2 - SPECIFICATION, HVAC Replacement in the Visitor’s Center.pdf
PDF 128 KB Posted
- Attached to
- HVAC Replacement in the Visitor's Center
- Solicitation number
- BPM058498
- Issued by
- Calvert County, Maryland
About this file
HVAC Replacement in the Visitor's Center - Project Specifications
This document is a project specification issued by the Maryland Department of Planning, Maryland Historical Trust, and Jefferson Patterson Park & Museum (JPPM) for the replacement of one heat pump system in the Visitor's Center at JPPM located at 10515 Mackall Road, Saint Leonard, Maryland 20685. The project requires furnishing all labor, equipment, materials, parts, and services necessary to replace one of three existing heat pump systems in building 14 of the Visitor's Center old section. The work is subject to Maryland Historical Trust and National Trust for Historic Preservation Section 106 review standards, as the structure is historically significant. A mandatory prebid meeting will be held on August 31, 2026, at 10:00 am, and only contractors who attend will be considered for contract award. Contractors are strongly urged to visit the project site to familiarize themselves with existing conditions. The contractor must complete all work within sixty (60) calendar days from the notice to proceed date, with all work performed during normal business hours (Monday through Friday, 7:30 am to 4:00 pm, except Maryland State Holidays), unless mutually agreed otherwise with the Executive Director of JPPM.
JPPM will award the contract based on the most favorable evaluated bid price, with selection criteria including attendance at the mandatory prebid meeting, Certified Small Business (CBS) or Veteran-Owned Small Business Enterprise (VSBE) certifications, qualifications, prior experience with Maryland agencies, ability to meet the project timeline, and cost. The contractor must provide pricing for the complete HVAC replacement work and shall submit all invoices within thirty (30) days of final inspection approval. A standard manufacturer's warranty or two-year warranty on parts and materials (whichever is greater) is required, commencing from the date of substantial completion. The specifications require installation of an efficient heat pump system with minimum ratings of 15 SEER, 8 HSPF, and 12 EER, along with associated electrical, refrigerant, and drain piping components. The contractor must comply with all Maryland regulations, OSHA requirements, and obtain all necessary licenses and permits, and must submit current insurance certificates naming the Maryland Historical Trust as certificate holder prior to bid submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MARYLAND DEPARTMENT OF PLANNING
MARYLAND HISTORICAL TRUST
JEFFERSON PATTERSON PARK & MUSEUM
August 19, 2026
PROJECT SPECIFICATIONS
HVAC Replacement in the Visitor’s Center
I. Summary of Work This project consists of furnishing all labor, overhead, equipment, materials, parts, incidentals, tests, supervision, and services necessary for and incidental to replace one of the three heat pump systems in the Visitor’s Center old section, bldg. 14, 10115 Mackall Road. The project site is located on Jefferson Patterson Park and Museum (JPPM), 10515 Mackall Road, Saint Leonard, Maryland 20685.
This is a Historic Structure that makes the project subject to review by the Maryland Historical Trust. All construction and repairs shall be in kind and shall comply with the Maryland Historical Trust and the National Trust for Historic Preservation (NTHP) Section 106 review standards. JPPM will apply for the review in cooperation with the contractor.
JPPM will give preference to contractors who are Certified Small Business (CBS), which include Small Business Reserve (SBR) and Small Business Preference (SBP), or Veteran-Owned Small Business Enterprise (VSBE). A mandatory prebid meeting will be held. Only contractors who attended the prebid meeting will be considered.
JPPM strongly urges the contractor to visit the site and familiarize themselves with the conditions under which they will perform the work. At the scheduled site visit, each contractor will be permitted to examine and familiarize themselves with the full nature and extent of the work and obtain answers to questions about or clarifications of the contract. It is the sole responsibility of the contractor to familiarize themselves fully with the contents of these specifications. Failure to do so does not relieve the contractor with the successful bid from their obligations to comply with all aspects of this Invitations for Bids (IFB) package for the amount they specify as their bid.
The State of Maryland or JPPM will not make allowance for any errors on the contractor’s part for failure to consider any conditions or circumstances existing on the site that may affect the contemplated work. The fact that the contractor submits a bid will be taken as evidence that the contractor has a full knowledge of the extent and character of the work and the problems in performing it.
II. Permits, Certificates, Laws, Licensing, and Ordinances A. The contractor must procure all necessary permits, certificates, and licenses required by law for the execution of the work. State of Maryland authorized inspection agencies will conduct inspections.
B. The contractor must comply with all requirements of Annotated Code of Maryland, Business Regulation Article (latest revisions and supplements), Code of Maryland Regulations (COMAR)
09.15 (latest revisions and supplements), any and all bulletins, policies, directives, etc. issued by the Maryland Department of Labor, Licensing, and Regulations (DLLR) (latest edition).
Additionally, the contractor must comply with the latest editions of applicable codes, regulations, standards, and laws in performing this work (for example, COMAR, the National Electric Code, International Building Code, International Mechanical Code, International Plumbing Code, etc.). The contractor will remove, replace, and repair any violations when so directed by the Executive Director of JPPM or a designee, at the contractor’s expense.
C. The contractor and subcontractors must comply with minimum insurance requirements established under Annotated Code of Maryland, Business Regulation Article. The contractor shall submit with the bid a copy of current insurance certificates. The certificate holder must list Maryland Historical Trust, ISAOA/ATIMA, 100 Community Place, Crownsville, MD 21032.
All insurance certificates must be kept current during the term of the work or contract. Please email updated insurance certificates to jppm.accountspayable@maryland.gov or mail to the Business Manager at JPPM.
mailto:jppm.accountspayable@maryland.gov
JEFFERSON PATTERSON PARK AND MUSEUM
2 - SPECIFICATION, HVAC REPLACEMENT IN THE VISITOR’S CENTER
D. The contractor or subcontractor must be licensed in Maryland or certified, depending on the nature of the work to be performed. The contractor will designate an individual as their Master License or Certificate holder who will be responsible for all services to be performed under the contract.
III. Bid Submission Packet A. JPPM must receive the bid on or before the due date. The contractor may submit their standard bid sheet but must also submit the filled out and signed IFB sheet. The following items must be submitted with the bid:
1. The completed Invitation for Bid form.
2. Signed Bid/Proposal Affidavit (attachment 1).
3. Signed “Conflict of Interest Affidavit and Disclosure” (attachment 2).
4. Provide Certified Small Business (CBS) certifications or Veteran-Owned Small Business
Enterprise (VSBE) certification.
5. Name and current license or certificate number of designated master license or certificate holder for the contract. Provide a copy of current license or certificate.
6. Copy of current insurance certificates. The certificate holder must list Maryland Historical
Trust, ISAOA/ATIMA, 100 Community Place, Crownsville, MD 21032. Insurance certificates must be kept current during the term of the work or contract. Please mail updated copies to the business manager at JPPM.
7. Acknowledgement of receipt of any amendment(s) to this IFB. Please supply a letter on the company’s letterhead acknowledging receipt of amendments.
B. Please fill in and submit the “No Reply” form (attachment 4) if you do not wish to provide a bid.
JPPM will regard any bids without the required and completed paperwork, or any bids received after the due date, as non-responsive.
C. If any amendment(s) to the IFB are distributed, all bidders must acknowledge receipt of the amendment(s).
D. The contractor must be validly formed and in good standing (or qualified to do business) in the State with the Maryland State Department of Assessments and Taxation. See website https://egov.maryland.gov/BusinessExpress/EntitySearch.
IV. Safety The contractor will adhere to the Maryland Occupational Safety and Health Act (MOSHA) and U.S.
Department of Labor, Occupational Safety and Health Administration (OSHA) laws, rules, and regulations as they apply to this project.
V. Quality Assurance and Workmanship
A. The contractor will engage experienced technicians who have completed similar work using similar material and to the same extent as the work required for this Project that has resulted in a record of successful in-service performance.
B. The contractor is responsible for any work subcontracted to others. It is the contractor’s responsibility to ensure that any subcontractor hired adheres to the specifications and contract terms and conditions. The contractor must supply the Executive Director of JPPM or a designee the list of subcontractors the contractor intends to utilize prior to any work commencing.
C. The contractor must perform the work to the satisfaction of the Executive Director of JPPM or a designee, including the duty to:
1. install all material and complete all work in a first-class manner. Any materials or equipment installed that does not present an orderly and reasonably neat workmanlike appearance and operation must be removed and replaced when so directed at the contractor’s expense.
https://egov.maryland.gov/BusinessExpress/EntitySearch
2 - SPECIFICATION, HVAC REPLACEMENT IN THE VISITOR’S CENTER
2. perform all cutting and patching necessary for the installation of the new work. Patching will be uniform in appearance and match the surrounding surface.
3. perform all necessary alterations, cutting, fitting, etc., of the existing work as necessary or required to make satisfactory connections between new and existing work when the work specified hereunder connects to any existing work.
VI. Inspection Upon Completion of Work A. The Executive Director of JPPM or a designee will conduct an inspection with the contractor upon completion of the work to confirm that all work described in the contract has been completed in a satisfactory manner.
B. If the contractor has completed the work described in the contract in a satisfactory manner, both parties will sign a document confirming that the contractor has completed all work in a satisfactory manner.
C. If the contractor has not completed the work described in the contract in a satisfactory manner, the parties will develop a “work list”.
D. Once the contractor performs all the work included on the “work list”, the parties will begin the inspection process anew.
E. JPPM will not authorize payment or begin to process bills for payment until the parties have inspected the work, the contractor has completed the punch or work list items, and all re-inspections have occurred.
F. This inspection process does not in any way void or negate any warranties and JPPM reserves all its rights and remedies in the event the work proves to be unsatisfactory. The inspection document shall not serve as final acceptance of the work. The inspection document confirms only that the parties completed a preliminary review of the work immediately after completion.
VII. Cleaning A. The contractor shall: remove all debris daily; at the end of each workday, remove empty cans, rags, rubbish, and other discarded materials from the site; continuously keep walkways, driveways, and outdoor living areas broom clean. The contractor will leave the work site in an orderly and clean manner.
B. Upon completion of this work, the contractor will leave the job site in as good or better condition as they found it before the commencement of the work. At the completion of the project, the contractor will immediately remove all their equipment and construction debris from the project site. The State reserves the right to keep all purchased but unused materials, parts, and supplies. The contractor must dispose of all federally or state regulated waste (e.g., asbestos, lead) as mandated by federal and state laws and regulations and must provide a Chain of Custody to the Executive Director of JPPM or a designee.
VIII. Other Conditions A. The contractor will complete all work during a normal workday. A normal workday is defined as
Monday through Friday, 7:30 am to 4:00 pm, except for Maryland State Holidays. The contractor may make mutually agreeable arrangements with the Executive Director of JPPM or a designee to come in earlier, later, or on non-working days without extra cost to the State.
B. The contractor must protect existing utilities. The contractor will verify the location of all existing utilities and is responsible for their protection and any relocation as required to complete the project.
C. The contractor will coordinate their work with that of other contractor(s) and staff members working on the premises.
D. The contractor is responsible for all damage to life and property due to its activities or those of its agents or employees relating to the services required under the work described herein.
2 - SPECIFICATION, HVAC REPLACEMENT IN THE VISITOR’S CENTER
Damage caused by the contractor will be reported to JPPM on the day of discovery and must be repaired within 30 calendar days.
E. The contractor will notify the Executive Director or a designee prior to any work that would result in the disturbance of soil in or around the work site. The Regional Archaeologist or a designee must be present to approve and monitor soil disturbance on the property.
F. Upon arrival on site to perform an inspection, service call, or repair, the contractor must check in with the Maintenance Supervisor or a designee. Immediately upon the conclusion of each inspection, service call, or repair, the contractor will notify the Maintenance Supervisor or a designee that the work has been completed.
IX. Warranty A. A standard manufacturer’s warranty on parts and materials or two-year warranty on parts and materials, whichever is greater, will be warranted by the contractor, commencing on the date of substantial completion. The contractor will guarantee:
1. All work contains no faulty or imperfect materials or equipment or any imperfect, careless or unskilled workmanship;
2. All material, supplies, equipment, machines, devices, etc., shall be adequate for the use to which they are intended, and shall operate with ordinary care and attention in a satisfactory and efficient manner;
3. All defective items must be replaced free of charge during the warranty period. All other terms and conditions of the manufacturer’s warranty must be provided to the Executive Director of JPPM or a designee.
B. The contractor will provide to the Executive Director of JPPM or a designee all warranties, owner’s manuals, operating information, etc., for the equipment and materials used on this project. The contractor shall neatly compile all information in a manner acceptable to the Executive Director of JPPM or a designee.
X. Duration of the Contract The contractor will complete all work within sixty (60) calendar days upon receiving the notice to proceed date.
XI. Payment to Contractor A. The contractor will submit all invoices for the work described herein within thirty (30) days of the completion of the final inspection of the work and the approval of the Executive Director of JPPM or a designee.
B. The contractor must invoice any approved additional work separately and provide the written document signed by the Executive Director of JPPM or a designee authorizing the additional work.
C. The contractor will submit all invoices, upon completion of the work described herein to the satisfaction of the Executive Director of JPPM or a designee, showing the purchase order number on each copy and submit to Jefferson Patterson Park and Museum, ATTN: Business Manager, 10515 Mackall Road, Saint Leonard, MD 20685-2433. Electronic invoices shall be sent to jppm.accountspayable@maryland.gov with ATTN: Business Manager clearly indicated in the email.
XII. Detailed Specifications A. The contractor is furnishing all materials, labor, tools, equipment, overhead to include travel, and incidentals as necessary to complete the following:
1. The contractor must adhere to the manufacturer’s instructions when installing the new heat pump system.
2. Contractor will ensure that the new unit is properly sized for the space.
mailto:jppm.accountspayable@maryland.gov
2 - SPECIFICATION, HVAC REPLACEMENT IN THE VISITOR’S CENTER
3. Disconnect and remove the installed heat pump system and associated piping. Dispose of per state and federal laws and regulations.
4. Inspect supply and return duct. Ensure they are sufficiently sized for the heat pump system to efficiently supply heat and cool the areas.
5. Inspect grilles and registers. Replace defective units.
6. Install the indoor air handler
a) Unit must be installed in such a manner that vibrations will be eliminated or minimized and be accessible for servicing.
b) Install disconnect or shut off switch near the unit and at the entrance to the space where the unit is located. It must be easily identifiable and accessible.
7. Install the outdoor heat pump unit.
a) Place the outdoor unit on an approved pad or mounting system.
b) Install waterproof disconnect near the unit, easily identifiable and accessible.
8. Install low voltage wiring as needed. This includes a new thermostat. Connect to the furnace and air conditioner adhering to the unit manufacturer’s instruction.
9. Install and connect electric lines and wires as needed to both the indoor and outdoor units.
a) Install new circuit breakers if needed.
b) Install all outdoor wires in water proof boxes, fittings, and rigid and flexible conduit.
c) The contractor shall sufficiently size wires to accommodate the units, per NEC.
10. Install and connect new refrigerant piping as required.
11. Install and connect new drain pipes for the condensate.
12. Charge system per the air conditioning unit manufacturer’s instruction.
13. Seal all penetrations to prevent water, air, and smoke infiltration.
14. Perform an exhaustive operational check to ensure all components are operating normally and provide a detailed report to include all test results and analysis.
B. The contractor will provide any work not specifically mentioned in the IFB but reasonably implied for the complete, safe, and satisfactory completion of the project.
C. If the contractor notes any existing defects not caused by the contractor while performing the work, during diagnosis, or start and operational checks, the contractor will provide the Executive Director of JPPM or a designee an immediate verbal notification, followed by a detailed report within five (5) business days from the date that contractor noted the defect, indicating what components require further work or replacement, recommendations, and itemized costs including labor, parts, and materials. Upon approval, the Executive Director of JPPM or a designee will provide a written and signed document approving the additional work necessary to correct the defect.
D. The building(s) will be occupied during all phases of this project. The contractor will plan and execute all work in such a manner as to reduce interference with the normal function of the building(s).
1. The contractor must provide adequate protection where required for the existing building(s), contents of same, and all building occupants.
2. The contractor must take particular care to prevent water infiltration into building(s).
3. The contractor will always keep all driveways and walkways clear of materials, debris, etc.
times so there will be no interference with the usual traffic serving the building(s).
4. The contractor must ensure that emergency vehicles have free and clear access to all points on the property.
5. The contractor will plan and execute all work to ensure, to the extent possible, that there is no interruption in the utilities servicing the building(s). The contractor will schedule any interruptions in advance.
E. If it is not possible for contractor to avoid interference with the normal use of the building or area, the work shall be performed at such a time or times as mutually agreed upon between the contractor and the Executive Director of JPPM or a designee.
2 - SPECIFICATION, HVAC REPLACEMENT IN THE VISITOR’S CENTER
XIII. Materials A. The contractor is furnishing all parts, materials, incidentals, and supplies to complete this work. Replacement parts and material will meet all specifications and ratings of listed or removed items and be of the same type, style, and be interchangeable. The Executive Director of JPPM or a designee must approve parts and materials or any substitutions. Parts, material, and other supplies include but are not limited to:
1. Efficient heat pump system, sized for the space, with electric backup heating, subject to approval by the Executive Director of JPPM or a designee. Provide the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Certificate of Product Rating for the system the contractor plans to install. Minimum Efficiencies:
a) 15 Seasonal Energy Efficiency Ratio (SEER) air conditioning system.
b) 8 Heating Seasonal Performance Factor (HSPF) heat pump system.
c) 12 Energy Efficiency Ratio (EER).
2. Units using discontinued or soon to be discontinued refrigerants are prohibited.
3. New thermostat.
4. Electrical supplies as needed, to include circuit breakers, conduit, fittings, liquid tight conduit, wires sized per unit requirements and NEC, disconnects and switches, etc.
5. Duct (supply and return) sized per unit requirements, to tie system to the existing ductwork if existing is acceptable.
6. Grilles and Registers as needed.
7. Refrigerant line sets as needed to connect the systems. Clean old lines sets if they are acceptable for use.
8. Drain piping and fittings (PVC) as needed. Any other piping as needed.
9. Pad or other mounting system for the condenser.
10. Sealants to seal all penetrations.
F. The contractor will provide, as if specified herein, any materials and supplies not specifically mentioned but reasonably implied for the complete, safe, and satisfactory completion of the project.
G. Asbestos containing material is prohibited. An asbestos containing material is defined as a material that contains one percent or more of asbestos by weight. The contractor will supply paperwork that indicates the composition of materials used (i.e., supplier’s and/or manufacturer’s legal statement or certification and Safety Data Sheet). The contractor is responsible for the replacement of any asbestos containing material they install in contravention of this provision at no cost to the State.
XIV. Pricing The contractor must provide pricing as indicated below. Additional prices are separate and in addition to, but not included in the total cost of the work described herein. Additional prices are intended to cover potentially unforeseen but possible repairs that the contractor may find while performing this work. The contractor may only complete this additional work if it is approved by the Executive Director of JPPM or a designee.
A. On the IFB form opposite item no. 1, the contractor shall insert cost to replace the Visitor’s
Center HVAC as detailed herein.
XV. Basis for Selection A. This IFB may be cancelled, and the State may reject any bids when it is in the best interest of the State to do so.
B. The Selection Committee will choose the bid based on the most favorable evaluated bid price.
Evaluation criteria include responsiveness of the bid to the project requirements, and which bid is the most advantageous to JPPM. The selection of the contractor is based on
2 - SPECIFICATION, HVAC REPLACEMENT IN THE VISITOR’S CENTER
1. Attending the mandatory prebid meeting. Vendors who did not attend the mandatory prebid meeting will not be considered.
2. Certified Small Business (CBS) certifications or Veteran-Owned Small Business Enterprise (VSBE) certification.
3. Qualifications.
4. JPPM’s or other Maryland agency’s previous experience with the contractor.
5. Ability to complete the project within the time allotted.
6. Cost.
XVI. IFB Mandatory State Provisions A. Bidders should give specific attention to the identification of those portions of their proposals that they deem to be confidential, proprietary information or trade secrets and provide any justification why such materials, upon request, should not be disclosed by the State under the Access to Public Records Act, State Government Article, Title 10, Subtitle 6, Annotated Code of Maryland;
B. Minority business enterprises and small businesses are encouraged to respond to this IFB;
C. By submitting a bid to this IFB, a bidder represents that it is not in arrears in the payment of any obligation due and owing the State of Maryland, including the payment of taxes and employee benefits, and that it shall not become so in arrears during the term of the contract if selected for contract award;
D. If JPPM determines before award that facts or circumstances exist giving rise to, or which could in the future give rise to, a conflict of interest, JPPM may request a bidder to provide a conflict of interest affidavit and disclosure. JPPM may also terminate the contract after award, in whole or in part, if it considers termination necessary to avoid an actual or potential conflict of interest;
E. JPPM shall give preference to products and equipment that are mercury-free as required under COMAR 21.11.07.07 where applicable.
F. All bidders certify that they will not engage in the unlawful manufacture, distribution, dispensing, possession, or use of drugs or the abuse of drugs or alcohol in the performance of the procurement, in compliance with the State’s Drug and Alcohol Free Workplace Policy and
COMAR 21.11.08.03.B.
| I. Summary of Work |
| II. Permits, Certificates, Laws, Licensing, and Ordinances |
| III. Bid Submission Packet |
| 5. Name and current license or certificate number of designated master license or certificate holder for the contract. Provide a copy of current license or certificate. |
| IV. Safety |
| V. Quality Assurance and Workmanship |
| VI. Inspection Upon Completion of Work |
| VII. Cleaning |
| VIII. Other Conditions |
| IX. Warranty |
| X. Duration of the Contract |
| XI. Payment to Contractor |
| XII. Detailed Specifications |
| XIII. Materials |
| XIV. Pricing |
| XV. Basis for Selection |
| XVI. IFB Mandatory State Provisions |
File details come from the government source that posted it. Updated .