SOURCE SELECTION SENSITIVE DRAFT SIR
PART I - THE SCHEDULE
SECTION E - INSPECTION AND ACCEPTANCE
E-1
E.1 Inspection of Services – Both Fixed-Price & Cost Reimbursement (April
1996) (AMS 3.10.4-4)
(a) 'Services,' as used in this clause, includes services performed, workmanship. and material furnished or utilized in the performance of services.
(b) The Contractor must provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor must be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government must perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor must furnish, and must require subcontractors to furnish, without additional charge if a fixed-price contract, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount, or if a cost reimbursement type contract, for no additional fee. When the defects in services cannot be corrected by re-performance, the Government may:
(1) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and
(2) reduce the contract price, or any fee payable under the contract, to reflect the reduced value of the services performed.
If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may:
(1) by contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service, (or if a cost reimbursement contract, reduce any fee payable by an amount
SOURCE SELECTION SENSITIVE DRAFT SIR
PART I - THE SCHEDULE
SECTION E - INSPECTION AND ACCEPTANCE
E-1 that is equitable under the circumstances), or
(2) terminate the contract for default.
(End of Clause)
E.2 ACCEPTANCE OF DELIVERY ITEMS
Final acceptance of all deliverable items must be made by the Contracting Officer (CO) or a Government representative designated by the CO, unless otherwise specified in the contract.