2019 Montague Plains Bee Study Bid Evaluation Form_Milam_jjs.xls

XLS spreadsheet 29 KB Posted

Attached to
DFW-2019-031 Bee Surveys Montague Plains
Solicitation number
BD-19-1046-DFW-FW104-36294
Issued by
Franklin County, New Bedford City, Massachusetts

About this file

The document provided is a Bid Evaluation Form for the 2019 Montague Plains Bee Study contract opportunity issued by the Massachusetts Division of Fisheries and Wildlife. This contract seeks proposals to sample bee populations throughout the active 2019 bee season at the Montague Plains Wildlife Management Area in Montague, Massachusetts. The evaluation form assesses proposals based on completeness, contractor experience, adequacy of the proposed scope and methods, budget understandability and completeness, and whether the total cost meets expectations. The total possible score is 50 points.

The related state and local contract opportunity, DFW-2019-031 Bee Surveys Montague Plains, is issued by the Massachusetts Division of Fisheries and Wildlife and is located within Franklin County, Massachusetts. No other details about pricing terms, set asides, incumbents, funding requirements, or contract term are provided.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Montague Plains Bee Study

Evaluation Form for Proposals Montaguie Plains Bee Study 2019
Vendor: Joan Milam
Evaluation Criteria :Score
Is the proposal complete? Are all the required sections included?
(Complete = 10 pts; Missing 1 section = 5 pts; Missing more than 1 section = 0 pts)10
Is the proposed contractor adequately experienced in similar projects in Massachusetts?
Extensive documented experience = 10 pts; Some documented experience = 5 pts; No demonstarted experience = 0 pts)10
Are the project scope and methods adequate / will DFW meet our project goals?
(Clear and appropriate = 10 pts; Vague or questionable = 5 pts; Incomplete = 0 pts)10
Is the budget understandable and complete?
(Complete, no questions remaining = 10 pts; Questions remain but low significance = 5 pts;10
Incomplete, substantial questions remain = 0 pts)
Does the total cost for the proposed products meet our expectations?
(Meets or exceeds = 10 pts; Cost higher than expectations = 5 pts; Cost prohibitive = 0 pts)10
Total Point Score50
Reviewer: John Scanlon
Title: Habitat Program supervisor
Date: March 25, 2019

File details come from the government source that posted it. Updated .