2-Exhibit E Spreadsheet.pdf

PDF 526 KB Posted

Attached to
Crime Lab LED Lighting and Controls Upgrade Energy Efficiency Project
Solicitation number
RFB-2025-623-GSD-KH
Issued by
Bernalillo County, Albuquerque City, New Mexico

About this file

This document is a cost spreadsheet format sample for the APD Crime Lab LED Lighting and Controls Upgrade Energy Efficiency Project. The spreadsheet provides a detailed template for breaking down project costs into three primary groups: Group A (Fixtures), Group B (Miscellaneous Material, Labor, Bond, Permit, NMGRT), and Group C (Subcontract Material, Labor, NMGRT - Parking Sign Alternate). The template includes columns for Lot Count, Lot Cost, Extended Cost, Markup per Contract, and Direct Cost, allowing for comprehensive financial documentation of the proposed lighting upgrade project.

The total project cost is set at $00000, with the spreadsheet designed to capture granular cost details across different project components. The template includes line items for Design & Engineering, Miscellaneous Materials, Labor, Permits, Bonds, Pre-Commissioning and Post-Commissioning activities, and an alternate parking sign component. While the specific dollar amounts are not filled in, the spreadsheet provides a structured approach to cost accounting, enabling precise tracking of expenses across various project elements and facilitating transparent financial reporting for the energy efficiency upgrade at the APD Crime Lab.

View the file

Other files

File Type Posted
4-Exhibit F - FIXTURE FORENSIC DELIVERABLE.xlsx XLSX spreadsheet
11-Exhibit H.pdf PDF
9-Addendum 3.pdf PDF
3-Metro Forensics Mechanical.pdf PDF
13-Addendum 6.pdf PDF
6-RFB Crime Lab Lighting FINAL 04.09.2025.pdf PDF
7-Addendum 1.pdf PDF
5-Exhibit G - Lighting Specs.pdf PDF
8-Addendum 2.pdf PDF
10-Addendum 4.pdf PDF
14-Addendum 7.pdf PDF
12-Addendum 5.pdf PDF
1-Exhibit D SUBCONTRACTOR LISTING.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit E: Cost Spreadsheet Format Sample

RFB Title: APD Crime Lab LED Lighting and Controls Upgrade Energy Efficiency Project

Lot

Count Lot

Cost Extended

Cost

Markup per

Contract Direct Cost

Group A – Fixtures Totals

Design & Engineering

Total Group A

$ 0000 0000 $00 $00 $00 $00

Group B - Mic. Material, Labor , Bond, Permit, NMGRT, Mic. Material:

Labor:

Permit:

Bond:

Pre-Commissioning & Post Commissioning

Total Group B

$0000 Group B Subtotals 0000 $00 $00 $00 $00 Group C- Sub Contract . Material, Labor , NMGRT, (Parking Sign) ALTERNATE

Material:

Labor:

NMGRT: (Labor Only) Pre-Commissioning & Post Commissioning

Total Group C

$0000 Group C Subtotals 0000 $00 $00 $00 $00

Group A + B + C Totals

TOTAL PROJECT COST $00000

File details come from the government source that posted it. Updated .