This document is Addendum #5 for a Request for Bid (RFB) issued by the City of Albuquerque's Department of Finance and Administrative Services Purchasing Division for the Crime Lab LED Lighting and Controls Upgrade Energy Efficiency Project, solicitation number RFB-2025-623-GSD-KH. The project involves upgrading lighting systems, with a contract term of twenty (20) weeks from the date of award, with an option to extend up to a total of thirty (30) weeks. The bid deadline is set for July 15, 2025, at 2:00 p.m. Mountain Time, and all work must be performed during normal business hours of 8:00 A.M. – 4:00 P.M. (MST), excluding overtime and holidays.
The addendum provides clarifications on the project scope, including that ESMD will provide the complete lighting package with total fixture count, all non-LED wall packs will be replaced with LED wall packs, and all exit lights are included except existing LED exit signs. Bidders are advised that existing lighting fixtures have seismic wires and should include an allowance for potential installations. The document emphasizes that bidders must acknowledge receipt of the addendum in the City's eProcurement system, with failure to do so potentially resulting in a non-responsive bid submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-Exhibit F - FIXTURE FORENSIC DELIVERABLE.xlsx | XLSX spreadsheet | |
| 11-Exhibit H.pdf | ||
| 2-Exhibit E Spreadsheet.pdf | ||
| 9-Addendum 3.pdf | ||
| 3-Metro Forensics Mechanical.pdf | ||
| 13-Addendum 6.pdf | ||
| 6-RFB Crime Lab Lighting FINAL 04.09.2025.pdf | ||
| 7-Addendum 1.pdf | ||
| 5-Exhibit G - Lighting Specs.pdf | ||
| 8-Addendum 2.pdf | ||
| 10-Addendum 4.pdf | ||
| 14-Addendum 7.pdf | ||
| 1-Exhibit D SUBCONTRACTOR LISTING.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFB-2025-623-GSD-KH “Crime Lab LED Lighting and Controls Upgrade Energy Efficiency Project”
City of Albuquerque
Addendum #5 Issued June 11, 2025
Solicitation Number: RFB-2025-623-GSD-KH
Crime Lab LED Lighting and Controls Upgrade Energy Efficiency Project
Deadline for Receipt of Bids: July 15, 2025: 2:00 p.m. (Mountain Time)
The City eProcurement System will not allow Proposals to be submitted after this date and time.
City of Albuquerque Department of Finance and Administrative Services
Purchasing Division
RFB-2025-623-GSD-KH “Crime Lab LED Lighting and Controls Upgrade Energy Efficiency Project”
The purpose of this Addendum is to answer potential Bidder questions that were submitted:
A). 1. QUESTION: Who is carrying the lighting package number?
ANSWER: ESMD will provide a complete package including the total fixture count.
2. QUESTION: What is the expected timeline for the project completion?
ANSWER: Term of Contract as stated in bid specifications “Term of Contract” section: The term of the Contract shall be for twenty (20) weeks from date of award with the option to renew for an additional three (3) weeks. The term of the Contract shall not exceed a total Contract term of thirty (30) weeks.
3. QUESTION: What are the hours technicians are allowed to work?
ANSWER: All work shall be done during normal business hours of 8:00 A.M – 4:00 P.M (MST) and shall not include overtime or holidays.
4. QUESTION: Are exit lights excluded?
ANSWER: All exit lights are included in the scope, except for the existing LED exit signs, which will remain in place as is.
5. QUESTION: Are there seismic wires on existing fixtures?
ANSWER: Yes, the existing lighting fixtures are equipped with seismic wires. Please include an allowance in the proposal to account for the possibility that some fixtures may not have seismic wires installed.
6. QUESTION: Are wall pack lights excluded?
ANSWER: All non-LED wall Packs will be replaced to LED Wall Pack.
Please incorporate the change in this Addendum into the original solicitation document.
Bidder must acknowledge receipt of this Addendum in the City’s eProcurement system.
Failure to acknowledge an Addendum may result in your response being deemed non-responsive.
END OF ADDENDUM #5