2. Schedule of Items.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- 127EAW26Q0014
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items document for USDA Forest Service solicitation 127EAW26Q0014, detailing roofing and siding repair work at multiple facilities within the Los Padres National Forest. The project is a Total Small Business Set Aside with an estimated magnitude between $500,000 and $1,000,000.
The base bid encompasses six primary project areas: roof replacement at Figueroa Mountain Fire Station Engine Garage (Building 333) involving 3,240 square feet of three-tab composite shingle roof and 962 square feet of decking replacement; roof replacement at Pozo Station Fire Station (Building 275) covering 1,138 square feet; roof replacement at Pozo Station Residence (Building 273) totaling 1,750 square feet; warehouse roof replacement and gutter installation at Figueroa Mountain Fire Station (Building 337) with 3,300 square feet of metal roofing; comprehensive exterior improvements at Los Prietos Building 400 including 3,130 square feet of metal roof, 2,300 square feet of fiber-cement siding, 27 window replacements, and 3 door replacements; roof replacement at Rincon Fire Station Engine Garage (Building 489) for 3,240 square feet; and roof replacement at Pine Canyon Warehouse (Building 354) for 1,811 square feet of metal roofing. Two bid options are available: Option 1 covers residence roof replacement at Los Prietos Building 473 (2,050 square feet), and Option 2includes exterior improvements at Los Prietos Building 401 with siding, roofing, gutters, windows, and door replacements. All quotes must be submitted by April 1, 2026, at 1:00 PM Pacific Time, with Requests for Information due by March 20, 2026. Prospective bidders are required to conduct independent site inspections prior to submitting proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
SOLICITATION NO. 127EAW26Q0014
| PROJECT: | FY26- ARA-FACILITIES REPAIRS – Roofing Repairs and Siding Repairs - Los Padres National Forest | ||||||||
| PAGE 1 OF 1 | |||||||||
| BIDDERS ARE REQUIRED TO INSPECT THE CONSTRUCTION SITE PRIOR TO BIDDING THE PROJECT | |||||||||
| ITEM NO. | SPEC ITEM NO. | DESCRIPTION | METHOD OF MEAS. | ESTD QNTY | UNIT | UNIT PRICE | AMOUNT | GAOA Total | ARA Total |
| ARA - Figueroa Mountain Fire Station - Engine Garage Roof Replacement - Building 333 | |||||||||
| 1 | 00190 | Mobilization | LSQ | 1 | JOB | ||||
| 2 | 024100 | Remove and dispose of existing three-tab composite shingle roof. | SQFT | 3,240 | SQFT | ||||
| 3 | --- | Remove and dispose of existing deteriorated roof decking and Provide and Install 5/8" thick plywood sheathing replacment. | SQFT | 962 | SQFT | ||||
| 4 | 073211 | Install three-tab composition shingle roof and flashing in all valleys. | SQFT | 3,240 | SQFT | ||||
| 5 | 07620 | Repair/replace gutters & downspouts | LF | 120 | LF | ||||
| Subtotal | |||||||||
| ARA - Pozo Station - Fire Station Roof Replacement - Building 275 | |||||||||
| 6 | 00190 | Mobilization | LSQ | 1 | JOB | ||||
| 7 | 024100 | Remove and dispose of existing three-tab composite shingle roof. | SQFT | 1,138 | SQFT | ||||
| 8 | --- | Remove and dispose of existing deteriorated roof decking and Provide and Install 5/8" thick plywood sheathing replacment. | SQFT | 285 | SQFT | ||||
| 9 | 073211 | Install three-tab composition shingle roof and flashing in all valleys. | SQFT | 1,138 | SQFT | ||||
| 10 | 06220 09912 | Replace facia boards as needed, replace, prime and paint. | LF | 60 | LF | ||||
| Subtotal | |||||||||
| ARA - Pozo Station - Residence Roof Replacement - Building 273 | |||||||||
| 11 | 00190 | Mobilization | LSQ | 1 | JOB | ||||
| 12 | 024100 | Remove and dispose of existing three-tab composite shingle roof. | SQFT | 1,750 | SQFT | ||||
| 13 | --- | Remove and dispose of existing deteriorated roof decking and Provide and Install 5/8" thick plywood sheathing replacment. | SQFT | 438 | SQFT | ||||
| 14 | 073211 | Install three-tab composition shingle roof and flashing in all valleys. | SQFT | 1,750 | SQFT | ||||
| 15 | 06220 09912 | Replace facia boards as needed, replace, prime and paint. | LF | 40 | LF | ||||
| 16 | 07620 | Remove and Replace Gutters & Downspouts | LF | 32 | LF | ||||
| Subtotal | |||||||||
| ARA - Figueroa Mountain Fire Station - Warehouse Roof Replacement & Gutters - Building 337 | |||||||||
| 17 | 00190 | Mobilization | LSQ | 1 | JOB | ||||
| 18 | 024100 | Remove and dispose of existing metal roof | SQFT | 3,300 | SQFT | ||||
| 19 | 076113 | Provide and install metal roof over new 5/8” plywood roof sheathing over existing roof truss | SQFT | 3,300 | SQFT | ||||
| 20 | 07620 | Provide and Install Gutters & Downspouts | LF | 220 | LF | ||||
| Subtotal | |||||||||
| ARA - Los Prietos Building 400 Exterior Improvements – Los Prietos Compound | |||||||||
| 21 | 00190 | Mobilization | LSQ | 1 | JOB | ||||
| 22 | 024100 | Remove and Dispose of Roof | SQFT | 3130 | SQFT | ||||
| 23 | --- | Remove and dispose of existing deteriorated roof decking and Provide and Install 5/8" thick plywood sheathing replacment. | SQFT | 783 | SQFT | ||||
| 24 | 076113 | Provide and install metal roof. | SQFT | 3130 | SQFT | ||||
| 25 | 07620 | Provide and Install Rain Gutters | LNFT | 164 | LNFT | ||||
| 26 | 024100 | Remove and Dispose of Existing Siding | SQFT | 2300 | SQFT | ||||
| 27 | 06220 | Replace Facia | LNFT | 164 | LNFT | ||||
| 28 | 074646 | Install fiber-cement siding & trim & weather-proof membrane | SQFT | 2300 | SQFT | ||||
| 29 | 09912 | Painting | SQFT | 2530 | SQFT | ||||
| 30 | 085000 | Remove and Replace Windows | JOB | 27 | JOB | ||||
| 31 | 08113 | Remove and Replace Doors | EA | 3 | EA | ||||
| Subtotal | ERROR:#REF! | $0 | |||||||
| ARA - Rincon Fire Station - Engine Garage Roof Replacement - Building 489 | |||||||||
| 32 | 00190 | Mobilization | LSQ | 1 | JOB | ||||
| 33 | 024100 | Remove and dispose of existing three-tab composite shingle roof. | SQFT | 3,240 | SQFT | ||||
| 34 | --- | Remove and dispose of existing deteriorated roof decking and Provide and Install 5/8" thick plywood sheathing replacment. | SQFT | 810 | SQFT | ||||
| 35 | 073211 | Install three-tab composition shingle roof and flashing in all valleys. | SQFT | 3,240 | SQFT | ||||
| 36 | 06220 09912 | Replace facia boards as needed, replace, prime and paint. | LF | 228 | LF | ||||
| Subtotal | |||||||||
| ARA - Pine Canyon Warehouse Roof Replacement - Building 354 | |||||||||
| 37 | 00190 | Mobilization | LSQ | 1 | JOB | ||||
| 38 | 024100 | Remove and dispose of existing metal roof | SQFT | 1,811 | SQFT | ||||
| 39 | 076113 | Provide and install metal roof over new 5/8” plywood roof sheathing over existing roof truss | SQFT | 1,811 | SQFT | ||||
| Subtotal | |||||||||
| Base Bid Total | |||||||||
| Bid Option 1: ARA - Los Prietos - Residence Roof Replacement - Building 473 (188 Paradise Road) | |||||||||
| 40 | 00190 | Mobilization | LSQ | 1 | JOB | ||||
| 41 | 024100 | Remove and dispose of existing three-tab composite shingle roof. | SQFT | 2,050 | SQFT | ||||
| 42 | --- | Remove and dispose of existing deteriorated roof decking and Provide and Install 5/8" thick plywood sheathing replacment. | SQFT | 513 | SQFT | ||||
| 43 | 073211 | Install three-tab composition shingle roof and flashing in all valleys. | SQFT | 2,050 | SQFT | ||||
| 44 | 06220 09912 | Replace facia boards as needed, replace, prime and paint. | LF | 150 | LF | ||||
| Subtotal | |||||||||
| Bid Option 2: ARA - Building 401 Exterior Improvements – Los Prietos Compound | |||||||||
| 45 | 00190 | Mobilization | LSQ | 1 | JOB | ||||
| 46 | 024100 | Remove and Dispose of Existing Siding | SQFT | 2700 | SQFT | ||||
| 47 | 024100 | Remove and dispose of existing roof. | SQFT | 3140 | SQFT | ||||
| 48 | 074646 | Install fiber-cement siding & trim & weather-proof membrane | SQFT | 2700 | SQFT | ||||
| 49 | 076113 | Provide and install metal roof over new 5/8” plywood roof sheathing over existing roof truss | SQFT | 3140 | SQFT | ||||
| 50 | 07620 | Provide and Install Rain Gutters | LNFT | 164 | LNFT | ||||
| 51 | 06220 | Replace Facia | LNFT | 164 | LNFT | ||||
| 52 | 09912 | Painting | SQFT | 2700 | SQFT | ||||
| 53 | 085000 | Remove and Replace Windows | JOB | 30 | JOB | ||||
| 54 | 08113 | Remove and Replace Doors | EA | 1 | EA | ||||
| Subtotal | |||||||||
| Total Base Bid + Bid Options |