18-Attachment FF - Drawings.pdf

PDF 141 MB Posted

Attached to
CSP - Dinner Creek Stormwater Detention Basin - Phase 1 for the Harris County Flood Control District (Estimated Budget $35, 656, 303)
Solicitation number
26/0071
Issued by
Harris County, Texas

About this file

This file consists of architectural and engineering drawings for the Dinner Creek Stormwater Detention Basin - Phase 1 project being undertaken by the Harris County Flood Control District in Texas. The drawings provide detailed plans and specifications for the construction of stormwater detention infrastructure designed to manage runoff and flooding in the Dinner Creek watershed. The drawings include site plans, grading layouts, drainage details, structural components, and other technical specifications necessary for bidders to understand the scope of construction work required. The project has an estimated budget of $35,656,303 and represents Phase 1 of a larger stormwater management initiative.

The drawings serve as essential contract documents that establish the technical requirements, design standards, and construction specifications that contractors must follow during project execution. These documents are fundamental to the bidding process, allowing prospective contractors to accurately assess project complexity, material requirements, labor needs, and costs. The drawings coordinate with other contract documents including the Scope of Work and supporting exhibits to provide a comprehensive basis for competitive solicitation and eventual contract award and performance.

View the file

Other files

File Type Posted
8-Attachment Z – MWBE Trucking Procedure Compliance Packet.pdf PDF
6-Attachment J - Payment Bond.pdf PDF
10-Attachment CC - Harris County Minimum Wage Policy and Certification.pdf PDF
21-Attachment LL - Report Files.pdf PDF
28-Attachment H - Performance Bond for Public Works over 100,000.pdf PDF
13-Attachment EE - Bid Bond and Bid Check Authorization Form.pdf PDF
15-Attachment Y – Non-HUB MWBE Goal Participation Information Packet.pdf PDF
22-Attachment MM - Project Sign Dimensions.pdf PDF
23-Attachment U - GLO Compliance Package.pdf PDF
20-Attachment KK - Heat Protection Safety Requirement.pdf PDF
14-Attachment HH - Harris County Contractor Minimum Wage Policy - FAQ.pdf PDF
3-Attachment F - References.pdf PDF
25-Attachment NN - Safety Record Questionnaire for Prime Contractors (Part A).pdf PDF
4-Attachment L - Minimum Insurance Requirements for Flood Control District.pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
5-Attachment M - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
16-Attachment Q – Davis Bacon Current Wage Decision.pdf PDF
26-Attachment OO - Safety Record Questionnaire for Sub-Contractors (Part B).pdf PDF
31-Federal CSP General Requirements and Specifications.pdf PDF
24-Attachment JJ - Harris County Contractor and Worksite Safety Policies.pdf PDF
7-Attachment D - Statement of Offeror Qualifications.pdf PDF
19-Attachment II - Bid Guaranty and Performance Bond Information and Requirements.pdf PDF
17-Attachment A – Proposal Addenda Acknowledgement.pdf PDF
30-Attachment K - Certification of Compliance with Federal Standards Requirements .pdf PDF
9-Attachment G - Contractor Profile.pdf PDF
29-Attachment N - Required Contract Provisions.pdf PDF
27-Attachment GG - Project Manual.PDF PDF
1-Attachment B - Pricing Form.pdf PDF
12-Attachment X – Non-HUB MWBE Utilization Plan Commitment Form.pdf PDF
11-Bid Guaranty and Performance.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .