About this file
Treatment Plant Solar Project - Bidding Documents Summary
This is a sealed bidding solicitation package issued by the Eastern York County Sewer Authority (EYCSA) for the design and installation of a rooftop and ground solar photovoltaic system at the Authority's Wastewater Treatment Plant located at 400 Friendship Avenue, Hallam, Pennsylvania. The project encompasses the complete design and installation of solar panels, inverters, racking systems, electrical infrastructure, site preparation, and restoration work to create a fully functional solar energy system. Sealed bids will be received online through the PennBid Program (www.PennBid.net) until 10:00 a.m. on Wednesday, April 22, 2026, with public opening and electronic reading occurring the same date at 10:00 a.m., with results available by end of business day. A pre-bid conference is scheduled for Thursday, April 9, 2026, at 10:00 a.m. at the treatment plant site; attendance is optional. Contract award will occur at a regularly scheduled EYCSA Board meeting following bid opening. The contract specifies a construction completion timeline with 120 days to substantial completion and 150 days to final completion after issuance of the Notice to Proceed, following a 30-day design review and approval period post-award.
Bidders must submit a bid bond or certified check equal to five percent of the maximum bid amount. The project is subject to Pennsylvania Prevailing Wage Act requirements (Serial No. 26-01133, dated February 6, 2026) and Pennsylvania Department of Labor and Industry wage determinations for various craft classifications. Award criteria prioritize the bidder whose proposal provides the best 30-year Net Present Value (NPV), calculated using specific financial assumptions including a 4% discount rate, $0.10/kWh initial electric rate with 2.5% annual escalation, and 0.5% annual system degradation. Warranty credits are applied based on manufacturer warranty periods for inverters, photovoltaic modules, racking systems, and workmanship/installation. Bidders must provide evidence of at least five completed commercial solar projects within the past three years. The Authority reserves the right to reject any or all bids and to reduce project scope to meet available financing. Current electrical costs indicate the facility's usage is approximately 74,421 kilowatt-hours monthly under a WGL Energy Services contract priced at $0.07559/kWh through December 2027, providing context for projected energy savings analysis.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .