The document is a Bid Evaluation Form for the 2019 Montague Plains Bee Study contract opportunity issued by the Massachusetts Division of Fisheries and Wildlife. The contract seeks proposals to sample bee populations throughout the active 2019 bee season at the Montague Plains Wildlife Management Area located in Montague, Massachusetts within Franklin County. The evaluation form reviews proposals on criteria such as completeness, contractor experience, project scope and methods, budget, and total costs. Two reviewers, Caren Caljouw and VHB, provided scores for the proposals, with Caljouw's review resulting in a total score of 50 points and VHB's review resulting in a total score of 45 points.

The contract opportunity has a total proposed cost that meets the Division's expectations. There are no specifics provided on pricing terms, set asides, incumbents, funding requirements or sources, or contract term and renewal options.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Milam

Evaluation Form for Proposals Montague Plains Bee Study 2019
Reviewer: Caren Caljouw
Evaluation Criteria :Score
Is the proposal complete? Are all the required sections included?10
(Complete = 10 pts; Missing 1 section = 5 pts; Missing more than 1 section = 0 pts)
Appears complete based on RFQ but somewhat disjointed narrative
Is the proposed contractor adequately experienced in similar projects in Massachusetts?10
Extensive documented experience = 10 pts; Some documented experience = 5 pts; No demonstarted experience = 0 pts)
Extensive experience in MA and specific study area
Are the project scope and methods adequate / will DFW meet our project goals?10
(Clear and appropriate = 10 pts; Vague or questionable = 5 pts; Incomplete = 0 pts)
Adequate
Is the budget understandable and complete?10
(Complete, no questions remaining = 10 pts; Questions remain but low significance = 5 pts;
Incomplete, substantial questions remain = 0 pts)
Does the total cost for the proposed products meet our expectations?10
(Meets or exceeds = 10 pts; Cost higher than expectations = 5 pts; Cost prohibitive = 0 pts)
Total Point Score50
Reviewer: Caren Caljouw
Title: Prescribed Fire Program Manager
Date: March 22, 2019

VHB

Evaluation Form for Proposals Montague Plains Bee Study 2019
Evaluation Criteria :Score
Is the proposal complete? Are all the required sections included?10
(Complete = 10 pts; Missing 1 section = 5 pts; Missing more than 1 section = 0 pts)
written proposal5
Is the proposed contractor adequately experienced in similar projects in Massachusetts?
Extensive documented experience = 10 pts; Some documented experience = 5 pts; No demonstarted experience = 0 pts)
Some experience with these sampling techniques but not extensive experience and knowledge.
Are the project scope and methods adequate / will DFW meet our project goals?10
(Clear and appropriate = 10 pts; Vague or questionable = 5 pts; Incomplete = 0 pts)
Is the budget understandable and complete?10
(Complete, no questions remaining = 10 pts; Questions remain but low significance = 5 pts;
Incomplete, substantial questions remain = 0 pts)
Does the total cost for the proposed products meet our expectations?10
(Meets or exceeds = 10 pts; Cost higher than expectations = 5 pts; Cost prohibitive = 0 pts)
Meets
Total Point Score45
Reviewer: Caren Caljouw
Title: Prescribed Fire Manager/Fire Ecologist
Date: March 20, 2019