This document is a comprehensive project manual and bid set for the Salt Lake City Corporation Department of Public Utilities, specifically for the 700 West Storm Drain project located between 1840 South and 2100 South. The project involves constructing approximately 1,800 linear feet of storm drain infrastructure, including 900 linear feet of 36-inch RCP and 850 linear feet of 24-inch RCP pipe. The bid is scheduled to be publicly opened on October 31st, 2025, with a contract time of 90 calendar days after the Notice to Proceed. Bidders must submit electronic proposals through the Utah Public Procurement Place (U3P) platform, with a pre-bid conference scheduled for October 8th, 2025, via Webex. The project will require various ancillary work including cleanout boxes, trench stabilization, traffic control, and utility conflict management.
The estimated project cost is approximately $1,078,500, with bid security requiring 5% of the total bid amount. The project will be awarded on a unit price contract basis, with specific line items for mobilization, pipe installation, utility relocations, and traffic control. Salt Lake City will utilize a Value-Based Procurement Program that considers factors beyond price, such as a contractor's non-discrimination policies, apprenticeship programs, drug testing policies, and local small business status. Funding appears to be from the city's fiscal year 2025-2026 budget, with the project aimed at improving stormwater quality and potentially creating future non-motorized transportation infrastructure. The project requires compliance with various local, state, and federal regulations, including stormwater permits, traffic control standards, and utility coordination requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Notice to Contractors DN00297320.pdf | ||
| 3-Final Bid Set Drawings 03OCT2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALT LAKE CITY CORPORATION
THE DEPARTMENT OF PUBLIC UTILITIES
PROJECT MANUAL FOR CONSTRUCTION OF
700 West Storm Drain - 1840 S to 2100 S
PROJECT NO. 534701250
FISCAL YEAR 2025-2026
ENGINEERING DIVISION
1805 W. 500 S.
SALT LAKE CITY, UTAH 84104
ERIN MENDENHALL
Mayor
City Council
VICTORIA PETRO DARIN MANO
ALEJANDRO PUY DAN DUGAN
CHRIS WHARTON SARAH YOUNG
EVA LOPEZ CHAVEZ
LAURA BRIEFER
Director
JESSE STEWART
Deputy Director
JASON DRAPER, P.E.
Chief Engineer
JASON BROWN
Deputy Director
[This page was intentionally left blank.]
Project Title Page
00 01 01 - 1
SALT LAKE CITY CORPORATION
Salt Lake City, Utah
PROJECT MANUAL
FOR
700 West Storm Drain – 1840 S to 2100 S
PROJECT NO. 534701250
PREPARED FOR
DEPARTMENT OF PUBLIC UTILITIES
ENGINEERING DIVISION
1805 W. 500 S.
SALT LAKE CITY, UTAH 84104
PREPARED BY
Bowen Collins & Associates 154 E. 14075 S.
DRAPER, UTAH 84020
Project Engineer: Wyatt Andersen, P.E.
Project Title Page
00 01 01 - 2
Seals Page 00 01 07 - 1
S E A L S P A G E
Project No. 534701250
PROJECT MANUAL PREPARED UNDER THE DIRECTION OF:
CIVIL
Professional’s Name: [ ________________________ ] Company: __________________________________ Address: __________________________________ Phone Number: _______________________________
Seals Page 00 01 07 - 2
Revised May 8, 2025 Table of Contents
00 01 10 - 1
T A B L E O F C O N T E N T S 700 West Storm Drain – 1840 S to 2100 S
Project No. 534701250
Reference No. of Number Title Pages
INTRODUCTORY INFORMATION
00 01 01 Project Title Page 00 01 07 Seals Page 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets
BIDDING AND CONTRACTING REQUIREMENTS
00 11 16 Invitation to Bid 00 21 13 Instructions to Bidders 00 22 13 Supplementary Instructions to Bidders 00 22 18 Supplementary Instructions (VP) 00 31 32 Geotechnical Data 00 41 00 Bid Form 00 43 00 Bid Schedule 00 43 36 Proposed Subcontractor Form 00 43 37 Work Under Contract Report 00 43 38 Bidder Status Report 00 43 40 Value Program Form 00 52 00 Agreement 00 61 13 Performance Bond 00 61 14 Payment Bond 00 62 11 Submittal Transmittal Form 00 62 16 Certificate of Insurance
CONDITIONS OF THE CONTRACT
00 73 00 Special Provisions 00 73 10 Modifications to the General Conditions 00 73 15 Modifications to APWA Standard Plans 00 73 50 Requirements of the Department of Public Utilities 00 91 13 Addenda
DIVISION 1 – GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 00 Work Restrictions………………………………………………………………………5 01 31 13 Coordination
Revised May 8, 2025 Table of Contents
00 01 10 - 2
01 32 17 Baseline and Progress Schedules 01 33 00 Submittal Procedure 01 35 24 Contractors Certification of Compliance to Safety Plan 01 45 00 Quality Control 01 55 26 Traffic Control 01 57 00 Temporary Controls 01 58 00 Project Identification and Signs 01 67 00 Utility Materials 01 71 13 Mobilization and Demobilization
DIVISIONS
31 EARTHWORK
31 23 19 Dewatering
32 EXTERIOR IMPROVEMENTS
32 90 00 Landscape Restoration
REFERENCE SPECIFICATIONS
Work not otherwise specified in this document or the construction drawings shall be performed in accordance with the applicable sections of the 2025 edition of the Manual of Standard Specifications published by the Utah Chapter of the American Public Works Association available on the web and SLCDPU Standard Practices. In case of conflict between project-specific supplemental specifications, SLCDPU Standard Practices, and general reference specifications, SLCDPU Standard Practices shall govern.
REFERENCE DRAWINGS
Work not otherwise specified in the construction drawings shall be performed in accordance with the applicable sections of the 2025 edition of the Manual of Standard Plans published by the Utah Chapter of the American Public Works Association available on the web and SLCDPU Standard Practices. In case of conflict between project-specific drawings, SLCDPU Standard Practices, and general reference drawings, SLCDPU Standard Practices shall govern.
END OF DOCUMENT
List of Drawing Sheets 00 01 15 - 1
DOCUMENT 00 01 15
LIST OF DRAWING SHEETS
DRAWINGS
Sheet No. Title
1 G-01 Index of Drawings, Project Location and Vicinity Maps 2 G-02 Abbreviations 3 G-03 Symbols 4 G-04 SLC General Notes 5 G-05 Project Notes 6 G-06 Key Sheet 7 C-01 Plan and Profile - 01 8 C-02 Plan and Profile - 02 9 C-03 Plan and Profile - 03 10 GC-01 General Civil Details - 01
REFERENCE DRAWINGS
1. Manual of Standard Plans published by the Utah Chapter of the American Public Works
Association.
List of Drawing Sheets 00 01 15 - 2
Revised September 24, 2025 Invitation to Bid 00 11 16 - 1
DOCUMENT 00 11 16
INVITATION TO BID
PART 1 GENERAL
1.1 CONSTRUCTION CONTRACT
A. Bidders are invited to bid on the Construction Contract named and numbered as:
700 West Storm Drain - 1840 S to 2100 S
700 West from 1840 South to 2100 South
Project No. 534701250
B. For information about the award of this Construction Contract, contact Jason Draper, P.E., Chief Engineer at (801) 483-6751.
C. Salt Lake City Corporation has migrated to the new Utah Public Procurement Place (U3P) platform, Euna, starting in January 2025. In order to respond to solicitations, you will need to register at the new U3P by clicking here. For first time users, click the link on the top right-hand side where you will see a “Register” button. Click that button and you will be taken through the registration process.
It is recommend that you watch this quick 5-minute video on how to register with Euna to aid in your registration process. Feel free to pause it as you go through the steps. If you have any questions or need assistance while using the platform, please consult the online knowledge base, explore the FAQs, or reach out to the Euna Support Team at support@gobonfire.com, for questions about technical requirements.
1.2 DESCRIPTION OF WORK
A. The location of the work is:
700 West from 1840 South to 2100 South
B. The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following:
1,800 linear feet of 24-Inch and 36-Inch RCP Storm Drain Pipe
1.3 BIDDERS' PRE-QUALIFICATION
A. Bidders are not required to be pre-qualified for the Work.
1.4 BASIS OF BIDS
A. Bids shall be on a unit price basis. Bids will only be accepted through the Utah Public
Procurement Place (U3P) electronic submission platform portal.
1.5 CONTRACT TIME
A. The Work will be Substantially Complete within 90 calendar days after the Notice to Proceed. Calendar days for winter shut down are not included above.
https://utah.bonfirehub.com/portal/?tab=openOpportunities https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fshare.vidyard.com%2Fwatch%2FnRJyoedyaNwRaWv43chZje%3F&data=05%7C02%7CJeanette.Hartvigsen%40slc.gov%7C879529440e944b17f66908dcfa862f7b%7C9fa2c952dd504b06ba6a4b9bd7adda03%7C1%7C0%7C638660701428626382%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&sdata=rFYvdTIYIPIS%2FzJUGKRgqKJC4YuQ6wyo4BqujbfT64U%3D&reserved=0 https://customer.eunasolutions.com/public/s/article/vendor-registration mailto:support@gobonfire.com Andrew McKinnon Based on the location, this project is a good candidate for a “calendar day” type project that provides flexibility for contractors to begin when they’re most available. We should provide a recommendation. Does the City have a funding deadline at all?
00 11 16 - 2
1.6 EXAMINATION AND PROCUREMENT OF DOCUMENTS
A. Complete sets of Contract Documents can be downloaded and examined on Friday, October 3rd, 2025, as a registered supplier through the Utah Public Procurement Place (U3P) website.
B. ALL BIDDERS must register through the U3P electronic procurement and submission platform to ensure access to all bid solicitation notifications and project related documents, such as access to plan holder copies of the project manual specifications and drawings.
Please refer to Article 1.1C-D of the Invitation to Bid (Document 00 11 16), to obtain the links to register or questions about registration. Questions or help with registering as a U3P supplier must be fielded through the U3P admin team and can be reached by emailing them at U3PAdmin@utah.gov.
C. It is the responsibility of all BIDDERS to periodically check and download addenda(s), question and answer responses, or any additional information that may be posted during the bidding period. The OWNER will only accept Bid Document submissions through U3P.
D. Hard-copy paper bid submissions will no longer be accepted; refer to Article 1.4A of the Invitation to Bid (Document 00 11 16)
1.7 PRE-BID CONFERENCE
A. A pre-bid conference will be held online on Wednesday, October 8th, 1:30 PM, via
Webex.
B. ALL CONTRACTORS intending to submit a bid are invited to attend to obtain relevant information concerning the project. Bidders are advised that information affecting drawings, specifications, conditions, Scope of the Work, etc. may be discussed. OWNER assumes no obligation to disclose information discussed at the pre-bid conference to Bidders who do not attend. Absent Bidders assume all risk of failure to attend.
C. This meeting will be held via Webex at the Salt Lake City Public Utilities (SLCDPU) West Campus location. To join for the pre-bid conference meeting from the convenience of your computer, tablet or smartphone, please use the link below:
Pre-Bid Meeting for 700 West Storm Drain - 1840 S to 2100 S (534701250) Wednesday, October 8, 2025, 1:30 AM | 1 hour | Mountain Time https://saltlakecity.webex.com/saltlakecity/j.php?MTID=mf69999ea93b0012626fa867315985ae4
Meeting/Access Number: 2497 207 2568
Password: prebid
Join by video system: Dial 24972072568@webex.com. You can also dial 173.243.2.68 and enter your meeting number.
Join by phone: +1-408-418-9388 United States Toll https://utah.bonfirehub.com/portal/?tab=openOpportunities mailto:U3PAdmin@utah.gov https://saltlakecity.webex.com/saltlakecity/j.php?MTID=mf69999ea93b0012626fa867315985ae4 mailto:24972072568@webex.com
00 11 16 - 3
1.8 BID SECURITY
A. Bid security must equal five (5%) percent of the total amount of the Bid. A PDF of the Bid security must be included in the submission of the Bid Documents. Bids utilizing cashier’s checks or cash equivalent may not be submitted electronically.
B. Bid security will be valid for forty-five (45) days from the day of the Bid opening or until the Construction Contract has been recorded by the Office of the Recorder, subject to Article 2.11A hereof, as specified in the Instructions to Bidders (Document 00 21 13).
1.9 BID LOCATION AND OPENING
A. Bids will be publicly opened and read from our Salt Lake City Department of Public
Utilities, West Campus location at 1805 West 500 South, Salt Lake City, Utah 84104, at about 2:00 p.m., local prevailing time, on October 31st, 2025, by a Public Utilities representative. Bids submitted after 2:00 PM to U3P’s project portal or delivered to any other location, will not be accepted.
B. This meeting will be held via Webex and in person at the Salt Lake City Department of Public Utilities, West Campus location. To join SLCDPU for the Bid open meeting from the convenience of your computer, tablet, or smartphone, please use the link below.
Bidders must submit final bid submission electronically through (U3P) BONFIRE. The following project bid(s) are to be opened and read aloud in this open-to-the-public meeting:
SLCDPUENG Construction Open As-Read Bid Meeting Friday, October 31, 2025, 2:00 PM | 1 hour | (UTC-06:00) Mountain Time https://saltlakecity.webex.com/saltlakecity/j.php?MTID=m20d3aa41653e02772718053c9cb3274d
Meeting/Access Number: 2491 983 2935 Password: openbid Join by video system: Dial 24919832935@webex.com. You can also dial 173.243.2.68 and enter your meeting number.
Join by phone: +1-408-418-9388 United States Toll
C. Successful and Unsuccessful Bid letters will be issued after the awarding of the Construction Contract. Bid tabulations may be requested through the Office of the City Recorder, once the project has been recorded, by accessing the following link:
https://www.slc.gov/attorney/recorder/ .
1.10 RIGHT TO REJECT BIDS
A. OWNER reserves the right to reject any or all bids or to waive any informality or technicality in any bid if OWNER deems it to be in its best interest.
1.11 VALIDITY PERIOD FOR BIDS
A. Bid security and proposal’s shall remain valid for forty-five (45) days from the day of the Bid opening, unless the Bidder and the OWNER agree to extend the forty-five (45) days, but https://saltlakecity.webex.com/saltlakecity/j.php?MTID=m20d3aa41653e02772718053c9cb3274d mailto:24919832935@webex.com https://www.slc.gov/attorney/recorder/
00 11 16 - 4 not to exceed sixty (60) days, see Article 2.11A hereof, as specified in the Instructions to Bidders (Document 00 21 13) or until a Construction Contract has been recorded.
B. In the event a Bidder receives a Notice of Intent to Award and then withdraws their bid after the Bid opening, but before the expiration of said period, shall forfeit their Bid security.
1.12 GOVERNING LAWS AND REGULATIONS
A. This project does not require the payment of specific wage rates. Payroll submittals will not be required.
B. Bidders on this Work will be subject to the applicable provisions of all federal rules, laws, and regulations or orders.
1.13 AMERICANS WITH DISABILITIES (ADA)
A. Assisted listening devices or interpreting services are available for all public meetings.
Salt Lake City Corporation complies with the American Disabilities Act (ADA). For further information, contact the TDD Number 801-483-6820.
1.14 REPRESENTATION REGARDING ETHICAL STANDARDS FOR CITY OFFICERS
AND EMPLOYEES AND FORMER CITY OFFICERS AND EMPLOYEES
A. A bid will not be accepted unless it contains the following representation.
THE BIDDER, OFFEROR OR CONTRACTOR represents that it has not:
1. Provided an illegal gift or payoff to a City officer or employee or former City officer or employee, or its relative or business entity.
2. Retained any person to solicit or secure this contract upon an agreement or understanding for a commission, percentage, or brokerage or contingent fee, other than bona fide employees or bona fide commercial selling agencies for the purpose of securing business.
3. Knowingly breached any of the ethical standards set forth in the City’s conflict of interest ordinance, Chapter 2.44, Salt Lake City Code; or
4. Knowingly influenced, and hereby promises that it will not knowingly influence, a City officer or employee or former City officer or employee to breach any of the ethical standards set forth in the City’s conflict of interest ordinance, Chapter 2.44, Salt Lake City Code.
1.15 AWARD
A. The Construction Contract will be awarded in compliance with the City’s Value-Based Procurement Program which takes into account certain factors in the Bidder’s work environment. For more information about this Program please read SLC Procurement Rules 53-1A-20: VALUE BASED PROCUREMENT PROGRAM.
Revised September 24, 2025 Instructions to Bidders
00 21 13 - 1
DOCUMENT 00 21 13
INSTRUCTIONS TO BIDDERS
PART 1 GENERAL
1.1 DEFINED TERMS
A. Terms used in the Bid Documents that are defined in Article 1.1 of the General Conditions will have the meanings indicated in the General Conditions.
B. General Conditions: as published in Document 00 72 00 in the current edition of the Manual of Standard Specifications by the Utah Chapter of the American Public Works Association.
1.2 COPIES OF BID DOCUMENTS
A. Complete sets of Bid Documents must be used in preparing Bids. The OWNER and
ENGINEER assume no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bid Documents.
B. Bid Documents are made available to Bidder only for the purpose of obtaining Bids on the Work. No license or grant for any other use is given.
C. Bidding Document copyrights shall remain with OWNER.
D. All provisions of the current edition of the Manual of Standard Specifications and Manual of Standard Plans published by the Utah Chapter of the American Public Works Association that are applicable to the Work are made a part of the Contract Documents by reference.
Those publications are available on the web at http://utah.apwa.net.
E. Salt Lake City Department of Public Utilities has a document entitled “Standard Practices for Salt Lake City Public Utilities”. (March 9, 2018, edition) The document is available from 1805 West 500 South, Salt Lake City, Utah 84104.
1.3 PRE-BID CONFERENCE
A. Representatives of OWNER and ENGINEER will be present at a pre-bid conference to discuss the Project. Bidders are encouraged to attend and participate in the conference.
ENGINEER will publish to U3P copies of the Bid Documents Addenda as ENGINEER/OWNER considers necessary in response to questions arising at the conference. The location and time of the conference are identified Article 1.7A in the Invitation to Bid (Document 00 11 16).
1.4 EXAMINATION OF SITE AND CONTRACT DOCUMENTS
A. In General: Bidders are permitted to converse with ENGINEER or ENGINEER's personnel having knowledge of the Project, Plans, Specifications, material sites, or conditions generally prevailing in the area of the Project to aid in pre-bid investigations.
OWNER is not bound by any statements or representations made by ENGINEER or ENGINEER's personnel before the Bid opening or award of the Construction Contract, nor for any assumptions or conclusions reached by a prospective Bidder as a result of such communication unless ENGINEER issues an Addendum to all prospective Bidders.
B. Access to Site: The lands upon which the Work is to be performed, and rights-of-way and http://utah.apwa.net/
00 21 13 - 2 easements for access thereto and other lands designated for use by Bidder in performing the Work are identified in the Contract Documents. All additional off-site lands and access thereto required for temporary construction facilities or storage of materials and equipment must be provided by Bidder.
C. Contract Documents: The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 1.4; that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents; and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
D. Bidder's Obligations: The submission of a Bid constitutes acknowledgement that Bidder has complied with all bidding instructions. It is the responsibility of each Bidder, before submitting a Bid, to:
1. Examine the Contract Documents thoroughly;
2. Visit the site to become familiar with local conditions that may affect cost, progress, performance, or furnishing of the Work;
3. Consider federal, state, and local Laws and Regulations that may affect cost, progress, performance, or furnishing of the Work;
4. Study and carefully correlate Bidder's observations with the Contract Documents; and
5. Identify and notify ENGINEER in writing of all specific conflicts, errors, or discrepancies in the Contract Documents, and of any doubts of Bidder about their meanings. The failure or omission of any Bidder to receive or examine any form, instrument, Addendum, or other document, visit the site and become acquainted with conditions there existing, or attend the pre-bid conference, shall in no way relieve any Bidder from obligations with respect to Bidder's Bid or to the Construction Contract.
E. Deviations from the Terms of the Contract Documents: OWNER will not accept any deviations whatsoever from the printed terms of the Agreement (Document 00 52 00) and the Contract Documents, except by Addendum or Change Order.
1.5 PHYSICAL CONDITIONS
A. In General: Before submitting a Bid, each Bidder is responsible for review of OWNER's explorations, tests, and data concerning surface conditions, subsurface conditions, and Underground Facilities at or contiguous to the site, or otherwise, that may affect cost, progress, performance, or furnishing of the Work in accordance with the time, price, and other terms and conditions of the Contract Documents.
B. Surface and Subsurface Conditions: Provisions concerning surface and subsurface conditions, if any, are set forth in the Geotechnical Data (Document 00 31 32). That document provides the identification of:
1. Those reports of explorations and tests of subsurface conditions at the site that have been utilized by ENGINEER in preparing the Contract Documents; and
2. Those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) at or contiguous to the site that have been utilized by ENGINEER in preparing the Contract Documents.
00 21 13 - 3
C. Underground Facilities: Information and data indicated in the Contract Documents regarding Underground Facilities at or contiguous to the site is based upon information and data furnished to OWNER and ENGINEER by owners of such Underground Facilities.
OWNER does not assume responsibility for the accuracy or completeness thereof other than as provided in paragraph 4.3A.2 of the General Conditions or unless expressly provided in the Modifications to the General Conditions (Document 00 73 10).
D. Additional Explorations: On request in advance, and if possible, OWNER will provide to each Bidder access to the site to conduct any explorations and tests as each Bidder deems necessary for submission of a Bid. Bidder shall obtain permits, fill all holes, and clean up and restore the site to its former condition upon completion of such explorations. Bidder shall indemnify and save OWNER harmless during and after the performance of additional explorations.
E. Modifications to the Contract Documents: Provisions concerning the adequacy of the data furnished for subsurface structures and underground facilities and the possibility of changes in the documents due to differing conditions appear in Articles 4.2 and 4.3 of the General Conditions.
PART 2 BIDDING PROCEDURES
2.1 INTERPRETATIONS AND ADDENDA
A. All requests for interpretation of the Contract Documents shall be made in writing and submitted through the U3P electronic submission portal to the ENGINEER no later than seventy-two (72) hours before the Bid opening. If required, ENGINEER will send a written interpretation to all persons receiving a set of Bid Documents in the form of a written Addendum. If a Bidder's request for interpretation is not responded to by ENGINEER, Bidder shall not rely on any interpretation in the request that is contrary to the intent and terms of the Contract Documents.
B. OWNER will not be responsible for any explanations or interpretations, except those duly issued in the form of written Addenda.
C. Addenda may also be issued to modify the Bidding Documents as deemed advisable by
ENGINEER.
D. Any Addenda so issued during the time of bidding shall be deemed to be included in the Bid. All Addenda shall become a part of the Contract Documents.
E. Except to postpone the Bid opening, no Addenda shall be issued within forty-eight (48) hours before the Bid opening.
2.2 EQUIPMENT AND MATERIAL OPTIONS BEFORE OPENING
A. If a Bidder or Supplier wishes to use items of equipment or materials other than those identified in the Contract Documents, said Bidder or Supplier shall submit a written request for approval to ENGINEER at least ten (10) days before the date set for the Bid opening.
B. The procedure for submission of any such request shall be as follows: submit 1) one (1) set of the written request and technical brochures and 2) a statement of variances. The statement of variances must list all features of the proposed substitution that differ from the Contract Documents and must further certify that the substitution has no other variant features. The
00 21 13 - 4 brochure and information submitted must be clearly marked showing make, model, size, options, and any other features and must include sufficient evidence for ENGINEER to evaluate each feature listed as a variance. If after installing the substituted product, an unlisted variance is discovered, CONTRACTOR shall immediately replace the product with a specified product at no cost to OWNER.
C. Any approval of such a request by ENGINEER must be made not later than forty-eight (48) before the Bid opening. ENGINEER's failure to approve by such time shall be deemed a denial of the request.
D. Any such approval is at the sole discretion of ENGINEER and will be in the form of an Addendum, issued to all Bidders holding Bid Documents, indicating that the additional equipment or materials are approved as equal to those specified for the Project.
2.3 BID SECURITY
A. Delivery of Bid Security: Bidders must upload the Bid Security, in the form of a Bid Bond, to the OWNER electronically through (U3P) at the time of their Bid submission. If Bid Security is not uploaded with the Bid, the Bid shall not be read.
B. Amount of Bid Security: The Bid security amount must equal five (5%) percent of the total amount of Bid. The total amount of the Bid shall be the sum of all items of the Bid, constituting the maximum amount of the possible award to the Bidder.
C. Bid Bond: If a Bid Bond is used, the Bond shall guarantee that the Bidder, if awarded the Work, will promptly enter into a Construction Contract to perform the Work in the manner required by the Contract Documents.
D. Cashier's Check or Cash Equivalent: Cashier’s checks or cash equivalent will not be accepted as Bid security through U3P. Bids utilizing cashier checks or cash equivalents for their Bid security may not be submitted electronically and shall not be read.
E. Return of Bid Security: OWNER will retain the PDF submission of Bid Security of all the Bidders. Bid Security will remain valid for forty-five (45) days after the date of the Bid opening or until the awarded Bidder receives a recorded Construction Contract. Access to this documentation will only be granted through a Government Records Access and Management Ace (GRAMA) request through the Office of the Recorder, and only if the requested documentation is not protected information as defined in the UCA 63G-2305.
Please use the following link to research and request access at https://www.slc.gov/attorney/recorder/.
F. Default: If the Bidder fails, within the time limit described in Article 3.6A, to enter into the Construction Contract and to deliver to OWNER a Performance Bond, Payment Bond, or any other Bonds or documents required by the Contract Documents after Notice of Intent to Award by OWNER, the Bidder shall forfeit the amount of the Bid Bond or cashier's check as liquidated damages to OWNER.
2.4 CONTRACT TIME AND PUNCH LIST TIME
A. Provisions concerning Contract Time and Punch List Time are set forth in the Agreement
(Document 00 52 00).
2.5 LIQUIDATED DAMAGES
A. Provisions concerning liquidated damages are set forth in the Agreement (Document 00 52 00).
https://www.slc.gov/attorney/recorder/
00 21 13 - 5
2.6 BID FORM
A. The Bid Form (Document 00 41 00) identifies all forms comprising the Bid Documents.
Additional copies may be obtained from ENGINEER.
B. All names must be typed or printed under or near the signature. The signature must meet applicable State and City code.
C. The Bid must contain an acknowledgment of receipt of all Addenda. The Addenda numbers must be filled in on the Bid Form.
D. The Bidder's address, telephone number, and email address for communications regarding the Bid must be shown on the first page of the Bid Form.
E. The Bidder shall make no stipulations or alterations on the Bid forms. The Bidder must use only the Bid Form and Bid Schedules bound in the Contract Documents (unless updated forms are included in an addendum, in which cause the Bidder shall use the updated forms).
F. OWNER may waive any failure to comply with the requirements of this paragraph 2.6 if OWNER determines that such failure 1) is not material to the terms of OWNER’s Bid Documents and process and does not render the Bid non-compliant with Laws and Regulations pertaining to bidding, or 2) involves ministerial or minor informalities that are evident from the Bid Documents or that can be waived without prejudice to other Bidders and that do not have a substantial effect on price.
2.7 BID SCHEDULE
A. Any work or material that is specified in the Contract Documents or that is necessary because of the nature of the Work, but that is not listed separately in the Bid Schedule (Document 00 43 00), shall not be measured or paid for separately. The cost of such work or material shall be considered as included in the Contract Price.
B. All blanks on the Bid Schedule (Document 00 43 00) must be completed in ink or by typewriter. If applicable, furnish both the unit and the total costs for each item. Numbers shall be stated in figures, and the signature of all people signing shall be in longhand. Any corrections, alterations or erasures made by the Bidder to the information the Bidder entered on the Bid Schedule shall be initialed in ink by the Bidder. OWNER may waive any failure to comply with the requirements of this paragraph if OWNER determines that such failure
1) is not material to the terms of OWNER’s Bid Documents and process and does not render the Bid non-compliant with Laws and Regulations pertaining to bidding, or 2) involves ministerial or minor informalities that are evident from the Bid Documents or that can be waived without prejudice to other Bidders and that do not have a substantial effect on price.
2.8 SUBMISSION OF BIDS
A. Bids shall be submitted at the time and place indicated in Article 1.9A-B, in the Invitation to Bid (Document 00 11 16).
B. Methods of submission:
a. Bids must only be submitted electronically through U3P. Submit one (1) electronic copy of the bid and any other corresponding documents that are listed as “REQUIRED” within the U3P bid posting, into a PDF file. Next upload your file(s), as requested in STEP 1: PROVIDE SUBMISSION INFORMATION section. Electronic submission responses must be successfully uploaded before or on the specified date of the Bid
00 21 13 - 6 opening, prior to the 2 PM (MST) closing. After the Bidder uploads their response files, the Bidder will receive a confirmation number from U3P, of their successful submission.
b. Responses submitted through U3P can be altered after the initial submission until the time prior to the bids closing. The bid submission to be altered can be accessed either by the registered Bidders using the U3P portal or through the confirmation email the bidder will receive upon a successful submission of the bid.
c. U3P will only accept document types such as Word, Excel, or PDF, as it is specified, and the maximum file size accepted is 1000 MB. Uploading documents that are not to the specification of the file type requested, will be rejected with the following message, “File type not allowed”. Such actions may cause your proposal to be deemed as "non-responsive".
C. Alternate bids, other than those called for in the Bid form, will not be considered.
D. No oral, email, or hard-copy bids will not be accepted. OWNER will only accept responses submitted electronically through U3P.
2.9 MODIFICATIONS AND WITHDRAWAL OF BIDS
A. At any time before the Bid opening, Bids may be modified or withdrawn; refer to Article 2.8B in the Instructions to Bidders (Document 00 21 13).
B. If the Bidder requests to withdraw their Bid Proposal after Bids have been opened and read to the public, the Bidder has two (2) business days after the Bids are opened, Bidder may file a written notice, email submission of said notice is acceptable, with the OWNER that there was a substantial mistake made in the preparation of their Bid. Bidder must thereafter promptly demonstrate Bidder's mistake to the reasonable satisfaction of the OWNER. If the OWNER agrees, the Bidder may withdraw their Bid.
C. The Bidders original submission, if approved by the OWNER for withdrawal, will remain with the project as a record of procurement. The Bidders Bid will be labeled in the procurement records as, “WITHDRAWN PER BIDDERS REQUEST”. The Bidder may satisfy the OWNER’s written notice requirement for the withdrawal of their bid, by email submission. It is the responsibility of the bidder to confirm with the OWNER that the Bidders notice for withdrawal has been received.
2.10 OPENING OF BIDS
A. Bids will be downloaded and opened via U3P, then read aloud publicly unless obviously
“non-responsive”. An abstract of the amounts of the base schedule of prices and any alternate schedules will be made available for review after the opening of Bids.
B. Bids attempting submission to the bid post via U3P after the time specified in the Invitation to Bid (Document 00 11 16) will be rejected by the system.
2.11 BIDS SUBJECT TO ACCEPTANCE FOR 45 DAYS
A. Subject to Paragraph 2.3E hereof, Bids remain subject to acceptance for forty-five (45) days after the day of the Bid opening. OWNER may, in its sole discretion, release any Bid and return the Bid security before that date. OWNER and Bidder may agree to extend the forty-five (45) day deadline, but not to exceed sixty (60) days.
2.12 NONDISCRIMINATION IN EMPLOYMENT
A. Work under this Bid will obligate the Bidder and Subcontractors not to discriminate in
00 21 13 - 7 employment practices.
B. Bidders must, if requested, submit a compliance report concerning employment practices and policies in order to maintain their eligibility to receive the award of the Construction Contract.
C. Equal opportunity employment shall be reflected in the racial and sexual composition of Bidder's work force and OWNER urges an affirmative action program to overcome under-utilization.
D. Bidders are advised that the Construction Contract and its performance are subject to the applicable provisions of all Laws and Regulations. Bidder will be obligated, upon written request, to give all applicable assurances of compliance in connection therewith.
E. If federal nondiscrimination requirements are applicable, Bidder must be fully knowledgeable and comply with such requirements. Refer to Community Development Block Grant Supplementary Conditions (CDBG) (Document 00 73 12) or Federal Aviation Administration Supplementary Conditions as applicable.
2.13 SECTION 3, HOUSING AND URBAN DEVELOPMENT ACT OF 1968
A. If Work under this Bid is funded with a federal community development block grant the requirements of Section 3 of the Housing and Urban Development Act of 1968 may apply to the Bidder and its Subcontractors. OWNER encourages the use of the State of Utah Section 3 register for all subcontracting https://jobs.utah.gov/housing/affordable/owhlf/section3/hudsection3.html.
B. Bidder will be obligated to give all applicable assurances of compliance in connection with this Section 2.13 at any time.
PART 3 AWARD OF CONSTRUCTION CONTRACT
3.1 QUALIFICATIONS OF BIDDERS
A. Within seven (7) calendar days of the OWNERS request, a Bidder whose bid is under consideration for the award shall submit to the OWNER the following information for the Bidder. The OWNER may request information on the Bidder’s Subcontractors, or Bidder's Suppliers or any other information the OWNER may require.
1. A current financial statement for the Work (as provided to the bonding company);
2. A chronological list of "completed" construction work done by Bidder during the last 3 years, including project name, address, owner, contract name, and current telephone number;
3. Work Under Contract Report (Document 00 43 37);
4. The proposed organizational structure for the project: firm ownership, project manager, progress scheduler, and CONTRACTOR’s Resident Superintendent’s resume;
5. Owned and rented equipment that is to be used to do the Work;
6. Investigations, arbitrations, litigation, or claims that are pending, threatened, settled, or disposed of within the last three (3) years;
7. Evidence of ability to perform and complete the Work in a manner and within the time https://jobs.utah.gov/housing/affordable/owhlf/section3/hudsection3.html
00 21 13 - 8 limit specified. As a minimum, identify specific projects similar to the Work in physical size, cost, and commercial nature. If the work experiences of the project manager and Resident Superintendent designated to construct this project are different than that of Bidder, provide resumes of their work history. Include their actual project titles and indicate their actual responsibilities on each given project;
8. Names of three (3) projects of similar size and nature that the Resident Superintendent has completed. Include the name, address, and telephone number of the office contracting for each project.
9. Information so OWNER’s Labor Relations Specialist can certify that Bidder has an acceptable Utilization Plan that offers economic opportunities to low and very low income persons and that Bidder qualifies as a Section 3 Contractor; and
10. Such other data as may be called for in the Supplementary Instructions to Bidders (Document 00 22 13) (if any).OWNER will hold all requested information confidential and, upon request, shall return such information to Bidder after acceptance or rejection of Bidder’s Bid.
B. Untimely response by Bidder will release OWNER of any obligation to further negotiate or consider Bidder's Bid.
3.2 EVALUATION OF BIDS
A. OWNER reserves the right: 1) to reject any and all Bids; 2) to waive minor informalities in the Bid Schedule and elsewhere so long as the informalities (a) are not material to OWNER’s Bid Documents and process and do not render the Bid non-compliant with Laws and Regulation pertaining to bidding, or (b) involve ministerial or minor informalities that are evident from the Bid Documents or that can be waived without prejudice to other Bidders and that do not have a substantial effect on price; 3) to negotiate and agree to contract terms with the successful Bidder; and 4) to disregard non-conforming, non-responsive, unbalanced, or conditional Bids.
B. OWNER reserves the right to reject any Bid if OWNER believes that it would not be in the best interest of the Project or OWNER to make an award to that Bidder. Such rejection may be because the Bid is non-responsive, or Bidder is unqualified or of doubtful ability, or Bidder’s Resident Superintendent is unqualified or of doubtful ability, or the Bid or Bidder fails to meet any other pertinent standard or criteria established by OWNER in the Supplementary Instructions to Bidders (Document 00 22 13).
C. OWNER will consider the qualifications of Bidder and such alternates, prices, and other data as may be requested in the Bid Form (Document 00 41 00), Bid Schedule (Document 00 43 00), or written requests issued prior to OWNER's Notice of Intent to Award the Construction Contract. OWNER will consider Bidder’s compliance with Section 3.24.115, Salt Lake City Code, see the Supplementary Instructions to Bidders (Document 00 22 13).
D. OWNER may consider the qualifications and experience of Subcontractors, Suppliers, and other people and organizations proposed for portions of the Work as provided in the Proposed Subcontractor Form (Document 00 43 36). OWNER will consider Bidder’s compliance with Section 3.24.115, Salt Lake City Code, see the Supplementary Instructions to Bidders (Document 00 22 13).
00 21 13 - 9
E. OWNER may consider the operating costs, maintenance requirements, performance data, and guarantees of materials and equipment when such data is required to be submitted prior to the Notice of Intent to Award the Construction Contract.
F. To establish qualifications of Bidder, OWNER may request such data indicated in Article 3.1 hereinabove and conduct such investigations as OWNER deems appropriate.
G. If the Construction Contract is to be awarded, it will be awarded to the most responsive and lowest, qualified, responsible Bidder as determined by OWNER. Alternates may be accepted depending upon availability of OWNER funds. Bid alternates will be considered in determining the most responsive, lowest, qualified, and responsible Bidder.
H. ENGINEER will evaluate Bid Schedules as follows:
1. ENGINEER will resolve discrepancies in the multiplication of quantities of Work items and unit prices in favor of the unit prices.
2. Prices written out in words shall govern over prices written out in numbers.
3. ENGINEER will resolve discrepancies between the indicated sum of any column of figures and the correct sum thereof in favor of the correct sum.
4. Bids shall not contain any recapitulations of or changes in the work to be done.
5. ENGINEER may accept a Bid despite obvious errors in a Bid Schedule, such as a failure to include unit prices or a misplaced decimal point, as long as ENGINEER reasonably can discern the intention of Bidder as to the amounts to be bid.
3.3 SUBCONTRACTORS, SUPPLIERS AND OTHERS
A. Bidder shall not subcontract more than seventy-five (75%) percent of the dollar value of the total contemplated Work (exclusive of the supply of materials and equipment to be incorporated in the Work) without OWNER's written approval.
B. Conflict of interest restrictions pertaining to Subcontractors are described in paragraph 6.5H of the General Conditions.
3.4 CONTRACT SECURITY AND OTHER SUBMITTALS
A. Performance Bond (Document 00 61 13) and Payment Bond (Document 00 61 14):
OWNER's requirements as to Performance and Payment Bonds are as set forth in the Modifications to General Conditions (Document 00 73 10). Specific requirements are set forth in the Performance Bond (Document 00 61 13) and the Payment Bond (Document 00 61 14).
1. Bidder should carefully examine the form of the Bonds.
2. When the successful Bidder delivers the executed Construction Contract to OWNER, it must be accompanied by the required Performance and Payment Bonds (using Documents 00 61 13 and 00 61 14, respectively).
B. Proposed Subcontractor Form (Document 00 43 36): Bidder must provide this report form to OWNER within twenty-four (24) hours after ENGINEER's request. See Bid Form, paragraph 1.5B (Document 00 41 00) for additional information. The form shall list the name and address of each Subcontractor who will perform work or labor or render service to Bidder at the site of the Work, or a Subcontractor who, off the job site, will specially fabricate a portion of the Work or improvement according to detail Drawings. In each
00 21 13 - 10 instance, the nature and extent of any Work to be subcontracted in an amount in excess of 2 percent of the Bid sum shall be described. Bidder must have the written consent of OWNER to substitute for any of the Subcontractors or Suppliers designated or to employ any Subcontractor or Supplier that is not listed.
C. Bidder Status Report (Document 00 43 38): Bidder must submit the completed form upon ENGINEER's request or after Bidder receives the Notice of Intent to Award.
D. Other Information: When a determination has been made to award the Construction Contract, Bidder is required, before the award or after the award, or both, to furnish such other information as ENGINEER requests.
3.5 ADJUSTMENTS TO THE COST OF THE WORK AFTER OPENING OF BIDS
A. The Contract Price identified in the Agreement (Document 00 52 00) represents the Cost of the Work that is to be paid by OWNER to CONTRACTOR. Adjustments to the Contract Price that are agreed to between OWNER and the successful Bidder shall be affected by signing an Agreement Supplement.
3.6 SIGNING OF AGREEMENT
A. Within ten (10) days, (or a longer period of time that OWNER in its discretion may allow) after OWNER gives a Notice of Intent to Award the Construction Contract to the successful Bidder. Bidder shall pick up, sign, and return the required number of copies of the Agreement (Document 00 52 00) and attached documents to OWNER with the required Bonds. The original signed Construction Contract will be submitted to the Office of the Recorder and a digital executed copy will be emailed through a secure server to the Bidder’s given email of record.
B. Transfers, delegations, or assignments of interests in the Contract Documents are prohibited, unless prior written authorization is received from OWNER.
C. At and from the time of Bidding through the completion of the Work, Bidder shall be properly licensed to do the Work and shall be in compliance with the license laws of the State of Utah, Salt Lake City and Salt Lake County.
PART 4 MISCELLANEOUS
4.1 EQUIPMENT AND MATERIAL OPTIONS AFTER BID OPENING
A. The Construction Contract, if awarded, will be on the basis of materials and equipment described in the Drawings, Specifications, and any Addenda.
B. The procedure for submitting an application for substitution after the effective date of the Construction Contract is set forth in Article 6.4 of the General Conditions.
Revised March 15, 2013 Supplementary Instructions to Bidders 00 22 13 - 1
DOCUMENT 00 22 13
SUPPLEMENTARY INSTRUCTIONS TO BIDDERS
Add the following paragraph to Article 3.3.
3.3 SUBCONTRACTOR, SUPPLIERS AND OTHERS
C. The following firms, that have been under contract to the OWNER in the design phase of the Work, shall not be used as subcontractors by the CONTRACTOR.
1. Design Consultant: Bowen Collins & Associates .
2. Geotechnical Consultants: .
3. Surveying Consultant: .
4. Other: .
5. Other: .
Add the following article to Part 4.
4.2 PARTNERING
A. Refer to Section 01 31 20 for description of partnering requirements.
B. OWNER's consultants listed in this project manual will be partners to the project.
Revised March 15, 2013 Supplementary Instructions to Bidders 00 22 13 - 2
Revised April 8, 2019 Supplementary Instruction (VP)
00 22 18 - 1
DOCUMENT 00 22 18
SUPPLEMENTARY INSTRUCTIONS (Value Program)
PART 1 GENERAL
1.1 INTRODUCTION
A. OWNER has determined that it obtains better value from contracted services when certain practices enhance a Bidder’s work environment. OWNER has implemented a Value- Based Procurement Program (the “Value Program”) to obtain the benefit of those practices.
1.2 THE VALUE PROGRAM
A. The Value Program is as set forth in Salt Lake City Procurement Rules Chapter 19 and can be found at the following web address:
https://codelibrary.amlegal.com/codes/saltlakecityut Click on “POLICIES AND PROCEDURES MANUAL FOR SALT LAKE CITY, UTAH” click on “TITLE 53 FINANCE, RISK MANAGEMENT”, click on “CHAPTER 1 PROCUREMENT, CONTRACTS, INSURANCE”,- Click on “ARTICLE A. PROCUREMENT”; click on
“53-1A-20: VALUE BASED PROCUREMENT PROGRAM”.
B. Participation by a Bidder is voluntary. Failure to comply shall not render a bid non-responsive.
C. If Bidder fails to participate in the Value Program at the time of submitting a bid, OWNER shall consider such bid as though Bidder had no factors under the Value Program. In such a case,
1. Bidder will receive no benefits allowable under the Value Program;
2. Bidder will NOT be allowed to submit additional information related to the Value
Program; and
3. Bidder waives any and all rights to raise a protest related to the Value Program.
D. If Bidder participates in the Value Program, Bidder shall provide the information shown in the Value Program Form (Document 00 43 40). In that form, Bidder certifies that the information given is true as of the time of submitting its bid. The information will be used in the manner stated in the Value Program to evaluate “responsibility” if bids are close.
E. When the Value Program is applicable, the Program will only affect bids that fall within the following dollar range.
1. For contracts with an estimated value of $250,000 or less, the Value Program will apply to all bids or offers that fall within 2% of the lowest amount submitted.
2. For contracts with an estimated value of more than $250,000 but less than $1,000,000, the Program will apply to all bids or offers that fall within 1/2% of the lowest amount submitted plus $5,000.
3. For contracts with an estimated value of $1,000,000 TO $2,000,000, the Program will apply to all bids or offers that fall within $10,000 of the lowest amount submitted.
https://codelibrary.amlegal.com/codes/saltlakecityut/latest/saltlakecity_ut/
Revised April 8, 2019 Supplementary Instruction (VP)
00 22 18 - 2
F. An award, if any, will be made in accordance with Salt Lake City Procurement Rules, Chapter 19. In general terms, Chapter 19 may apply based on the amount bid and other factors. If the Value Program applies, OWNER will first consider all matters relating to responsiveness and responsibility except the Value Program. OWNER will then further evaluate responsibility under the Value Program and will award the Contract to the Bidder who demonstrates the most points among the following factors. If two or more bidders have the same number of points, the award will be made to the bidder with the lowest bid price.
Policy of nondiscrimination 1/2 point
Sponsorship of state-compliant apprenticeship programs(s) 1/2 point
Use of a pre-employment and “for cause” drug testing program 1/2 point
Local small business 1/2 point
1. OWNER reserves the right to review or audit any information provided by Bidder to make its evaluation.
2. Bidder shall provide or furnish access to any necessary records or other information in order to permit OWNER to verify these certifications.
3. Bidder shall provide or furnish access to such records and information no later than 3 business days after OWNER issues a written request for the same.
1.3 VALUE-BASED PROCUREMENT PROGRAM
A. In situations in which the factors listed in the Value Program Form affect the award of the
Bid, the winning Bidder will be required to enter into a Value Program Supplemental Agreement (Document 00 54 15) with OWNER.
Revised June 5, 2025 Bid Form
00 41 00 - 1
DOCUMENT 00 41 00
BID FORM
1.1 BIDDER
A. Name:
B. Address:
C. Telephone number:
D. Email address:
E. Tax identification number:
F. Bidder holds license number ____________________________________, issued by the
Utah State Department of Commerce, Division of Occupational and Professional Licensing. Bidder is licensed to practice as a _________________________________ Contractor. The license expiration date _____________________________________.
1.2 NOTICE
A. Pursuant to Section 58-55-501(8), Utah Code Annotated (UCA), it is unlawful to submit a…