
ADD-01
3"
A-2
ADD-01
1 1/2"
1" X 5 1/2" BOARDS
ITB 2022200045 Whiteaker Head Start Kitchen Improvements 15
VI. FORMS TO SUBMIT WITH BID
STANDARD BID FORM - REVISED
CITY OF EUGENE
Solicitation 2022200045
I, the undersigned, and authorized representative of certify the following: (Company Name)
Acknowledgement of terms, conditions and specifications
1. The bidder represents that bidder is properly licensed and adequately experienced, equipped, organized and financed to furnish and deliver the equipment specified and perform the services required.
2. The bidder has carefully checked the figures entered in the form, has carefully reviewed for accuracy all statements in this bid and attachments, and agrees that the City will not be responsible for any errors or omissions of the bidder in preparing this bid. The bidder agrees that this bid may not be revoked or withdrawn for 60 calendars days after the date on which bids are received.
3. Contract Execution. The bidder agrees that if this bid is accepted it will, within 14 calendar days after having received the Notice of Award, execute and return to the City the Contract in the form included in the Contract Documents and will, at or before that time, deliver insurance documentation as required.
4. Addenda. The bidder acknowledges that it has received the following Addenda No(s):
and agrees that all addenda issued are a part of the Contract Documents and have been considered in preparing this bid. (Bidder: insert the number of each addendum received; if no addenda were received, write “NONE” in the space.)
Compliance with Laws Offeror hereby agrees to comply with all applicable Oregon public contracting code provisions, as more specifically described in the attached contract and associated Exhibit A. Offeror attests that it complied with the applicable state and local tax laws including, but not limited to, ORS 305.385, ORS 305.620, ORS chapters 316, 317, and 318 for no fewer than six years into the past from signature and will continue to comply with the tax laws during the term of this contract. ____ initials.
Access to Plant or Place of Business Bidder agrees that the City may enter a contractor’s or subcontractor’s plant or place of business during normal business hours for the following purposes: inspect and/or test supplies or services for acceptance by the City pursuant to the terms of the Contract, and investigate the bidder’s minority business certification or other bidder qualifications.
Residency Bidder is _____ is not _____ an Oregon Resident Bidder.
An Oregon Resident Bidder, as defined by ORS 279A.120, means a bidder that has paid unemployment taxes or income taxes in this state during the 12 calendar months immediately preceding submission of the bid, and has a business address in this state.
ITB 2022200045 Whiteaker Head Start Kitchen Improvements 16
If bidder is not an Oregon Resident Bidder, in the field provided indicate the bidder’s (Business) State of Residence. _____________________
Certification of Nondiscrimination Bidder has not and will not discriminate against a subcontractor in the awarding of a subcontract because a subcontractor is a minority, woman, or emerging small business enterprise certified under ORS 200.055, or against a business enterprise that is owned or controlled by or that employs a disabled veteran as defined in ORS 408.225.
Certification Regarding Debarment By submitting a bid under this solicitation, the bidder certifies that neither it nor its principals are presently debarred or suspended by any Federal department or agency from participation in this transaction and will verify each lower tier subcontract that exceeds $25,000 is not debarred or otherwise disqualified in this federally assisted project.
Noncollusion The bidder certifies that the bid has been arrived at by the bidder, independently, and has been submitted without collusion with, and without any agreement, understanding or planned course of action with, any other contractor, bidder, or vendor on materials, supplies, equipment or services, described in the solicitation documents, designed to limit independent bids or competition. The contents of the bid herein presented and made have not been communicated by the bidder or their employees or agents to any person not an employee or agent of the bidder or its surety on any bond furnished with the solicitation, and will not be communicated to any such person prior the closing time of the solicitation.
We therefore offer the following equipment/service at the prices indicated hereon in fulfillment of the requirements and specifications contained within the solicitation documents and all addenda.
BID PRICING
(refer to Attachment A Plans and Attachment B Specifications) Award will be based on the Base Bid amount.
ITEM DESCRIPTION UNIT AMOUNT
BASE BID: Lump sum to complete the project per the included plans and specifications.
LUMP
SUM $
ADDITIVE ALTERNATE: Transportation of cooler from it’s current location to the job site.
LUMP
SUM
Prevailing Wage Rate Acknowledgement The contract is subject to the Davis-Bacon Act (40 U.S.C. 276a). The contractor and every subcontractor on the project shall pay at a minimum the federal prevailing wage as specified for this project. The contractor certifies compliance with the Davis-Bacon Act concerning the payment and certification of payment of prevailing wage rates and has considered this when preparing this bid. __________ (initial).
Completion/Delivery Date The bidder agrees, if awarded the contract, to begin the work within ____ days after receipt of notice to proceed is received from the City of Eugene and to maintain progress as outlined in the contractor provided progress schedule.
ITB 2022200045 Whiteaker Head Start Kitchen Improvements 17
Experience Bidder certifies they have _______ years’ experience of similar construction work, and that Bidder or subcontractor(s) meet the minimum experience requirements outlined in the specifications.
CCB Registration As a condition to submitting this bid, a contractor must be registered with the Oregon Contractors Board in accordance with Oregon State Law, and disclose their registration number. Failure to register and disclose the number will make this a nonresponsive bid and the bid will be rejected, unless contrary to Federal Law. In the field below, enter your Oregon Contractor Board Registration Number.
Oregon Licensed Contractor Business Contractor Registration Number:
Expiration Date:
Subcontractor CCB Registration The bidder hereby certifies that all subcontractors performing construction work for this contract are eligible to receive Public Works Contracts and have filed a Public Works bond with the Oregon Construction Contractors Board prior to commencing work under this contract.
Bid 2022200045 submitted by:
Name: Title:
Signature: Date:
Company Name:
Address:
Phone: Fax:
Email Address:
Company contact for this project (if different from above):
Name: Title:
Phone: Email Address:
Required Submittals Check List Requirement Initials
Signed Standard Bid form
Drug Program Certificate
1STTier Subcontractor Disclosure form
References/Experience form
HUD Section 3 Contractor Compliance Plan
Bid Security equal to 5% of Base Bid
| 2022200045_A2_Addendum_1_DRAFT |
| Pre-bid Attendance Sheet |
| RefrigerationSpecs_22-IB-73619.00 |
| A-2 |
| Standard Bid Form - REVISED |
File details come from the government source that posted it. Updated .