20-Attachment KK - Heat Protection Safety Requirement.pdf

PDF 51 KB Posted

Attached to
CSP - Dinner Creek Stormwater Detention Basin - Phase 1 for the Harris County Flood Control District (Estimated Budget $35, 656, 303)
Solicitation number
26/0071
Issued by
Harris County, Texas

About this file

This is a Heat Protection Safety Requirement Guidance document for the Dinner Creek Stormwater Detention Basin - Phase 1 project managed by the Harris County Flood Control District in Texas, with an estimated budget of $35,656,303. The document establishes mandatory safety requirements that all prime contractors and vendors must incorporate into their project Safety Plans to protect workers from weather-related hazards. The guidance requires provisions for safeguarding workers against heat-related and cold-related illnesses throughout project execution, with specific protocols for extended adverse weather periods as deemed necessary by the Prime Contractor.

The document mandates implementation of a project-specific Heat Awareness Plan when temperatures reach 90 degrees Fahrenheit or higher (including heat index calculations), which must include provisions for worker acclimatization, water availability, rest periods, and shade. All vendors acknowledge their agreement to comply with this heat protection safety requirement upon signing the Competitive Sealed Proposal Acknowledgement at the time of bid submission. This requirement applies comprehensively to all weather-related safety considerations throughout the project duration.

View the file

Other files

File Type Posted
8-Attachment Z – MWBE Trucking Procedure Compliance Packet.pdf PDF
6-Attachment J - Payment Bond.pdf PDF
10-Attachment CC - Harris County Minimum Wage Policy and Certification.pdf PDF
21-Attachment LL - Report Files.pdf PDF
28-Attachment H - Performance Bond for Public Works over 100,000.pdf PDF
13-Attachment EE - Bid Bond and Bid Check Authorization Form.pdf PDF
15-Attachment Y – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
22-Attachment MM - Project Sign Dimensions.pdf PDF
23-Attachment U - GLO Compliance Package.pdf PDF
14-Attachment HH - Harris County Contractor Minimum Wage Policy - FAQ.pdf PDF
3-Attachment F - References.pdf PDF
25-Attachment NN - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
4-Attachment L - Minimum Insurance Requirements for Flood Control District.pdf PDF
18-Attachment FF - Drawings.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
5-Attachment M - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
16-Attachment Q – Davis Bacon Current Wage Decision.pdf PDF
26-Attachment OO - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
31-Federal CSP General Requirements and Specifications.pdf PDF
24-Attachment JJ - Harris County Contractor and Worksite Safety Policies.pdf PDF
7-Attachment D - Statement of Offeror Qualifications.pdf PDF
19-Attachment II - Bid Guaranty and Performance Bond Information and Requirements.pdf PDF
17-Attachment A – Proposal Addenda Acknowledgement.pdf PDF
30-Attachment K - Certification of Compliance with Federal Standards Requirements .pdf PDF
9-Attachment G - Contractor Profile.pdf PDF
29-Attachment N - Required Contract Provisions.pdf PDF
27-Attachment GG - Project Manual.PDF PDF
1-Attachment B - Pricing Form.pdf PDF
12-Attachment X – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
11-Bid Guaranty and Performance.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Heat Protection Safety Requirement

Guidance for all weather-related safety of workers, including but not limited to, extreme heat, cold weather or any adverse weather conditions shall be included in the project

Safety Plan. At a minimum, this must include provisions for keeping workers safe from heat related and/or cold related illnesses throughout the execution of their work. During extended periods of adverse weather conditions, the Prime Contractor shall provide accommodations to the workers as deemed necessary. This may include a project specific Heat Awareness Plan when temperatures reach over 90 degrees (temperature or heat index) with provisions for acclimatization, water, rest and shade.

Vendor understands by signing the Competitive Sealed Proposal Acknowledgement at the time of submission that they agree to follow this heat protection safety requirement.

File details come from the government source that posted it. Updated .