2. Sourgrass Drawings - Plans.pdf
PDF 10 MB Posted
- Solicitation number
- 127EAW21R0040
About this file
This solicitation is for the Sourgrass Water System Rehabilitation Project. The project involves work between $250,000 and $500,000 to rehabilitate the water system for the Calaveras Ranger District of the Stanislaus National Forest. The solicitation is a total small business set aside issued by the Department of Agriculture Forest Service Pacific Southwest Region. All requests for information must be submitted to the contracting officer by July 1, 2021. An organized pre-proposal site visit will also be held. Interested parties should review the solicitation in full for complete details on submission requirements and evaluation criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Official Responses - 3.pdf | ||
| Sourgrass Water System Rehabilitation Project Specifications.pdf | ||
| A00003.pdf | ||
| RFI Official Responses - 2.pdf | ||
| A00002 - RFIs.pdf | ||
| RFI Official Responses - 1.pdf | ||
| A00001 - Site Visit Notes.pdf | ||
| 4. Fire Plan.pdf | ||
| 127EAW21R0040.pdf | ||
| 6. RFI Form.docx | DOCX document | |
| 5. Davis-Bacon Act WD # CA20210018.pdf | ||
| 3. Sourgrass Specifications.pdf | ||
| 1. Statement of Work.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
R05 Pacific Southwest Region
SOURGRASS WATER
SYSTEM
REHABILITATION
Stanislaus National Forest
CALAVERAS RD
SITE MAP
NO SCALE
3/15/2021
T. Hughes
T.Hughes
K. Baker
051652-21-01
C-02
007003
ABBREVIATIONS:
AB AGGREGATE ROAD BASE
AC ASPHALT CONCRETE
CMP CORRUGATED METAL PIPE
CO CONTRACTING OFFICER
COR CONTRACTING OFFICER'S REPRESENTATIVE
CY CUBIC YARD
LF LINEAR FOOT
PRV PRESSURE REDUCING VALVE
SF SQUARE FOOT
STA STATION
SY SQUARE YARD
TYP TYPICAL
(N) NEW
WORK NOTES:
1. ALL FOREST SERVICE ROADS OR INFRASTRUCTURE DAMAGED BY CONTRACTOR DURING
CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR
2. BORROW SOURCES, IF NEEDED, WILL BE DESIGNATED BY THE FOREST SERVICE DURING
CONSTRUCTION
3. WASTE AREAS WILL BE DESIGNATED BY THE FOREST SERVICE DURING CONSTRUCTION
4. WATER SOURCES, IF NEEDED, SHALL BE DESIGNATED BY THE FOREST SERVICE DURING
CONSTRUCTION
5. UTILITIES: THERE ARE BURIED UTILITIES WITHIN THE PROJECT AREA. CONTACT 811
PRIOR TO DIGGING. DO NOT BEGIN GROUND DISTURBING WORK UNTIL A MEETING IS
HELD WITH THE FOREST SERVICE TO CONVEY THE LOCATION OF FOREST SERVICE
UTILITIES THAT NEED TO BE PROTECTED.
6. PROVIDE COPIES OF WEIGHT TICKETS FOR MATERIAL DELIVERED TO THE SITE FROM
COMMERCIAL SOURCES. AGGREGATE SHALL BE OBTAINED FROM AN APPROVED
SOURCE, CERTIFIED WEED FREE AND CERTIFIED TO CONTAIN NO MORE THAN 0.25%
ASBESTOS TO BE IN COMPLIANCE WITH CALIFORNIA HEALTH AND SAFETY CODE
SECTIONS 93105 AND 93106
7. ANY DISTURBANCE (SUCH AS BORROW SITES AND STAGING AREAS) SHALL BE
RESTORED
GENERAL NOTES:
1. THE WORK SHOWN ON THESE PLANS INCLUDE THREE TASKS FOR THE USFS SOURGRASS WATER SYSTEM ON THE CALAVERAS RANGER DISTRICT, STANISLAUS NATIONAL FOREST. THE
THREE TASKS ARE:
A. TASK 1: PLACE 3900' OF NEW SUPPLY WATERLINE FROM HUMMINGBIRD SPRING (SOURCE) TO WATER TANK (STORAGE)
B. TASK 2: PLACE TWO PRESSURE EQUALIZATION TANKS ON THE DISTRIBUTION WATERLINE BETWEEN THE WATER TANK AND FIRST DISTRIBUTION POINT (SOURGRASS DAY USE AREA).
REPLUMB TWO EXISTING PRESSURE REDUCING VALVES IN THE SOURGRASS DAY USE AREA, AND RECONNECT WATERLINE AFTER VALVE REMOVAL.
C. TASK 3 (OPTION ITEM): SEAL (E) 10,000 GALLON CONCRETE WATER TANK
2. WORK ON TASKS 2 AND 3 SHALL NOT, BE STARTED UNTIL SEPTEMBER 7,2021. WORK ON TASK 1 CAN BE PERFORMED ANYTIME AFTER CONTRACT AWARD BUT SHALL BE COMPLETED PRIOR
TO COMPLETION OF TASK 1 FOR PURPOSES OF TESTING THE ENTIRE SYSTEM.
3. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH THE CONTRACT TO THE CO FOR APPROVAL PRIOR TO THE START OF WORK
4. REQUIRED WORK NOT SPECIFIED IN THE SCHEDULE OF ITEMS SHALL BE CONSIDERED SUBSIDIARY TO OTHER PAY ITEMS
5. BEFORE ANY EXCAVATION ACTIVITIES BEGIN, THE CONTRACTOR SHALL CONTACT A SERVICE TO LOCATE ANY BURIED UTILITIES. USA = 1-800-642-2444, THE NATIONAL 811 NUMBER, OR THE
WEBSITE HTTP://WWW.USANORTH811.ORG/
6. EQUIPMENT FOR THIS PROJECT, IF DRIVEN ON STATE OR COUNTY ROADS, SHALL BE CURRENTLY LICENSED
7. ALL WORK SHALL BE IN COMPLIANCE WITH THE BEST MANAGEMENT PRACTICES DESCRIBED IN THE REGION 5 FOREST SERVICE SOIL AND WATER CONSERVATION HANDBOOK, DATED
DECEMBER 2011, AND THE NATIONAL BEST MANAGEMENT PRACTICES FOR WATER QUALITY MANAGEMENT ON NATIONAL FOREST SYSTEM LANDS, DATED APRIL 2012
8. ALL DIMENSIONS, UNLESS OTHERWISE SPECIFIED, ARE IN U.S. FEET
9. CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT AND SAFETY COMPLIANCE
10. CONTRACTOR SHALL INSPECT THE PIPE BETWEEN THE SOURCE (HUMMINGBIRD SPRING) AND PRVS (SOURGRASS DAY USE AREA) PRIOR TO CONSTRUCTION AND WEEKLY DURING THE
PERFORMANCE OF THE CONTRACT AND REPORT ALL LEAKS AND BREAKS TO THE COR.
SCHEDULE OF ITEMS
PAY ITEM NUMBER PAY ITEM DESCRIPTION UNIT SHEET NUMBER/DESCRIPTION QUANTITY REMARKS
MOBILIZATION LS 1
TASK 1: INSTALL NEW 1.5" POLY WATERLINE LF C-03, C-04 3900
TASK 2: PLACE 500-600 GALLON WATER TANKS EA C-05, C-06 2
TASK 2: REPLUMB PRESSURE REDUCING VALVES EA C-06 2
OPTION ITEM
TASK 3: SEAL 10,000 GALLON WATER TANK LS C-05 1
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
24" CMP BURIED
DEEP, NO CONFLICT
WITH WATERLINE
30" CMP BURIED
DEEP, NO CONFLICT
WITH WATERLINE
18" CMP BURIED
DEEP, NO CONFLICT
WITH WATERLINE
18" CMP BURIED
DEEP, NO CONFLICT
WITH WATERLINE
24" CMP, SEE DETAIL
2 THIS SHEET FOR
CROSSING
HUMMING BIRD
SPRING (SOURCE),
SEE DETAIL 1 THIS
SHEET
18" CMP, SEE DETAIL
3 THIS SHEET FOR
CROSSING
ROAD CROSSING,
MAINTAIN EXISTING
GRADE ACROSS
ENTIRE LENGTH
10,000 GALLON
CONCRETE WATER
TANK
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
3/1 6/2
1 1 0:
T
HU
GH
ES
C :\1
ST
F
- E
NG
IN
EE
RI
NG
\20
XX
A
LL
P
RO
JE
CT
S\
P
RO
JE
CT
S\
GA
OA
SO
UR
GR
AS
S W
AT
ER
S
YS
TE
M\
DR
AW
IN
G\
SO
UR
GR
AS
S W
AT
ER
S
YS
TE
M
RE
HA
BI
LA
TI
ON
.D W
G;
R05 Pacific Southwest Region
SOURGRASS WATER
SYSTEM
REHABILITATION
Stanislaus National Forest
CALAVERAS RD
NEW WATERLINE
CULVERT CROSSINGS
1"=300'
3/15/2021
T. Hughes
T.Hughes
K. Baker
051652-21-01
C-04
007005
DETAIL 1
(E) 1.25" PIPE FROM SPRING,
CONNECT NEW PIPE AS CLOSE TO
SPRING AS POSSIBLE.
DETAIL 2
(E) 1.25" PIPE ABOVE 24" CMP
CULVERT, ROUTE NEW PIPE UNDER
CULVERT OR IN FRONT OF INLET.
DETAIL 3
(E) 1.25" PIPE IN FRONT OF 18" CMP
CULVERT INLET, ROUTE NEW PIPE
UNDER CULVERT OR IN FRONT OF
INLET.
CLEARANCE NOTE:
MAINTAIN 6" CLEARANCE
BETWEEN BOTTOM OF
CULVERT AND TOP OF PIPE IF
ROUTING UNDERNEATH THE
CULVERT.
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
(E)10,000 GALLON
CONCRETE WATER
TANK
ELEV = 4580' +/-
TANK PAD #1
LOCATION
ELEV = 4380' +/-
TANK PAD #2
LOCATION
ELEV = 4140' +/-
DUAL PRV LOCATION
ELEV = 4000' +/-
TANK FRAME
WATER TANK
UNDISTURBED GROUND
COMPACTED FILL SHALL
BE LEVEL 1.0' PAST
FRAME, SLOPE @ 2:1 MIN
TO EXISTING
EXISTING GROUND,
CUT LEVEL 1.0' PAST
FRAME, SLOPE @ 2:1
MIN TO EXISTING.
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
C:
\1S
TF
EN
GI
NE
ER
IN
G\
XX
A
LL
P
RO
JE
CT
S\
P
RO
JE
CT
S\
GA
OA
SO
UR
GR
AS
S W
AT
ER
S
YS
TE
M\
DR
AW
IN
G\
SO
UR
GR
AS
S W
AT
ER
S
YS
TE
M
RE
HA
BI
LA
TI
ON
.D W
G
R05 Pacific Southwest Region
SOURGRASS WATER
SYSTEM
REHABILITATION
Stanislaus National Forest
CALAVERAS RD
PRESSURE REDUCING
TANKS
1" = 200'
3/15/2021
T. Hughes
T.Hughes
K. Baker
051652-21-01
C-05
007006
DUAL PRV MODIFICATION:
REPLUMB (E) DUAL PRV SO ONLY
ONE REMAINS, DISCONNECT THE
SECOND AND RETURN TO COR.
WATERLINE FROM TANK
WATERLINE TO DAY
USE/CAMPGROUND
PRV AND VALVES
TANK PAD #1:
GRADE LEVEL PAD AND HAND COMPACT WITH TAMPERS, PAD SIZE TO
BE 2.0' WIDER THAN TANK FRAME (SHEET C-06), COR TO APPROVE PAD
LOCATION PRIOR TO CONSTRUCTION.
TANK PAD #2:
GRADE LEVEL PAD AND HAND COMPACT WITH TAMPERS, PAD SIZE TO
BE 2.0' WIDER THAN TANK FRAME (SHEET C-06), COR TO APPROVE PAD
LOCATION PRIOR TO CONSTRUCTION. REMOVE EXCESS PIPE TO
LOWER BACK TO GRADE AS SHOWN.
TANK PAD #1,
APPROXIMATE LOCATION
TANK PAD #2,
APPROXIMATE
LOCATION
EXCESS PIPE TO
BE LOWERED
ACCESS NOTE
THE TANK LOCATIONS ARE ON A STEEP HILLSIDE WITH NO VEHICLE
OR TRAIL ACCESS AND DENSE BRUSH AND TREES. CONTRACTOR CAN
NOT CONSTRUCT ACCESS.
OPTION ITEM: SEAL WATER TANK:
SEAL 10,000 GALLON CONCRETE
WATER TANK PER SPECIFICATIONS.
DISTRIBUTION LINE MODIFICATION
SCALE 1"=200'
WATER TANK PAD
NTS
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| SOURGRASS WATER SYSTEM REHABILATION NOTES.pdf |
| Sheets and Views |
| NOTES C02 |
| SOURGRASS WATER SYSTEM REHABILATION WATER C04.pdf |
| Sheets and Views |
| WATERLINE C04 |
| SOURGRASS WATER SYSTEM REHABILATION TANK C-05.pdf |
| Sheets and Views |
| TANK C05 |
| 2021-03-16T10:37:27-0700 | |
| TIMOTHY HUGHES |
| 2021-03-16T10:37:46-0700 | |
| TIMOTHY HUGHES |
| 2021-03-18T13:38:29-0700 | |
| RAYMOND CABLAYAN |
| 2021-03-19T08:50:48-0700 | |
| JASON KUIKEN |
File details come from the government source that posted it. Updated .