This is a Schedule of Items for a federal construction contract with the Shasta-Trinity National Forest, McCloud Ranger District, for the Ash Creek Helispot – Phase 1 project, dated 6/30/2026.

The base bid consists of 16 line items (A through P) totaling construction and infrastructure work for a helispot facility. Primary base items include: mobilization; clearing and grubbing of 7 acres; overexcavation and subgrade preparation for 6,700 cubic yards; furnishing and placing 500 cubic yards of Class 2 aggregate base; constructing a 19 cubic yard reinforced concrete helipad; painting helipad markings; installing 492 linear feet of 3-inch Schedule 80 PVC pipe and fittings; connecting to existing water lines; installing two fire hydrant laterals with associated gate valves and check valves; constructing a connection to a 4-inch cast-in-place pipe; removing an existing gate valve; installing a 3-inch gate valve with double check valve and insulated enclosure; furnishing and installing two water line markers; and pressure testing, disinfecting, and sampling the potable water system. The option bid includes two additional items: furnishing and placing 300 cubic yards of Class 2 aggregate base for a gravel helipad loop road and furnishing and installing 260 linear feet of electrical and communications duct bank. All items are priced on a lump sum basis except for unit-priced items measured in acres, cubic yards, linear feet, and each. Unit prices and total prices are blank in this schedule, indicating this is a pricing template for bidder completion.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6/30/2026

Item Description Quantity Estimated Qty Unit Unit Unit Price Total Price

A Mobilization 1 1 LS LS B Clearing and Grubbing 1 7 AC LS C Overexcavation, Subgrade Preparation, Fill Placement and Grading 1 6700 CY LS D Furnish and Place Class 2 Aggregate Base 1 500 CY LS E Construct Reinforced Concrete Helipad 1 19 CY LS F Paint Helipad Designation Markings 1 1 LS LS G Furnish and Install 3" Sch 80 PVC Pipe & Fittings 1 492 LF LS H Join Existing 3" Water Line per Detail 1, Sheet 7 1 1 LS LS

I Furnish and Install Fire Hydrant Lateral with Gate Valve and Swing Check Valve per Details 4 and 5, Sheet 7 2 2 EA EA

J Furnish and Install 3" Gate Valve & Stub per Detail 4, Sheet 7 1 1 LS LS K Construct Connection to 4" CIP per Detail 2, Sheet 7 1 1 LS LS L Remove Existing 3" Gate Valve per Detail 3, Sheet7 1 1 LS LS

M Furnish and Install 3" Gate Valve, 3" Double Check Valve and Insulated DC Valve Enclosure per Detail 6, Sheet 7. 1 1 LS LS

N Furnish and Install Water Line Marker per Detail 7, Sheet 7. 2 2 EA EA O Pressure Test/Leak Test Water Line 1 1 LS LS P Disinfect, Sample & Test Potable Water System 1 1 LS LS

Base Bid Total

Item Description Quantity Estimated Qty Unit Unit Unit Price Total Price

Q Furnish and Place Class 2 Aggregate Base 1 300 CY LS R Furnish and Install Electrical and Communications Duct Bank 1 260 LF LS

Option Bid Total

Bid Total

Option Items (Gravel Helipad Loop Road & Install Electrica/Communicationsl Conduit)

Shasta-Trinity National Forest McCloud Ranger District

Ash Creek Helispot - Phase 1

SCHEDULE OF ITEMS

Total Base Items