This document package includes a federal contract opportunity solicitation and related specifications for road construction and maintenance work on National Forest lands. The U.S. Forest Service is soliciting proposals for a Multiple Award Task Order Contract to provide road construction, bridge work, culvert installation, and site development services over a five-year period with an estimated value of $10 million to be shared among multiple awardees. The scope of work involves repair, construction, and reconstruction of native surface, gravel and paved roads; road and trail decommissioning; building demolition and construction; bridge and structure work; and installation of culverts, retaining walls, and related road features. Task orders will be competed among contract holders. The specifications reference standard construction terms and methods and outline technical requirements for aggregate courses, road reconditioning, asphalt milling, and related items.

View the file

Other files for this federal contract opportunity

Other files attached to Wayne NF MATOC IDIQ ~ Roads and General Construction, newest first.
File Type Posted
Sol_12318721R0005_Amd_0004.pdf PDF
QA as of 7-8-21 (rev) FINAL.pdf PDF
Sol_12318721R0005_Amd_0003.pdf PDF
QA as of 7-2-21.pdf PDF
3. Task Order #2 Trail Maintenance (REV 7-1-21).pdf PDF
TO 2 (NEW) Ironton Hanging Rock.xlsx XLSX spreadsheet
Sol_12318721R0005_Amend_0002.pdf PDF
TO 2 (Rev) S.O.I. Bear Claw Ironton BDA 3.xlsx XLSX spreadsheet
SOLICITATION 12318721R0005 Amend 0001 Signed to post.pdf PDF
Attachment 4. Q&A as of June 21, 2021.pdf PDF
3. Task Order #2 Trail Maintenance.pdf PDF
Task Order 2 Trail Maintenance Schedule of items - Ironton.xlsx XLSX spreadsheet
Task Order 1 Road Maintenance Schedule of items.xlsx XLSX spreadsheet
1. Wage Det WD OH20210001 Dated 05282021.pdf PDF
Task Order 2 Trail Maintenance Schedule of items - Bear Claw Ironton.xlsx XLSX spreadsheet
SOLICITATION 12318721R0005.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPEC. No. Unit Amount Cost

404 LS 1

303 LS 1

Total Estimated Cost: __________

SCHEDULE OF ITEMS

Project : Road Maintenance Task

Order #1 (Seed)

Location: Morgan, Lawrence, and

Scioto County

Contractor Name: _______ Contractor Signature: _______ Date: _______

Desciption

Mill, re‐pave 13,000 sq. ft. asphalt with 2 1/2 inces base course, 1 1/2 inches top coat and tack coat. Millings to be spread and compacted on site

Machine grade FR 132 (4.6 mi.) and apply 60 tons

#57 spot surfacing

STANDARD SPECIFICATIONS

FOR

CONSTRUCTION OF ROADS AND BRIDGES ON

FEDERAL HIGHWAY PROJECTS (FP-14)

SPECIFICATIONS LIST

PROJECT: Roads, Trails, & General Construction IDIQ

Road Task Order #1

The standard specifications are hereby referenced and are available for viewing and download at:

https://flh.fhwa.dot.gov/resources/specs/

Table of Contents Preface

101 - Terms¸ Format¸ and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid¸ Award¸ and Execution of Contract

Delete Section 102

103 - Scope of Work

Delete Subsections 103.02, 103.03, 103.04, 103.05

104 - Control of Work

Delete Subsections 104.01, 104.02, 104.04

104.06 Use of Roads by Contractor

105 - Control of Material

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.01 Conformity with Contract Requirements

106.02 Visual Inspection

107 - Legal Relations and Responsibility to the Public

Delete Subsection 107.05

108 - Prosecution and Progress

Delete Section 108

109 - Measurement and Payment

Delete Subsections 109.06, 109.07, 109.08, 109.09

109.01 Measurement of Work

109.02 Measurement Terms and Definitions

155 - Schedules for Construction Contracts

Delete Section 155

301 - Untreated Aggregate Courses

301.03 General

303 - Road Reconditioning

Section 303. — ROAD RECONDITIONING

413 - Asphalt Pavement Milling

413.01 Description

413.03 Milling

413.05 Measurement

413.06 Payment

Preface Preface_wo_02_24_2021

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

101 - Terms¸ Format¸ and Definitions 101.01_National_9_15_2016

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_National_4_7_2015

Add the following to Subsection 101.03:

101.03 Abbreviations.

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSAR — Forest Service Acquisition Regulations

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(f) Miscellaneous unit abbreviations.

MP — milepost location ppm — parts per million volume

STA station location

101.04_National_9_5_2018

Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Utilization Standards —

The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid¸ Award¸ and Execution of Contract 102.00_National_9_15_2016

Delete Section 102 in its entirety.

Delete Section 102.

103 - Scope of Work 103.00_National_9_15_2016

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

104 - Control of Work 104.00_National_9_15_2016

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

104.06_National_9_16_2016

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.05_National_6_29_2020

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.

106 - Acceptance of Work 106.01_National_7_18_2017

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project.

When the Government tests work, copies of test reports are furnished to the Contractor upon request.

Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive.

The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;

providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method;

2. Number of samples;

3. Sample transport;

4. Test procedures;

5. Testing laboratories;

6. Reporting;

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.02_National_10_23_2016

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.

107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017

Delete Subsection 107.05.

Delete Subsection 107.05.

108 - Prosecution and Progress 108.00_National_9_16_2016

Delete Section 108 in its entirety.

Delete Section 108.

109 - Measurement and Payment 109.00_National_9_16_2016

Delete Subsections 109.06, 109.07, 109.08, and 109.09:

Delete Subsections 109.06, 109.07, 109.08, 109.09.

109.01_National_2_22_2019

Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:

109.01 Measurement of Work.

Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.

Table 109-1

Decimal Accuracy of Quantities for Final Payment

Pay Item Level of Precision Linear Foot 1

Exception--Timber, Steel, and concrete Piles 0.1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1 Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1

Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;

0.1

Exception--Concrete; Masonry 0.01 Pound 1 Ton 0.1

Exception--Calcium Chloride;

Sodium Chloride; Hydrated Lime;

Bituminous Materials; Pavements;

Bed Course Materials

0.01

Hour 0.1

MFBM 0.01

Station Yard 1 Cubic Yard Mile 1 Ton Mile 1

109.02_National_9_16_2016

Add the following sentence to Subsection 109.02(b):

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

155 - Schedules for Construction Contracts 155.00_National_9_14_2016

Delete Section 155 in its entirety.

Delete Section 155.

301 - Untreated Aggregate Courses 301.03_National_7_17_2017

Add the following to Subsection 301.03:

301.03 General.

Written approval of the roadbed is required before placing aggregate.

For pit run or grid-rolled material, furnish material smaller than the maximum size, no gradation will be required otherwise. After processing on the road, remove all oversize material from the road and dispose as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

Develop and use Government furnished sources according to Section 105.

If the aggregate is produced and stockpiled before placement, handle and stockpile according to Section 314.

303 - Road Reconditioning 303.00_Forest_3_8_2019

Delete Section 303 in its entirety and replace with the following.

Section 303. — ROAD RECONDITIONING Description

303.01 This work consists of reconditioning ditches, shoulders, roadbeds, and aggregate surfaces.

Material

303.02 N/A.

Construction Requirements

303.03 Ditch Reconditioning. Remove all slide material, sediment, vegetation, blowdown, and other debris from ditches and culvert inlets/outlets. Reshape ditches and culvert inlets/outlets to achieve positive drainage ad uniform ditch width, depth, and grade. Dispose of waste material on the downhill side of the road away from any live streams.

303.04 Shoulder Reconditioning. Remove all slide material, sediment, vegetation, blowdown, and other debris from existing shoulders including parking areas, turnouts, and other widened areas. Repair soft and unstable areas according to Subsection 204.07. Reshape shoulders. Dispose of waste material on the downhill side of the road away from any live streams.

303.05 Roadbed Reconditioning. Remove all slide material, sediment, vegetation, blowdown, and other debris from the roadbed. Dispose of waste material on the downhill side of the road away from live streams. Materials dislodged by work activities such as rocks, roots, branches, and trees shall be removed from the roadway and ditches. Pull any trees larger than 2 inches in diameter. Repair holes, soft, and unstable areas according to Subsection 204.07. Compact according to Subsection 204.11.

303.06 Aggregate Surface Reconditioning. Repair soft and unstable areas to the full aggregate surface according to Subsection 204.07. Remove irregularities and shape to a uniform surface. Finish and compact the surface according to Subsection 302.05.

303.07 Roadway Reconditioning. Perform applicable work described in Subsections 303.03 through 303.06.

303.08 Acceptance. Road Reconditioning work will be evaluated under Subsection 106.02. The road will be smooth, uniform appearance, and free from any debris.

Measurement

303.09 Measure the Section 303 pay items listed in the bid schedule according to Subsection 109.02.

Payment

303.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 303 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

413 - Asphalt Pavement Milling 413.00_National_10_24_2016

Add the following to Subsection 413.01:

413.01 Description.

This work also includes cutting asphalt pavement.

Make the following changes to Subsection 413.03:

413.03 Milling.

Add the following to the end of the first paragraph:

Prior to milling, cut existing asphalt pavement at the locations and to the extent shown on the plans.

Cut the asphalt pavement to form a vertical face in unfractured asphalt surfacing.

Delete the first sentence of paragraph five and replace with the following:

Remove and completely recover all loose milled material.

Delete the second paragraph of Subsection 413.05and replace with the following:

413.05 Measurement.

Do not measure asphalt pavement milling or asphalt pavement cutting.

Delete the first sentence of Subsection 413.06 and replace with the following:

413.06 Payment.

Payment is indirect to Section 403 pay items listed in the Schedule of Items.

-1 TO -3%

AS APPROVED

BY C.O.R.

-1 TO -3%

AS APPROVED

BY C.O.R.

Burr Oak Lake Recreation Area

Trimble Wildlife Area

Wayne NF Supervisor's Office

Athens Ranger District Office

Burr Oak State Park

Wolf Creek Wildlife Area

Perry State Park

Strouds Run State Park

Acadia Cliffs Nature Preserve

Gifford State Forest

Fox Lake Wildlife Area

Waterloo Wildlife Area

Zaleski State Forest

Hocking Hills State Parks

Hocking State Forest

Lake Hope State Park

Lake Logan State Park

Clear Creek Nature

Preserve Hiking Trails

ORV Trails

ORV Trails

ORV Trails

Horse Trails

Utah Ridge Pond

Frogwood Pond

Hiking Trails

Shawnee Fire Tower Sand Run Picnic Area

Hockhocking Adena

Bikeway

Moonville Tunnel

Covered Bridge

Williams Campground

Camp Ohio

312 13

664158

78793

Lancaster

Chesterhill

S. Bloomingville

Athens

Logan

Nelsonville

McConnelsville

Corning New

Straitsville

Glouster

New Lexington

0 5 102.5 Miles

Fishing Pond

Off-Road Vehicle Trail

Horse Trail

Hiking Trail

District Office

Ohio Dept of Natural Resources Area

Wayne NF Rec-reation Area

LEGEND

Picnic Area

Fire Tower

Bike Path

Covered Bridge

Railroad Tunnel

Campground

BURR OAK -

COVE ROAD

SITE

ATHENS DISTRICT MAP

Burr Oak - Cove Road

FR 132*

IRONTON DISTRICT MAP

FR 132

chadbmeenach Pencil

ADP1F1E.tmp
Preface
101 - Terms¸ Format¸ and Definitions
101.01 Meaning of Terms.
101.03 Abbreviations.
101.04 Definitions.
102 - Bid¸ Award¸ and Execution of Contract
Delete Section 102.
103 - Scope of Work
Delete Subsections 103.02, 103.03, 103.04, 103.05.
104 - Control of Work
Delete Subsections 104.01, 104.02, 104.04.
104.06 Use of Roads by Contractor.
105 - Control of Material
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.01 Conformity with Contract Requirements.
106.02 Visual Inspection.
107 - Legal Relations and Responsibility to the Public
Delete Subsection 107.05.
108 - Prosecution and Progress
Delete Section 108.
109 - Measurement and Payment
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.01 Measurement of Work.
109.02 Measurement Terms and Definitions.
155 - Schedules for Construction Contracts
Delete Section 155.
301 - Untreated Aggregate Courses
301.03 General.
303 - Road Reconditioning
Section 303. — ROAD RECONDITIONING
413 - Asphalt Pavement Milling
413.01 Description.
413.03 Milling.
413.05 Measurement.
413.06 Payment.
Burr Oak Cove Road Location map.pdf
athens unit map.pdf
Burr Oak SITE
FR132 Location map.pdf
ironton unit map.pdf
FR132