This document is a draft Request for Proposals (RFP) for the FY25-FY34 AEGIS Ship Integration and Test (SI&T) contract. The Navy is seeking industry feedback on the draft solicitation, which covers combat system equipment testing and troubleshooting for new construction and in-service AEGIS Destroyers and Cruisers, as well as allied navy ships, AEGIS land-based sites, and Ballistic Missile Defense upgrades.

The RFP outlines the evaluation factors, including Technical Approach, Sample Problems, Management Approach, Past Performance, and Total Evaluated Cost/Price, with Factors 1-4 being significantly more important than price. It provides details on the information to be included in the technical, management, and pricing volumes of proposals. The Government will make a Bidder's Library available to assist offerors in proposal preparation. Industry feedback on the draft RFP is requested within 30 days.

View the file

Other files

File Type Posted
1. DRAFT SI&T Section B-C-F-J.docx DOCX document
S-1 - TOUA.pdf PDF
3. DRAFT SI&T Exhibit Table of Contents.docx DOCX document
S-2 - Bidders Question Submittal Form.xlsx XLSX spreadsheet
1. DRAFT SI&T Section B-C-F-J.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft Section L and M Summary for AEGIS SI&T Competitive Follow-On

· Section L

Volume
Title
Page Limit
I
Factor 1: Technical Approach
30
II
Factor 2: Sample Problems
30 Cumulative
III
Factor 3: Management Approach
25
IV
Factor 4: Past Performance
5 Pages Plus 2 Pages for Each Self-Assessment
V
Factor 5: Cost/Price proposal
None
VI
SF30/Contract

Documents None

· Section 3.1 Volume I: Factor 1: Technical Approach

· 3.1.1 Element 1 – Ship Integration and Engineering Activities

· The Offeror shall describe its approach to ensuring operational effectiveness, lifecycle, and US Navy shipbuilding and overhaul standards.

· 3.1.2 Element 2 – Waterfront Integration and Test

· The Offeror shall provide details to demonstrate the application of the stage testing approach detailed in NAVSEAINST S9095 AD-TRQ-010/TSTP, Total Ship Test Program Manual.

· 3.1.3 Element 3 – Integration Engineering

· The Offeror will study, investigate, and resolve in-service and new construction issues related to the physical integration of Aegis Combat Systems and its components, and manage the lifecycle engineering for SI&T including areas of topside design, cabling, power, cooling, alignment and environmental qualifications.

· 3.1.4 Element 4 – Test Facilities and Equipment for Integration and Test

· The Offeror shall identify and describe the proposed use of Contractor-owned and Government-furnished facilities (NOTE - Government facilities include SUPSHIP 574 Washington St in Bath, ME; Multi-Purpose Warehouse in Pascagoula, MS; Naval Base San Diego, 32nd Street, Building 322 in San Diego, CA; Naval Base Norfolk, Building V-29 in Norfolk, VA; AEGIS Ashore Romania and Poland; CSEDS; and SCSC only for engineering, integration, and test.

· 3.1.5 Element 5 – Personnel

· 3.1.5.1 Contract Wide Staffing Plan

· 3.1.5.2 Recommended LOE Labor Mix

· 3.1.5.3 Key Personnel

· 3.1.6 Element 6 – Schedule

· Provide a sample Integrated Master Schedule (IMS) for one new construction ship and one modernization ship to include the products and activities in support of sample milestones.

· 3.1.7 Element 7 – Basis of Estimate

· The BOE shall include an annual hour executive summary by CLIN, performing company, and proposed labor category for every cost-reimbursement Completion CLIN.

· 3.1.8 Element 8 – LOE CLIN Approach

· The Offeror shall demonstrate a sufficient technical approach to meet the LOE requirements under CLINs X001-X008, X017, and X018.

· Section 3.2 Volume II: Factor 2: Sample Problems

· Offeror shall provide details regarding its technical approach for accomplishing the technical challenges presented in the sample problems

· 4 Sample Problems

· Section 3.3 Volume III: Factor 3: Management Approach

· 3.3.1 Element 1 – Management Plan

· The Offeror shall describe the proposed management plan, how it will be implemented, and key features of the management proposal to plan, execute, manage, and support the proposed system.

· 3.3.2 Element 2 – Management Process

· The Offeror shall describe their management processes relative to Cost Control and Efficiency.

· 3.3.3 Element 3 – Subcontractor Management

· The Offeror shall describe their methods used to monitor and report on all aspects of the subcontractor(s) performance (technical, schedule, and cost).

· 3.3.4 Element 4 – Small Business

· The Offeror shall describe how small business concerns will be utilized to fulfill the contract requirements, including the complexity and variety of work that small businesses will accomplish.

· 3.3.5 Element 5 – Cost and Software Data Reporting

· The Government-approved CSDR Plan for the contract, DD-Form 2794 (Attachment J-01) is included in this solicitation.

· 3.3.6 Element 6 – Transition Plan

· Describe a detailed plan of action addressing all required steps that need to be taken to fully assume responsibilities under this task order within 60 days after award.

· 3.4 Volume IV: Factor 4: Past Performance

· Offeror shall demonstrate through its past performance on efforts of similar size, scope, and complexity that the Offeror will be able to perform the requirements outlined in this solicitation.

· 3.5 Volume V: Factor 5: Cost/Price Proposal

· The burden of cost credibility rests with the Offeror to demonstrate the realism of its proposed costs; as such, the Offeror must submit substantiating data for every major cost element it proposes (e.g., direct labor rates and hours, material, fringe rate, overhead rate, G&A rate, subcontract costs, etc.) for all Cost-Reimbursement type CLINs.

· 3.5.1– Total Cost/Price Buildup

· 3.5.2 – CLIN Specific Details

· 3.5.3 – Substantiating Cost Narrative and Cost Information

· 3.6 Volume VI: SF 33/Completed Contract forms

· Section M

· 2.0 Evaluation Factors and Relative Order of Importance

· Factor 1: Technical Approach (Adjectival Rating)

· Factor 2: Sample Problems (Adjectival Rating)

· Factor 3: Management Approach (Adjectival Rating)

· Factor 4: Past Performance (Acceptable/Unacceptable)

· Factor 5: Total Evaluated Cost/Price (Completeness, Materially Balanced, Reasonableness)

· Factors 1-4, when combined, are significantly more important than the Total Evaluated Price factor (Factor 5). However, the significance of Total Evaluated Price as an evaluation factor will increase with the degree of equality in overall merit of competing proposals under the non-price factors.

· 3.1 Adjectival Rating Process Table M-1: Adjectival Rating Standards

Color Rating
Adjectival Rating
Description
Blue
Outstanding
Proposal demonstrates an exceptional approach and understanding of the requirements and contains multiple strengths and/or at least one significant strength, and risk of unsuccessful performance is low.
Purple
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength or significant strength, and risk of unsuccessful performance is low to moderate.
Green
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements and/or risk of unsuccessful performance is high.
Red
Unacceptable
Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable, and/or risk of performance is unacceptably high.