Trailhead Road & Pony Express Traffic Signal Project - Construction Bid Set
This is a preliminary construction bid set document for Eagle Mountain City, Utah for a traffic signal and roadway improvement project located at the intersection of Trailhead Road and Pony Express Parkway. The scope of work includes installation of a new traffic signal system, asphalt pavement removal and replacement, curb and gutter construction, raised median curb installation, concrete sidewalk work, and asphalt trail construction. The project encompasses grading plans, demolition of existing improvements, site preparation, storm drain installation, utility coordination, signage and striping, and all associated roadway features. The construction drawings include 21 sheets covering survey control, demolition plans, site plans, horizontal and vertical control, grading plans, signage and striping details, signal system details and schedules, and intelligent transportation systems (ITS) specifications. The design documents reference Eagle Mountain City standards and UDOT specifications, with the project identified as IF25608.00 and dated June 2026.
The bid documents require a 5% bid bond with proposal submission, along with insurance verification and certificates of insurance prior to contract award. The selected contractor must post a 100% performance bond and 100% payment bond at contract signing. All work must conform to current Eagle Mountain City standards, APWA specifications, UDOT standard drawings, and applicable federal, state, and local ordinances. The contractor is responsible for obtaining all required permits, including an excavation permit and UPDES storm water permit, and must prepare and submit a Storm Water Pollution Prevention Plan (SWPPP) prior to any land disturbance. Coordination is required with multiple entities including Eagle Mountain City Engineering, Rocky Mountain Power for electrical service, Pinetop Engineering for signal design coordination, and Direct Communications for ITS fiber optic integration. A pre-construction meeting will be required, and the contractor assumes full responsibility for site safety, dust abatement, utility coordination, and restoration of any disturbed areas to original condition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-EMC Trailhead Pony Express Signal.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALL CONTRACTOR FURNISHED MAST ARM MOUNTED SIGNS.(SEE SHEET C-211 FOR SIGN DETAILS)ZG 501
III
III PC
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
8.
EM
C P on y
Ex p
Tr ai lh ea d
Si gn al D ec -2
5\
- C
AD
\8
Sh ee ts
\2
-G
-0
.d w g
- P
LO
TT
ED
:T
BU
R
KE
TT
D
AT
E:
6/ 4/
:2
PM
SHEET TITLE
VICINITY MAP
PROJECT MAP
(N.T.S.)
(N.T.S.)
TRAILHEAD ROAD & PONY EXPRESS PARKWAY SIGNAL
BID SET
EAGLE MOUNTAIN, UT
JUNE, 2026
W . C lu bh ou se
D riv e, St e.
A
Le hi
, U T 8
1.7
.72
PRELI
MINARY
NOT F
OR
CONSTRUCTIO
N
OF
TR
AI
LH
EA
D R
O
AD
P
O N
Y
EX
PR
ES
S
PA
R
KW
AY
S
IG
N
AL
EA
G
LE
M
O U
N
TA
IN
, U
T
IF25608.00
JUNE, 2026
TPB
RWD
G-001
COVER
1 21
BI
D
S
ET
ARIZONA
WYOMING
IDAHO
CO
LO
RA
DO
NE
VA
DA
Logan
Ogden
SALT LAKE CITY
Salina Green River
Moab
St. George
Cedar City
Delta
G R
EE
N
R
IV
ER
CO
LO
RA
DO
RIV
ER
SANJUAN RIVER
APPROXIMATE
PROJECT
LOCATION
1650 E. Stagecoach Run Eagle Mountain, UT 84005 801.789.6671
3160 W. Clubhouse Drive, Ste. A Lehi, UT 84043 801.768.7200
N
N
TRAILHEAD ROAD
PO
N
Y
EX
PR
ES
S
PA
R
KW
AY
TRAILHEAD ROAD
EAG
LE PARK ACCESS
STAGECOACH RUN
SHEET INDEX
PAGE SHEET ID SHEET TITLE
1 G-001 COVER
2 G-002 GENERAL NOTES
3 G-003 LEGEND & ABBREVIATIONS
4 V-101 SURVEY CONTROL
5 C-101 DEMOLITION PLAN
6 C-111 SITE PLAN
7 C-112 HORIZONTAL CONTROL
8 C-121 GRADING PLAN
9 C-122 GRADING PLAN
10 C-123 GRADING PLAN
11 C-201 SIGNAGE & STRIPING
12 C-211 SIGNAL DETAILS
13 C-212 SIGNAL PLAN
14 C-213 SIGNAL CIRCUIT
15 C-214 SIGNAL SCHEDULE
16 C-215 SIGNAL SCHEDULE
17 C-216 SIGNAL SCHEDULE
18 C-217 ITS PLAN
19 C-218 ITS SCHEDULE
20 C-401 CIVIL DETAILS
21 C-402 CIVIL DETAILS
6/4/2025
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
8.
EM
C P on y
Ex p
Tr ai lh ea d
Si gn al D ec -2
5\
- C
AD
\8
Sh ee ts
\2
-G
-0
.d w g
- P
LO
TT
ED
:M
C O
R
BI
N
- D
AT
E:
6/ 4/
:2
PM
SHEET TITLE
W . C lu bh ou se
D riv e, St e.
A
Le hi
, U T 8
1.7
.72
PRELI
MINARY
NOT F
OR
CONSTRUCTIO
N
OF
TR
AI
LH
EA
D R
O
AD
P
O N
Y
EX
PR
ES
S
PA
R
KW
AY
S
IG
N
AL
EA
G
LE
M
O U
N
TA
IN
, U
T
IF25608.00
JUNE, 2026
TPB
RWD
G-002
GENERAL
NOTES
2 21
BI
D
S
ET
GENERAL PROJECT NOTES
1. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM WITH THE CURRENT EAGLE
MOUNTAIN CITY STANDARDS AND SPECIFICATIONS AND WITH ALL OTHER APPLICABLE
FEDERAL, STATE AND LOCAL ORDINANCES AND LAWS.
2. THE CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY TO COMPLETE THE
CONSTRUCTION.
3. THE TERM ENGINEER HEREIN REFERS TO THE CONSTRUCTION ENGINEER. COORDINATE ALL
WORK WITH ENGINEER AND INSPECTORS. EAGLE MOUNTAIN CITY ENGINEER IS CALLED OUT
SEPARATELY IN THESE DOCUMENTS.
4. THE CONTRACTOR SHALL COORDINATE SITE CONSTRUCTION WITH ALL UTILITY
CONSTRUCTION AND OTHERS WHICH MAY BE SPECIFIC TO THE PROJECT.
5. THE CONTRACTOR IS RESPONSIBLE FOR DUST ABATEMENT AND ANY LIABILITY ISSUES
RELATED TO DUST WITHIN THE PROJECT LIMITS.
6. ALL WORK SHALL BE COMPLETED WITHIN THE PUBLIC RIGHT-OF-WAY AND WITHIN
TEMPORARY CONSTRUCTION EASEMENTS. THE CONTRACTOR SHALL TAKE EVERY
PRECAUTION TO ELIMINATE ANY ADVERSE EFFECTS ON ADJACENT PROPERTIES AND/OR
RESTORE IT TO ITS ORIGINAL CONDITION.
7. THE OFFICE OF THE EAGLE MOUNTAIN CITY ENGINEER, PUBLIC WORKS DIRECTOR, AND
CONSTRUCTION ENGINEER SHALL BE GIVEN AT LEAST ONE (1) WEEK'S NOTICE PRIOR TO
BEGINNING ANY CONSTRUCTION. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE
APPROVED PLANS AND SPECIFICATIONS.
8. DEVIATION FROM THESE PLANS AND SPECIFICATIONS WITHOUT THE PRIOR WRITTEN
CONSENT OF THE ENGINEER MAY CAUSE THE WORK TO BE DEEMED UNACCEPTABLE.
9. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFICATIONS AND LIAISON WITH UTILITY
COMPANIES IN THE PROCESS OF LOCATING, RELOCATION, AND TIE-IN TO PUBLIC UTILITIES.
ALSO, THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING ALL INSPECTORS, INCLUDING THE
ENGINEER PRIOR TO BEGINNING SITE CONSTRUCTION.
10. IN THE CASE OF UNFORESEEN CONSTRUCTION COMPLICATIONS OR DISCREPANCIES, THE
CONTRACTOR IS TO NOTIFY THE ENGINEER IMMEDIATELY AND PROVIDE NECESSARY
DOCUMENTATION FOR EVALUATION AND DIRECTION.
11. THE PLANS WERE PREPARED IN ACCORDANCE WITH ESTABLISHED PRACTICES OF CIVIL
ENGINEERING DESIGN. THE ENGINEER NOR ITS PERSONNEL CAN OR DO WARRANT THESE
PLANS AS CONSTRUCTED EXCEPT WHERE THE ENGINEER INSPECTS AND CONTROLS THE
PHYSICAL CONSTRUCTION ON A CONTEMPORARY BASIS AT THE SITE.
12. COORDINATE ALL CONSTRUCTION WORK ON PRIVATE PROPERTY WITH LOCAL RESIDENCES
OR BUSINESSES. ANY CLOSURE OF AN ACCESS TO A RESIDENCE OR A BUSINESS REQUIRES
48 HOUR NOTICE (MIN.), AND SHALL BE COORDINATED WITH THE PROPERTY OWNER, AND
PERMISSION GRANTED FROM THE PROPERTY OWNER, BEFORE ANY WORK CAN COMMENCE
AT THE ACCESS LOCATION.
13. FINAL QUANTITIES AND PROJECT LOCATIONS WILL BE DEPENDENT UPON BIDS AND THE
PROJECT BUDGET.
14. A PRE-CONSTRUCTION MEETING WILL BE REQUIRED PRIOR TO CONSTRUCTION.
COORDINATE WITH EAGLE MOUNTAIN CITY FOR TIME AND LOCATION.
CONSTRUCTION SITE SAFETY
1. THE CONTRACTOR IS REQUIRED TO MEET ALL APPLICABLE REGULATIONS CONCERNING
PROJECT SAFETY AND ASSUMES FULL RESPONSIBILITY FOR SAFETY ON THE PROJECT.
2. WORKERS AND THE PUBLIC SHALL BE PROTECTED BY THE CONTRACTOR FROM ANY AND ALL
HAZARDS CONNECTED WITH THE CONSTRUCTION WORK.
3. OPEN TRENCHES, MATERIALS, OR EQUIPMENT WITHIN THE WORKING LIMITS ARE TO BE
PROTECTED BY THE USE OF ADEQUATE BARRICADES.
4. ALL WORK SHALL BE IN CONFORMANCE WITH CURRENT OSHA REGULATIONS FOR PROJECTS
OF THIS TYPE.
5. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE
CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF
THE JOB SITE, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY DURING
PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND
SHALL NOT BE LIMITED TO NORMAL WORKING HOURS. ANY CONSTRUCTION OBSERVATION
BY THE ENGINEER OF THE CONTRACTOR'S WORK IS NOT INTENDED TO INCLUDE THE
ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES EITHER, ON, OR NEAR THE
CONSTRUCTION SITE.
STORM WATER POLLUTION PREVENTION
1. PRIOR TO ANY LAND DISTURBANCE OR CITY EXCAVATION PERMIT, THE CONTRACTOR WILL
PREPARE AND SUBMIT A SWPPP DOCUMENT AND OBTAIN AN NPDES PERMIT. THE
CONTRACTOR WILL BE REQUIRED TO KEEP THE SWPPP ON SITE AT ALL TIMES AND ABIDE BY
IT. THE SWPPP SHALL MEET ALL REQUIREMENTS OF THE STATE CONSTRUCTION GENERAL
PERMIT.
STORM DRAIN CONSTRUCTION
1. THE CONTRACTOR SHALL PROVIDE ON-SITE STORM DRAINAGE FACILITIES ACCORDING TO
THE STORM WATER DRAINAGE DESIGN MANUAL AND IN ACCORDANCE WITH THE
ORDINANCES OF THE CITY.
REMOVALS
1. ANY EXISTING STRUCTURES OR SURFACE FEATURES DISTURBED BY CONSTRUCTION ARE TO
BE RESTORED TO THEIR ORIGINAL LOCATION AND CONDITION.
2. EXCESS EXCAVATED MATERIALS INCLUDING PIPE, STUMPS, ROOTS, SOIL MATERIALS OR ANY
OTHER ITEMS THE OWNER DOES NOT WISH TO SALVAGE SHALL BECOME THE
CONTRACTOR'S PROPERTY AND SHALL BE REMOVED FROM THE SITE AND DISPOSED OF
PROPERLY. THE CONTRACTOR IS REQUIRED TO USE A LICENSED SOLID WASTE COLLECTION
AND DISPOSAL SERVICE FOR ALL WASTE GENERATED FROM THE CONSTRUCTION SITE.
PERMITS REQUIRED
1. EXCAVATION PERMIT - OBTAINED BY CONTRACTOR AT CITY
2. UTAH POLLUTANT DISCHARGE ELIMINATION SYSTEM (UPDES) STORM WATER PERMIT -
OBTAINED BY CONTRACTOR.
EAGLE MOUNTAIN CITY UTAH
RANGELAND SEED MIX
SEED: COMMON NAME SEED: SCIENTIFIC NAME
BULK
POUNDS
PER ACRE
WHEATGRASS, SIBERIAN AGROPYRON FRAGILE 1.00
WHEATGRASS, CRESTED AGROPYRON CRISTATUM 1.00
BLUEGRASS, SANDBERG POA SECUNDA 2.00
WHEATGRASS BLUEBUNCH PSEUDOROEGNERIA SPICATA 3.00
FESCUE, SHEEP FESTUCA OVINA 2.00
STERILE TRITICALE TRITICUM AESTIVUM 2.00
ALFALFA, FALCATA MEDICAGO SATIVA, FALCATA 3.00
ALFALFA LADAK MEDICAGO SATIVA 1.00
FLAX, BLUE LINUM PERENNE 2.00
SALAD BURNETE SANGUISORBA MINOR 4.00
RUSSIAN WILDRYE PSATHYROSTACHYS JUNCEUS 2.00
YARROW, WESTERN ACHILLEA MILLEFOLIUM 1.00
SUNFLOWER, ANNUAL HELIANTHUS ANNUUS 1.00
EMC STRONGLY RECOMMENDS PLANTING IN OCTOBER OR NOVEMBER AS WEATHER PERMITS. SEEDINGS THAT DON'T TAKE BECAUSE THEY WERE PLANTED IN THE SPRING OR SUMMER WILL NEED TO BE REPLANTED.
SEEDED AREAS WILL BE INSPECTED MID SUMMER POST PLANTING. WE RECOMMEND USING A DRILL SEEDER OR BROADCASTING SEED ON THE AREA TO BE RESEEDED, IF AERIAL BROADCASTING, WE RECOMMEND THE SOIL BE DISTURBED BEFORE SEEDING AND OR HAVE A LIGHT LAYER OF TOPSOIL SPREAD OVER THE TOP OF THE SEEDING. SEED MIX NEEDS TO BE AT THE RATE OF 20LBS PER ACRE. SEED MIXES MAY DIFFER FROM MIX ABOVE BUT MUST INCLUDE A MINIMUM OF; 4 SPECIES OF GRASS LISTED ABOVE (ONE HAS TO BE SIBERIAN WHEATGRASS) 5 SPECIES OF FORBS (OF WHICH ONE HAS TO BE FALCATA ALFALFA). ANY SHRUBS
(RECOMMENDED @50/ACRE) MUST BE BARE ROOT STALK OR POTTED SHRUBS.
EAGLE MOUNTAIN CITY GENERAL NOTES FOR CONSTRUCTION DRAWINGS:
SEWER
1. PIPE BEDDING: ¾” GRAVEL REQUIRED 6” BELOW, ON THE SIDES & 12” ABOVE THE PIPE (MINIMUM).
2. DEPTH: SEWER MAIN/LATERALS TO MAINTAIN 4' OF COVER (MINIMUM) FROM FINISHED GRADE, 3' MINIMUM
FROM TOP OF PIPE AT TIME OF INSTALLATION.
3. SEPARATION: SEWER MAINS & LATERALS TO MAINTAIN 10' SEPARATION (MINIMUM) FROM CULINARY WATER
MAINS & LATERALS.
4. SEWER Y'S: 3' MINIMUM SEPARATION BETWEEN SEWER Y'S.
5. LATERAL STUBS: A) STUBS MUST EXTEND 15' INTO PROPERTY AND BE MARKED WITH 2X4 PAINTED GREEN. B)
ALL LATERALS MUST BE GIS (SHOT IN) AT THE Y'S AND STUBS. ALSO SLOPES (2% MIN. ON 4” PIPE) TO BE
CHECKED BEFORE BACKFILL.
6. MANHOLES: MANHOLES TO BE WITHIN 1' OF FINISHED GRADE. 12” OF WHIRLY GIG FORM (MAX) AND NO FLAT
RINGS ALLOWED. 12” OF ¾” GRAVEL REQUIRED UNDER MANHOLES/BOXES.
WATER
1. VALVES: 1. VALVES MUST BE FLANGED TO TEE'S (FITTINGS). 2. VALVES 12” AND LARGER TO BE BUTTERFLY
VALVES.
2. BEDDING: SAND MUST MEET AASHTO (A-3) GRADATION WITH 100% PASSING THE #4 SIEVE. 6” BELOW PIPE
ON THE SIDES & 12” ABOVE PIPE (MINIMUM).
3. DEPTH: WATER MAIN & LATERALS MUST MAINTAIN 4' COVER FROM FINISHED GRADE (MINIMUM), 3' MINIMUM
FROM TOP OF PIPE AT TIME OF INSTALLATION. MAX DEPTH 72” FROM FINISHED GRADE.
4. SERVICES & FITTINGS: SERVICES & FITTINGS TO MAINTAIN 3' MINIMUM SEPARATION FROM PIPE JOINTS AND
OTHER FITTINGS.
5. SETTERS: ALL SETTERS TO BE 21” TALL (MINIMUM), HAVE UNIONS AT THE BASE AND BE DUAL CHECK
MODEL, ALSO ¾” SETTERS TO HAVE DOUBLE BRACES. SETTERS TO BE SET AT: 18” TO 22” FROM THE TOP OF
SETTER TO TOP OF LID.
6. WATER CAN LID: ALL LIDS TO SAY “EAGLE MOUNTAIN” ON THEM RECESSED WITH A HOLE FOR THE ERT
AND TO BE SET AT LEVEL TO 1” ABOVE THE PLANE OF THE CURB & SIDEWALK.
7. WATER CAN: THE WATER CAN FOR ¾” & 1” SERVICES WILL NEED TO BE A 36” TALL MINIMUM AND 21” INSIDE DIAMETER. WATER CAN FOR 1-1/2” TO 2” SERVICE WILL NEED TO FOLLOW APWA SPECIFICATION.
8. HYDRANTS: HYDRANTS TO BE 5' BURY (MINIMUM).
9. LATERALS: ALL LATERALS NEED TO BE GIS (SHOT IN) AT THE CORP. STOP & SETTER, AND ALSO VISUAL
INSPECTION ON POLY INSERTS BEFORE BACKFILL. WATER LATERALS TO EXTEND 15' INTO PROPERTY AND BE MARKED WITH A 2X4 PAINTED BLUE. ALL POLY LINES TO HAVE VISUAL POLY INSERT INSPECTION.
10. TRACER WIRE: RUN TRACER WIRE ALONG MAIN & EXTEND UP SETTERS AND HYDRANTS, DO NOT RUN UP
VALVE BOXES.
11. WATER FITTINGS: ALL WATER FITTINGS TO BE CHECKED FOR THRUST BLOCKS (PRE & POST) AND GIS (SHOT
IN) BEFORE BACKFILL.
12. VERTICAL SEPARATION: WATER MAIN TO MAINTAIN 18” MINIMUM SEPARATION FROM STORM DRAIN OR
OTHER OBSTACLES/UTILITIES.
13. WATER LINE FITTINGS: ALL FITTINGS TO HAVE MEGA LUG FOLLOWERS.
14. WATER MAIN LINE: NO DEFLECTION OR BENDING OF PIPE WILL BE ALLOWED IN THE WATER LINES AND BEND
FITTINGS WILL BE REQUIRED. ALL FITTINGS TO BE MEGA-LUG FITTINGS.
STORM DRAIN
1. BEDDING: ¾” GRAVEL 6” BELOW AND ON SIDES OF PIPE & 12” ABOVE PIPE (MINIMUM).
2. ADS: ALL ADS PIPE TO BE “HP” BRAND.
3. COLLARS: COLLARS TO BE 1'X1' AROUND PIPE, 4000 PSI CONCRETE, INSPECTION IS NEEDED PRE & POST
COLLAR POUR.
4. MANHOLES: MANHOLES TO BE WITHIN 1' OF FINISHED GRADE. 12” OF WHIRLY GIG FORM (MAX) AND NO FLAT
RINGS ALLOWED. 12” OF ¾” GRAVEL REQUIRED UNDER MANHOLES/BOXES.
ROAD SECTION
1. PROOF ROLLS: PROOF ROLL REQUIRED ON ALL SECTIONS OF ROAD: I.E. SUB-GRADE, SUB-BASE, AND CURB
BASE AND ROAD BASE. CURB STAKES REQUIRED FOR SUB-GRADE INSPECTION AND STRING LINE REQUIRED
FOR SUB-BASE AND ROAD BASE INSPECTION.
2. UTBC: STATE SPEC. ROAD BASE REQUIRED FOR ALL ROADS, COMMERCIAL BASE ACCEPTABLE FOR THE
SIDEWALKS & TRAILS.
3. COLLARS: ALL COLLARS TO BE 1' WIDE BY 1' DEEP WITH A 6000 PSI CONCRETE WITH 1.5# FIBER MESH PER CUBIC YARD (3/4” MONOFILAMENT) REQUIRED FOR ALL STREET COLLARS. MANHOLE COVERS AND WATER VALVE TOWERS TO BE ½” DOWN FROM ASPHALT EDGE AND CONCRETE TO BE ¼” TO 3/8” DOWN FROM
ASPHALT EDGE.
PAVEMENT MARKING REMOVAL
1. ALL EXISTING PAVEMENT MARKINGS DESIGNATED FOR REMOVAL SHALL BE REMOVED BY WATER BLASTING
ONLY. GRINDING, SCARIFYING, OR OTHER ABRSAIVE REMOVAL METHODS WILL NOT BE PERMITTED UNLESS
SPECIFICALLY APPROVED BY THE CITY ENGINEER.
2. THE CONTRACT SHALL EXERCISE CARE DURING REMOVAL OPERATIONS TO PREVENT DAMAGE TO EXISTING PAVEMENT SURFACES, JOINTS, UTILITIES, EXISTING STRIPING, AND ADJACENT IMPROVEMENTS.
3. ANY DAMAGE TO EXISTING PAVEMENT, EXISTING STRIPING, OR IMPROVEMENTS INTENDED TO REMAIN IN PLACE, RESULTING FROM STRIPING REMOVAL OPERATIONS OR OTHER CONSTRUCTION ACTIVITIES, SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE CITY AND TO THE
SATISFACTION OF THE CITY ENGINEER.
4. REMOVED PAVEMENT MARKING AREAS SHALL PRESENT A UNIFORM APPEARANCE WITH NO EXCESSIVE SCARRING, GROOVING, DISCOLORATION, OR VISIBLE GHOST MARKINGS REMAINING AFTER REMOVAL OPERATIONS, AS DETERMINED ACCEPTABLE BY THE CITY ENGINEER. THE CITY ENGINEER MAY REQUIRE ADDITIONAL REMOVAL WORK IF VISIBLE GHOST MARKINGS REMAIN. WHERE EXISTING PAVEMENT MARKINGS ARE REMOVED PRIOR TO PLACEMENT OF FINAL STRIPING, TEMPORARY PAVEMENT MARKINGS AND DELINEATION SHALL BE INSTALLED AND MAINTAINED BY THE CONTRACTOR AS REQUIRED BY THE CITY
ENGINEER.
PAVEMENT MARKING REMOVAL NOTES
1. ALL EXISTING PAVEMENT MARKINGS DESIGNATED FOR REMOVAL SHALL BE REMOVED BY WATER BLASTING ONLY. GRINDING, SCARIFYING, OR OTHER ABRASIVE REMOVAL METHODS WILL NOT BE PERMITTED UNLESS
SPECIFICALLY APPROVED BY THE CITY ENGINEER.
2. THE CONTRACTOR SHALL EXERCISE CARE DURING REMOVAL OPERATIONS TO PREVENT DAMAGE TO EXISTING PAVEMENT SURFACES, JOINTS, UTILITIES, EXISTING STRIPING, AND ADJACENT IMPROVEMENTS.
3. ANY DAMAGE TO EXISTING PAVEMENT, EXISTING STRIPING, OR IMPROVEMENTS INTENDED TO REMAIN IN PLACE, RESULTING FROM STRIPING REMOVAL OPERATIONS OR OTHER CONSTRUCTION ACTIVITIES, SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE CITY AND TO THE
SATISFACTION OF THE CITY ENGINEER.
4. REMOVED PAVEMENT MARKING AREAS SHALL PRESENT A UNIFORM APPEARANCE WITH NO EXCESSIVE SCARRING, GROOVING, DISCOLORATION, OR VISIBLE GHOST MARKINGS REMAINING AFTER REMOVAL OPERATIONS, AS DETERMINED ACCEPTABLE BY THE CITY ENGINEER. THE CITY ENGINEER MAY REQUIRE
ADDITIONAL REMOVAL WORK IF VISIBLE GHOST MARKINGS REMAIN.
5. WHERE EXISTING PAVEMENT MARKINGS ARE REMOVED PRIOR TO PLACEMENT OF FINAL STRIPING, TEMPORARY PAVEMENT MARKINGS AND DELINEATION SHALL BE INSTALLED AND MAINTAINED BY THE
CONTRACTOR AS REQUIRED BY THE CITY ENGINEER.
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
8.
EM
C P on y
Ex p
Tr ai lh ea d
Si gn al D ec -2
5\
- C
AD
\8
Sh ee ts
\2
-G
-0
.d w g
- P
LO
TT
ED
:T
BU
R
KE
TT
D
AT
E:
6/ 4/
:2
PM
SHEET TITLE
W . C lu bh ou se
D riv e, St e.
A
Le hi
, U T 8
1.7
.72
PRELI
MINARY
NOT F
OR
CONSTRUCTIO
N
OF
TR
AI
LH
EA
D R
O
AD
P
O N
Y
EX
PR
ES
S
PA
R
KW
AY
S
IG
N
AL
EA
G
LE
M
O U
N
TA
IN
, U
T
IF25608.00
JUNE, 2026
TPB
RWD
G-003
LEGEND &
ABBREVIATIONS
3 21
BI
D
S
ET
AC ACRE
ACE ARMY CORPS OF ENGINEERS
AGGR AGGREGATE
ALT. ALTERNATE
APPR. APPROXIMATE
AR MH AIR RELEASE MANHOLE
ARV AIR RELEASE VALVE
ASSY. ASSEMBLY
ASTM AMERICAN SOCIETY FOR TESTING MATERIALS
AVE AVENUE
BFV BUTTERFLY VALVE
BH BORE HOLE
BITUM. BITUMINOUS
BK BACK
B.O. BY OTHERS
BOA BEGINNING OF ALIGNMENT
BOP BEGINNING OF PROJECT
BSW BACK OF SIDEWALK
BVC BEGIN VERTICAL CURVE
BW BOTTOM OF WALL
C&G CURB AND GUTTER
CB CATCH BASIN
C-C CENTER TO CENTER
CE/L CONSTRUCTION EASEMENT LINE
CF CUBIC FEET
CFS CUBIC FEET PER SECOND
CI CAST IRON
CIP CAST IRON PIPE
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CO CLEANOUT
COMM. COMMUNICATION
CONC. CONCRETE
CONST. CONSTRUCTION
CU COPPER
CY/CU YD CUBIC YARD
DBL DOUBLE
DI DUCTILE IRON
DIA/D DIAMETER
DIP DUCTILE IRON PIPE
DR DRIVE
DRWY DRIVEWAY
DWG DRAWING
E. EAST
EA. EACH
EG EXISTING GRADE
EP/EOP EDGE OF PAVEMENT
ELEC. ELECTRICAL
EL/ELEV. ELEVATION
ELOH OVERHEAD ELECTRICAL
EOA END OF ALIGNMENT
ESMT EASEMENT
EVC END VERTICAL CURVE
EX/EXIST. EXISTING
EXT. EXTENSION
FEMA FEDERAL EMERGENCY MANAGEMENT AGENCY
FES FLARED END SECTION
FG FINISHED GRADE
FH FIRE HYDRANT
FIRM FLOOD INSURANCE RATE MAP
FL FLOWLINE
FM FORCE MAIN
FO FIBER OPTIC
FS FINISHED SURFACE
FT FOOT/FEET
GALV. GALVANIZED
GB GRADE BREAK
GR GRATE
GV GATE VALVE
HDPE HIGH-DENSITY POLYETHYLENE
HMA HOT MIX ASPHALT
HOR. HORIZONTAL
HP HIGH POINT
HYD. HYDRANT
IN. INCH
I.D. INSIDE DIAMETER
INV. INVERT
IRR. IRRIGATION
INS. INSERT
LEN. LENGTH
LF LINEAR FEET
LP LOW POINT
LT LEFT
MA/EX MATCH EXISTING
MAX MAXIMUM
MFG. MANUFACTURER
MH MANHOLE
MIN. MINIMUM
MJ MECHANICAL JOINT
N. NORTH
NO. NUMBER
NTS NOT TO SCALE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
OH OVERHEAD
OSHA OCCUPATION SAFETY & HEALTH ADMIN.
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
PI POINT OF INTERSECTION
PL PROPERTY LINE
POLY POLYETHYLENE
POT. POTABLE
PP POWER POLE
PR PROPOSED
PRC POINT OF REVERSE CURVATURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PUE PUBLIC UTILITY EASEMENT
RAD/R RADIUS
RCP REINFORCED CONCRETE PIPE
REQ'D REQUIRED
ROW RIGHT-OF-WAY
RR RAILROAD
RT RIGHT
S. SOUTH
SAN SANITARY
SCH. SCHEDULE
SD STORM DRAIN
SDR STANDARD DIMENSION RATIO
SF/SQ FT SQUARE FEET
SHT SHEET
SIM. SIMILAR
SS SANITARY SEWER
ST STREET
STA STATION
STD STANDARD
SW SIDEWALK
SY/SQ YD SQUARE YARD
TA TOP OF ASPHALT
TBC TOP BACK OF CURB
TBR TO BE REMOVED
TC TOP OF CONCRETE
TOP TOP OF PIPE
TW TOP OF WALL
TYP. TYPICAL
VAR. VARIES
VERT. VERTICAL
WAT. WATER
WL WATER LINE
ABBREVIATIONS
E E
LEGEND
EXISTING PROPOSED DESCRIPTION
MAJOR CONTOUR
MINOR CONTOUR
CURB AND GUTTER
EDGE OF PAVEMENT
EDGE OF GRAVEL
STREET CENTERLINE
PROPERTY LINE
LOT LINE
SECTION LINE
SECTION CORNER
RIGHT-OF-WAY LINE
EASEMENT LINE
FENCE
SANITARY SEWER LINE
SANITARY SEWER - FORCE
SANITARY SEWER MANHOLE
SANITARY SEWER CLEAN OUT
WATER LINE
WATER TEE
WATER VALVE
WATER BEND (ANGLE NOTED)
WATER STUB / CAP
FIRE HYDRANT
WATER METER
WATER MANHOLE
PRESSURIZED IRRIGATION LINE
IRRIGATION LINE
IRRIGATION TEE
IRRIGATION VALVE
IRRIGATION BEND (ANGLE NOTED)
IRRIGATION STUB / CAP
IRRIGATION METER
IRRIGATION MANHOLE
IRRIGATION BOX
STORM DRAIN PIPE
CULVERT WITH FLARED END
SECTION
STORM DRAIN MANHOLE
STORM DRAIN COMBO BOX
LEGEND
EXISTING PROPOSED DESCRIPTION
STORM DRAIN INLET/CATCH BASIN
JUNCTION STRUCTURE
BURIED ELECTRIC LINE
OVERHEAD ELECTRIC LINE
POWER POLE
GUY WIRE ANCHOR
ELECTRICAL EQUIPMENT
ELECTRICAL TRANSFORMER
GAS LINE
GAS VALVE
GAS METER
BURIED TELEPHONE
OVERHEAD COMMUNICATIONS LINE
BURIED COMMUNICATIONS LINE
OVERHEAD CABLE TV
BURIED CABLE TV
BURIED FIBER OPTIC LINE
COMMUNICATIONS PEDESTAL
COMMUNICATIONS HANDHOLE
GRADE TO DRAIN
EXTENTS OF GRADING
FIRE DEPARTMENT CONNECTION
FIRE SPRINKLER RISER
STREET LIGHT
SIGN (SINGLE POLE, 2 OR MORE
POLES)
MAILBOX
ASPHALT PAVEMENT
CONCRETE FLATWORK
UNTREATED BASE COURSE
LANDSCAPE
GRAVEL ROADWAY
UNDISTURBED EARTHWORK
COMPACTED FILL EARTHWORK
FILTRATION BED
SPOT ELEVATION
SECTION INDICATOR
DETAIL INDICATOR
KEYNOTE INDICATOR
IRR
OHE
UGE
SD
IRR
PI
W W
SAN
R/W
UGE
UGE
CP CP
SD
IRR
W W
SAN
R/W
CATV
CATV
COMM
COMM
CATV
CATV
COMM
COMM
T T T
G
FO
G
IRR
S
CO
W
W
D
G
H
CP
FD
A1 A-101
IRR
IRR
W
W
D
CI
S
CO
G
H
CP
FD
PI
D D
CP CP
FO
T T T
9990.359990.35
IRRIRR
IRR IRR
SS SSSS SS
G G
CB
A1 A-101
CUT FILL
NW COR SEC 12
T6S R2W SLB&M
FND BRASS CAP, PER
COUNTY TIE SHEET 22-26
NORTHING: 287907.140
EASTING: 494538.283
ELEVATION: 4891.17
SW COR SEC 12
T6S R2W SLB&M
FND BRASS CAP, PER
COUNTY TIE SHEET 22-28
NORTHING: 282562.318
EASTING: 494516.635
ELEVATION: 4867.68
S 14 COR SEC 12
T6S R2W SLB&M
FND BRASS CAP, PER
COUNTY TIE SHEET 23-28
NORTHING: 282541.104
EASTING: 497187.067
ELEVATION: 4868.85
SE COR SEC 12
T6S R2W SLB&M
FND BRASS CAP, PER
COUNTY TIE SHEET 24-28
NORTHING: 282518.906
EASTING: 499853.421
ELEVATION: 4867.26
E 14 COR SEC 12
T6S R2W SLB&M
FND BRASS CAP, PER
COUNTY TIE SHEET 24-27
NORTHING: 285184.784
EASTING: 499874.404
ELEVATION: 4878.92
W 14 COR SEC 12
T6S R2W SLB&M
PER FOUND MONUMENTS &
COUNTY TIE SHEET 22-27
(CALCULATED)
NORTHING: 284896.614
EASTING: 494418.066
NE COR SEC 12
T6S R2W SLB&M
PER FOUND MONUMENTS &
COUNTY TIE SHEET 24-26
(CALCULATED)
NORTHING: 287853.928
EASTING: 499896.383
N 14 COR SEC 12
T6S R2W SLB&M
FND BRASS CAP, PER
COUNTY TIE SHEET 23-26
NORTHING: 287877.259
EASTING: 497223.222
ELEVATION: 4891.42
S89°32'41"E 2670.52' (S89°32'48"E 2670.47')
(BASIS OF BEARING)
S89°31'23"E 2666.45'
(S89°31'17"E 2666.35') (N
0°
'0 9"
E
6.
N 0°
'0
3" E
.9 6'
N 0°
'1
8" E
.2 3'
(N 0°
'1
7" E
9.
S89°30'00"E 2673.27' (S89°29'59"E 2673.21')
S89°21'44"E 2685.10' (S89°21'56"E 2685.02')
N 2°
'1
2" E
.9 2'
(3
2.
N
2°
'0 5"
W
6.
(N 2°
'0
0" W
.4
2'
PONY EXPRESS PARKWAY
DESIGN ALIGNMENT
STA: 0+00
NORTHING: 283049.1080
EASTING: 497308.8652
0+00
5+00
10+00
15+00
20+00
25+00
30+00
34+41.38
55+00
60+00
N
°5 5'
"E
9.
N 0°
'0
0" E
.1 5'
END ALIGNMENT
STA: 34+41.38
N: 286436.42 E: 497666.23
8.
' N90°00'00"W
118.36'
S0 °2
3'
"W
.2
7'
.2
5'
10+00
15+00
20+00
PC: 7+89.73
PC: 15+23.00
PT: 13+46.93
PT: 15+86.23
55+00
60+00
PO
B:
0+
.0
PO
E:
1+
.1
PC
: 5
0+
.4
PC
: 5
5+
.9
PT
: 5
3+
.4
PT
: 5
7+
.1
PRC: 51+82.63
TRAILHEAD ROAD
DESIGN ALIGNMENT
NORTHING: 284327.324
EASTING: 497068.507
N
°5 5'
"E
9.
N 0°
'0
0" E
.1 5'
L2S89°50'58"E 259.49'
S84°18'44"E 412.97'
L1
END ALIGNMENT
N: 284357.63 E: 498240.30
L3 L4
C3
C6
C7
C
C
C1
C2
LINE TABLE: ALIGNMENTS
LINE #
L1
L2
LENGTH
15.44'
176.07'
DIRECTION
N89°58'07"E
N1°12'23"E
CURVE TABLE: ALIGNMENTS
CURVE #
C1
C2
C4
C5
LENGTH
167.19'
140.78'
63.23'
557.20'
RADIUS
307.00'
257.00'
3003.50'
1600.00'
DELTA
31°12'12"
31°23'07"
1°12'22"
19°57'12"
CHORD DIRECTION
N0°36'11"E
N10°03'53"E
CHORD LENGTH
63.23'
554.39'
C6 26.85' 2000.00' 0°46'09" - -
C3 193.28' 2000.00' 5°32'14" - -
C7 166.44' 2000.00' 4°46'05" - -
L3 66.34' N1°12'23"E
L4 109.73' N1°12'22"E
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
8.
EM
C P on y
Ex p
Tr ai lh ea d
Si gn al D ec -2
5\
- C
AD
\8
Sh ee ts
\2
-V
-1
.d w g
- P
LO
TT
ED
:T
BU
R
KE
TT
D
AT
E:
6/ 4/
:2
PM
SHEET TITLE
W . C lu bh ou se
D riv e, St e.
A
Le hi
, U T 8
1.7
.72
OF
TR
AI
LH
EA
D R
O
AD
P
O N
Y
EX
PR
ES
S
PA
R
KW
AY
S
IG
N
AL
EA
G
LE
M
O U
N
TA
IN
, U
T
IF25608.00
JUNE 4, 2026
TPB
DTM
V-101
SURVEY
CONTROL
4 21
BI
D
S
ET
SURVEY CONTROL NOTES:
1. THE BASIS OF BEARING FOR THIS SURVEY IS S89°31'23"E, ALONG
THE SOUTH LINE OF THE SOUTHEAST 1/4 SECTION 12, TOWNSHIP
6 SOUTH RANGE 2 WEST, BETWEEN TWO FOUND MONUMENTS,
TYPE AND LOCATIONS OF WHICH ARE SHOWN ON THIS PLAN.
2. THE "PROJECT COORDINATES" AND DISTANCES DERIVED
THEREFROM ARE EXPRESSED IN A LOCAL GROUND SYSTEM
DEFINED AS FOLLOWS: HORIZONTAL DATUM = NORTH AMERICAN
DATUM OF 1983 (NAD83) VERTICAL DATUM = NORTH AMERICAN
VERTICAL DATUM ON 1988 (NAVD88) COORDINATE SYSTEM = US
STATE PLAN 1983, UTAH CENTRAL ZONE CALIBRATED AT GROUND
GEOID MODEL = GEOID 12A
UNITS - US SURVEY FOOT
3. THE CONTROL SURVEY WAS PERFORMED BETWEEN NOV 2019
AND JUNE 2022, AND REVISITED IN JANUARY 2025.
4. CONTRACTOR SHALL COORDINATE WITH EAGLE MOUNTAIN CITY
ENGINEERING DEPARTMENT TO ESTABLISH SURVEY CONTROL
BEFORE COMMENCING PROJECT. ALL CONSTRUCTION STAKING
AND WORK DONE TO ESTABLISH SURVEY CONTROL SHALL BE
DONE BY A PROFESSIONAL SURVEYOR LICENSED IN THE STATE
OF UTAH.
SCALE: 1" = 300'
SURVEY CONTROLA
N
EAGLE MOUNTAIN BOULEVARD
PO
NY
EX
PR
ES
S P
AR
KW
AY
TRAILHEAD ROAD
0 300' 600'150'
B V-101
PO
NY
EX
PR
ES
S P
AR
KW
AY
SCALE: 1" = 150'
ENLARGED PLAN VIEWB 0 150' 300'75'
DA
VI
D T
MORTENSEN
PLS-643655
06/04/2026
X
X X
X X
X
S S
S S
S S
S
SS
S
SSSSSSSSSSSSSSSSSSSSSS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
W
WW
WW
WWW
WW
WW
WW
WW
WWWWWWWWWWWWWW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
PPPPPP
P
PPPPPP
P
P P
P
PP
P
P
P
P
P P
P
P P
P
P
P
P
P
P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P P
P
P
P
P P
P P
P P
P P P P P P P P P P P P P P
P
P P
P P
P P
P P
P P
P P P P P P P
P
P
P
P P
P P
P P
P
P
P
P
P P
P P
P P
P
P P
P P
P
P
P P
P P P P P P P
P
P P
P P
P
P P
P P
P P
P P
P P
P P
P P
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
P
P P
P P
P P
11+00
12+00
13+00
14+00
15+00
16+00
17+00
25+00
26+00
P P
P P
W W
W W
S S
S S
18+00
19+00
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
8.
EM
C P on y
Ex p
Tr ai lh ea d
Si gn al D ec -2
5\
- C
AD
\8
Sh ee ts
\2
-C
-1
.d w g
- P
LO
TT
ED
:T
BU
R
KE
TT
D
AT
E:
6/ 4/
:2
PM
SHEET TITLE
SCALE: 1" = 40'
DEMOLITION PLANA 0 40' 80'20'
N
W . C lu bh ou se
D riv e, St e.
A
Le hi
, U T 8
1.7
.72
PRELI
MINARY
NOT F
OR
CONSTRUCTIO
N
OF
TR
AI
LH
EA
D R
O
AD
P
O N
Y
EX
PR
ES
S
PA
R
KW
AY
S
IG
N
AL
EA
G
LE
M
O U
N
TA
IN
, U
T
IF25608.00
JUNE, 2026
TPB
RWD
C-101
DEMOLITION
PLAN
5 21
BI
D
S
ET
GENERAL SHEET NOTES
1. ALL SELECTIVE SITE DEMOLITION AND PAVEMENT
REMOVAL MUST CONFORM TO THE APWA
STANDARD SPECIFICATIONS.
2. CONTRACTOR MUST COORDINATE REMOVAL AND
RELOCATION OF EXISTING UTILITIES WITH
UTILITY OWNERS.
3. PARTIAL REMOVALS OF CONCRETE CURB AND
GUTTER, CONCRETE SIDEWALK, AND CONCRETE
DRIVEWAYS SHALL BE AT AN EXISTING JOINT.
4. ALL IMPROVEMENTS SHOWN IN COLOR ARE TO
BE REMOVED, RELOCATED, OR REPLACED.
REFERENCE STANDARDS
APWA - MANUAL OF STANDARD
SPECIFICATIONS
DIVISION 03 - EXISTING CONDITIONS
02 41 13 SELECTIVE SITE DEMOLITION
02 41 14 PAVEMENT REMOVAL
LEGEND
ASPHALT PAVEMENT REMOVAL
CONCRETE SIDEWALK, FLATWORK
AND DRIVEWAY REMOVAL
CLEAR AND GRUB SURFACE
INCLUDING LANDSCAPING, ROCK
MULCH
CURB & GUTTER REMOVAL
SHEET KEYNOTES
REMOVE EXISTING ASPHALT PAVEMENT PER
APWA SPECIFICATIONS.
REMOVE EXISTING CURB AND GUTTER PER APWA
SPECIFICATIONS.
REMOVE EXISTING CONCRETE PER APWA
SPECIFICATIONS.
REMOVE EXISTING IRRIGATION CONTROL VALVE
PER APWA SPECIFICATIONS.
REMOVE EXISTING SIGN AND SALVAGE TO EAGLE
MOUNTAIN CITY. (SEE SIGNAGE & STRIPING SHEET)
5A
REMOVE EXISTING LANDSCAPE BOULDER.6
REMOVE EXISTING SHRUB
7 OBLITERATE EXISTING PAVEMENT MARKINGS
WITH HIGH PRESSURE WATER SPRAY.
REMOVE LIGHT POLE AND SALVAGE TO EAGLE
MOUNTAIN CITY.
9A
REMOVE WATER METER, CAP SERVICE AT MAIN.10
RELOCATE EXISTING SIGN.
(SEE SIGNAGE & STRIPING SHEET)
5B
REMOVE STORM DRAIN STRUCTURE PER APWA
SPECIFICATIONS.
REMOVE EXISTING RRFB ASSEMBLY AND
SALVAGE TO EAGLE MOUNTAIN CITY
(SEE SIGNAGE & STRIPING SHEET)
5C
RELOCATE LIGHT POLE (SEE SITE PLAN SHEET)9B
SAWCUT ASPHALT FULL DEPTH.12
TREE TO BE REMOVED BY EAGLE MOUNTAIN CITY.13
37:386:0001
UTAH COMMUNITY FEDERAL
CREDIT UNION
4314 N PONY EXPRESS PKWY
59:044:0152
EAGLE MOUNTAIN PROPERTIES
COMMUNITIES MASTER ASSOCIATION INC.
1645 E STAGECOACH RUN
37:386:0003
DISTRICT AT EAGLE
MOUNTAIN TOWN CENTER
4272 N PONY EXPRESS PKWY
37:386:0002
DISTRICT AT EAGLE
MOUNTAIN TOWN CENTER
1634 E STAGECOACH RUN
53:541:0067
COMMON AREA
53:541:0067
COMMON AREA
59:044:0028
EAGLE MOUNTAIN CITY
:0
:0
E A
G
LE
M O
U N
TA
IN
C
IT
Y
67:144:0202
EM COMMERCIAL
DEVELOPMENT LLC
4315 N PONY EXPRESS PKWY
67:182:0001
EAGLE MOUNTAIN MEDICAL
PARTNERS LLC
4317 N PONY EXPRESS PKWY
67:144:0205
TMG REAL ESTATE LLC
1495 E RAVEN WAY
38:257:0081
LABONDE, FLORENT DANIEL (ET AL)
4402 N EAGLE PARK ENTRY
38:257:0082
JACOBS, SANDRA MACDOUGALL
1496 E OSPREY WY
38:257:0104
TOWN OF EAGLE MOUNTAIN
38:257:0080
LOPEZ, OSCAR ESPINOZA (ET AL)
4406 N KESTREL WY
67:144:0201
GEN2 UTAH PROPERTIES LLC
4265 N PONY EXPRESS PKWY
TRAILHEAD ROAD
EAGLE PARK ENTRY
TRAILHEAD ROAD
STAGECOACH RUN
EA
ST
STONE CREEK WAY
PO
NY
EX
PR
ES
S P
AR
KW
AY
SCALE: 1" = 40'
MID-BLOCK CROSSING DETAILB
PO
NY
EX
PR
ES
S
PA
RK
W
AY
(TYP.)
(TYP.)
13 (TYP.)
8 (TYP.)
13 (TYP.)
7(TYP.)
7(TYP.)
7(TYP.)
5A
5C 5C
5B
5A
5A
5C
5C
5A
5A
5A
5A
5A
9A
9A
9B
9B
5A
5B
REMOVE DETECTABLE
WARNING SURFACE
CONCRETE PEDESTRIAN
REFUGE, PROTECT IN PLACE
MATCHLINE - STA. 17+50
SEE LEFT
MATCHLINE - STA. 17+50
SEE RIGHT
5A STA. 19+57
5ASTA. 22+64
5ASTA. 28+45
REMOVE FENCE
PO
NY
EX
PR
ES
S P
AR
KW
AY
7 (TYP.)
8 (TYP.)
8 (TYP.)
7(TYP.)
X X
X X
X
III
III PC
11+00
12+00
13+00
14+00
15+00
16+00
17+00
51+00
52+00
53+00
54+00
55+00
56+00
57+00
58+00 59+00 60+00
SD
SD
SD
SD
25+00
26+00
P P
P P
18+00
19+00
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
8.
EM
C P on y
Ex p
Tr ai lh ea d
Si gn al D ec -2
5\
- C
AD
\8
Sh ee ts
\2
-C
-1
.d w g
- P
LO
TT
ED
:T
BU
R
KE
TT
D
AT
E:
6/ 4/
:2
PM
SHEET TITLE
SCALE: 1" = 40'
SITE PLANA 0 40' 80'20'
N
W . C lu bh ou se
D riv e, St e.
A
Le hi
, U T 8
1.7
.72
PRELI
MINARY
NOT F
OR
CONSTRUCTIO
N
OF
TR
AI
LH
EA
D R
O
AD
P
O N
Y
EX
PR
ES
S
PA
R
KW
AY
S
IG
N
AL
EA
G
LE
M
O U
N
TA
IN
, U
T
IF25608.00
JUNE, 2026
TPB
RWD
C-111
SITE PLAN
6 21
BI
D
S
ET
GENERAL SHEET NOTES
1. SEE GRADING PLAN SHEETS FOR ADDITIONAL
INFORMATION.
2. SEE SIGNAGE AND STRIPING SHEETS FOR
ADDITIONAL INFORMATION.
LEGEND
ASPHALT PAVEMENT
(SEE EAGLE MTN. CONST. STD.
SECTION 15.60.020)
CONCRETE SIDEWALK/FLATWORK
STAMPED CONCRETE
(ASHLAR SLATE PATTERN STAMP)
3/4" WASHED ROCK MULCH,
3" THICK (TRICOLOR LIMESTONE)
NATIVE SEED MIX PER EAGLE
MOUNTAIN CITY STANDARDS.
(SEE SHEET G-002.)
SHEET KEYNOTES
TYPE A - 24" STANDARD CURB AND GUTTER
(SEE APWA PLAN 205.1)
UDOT TYPE B3 CURB
(SEE UDOT STD. DWG. NO. GW 2A)
2A
PEDESTRIAN REFUGE ISLAND
(SEE UDOT STD. DWG. NO. PA 4)
3 4-INCH THICK CONCRETE SIDEWALK
(SEE APWA PLAN 231)
PLOWABLE END SECTION/CORNER
(SEE DETAIL 5, SHEET C-402)
PEDESTRIAN ACCESS RAMP
(SEE APWA PLAN 235.1-4)
TRAFFIC SIGNAL EQUIPMENT
(SEE SIGNAL SHEETS)
10 ASPHALT PAVEMENT TRAIL
(SEE DETAIL 6, SHEET C-402)
4 6-INCH THICK CONCRETE MEDIAN
UDOT TYPE M2 CURB
(SEE UDOT STD. DWG. NO. GW 2A)
2B
ADJUST MANHOLE FRAME TO GRADE11
TYPE Q CURB
(SEE APWA PLAN 209)
2C
8-INCH THICK CONCRETE TRUCK APRON6
TYPE Q MODIFIED CURB
(SEE DETAIL 1, SHEET C-402)
2D
TYPE M1 MODIFIED CURB AND GUTTER
(SEE DETAIL 2, SHEET C-402)
2E
PONY EXPRESS MEDIAN CURB
(SEE DETAIL 3 & 7, SHEET C-402)
2F
RELOCATED STREET LIGHT POLE
(SEE SHEET C-101)
37:386:0001
UTAH COMMUNITY FEDERAL
CREDIT UNION
4314 N PONY EXPRESS PKWY
59:044:0152
EAGLE MOUNTAIN PROPERTIES
COMMUNITIES MASTER ASSOCIATION INC.
1645 E STAGECOACH RUN
37:386:0003
DISTRICT AT EAGLE
MOUNTAIN TOWN CENTER
4272 N PONY EXPRESS PKWY
37:386:0002
DISTRICT AT EAGLE
MOUNTAIN TOWN CENTER
1634 E STAGECOACH RUN
53:541:0067
COMMON AREA
53:541:0067
COMMON AREA
59:044:0028
EAGLE MOUNTAIN CITY
:0
:0
E A
G
LE
M O
U N
TA
IN
C
IT
Y 67:144:0202
EM COMMERCIAL
DEVELOPMENT LLC
4315 N PONY EXPRESS PKWY
67:182:0001
EAGLE MOUNTAIN MEDICAL
PARTNERS LLC
4317 N PONY EXPRESS PKWY
67:144:0205
TMG REAL ESTATE LLC
1495 E RAVEN WAY
38:257:0081
LABONDE, FLORENT DANIEL (ET AL)
4402 N EAGLE PARK ENTRY
38:257:0082
JACOBS, SANDRA MACDOUGALL
1496 E OSPREY WY
38:257:0104
TOWN OF EAGLE MOUNTAIN
38:257:0080
LOPEZ, OSCAR ESPINOZA (ET AL)
4406 N KESTREL WY
TRAILHEAD ROAD
EAGLE PARK ENTRY
TRAILHEAD ROAD
STAGECOACH RUN
EA
ST
STONE CREEK WAY
PO
NY
EX
PR
ES
S P
AR
KW
AY
SCALE: 1" = 40'
MID-BLOCK CROSSING DETAILB
PO
NY
EX
PR
ES
S
PA
RK
W
AY
2F
2F
2F
2B
2B
2B
2B
2A
3 4
OVER 6" UTBC
OVER 6" UTBC 4
PLACE ROCK MULCH ON TOP
OF EXISTING CONCRETE
MATCHLINE - STA. 17+50
SEE LEFT
MATCHLINE - STA. 17+50
SEE RIGHT
2D
2F
2E
2C
OVER 6" UTBC
2B
EXISTING FIBER HANDHOLES
TO BE RELOCATED BY
OTHERS (COORDINATE WITH
FIBER COMPANY)
B2B
X X
X X
X
III
III PC
11+00
12+00
13+00
14+00
15+00
16+00
17+00
51+00
52+00
53+00
54+00
55+00
56+00
57+00
58+00 59+00 60+00
SD
SD
SD
SD
R26'
R33'R33'
R33'
R4 6.
R69.25'
R69.25'
R69.25'
R 69.25'
R31.25'
R 191.25'
R311.25'
R0.75'
R331.25'
R491.25'
R0 .7
5'
R 281.25'
R
5.
'R0.75'
R151.25' R601.25'
R0.75'
R58'
R50
R55'
R170'
R5'
R
.5
STA: 55+21.89
OFF: 27.99' L
STA: 54+82.26
OFF: 50.87' L
STA: 55+31.57
OFF: 6.74' L
STA: 54+65.89
OFF: 6.75' L
STA: 53+81.76
OFF: 9.60' R
STA: 53+77.41
OFF: 6.21' R
STA: 53+71.69
OFF: 24.56' L
STA: 53+72.61
OFF: 25.58' LSTA: 53+04.33
OFF: 74.94' L
STA: 53+02.89
OFF: 69.98' L
STA: 52+86.58
OFF: 116.15' L
STA: 52+79.42
OFF: 115.93' L
STA: 52+82.76
OFF: 128.50' L
STA: 52+79.05
OFF: 128.43' L
STA: 52+80.78
OFF: 135.64' L
STA: 52+78.74
OFF: 134.95' L
STA: 52+77.74
OFF: 59.95' L
STA: 52+76.85
OFF: 60.72' LSTA: 52+38.71
OFF: 3.82' L
STA: 52+34.68
OFF: 6.86' L
STA: 52+40.36
OFF: 22.23' R
STA: 52+39.26
OFF: 23.12' R
STA: 52+02.86
OFF: 10.78' R
STA: 52+02.54
OFF: 0.27' R
STA: 51+90.02
OFF: 0.96' R
STA: 51+89.90
OFF: 6.70' R
STA: 51+79.97
OFF: 0.73' R
STA: 53+29.77
OFF: 64.80' R
STA: 53+30.75
OFF: 65.76' R
STA: 53+00.41
OFF: 68.88' R
STA: 52+94.96
OFF: 73.48' R
STA: 53+17.88
OFF: 97.04' R
STA: 52+99.89
OFF: 96.11' R
STA: 53+00.70
OFF: 108.76' R
STA: 53+10.89
OFF: 109.31' R
STA: 53+05.01
OFF: 118.74' R
STA: 53+00.11
OFF: 118.35' R
STA: 55+28.36
OFF: 27.99' L
STA: 56+94.72
OFF: 42.50' R
STA: 57+20.16
OFF: 42.39' R
STA: 57+81.58
OFF: 99.69' R
STA: 57+82.06
OFF: 119.36' R
STA: 57+92.19
OFF: 206.94' R
STA: 57+92.53
OFF: 221.00' R
STA: 58+01.88
OFF: 40.47' R
STA: 57+99.05
OFF: 45.78' R
STA: 58+05.00
OFF: 70.20' R
STA: 58+39.13
OFF: 39.61' R
STA: 58+05.26
OFF: 100.65' R
STA: 59+38.60
OFF: 5.50' R
STA: 57+76.18
OFF: 5.50' R
STA: 56+97.79
OFF: 5.50' R
STA: 56+80.36
OFF: 33.50' L
STA: 58+02.39
OFF: 33.50' L
STA: 57+76.18
OFF: 33.50' L
STA: 58+28.05
OFF: 55.31' L
STA: 58+35.99
OFF: 103.90' L
R
.5
STA: 57+73.63
OFF: 107.17' R
BSW
STA: 57+18.22
OFF: 57.73' R
BSW
STA: 13+35.07
OFF: 48.88' R
STA: 11+52.49
OFF: 49.00' R
STA: 10+35.85
OFF: 38.06' R
STA: 13+22.90
OFF: 49.00' R
STA: 11+63.28
OFF: 4.36' L
STA: 12+10.43
OFF: 9.76' L
STA: 12+44.62
OFF: 9.33' L
STA: 13+33.88
OFF: 8.02' L
STA: 13+03.21
OFF: 8.78' L
STA: 14+72.75
OFF: 49.50' L
STA: 16+75.88
OFF: 49.50' L
STA: 14+96.44
OFF: 8.31' R
STA: 15+50.28
OFF: 8.32' R
STA: 17+33.23
OFF: 8.16' R
STA: 16+81.59
OFF: 8.16' R
STA: 15+14.97
OFF: 39.79' R
STA: 14+78.81
OFF: 39.62' R
STA: 53+07.95
OFF: 0.22' L
STA: 58+42.88
OFF: 48.04' R
STA: 58+08.86
OFF: 101.10' R
9'
6' 8'
8'
4'
9'
STA: 51+79.59
OFF: 3.61' R
R1348.54'
R1649'
25+00
26+00
P P
P P
18+00
19+00
STA: 17+77.67
OFF: 39.32' L
STA: 17+54.70
OFF: 8.33' R
STA: 18+93.50
OFF: 7.80' L
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
8.
EM
C P on y
Ex p
Tr ai lh ea d
Si gn al D ec -2
5\
- C
AD
\8
Sh ee ts
\2
-C
-1
.d w g
- P
LO
TT
ED
:T
BU
R
KE
TT
D
AT
E:
6/ 4/
:2
PM
SHEET TITLE
SCALE: 1" = 40'
SITE PLANA 0 40' 80'20'
N
W . C lu bh ou se
D riv e, St e.
A
Le hi
, U T 8
1.7
.72
PRELI
MINARY
NOT F
OR
CONSTRUCTIO
N
OF
TR
AI
LH
EA
D R
O
AD
P
O N
Y
EX
PR
ES
S
PA
R
KW
AY
S
IG
N
AL
EA
G
LE
M
O U
N
TA
IN
, U
T
IF25608.00
JUNE, 2026
TPB
RWD
C-112
HORIZONTAL
CONTROL
7 21
BI
D
S
ET
GENERAL SHEET NOTES
1. SEE GRADING PLAN SHEETS FOR ADDITIONAL
INFORMATION.
LEGEND
ASPHALT PAVEMENT
(SEE EAGLE MTN. CONST. STD.
SECTION 15.60.020)
CONCRETE SIDEWALK/FLATWORK
STAMPED CONCRETE
(ASHLAR SLATE PATTERN STAMP)
3/4" WASHED ROCK MULCH,
3" THICK (TRICOLOR LIMESTONE)
NATIVE SEED MIX PER EAGLE
MOUNTAIN CITY STANDARDS.
(SEE SHEET G-002.)
37:386:0001
UTAH COMMUNITY FEDERAL
CREDIT UNION
4314 N PONY EXPRESS PKWY
59:044:0152
EAGLE MOUNTAIN PROPERTIES
COMMUNITIES MASTER ASSOCIATION INC.
1645 E STAGECOACH RUN
37:386:0003
DISTRICT AT EAGLE
MOUNTAIN TOWN CENTER
4272 N PONY EXPRESS PKWY
37:386:0002
DISTRICT AT EAGLE
MOUNTAIN TOWN CENTER
1634 E STAGECOACH RUN
53:541:0067
COMMON AREA
53:541:0067
COMMON AREA
59:044:0028
EAGLE MOUNTAIN CITY
:0
:0
E A
G
LE
M O
U N
TA
IN
C
IT
Y 67:144:0202
EM COMMERCIAL
DEVELOPMENT LLC
4315 N PONY EXPRESS PKWY
67:182:0001
EAGLE MOUNTAIN MEDICAL
PARTNERS LLC
4317 N PONY EXPRESS PKWY
67:144:0205
TMG REAL ESTATE LLC
1495 E RAVEN WAY
38:257:0081
LABONDE, FLORENT DANIEL (ET AL)
4402 N EAGLE PARK ENTRY
38:257:0082
JACOBS, SANDRA MACDOUGALL
1496 E OSPREY WY
38:257:0104
TOWN OF EAGLE MOUNTAIN
38:257:0080
LOPEZ, OSCAR ESPINOZA (ET AL)
4406 N KESTREL WY
TRAILHEAD ROAD
EAGLE PARK ENTRY
TRAILHEAD ROAD
STAGECOACH RUN
EA
ST
STONE CREEK WAY
PO
NY
EX
PR
ES
S P
AR
KW
AY
SCALE: 1" = 40'
MID-BLOCK CROSSING DETAILB
PO
NY
EX
PR
ES
S
PA
RK
W
AY
MATCHLINE - STA. 17+50
SEE LEFT
MATCHLINE - STA. 17+50
SEE RIGHT
10+00
11+00
12+00 13+00
14+00
SD
SD
SD
SD
EA/MATCH EX
4876.77
TA/MATCH EX
4874.97
TA/MATCH EX
4876.36
EA/MATCH EX
4877.15
TA/MATCH EX
4876.22
TA/MATCH EX
4876.24
TA/MATCH EX
2.
2.
2.
0.69%
0.55%
0.50%
2.
2.
4875.00
TBC/MATCH EX
4875.31
TBC/HP
4875.97
TBC
4876.66
TBC
4876.81
TBC/MATCH EX
4876.94
TBC/MATCH EX
4877.48
TBC/MATCH EX
0.60%
4875.30
TA/MATCH EX
2.
2.
1.
4875.61
TA
4876.59
TA/TC
4876.05
TBC
4876.44
TBC
4876.49
TC
4876.67
TBC/HP
4877.08
TA/MATCH EX
4877.00
TA/MATCH EX
4876.22
TA/MATCH EX
4876.28
TA
4875.82
LIP
4876.33
LIP
0.50%
4875.14
TBC/LP
3.
0.55%
SDCI-05
TBC:4875.31
12" INV IN: 4870.66 (S)
12" INV OUT: 4870.66 (W)
7.1 LF 12" HDPE
SD @ 1.0%
4875.91
TBC
EX. SDMH-01
RIM:4875.29
EX. 36" INV IN: 4867.41 (N)
12" INV IN: 4870.59 (E)
EX. 36" INV OUT: 4867.41 (S)
4876.65
TC
4876.38
TC
4876.04
TC
4876.23
TBC
4876.50
TC
4876.23
TC
4874.88
TBC/LP
SDCI-06
TBC:4875.31
12" INV OUT: 4871.81 (N)
114.7 LF 12" HDPE
SD @ 1.0%
4875.03
TBC/HP
0.50%3.
15+00
16+00
17+00
18+00
19+00
55+00
56+00
SD
SD
SD SD SD
4876.13
EA/MATCH EX
4876.79
EA/MATCH EX
4876.47
EA/MATCH EX
4876.43
TBC/MATCH EX
4875.99
TBC/LP
4876.42
TBC
4876.51
TBC
4876.46
TBC/GB
4876.17
TBC/MATCH EX.
3.
4.
3.
4877.02
TA/MATCH EX
4876.55
TA
4876.51
TC/MATCH EX
0.51%
4877.27
EA/MATCH EX
4877.30
EA/MATCH EX
4877.17
EA/MATCH EX
4876.95
EA/MATCH EX
4876.51
EA/MATCH EX
4877.35
TBC
4878.03
TBC
1.
1.
2.
0.09%0.21%
0.64%
4876.66
TC/TA
4876.60
TBC/HP
4876.45
TC/TA
4876.50
TC/TA
4876.58
TC/TA
4876.51
TBC
4876.37
TBC
4877.69
TBC/MATCH EX.
4876.93
TA/MATCH EX.
1.
2.
4876.22
LIP
4876.22
TBC/HP
SDCI-01
TBC:4876.12
12" INV IN:4872.17 (S)
12" INV OUT:4872.17 (E)
SDCI-02
TBC:4875.99
12" INV IN: 4872.50 (S)
12" INV OUT: 4872.50 (N)
65.4 LF 12" HDPE
SD @ 0.5%
3.0 LF 12" HDPE
SD @ 0.5%
CONNECT TO EX.
12" HDPE SD PIPE
4876.20
TBC/HP
4875.87
TBC/LP
4877.56
TBC/GB
2.
4877.10
TBC/LP
4876.85
TA
4877.22
TBC
4876.84
*TA
4877.56
TBC
4877.06
*TA
4877.75
TBC
4877.09
*TA
4877.92
TBC
4877.20
*TA
4877.29
*TA
*TA = DENOTES TOP OF ASPHALT ELEVATION IS MODIFIED FROM TYPICAL DETAIL.
SDCI-04
TBC:4876.93
EX. 12" INV IN:4871.57 (W)
EX. 12" INV OUT:4871.57 (E)
0.62% 0.76% 3.
0.64%
92.7 LF 12" HDPE
SD @ 0.5%SDCI-03
TBC:4875.87
12" INV OUT: 4872.96 (N)
0.56%0.57%0.53%
0.50% 0.77%
0.50%
4878.05
TBC/HP
CROWN
CROWN
TRANSITION CURB TO MATCH EXISTING
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
8.
EM
C P on y
Ex p
Tr ai lh ea d
Si gn al D ec -2
5\
- C
AD
\8
Sh ee ts
\2
-C
-1
.d w g
- P
LO
TT
ED
:T
BU
R
KE
TT
D
AT
E:
6/ 4/
:2
PM
SHEET TITLE
SCALE: 1" = 20'
PONY EXPRESS PARKWAY GRADING PLAN - SOUTHA 0 20' 40'10'
SCALE: 1" = 20'
PONY EXPRESS PARKWAY GRADING PLAN - NORTHB 0 20' 40'10'
N
W . C lu bh ou se
D riv e, St e.
A
Le hi
, U T 8
1.7
.72
PRELI
MINARY
NOT F
OR
CONSTRUCTIO
N
OF
TR
AI
LH
EA
D R
O
AD
P
O N
Y
EX
PR
ES
S
PA
R
KW
AY
S
IG
N
AL
EA
G
LE
M
O U
N
TA
IN
, U
T
IF25608.00
JUNE, 2026
TPB
RWD
C-121
GRADING PLAN
8 21
BI
D
S
ET
GENERAL SHEET NOTES
1. SEE SITE PLAN FOR ADDITIONAL INFORMATION.
LEGEND
PONY EXPRESS PARKWAY
PONY EXPRESS PARKWAY
N
ASPHALT PAVEMENT
(SEE EAGLE MTN. CONST. STD.
SECTION 15.60.020)
CONCRETE SIDEWALK/FLATWORK
STAMPED CONCRETE
(ASHLAR SLATE PATTERN STAMP)
3/4" WASHED ROCK MULCH,
3" THICK (TRICOLOR LIMESTONE)
NATIVE SEED MIX PER EAGLE
MOUNTAIN CITY STANDARDS
SHEET KEYNOTES
SINGLE GRATE CATCH BASIN
(SEE APWA PLAN 315.1)
PIPE TRENCH AND BACKFILL
PER APWA PLAN 382
2. SLOPE LABELS ARE FOR INFORMATION ONLY.
12+00
13+00
14+00
15+00
56+00
57+00
58+00
59+00
60+00
SD
4876.66
TBC
4876.44
TBC
4876.67
TBC/HP
4875.05
TBC/MATCH EX.
4877.97
TBC
4876.65
TBC
4877.54
TBC
4875.55
TBC
4875.78
TBC
4876.73
TBC
4877.13
TBC
4876.98
TBC
4876.63
TBC 4876.46
TBC
4876.24
TBC
4875.49
TBC
4875.24
TBC
4877.14
TBC/GB
4876.84
TBC
4876.62
TA/MATCH EX.
4876.99
TA/MATCH EX.
4876.59
TA/MATCH EX.
4876.36
TA/MATCH EX.
4876.77
TA/MATCH EX.
4874.62
TA/MATCH EX.
4874.84
TA/MATCH EX.
4875.82
TA/MATCH EX.
4875.87
TA/MATCH EX.
4873.71
TA/MATCH EX.
4873.57
TA/MATCH EX.
CROWN
4876.65
TC
4876.43
TC
4876.64
TC/MATCH EX.
4876.88
TC/MATCH EX.
4877.16
TC
4877.22
TC
4876.82
TC
4876.78
TC
4875.98
TBC
4875.94
TBC
4876.55
TBC
4876.25
TBC
4875.27
TBC
4875.36
TBC
R170'
R55' R5'
R
.5
R 60'
4875.32
TBC
R54'
5.
4.
2.41%
1.4 2%
4.26%
4.54%
2.
2.20%
2.06%2.14%
2.
2.
2.
2.
2.
3.
2.
1.91%
2.41%
3.
2.
2.
3.96% 2.38%
3.08% 2.83%
1.16%
4876.45
TA/MATCH EX.
4875.97
TA
1.
4875.61
TBC
4875.70
TBC
4875.25
TBC
2.
3.
4.
%CROWN
CROW
N
4.26%
4875.65
TC/MATCH EX.
4875.61
TC/MATCH EX.
4875.57
TBC/MATCH EX.
4875.56
TBC/MATCH EX.
4875.48
TC
4875.47
TC
4875.40
TC
4875.39
TC
4876.40
TBC
2.45%
4873.94
TBC/MATCH EX.
4874.01
TBC/MATCH EX.
4875.13
TBC
4875.38
TC
4875.53
TC
4874.12
TC
4874.26
TC
4876.48
TC
4876.32
TC
4876.80
TC
4876.67
TC
2.28%
2.20%
2.
4876.72
TC
4876.66
TC
4876.59
TC
2.31%
4877.16
TBC/HP
4875.75
TBC
4876.56
TBC/GB
4876.27
TC
REVERSE
SIDEWALK
CROSS SLOPE
CURB WALL NEXT TO THIS SIDEWALK
SHALL BE POURED SLIGHTLY LARGER
THAN THE BASE DIMENSIONS SHOWN
IN THE DETAIL SO THAT THE CURB
MATCHES THE BACK OF SIDEWALK.
4877.06
TC
4876.92
TC
4875.65
TA
4875.50
TA
4875.24
TA
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
8.
EM
C P on y
Ex p
Tr ai lh ea d
Si gn al D ec -2
5\
- C
AD
\8
Sh ee ts
\2
-C
-1
.d w g
- P
LO
TT
ED
:T
BU
R
KE
TT
D
AT
E:
6/ 4/
:2
PM
SHEET TITLE
SCALE: 1" = 20'
TRAILHEAD ROAD GRADING PLANA 0 20' 40'10'
W . C lu bh ou se
D riv e, St e.
A
Le hi
, U T 8
1.7
.72
PRELI
MINARY
NOT F
OR
CONSTRUCTIO
N
OF
TR
AI
LH
EA
D R
O
AD
P
O N
Y
EX
PR
ES
S
PA
R
KW
AY
S
IG
N
AL
EA
G
LE
M
O U
N
TA
IN
, U
T
IF25608.00
JUNE, 2026
TPB
RWD
C-122
GRADING PLAN
9 21
BI
D
S
ET
GENERAL SHEET NOTES
1. SEE SITE PLAN FOR ADDITIONAL INFORMATION.
LEGEND
PO
NY
EX
PR
ES
S P
AR
KW
AY
EA
ST
STAGECOACH RUN
TRAILHEAD ROAD
STONE CREEK WAY
N
ASPHALT PAVEMENT
(SEE EAGLE MTN. CONST. STD.
SECTION 15.60.020)
CONCRETE SIDEWALK/FLATWORK
STAMPED CONCRETE
(ASHLAR SLATE PATTERN STAMP)
3/4" WASHED ROCK MULCH,
3" THICK (TRICOLOR LIMESTONE)
NATIVE SEED MIX PER EAGLE
MOUNTAIN CITY STANDARDS
III PC
14+00
15+00
16+00
17+00
52+00
53+00
54+00
55+00
56+00
SD
SD
SD
SD
4875.68
TA/MATCH EX.
-2 .1
0%
4875.75
TA/MATCH EX.
4875.28
TA/MATCH EX.
4876.25
TA/MATCH EX.
4875.12
TA/MATCH EX.
4876.00
TA/MATCH EX.
4875.80
TA/MATCH EX.
4876.47
TA/MATCH EX.
4876.78
TBC
4876.53
TBC
-2 .6
0%
-2 .6
0%
-2 .6
0%
-4 .1
3%
-4.
-2.95%
-2.01% -6.02%
-1.98%
-4.38%
-1.78%
-2.23%
-2.31%
-2.02%
-2 .0
0%
-2.02%
-2.00%
4876.14
TA
4876.07
TA
4875.68
TA
4875.80
TA
4876.21
TA
4876.13
TA
4876.04
TA
4876.05
TA
4876.22
TA
4876.22
TA
4876.63
TA
4876.63
TA
4876.56
TA
4876.55
TA
4875.77
TA/TC
4875.69
TA/TC
4875.82
TA/TC
4875.85
TA/TC
4875.90
TBC
4876.46
TBC/GB
4876.51
TBC
4876.60
TBC
4877.11
TBC/HP
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
8.
EM
C P on y
Ex p
Tr ai lh ea d
Si gn al D ec -2
5\
- C
AD
\8
Sh ee ts
\2
-C
-1
.d w g
- P
LO
TT
ED
:T
BU
R
KE
TT
D
AT
E:
6/ 4/
:2
PM
SHEET TITLE
SCALE: 1" = 20'
TRAILHEAD ROAD WEST GRADING PLANA 0 20' 40'10'
W . C lu bh ou se
D riv e, St e.
A
Le hi
, U T 8
1.7
.72
PRELI
MINARY
NOT F
OR
CONSTRUCTIO
N
OF
TR
AI
LH
EA
D R
O
AD
P
O N
Y
EX
PR
ES
S
PA
R
KW
AY
S
IG
N
AL
EA
G
LE
M
O U
N
TA
IN
, U
T
IF25608.00
JUNE, 2026
TPB
RWD
C-123
GRADING PLAN
10 21
BI
D
S
ET
GENERAL SHEET NOTES
1. SEE SITE PLAN FOR ADDITIONAL INFORMATION.
LEGEND
PO
NY
EX
PR
ES
S P
AR
KW
AY
TRAILHEAD ROAD
EAGLE PARK ENTRY
N
ASPHALT PAVEMENT
(SEE EAGLE MTN. CONST. STD.
SECTION 15.60.020)
CONCRETE SIDEWALK/FLATWORK
STAMPED CONCRETE
(ASHLAR SLATE PATTERN STAMP)
3/4" WASHED ROCK MULCH,
3" THICK (TRICOLOR LIMESTONE)
NATIVE SEED MIX PER EAGLE
MOUNTAIN CITY STANDARDS
TBC/HP
X X
X X
X
15'
14'
18'
16'
TRAILHEAD RD
EAGLE PARK ENTRY
TRAILHEAD ROAD
STAGECOACH RUN
EA
ST
STONE CREEK WAY
PO
NY
EX
PR
ES
S P
AR
KW
AY
TALON WAY
:0
:0
E A
G
LE
M O
U N
TA
IN
C
IT
Y
16'
12'
12'
.5
5'
.5
16'
14'
12'
12'
12'
4'
4'
III
III PC
SD
SD
SD
SD
13.5'
14.5'
13.5'
25+00
26+00
18+00
19+00
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec ts \A ct iv e
\IF
8.
EM
C P on y
Ex p
Tr ai lh ea d
Si gn al D ec -2
5\
- C
AD
\8
Sh ee ts
\2
-C
-2
.d w g
- P
LO
TT
ED
:T
BU
R
KE
TT
D
AT
E:
6/ 4/
:2
PM
SHEET TITLE
SCALE: 1" = 40'
SIGNAGE & STRIPING PLANA 0 40' 80'20'
N
W . C lu bh ou se
D riv e, St e.
A
Le hi
, U T 8
1.7
.72
PRELI
MINARY
NOT F
OR
CONSTRUCTIO
N
OF
TR
AI
LH
EA
D R
O
AD
P
O N
Y
EX
PR
ES
S
PA
R
KW
AY
S
IG
N
AL
EA
G
LE
M
O U
N
TA
IN
, U
T
IF25608.00
JUNE, 2026
TPB
RWD
C-201
SIGNAGE &
STRIPING
11 21
BI
D
S
ET
NOTES & ABBREVIATIONS
1. REFER TO APWA AND UTAH MUTCD FOR
SIGN PLACEMENT AND PAVEMENT
MARKING DETAILS.
2. ALL SIGNS AND BASES SHALL MEET APWA
STANDARDS.
SWL SOLID WHITE LINE
BLA BIKE LANE & ARROW
BWL BROKEN WHITE LINE
DWL LANE DROP WHITE LINE
BLB BIKE LANE BARRIER
LMS LANE MERGE SYMBOL
LTS LEFT TURN SYMBOL
MSG PAVEMENT MESSAGE/LETTERING
RTS RIGHT TURN SYMBOL
S&BYL SOLID AND BROKEN YELLOW LINE
DYL DOUBLE YELLOW LINE
SB STOP BAR
CW CROSSWALK
SYL SINGLE YELLOW LINE
N PROPOSED SIGN
R RELOCATE EXISTING SIGN
X REMOVE AND SALVAGE EXISTING
SIGN
U EXISTING SIGN TO REMAIN
SLP SLIP BASE PER UDOT STANDARDS
R3-7R (N) (30"X30")
R4-7 & OM3-L (N,SLP)
(24"X30" & 12"X36")
R4-7 & OM3-L (X)
R4-7 & OM3-L (X)
R2-1 (U)
R1-2 & R3-2 (X)
R1-2 & R3-2 (X)
R1-2 (R)
R1-2 & D3-1 (R)
R1-2 (X)
R1-2 (X)
CUSTOM
R2-1 (U)
R1-1 & D3-1 (U)
CUSTOM
"NEIGHBORHOOD WATCH" (X)
R1-1 & (2) D3-1 (X)
W11-2 & W16-7P
W/ RRFB (X)
W11-2 & W16-7P
W/ RRFB (X)
R1-1 & D3-1 (X)
10'X24" CW @
4' O.C. (TYP.)
R4-7 & OM3-L (N,SLP)
(24"X30" & 12"X36")
R4-7 & OM3-L (N,SLP)
(24"X30" & 12"X36")
R4-7 & OM3-L (N,SLP)
(24"X30" & 12"X36")
R4-7 & OM3-L (N,SLP)
(24"X30" & 12"X36")
R4-7 & OM3-L (N,SLP)
(24"X30" & 12"X36")
R4-7 & OM3-L (N,SLP)
(24"X30" & 12"X36")
R6-4B (N,SLP)
(60"X24")
D1 (N,SLP)
(12"X60")
D1 (N,SLP)
(12"X60")
D1 (N,SLP)
(12"X60")
W11-2 & W16-7P (N) (30"X30" & 24"X12")
W11-2 & W16-7P (N) (30"X30" & 24"X12")
W11-2 & W16-7P (N) (30"X30" & 24"X12")
W11-2 & W16-7P (N) (30"X30" & 24"X12")
W11-2 & W16-7P (N) (30"X30" & 24"X12")
W11-2 & W16-7P (N) (30"X30" & 24"X12")
R1-2 (N) (30"X30")R1-2 (N)
(30"X30")
R1-2 (N) (30"X30")
(4) R6-1R (N) (36"X12")
R1-1 & D3-1 (N) (30"X30" & 36"X12")
YIELD LINE PER UDOT
STD. DWG. NO. ST 1 (TYP.)
8" BWL (TYP.)
4" SWL
(TYP.)
4" SYL
(TYP.)
8" SWL
(TYP.)
12" SB
12" SWL
4" DYL
(TYP.)
8" DWL
8" DWL (TYP.)
RTS (TYP.)
LTS (TYP.)
R4-7 & OM3-L (N,SLP)
(24"X30" & 12"X36")
R4-7 & OM3-L (N,SLP)
(24"X30" & 12"X36")
SCALE: 1" = 40'
MID-BLOCK CROSSING DETAILB
PO
NY
EX
PR
ES
S
PA
RK
W
AY
SCALE: 1" = 40'
MID-BLOCK CROSSING DETAILB
12" SWL
(TYP.)
24" SB
(TYP.)
12" SB
(TYP.)
8" SWL
(TYP.)
RTS (TYP.)
RTS (TYP.)
8" SWL (TYP.)
W11-2 & W16-7P
W/ RRFB (X)
W11-2 & W16-7P
W/ RRFB (X)
YIELD
STOP
ONE WAY
STAGECOACH RUN
SPEED
LIMIT
YIELD
YIELD
TRAILHEAD ROAD
EAGLE PARK ENTRY
YIELD STOP
PONY EXPRESS PKWY
YIELD
YIELD
TRAILHEAD ROAD
RIGHT LANE
MUST
TURN RIGHT
YIELD
STOP
EAGLE PARK ENTRY
PONY EXPRESS PKWY
TRAILHEAD ROAD
TRAILHEAD ROAD
YIELD
YIELD
8" DWL
(TYP.)
4" SYL (TYP.) STOP
RTS (TYP.)
MATCHLINE - STA. 17+50
SEE LEFT
MATCHLINE - STA. 17+50
SEE RIGHT
STA. 28+45
W11-2 & W16-9P
W/ FLASHERS (X)
AHEAD
STA. 22+64
W11-2 & W16-9P
W/ FLASHERS (X)AHEAD
STA. 19+57
W11-2 & W16-9P
W/ FLASHERS (X) AHEAD
W11-2 & W16-9P
W/ FLASHERS (X)
AHEAD
37:386:0001
UTAH COMMUNITY FEDERAL
CREDIT UNION
4314 N PONY EXPRESS PKWY
59:044:0152
EAGLE MOUNTAIN PROPERTIES
COMMUNITIES MASTER ASSOCIATION INC.
1645 E STAGECOACH RUN
37:386:0003
DISTRICT AT EAGLE
MOUNTAIN TOWN CENTER
4272 N PONY EXPRESS PKWY
37:386:0002
DISTRICT AT EAGLE
MOUNTAIN TOWN CENTER
1634 E STAGECOACH RUN
53:541:0067
COMMON AREA
53:541:0067
COMMON AREA
59:044:0028
EAGLE MOUNTAIN CITY
67:144:0202
EM COMMERCIAL
DEVELOPMENT LLC
4315 N PONY EXPRESS PKWY67:182:0001
EAGLE MOUNTAIN MEDICAL
PARTNERS LLC
4317 N PONY EXPRESS PKWY
67:144:0205
TMG REAL ESTATE LLC
1495 E RAVEN WAY
38:257:0081
LABONDE, FLORENT DANIEL (ET AL)
4402 N EAGLE PARK ENTRY
38:257:0082
JACOBS, SANDRA MACDOUGALL
1496 E OSPREY WY
38:257:0104
TOWN OF EAGLE MOUNTAIN
38:257:0080
LOPEZ, OSCAR ESPINOZA (ET AL)
4406 N KESTREL WY
4" SWL
(TYP.)
4" SWL
(TYP.)
4" DYL
(TYP.)
8" DWL
8" DWL
R6-4B (N,SLP)
(60"X24")
R3-4P & CUSTOM (N,SLP)
(24"X24" & 24"X12")
W4-2 (N) (36"X36")
2.
3.
8.98 6.04
1.
3.
1.63 20.74
8.98
1.63
2.
.0
24.00
1.50" Radius, 0.63" Border, 0.38" Indent, Black on White;
"USE", C;
"ROUNDABOUT", C 80% spacing;
USE ROUNDABOUT SIGN DETAILA
3.
3.14 9.8 3 10.92
2.
5.91 18.18
2.
12.33 5.34
4.62 20.76
11 8
3.14
5.91
12.33
4.62
3.
RS10-21ex LEFT TURN YIELD ON FLASHING Yellow Arrow Symbol Sign;
1.88" Radius, 0.75" Border, 0.50" Indent, Black on, White;
"LEFT TURN", C; "YIELD", C; "ON", C;
"FLASHING", C; Rounded Rectangle 4.00" Radius;
MAST ARM MOUNTED SIGN SCHEDULE
POLE I.D. MESSAGE
MOUNT TYPE
(SEE UDOT STD DWG SL 7 )
REQ'D MOUNTING HARDWARE
ARM CLAMP ONLY
(120" CABLE)
GUSSETED TUBE ONLY
(96" LENGTH) SIGN CLAMP
P1 Pony Express Pkwy OPTION C 1 1 6
P1
NO U-TURN
(R3-4) OPTION A N / A N / A N / A
P1
LEFT TURN YIELD
ON FLASHING ← OPTION A N / A N / A N / A
P3 Trailhead Rd OPTION A N / A N / A N / A
P3
LEFT TURN YIELD
ON FLASHING ← OPTION A N / A N / A N / A
P3 NO TURN ON RED ARROW OPTION A N / A N / A N / A
P5 Pony Express Pkwy OPTION C 1 1 6
P5
LEFT TURN YIELD
ON FLASHING ← OPTION A N / A N / A N / A
P5
RIGHT TURN ONLY
(R3-5) OPTION C N / A N / A N / A
P6 Trailhead Rd OPTION A N / A N / A N / A
P6
LEFT TURN YIELD
ON FLASHING ← OPTION A N / A N / A N / A
3.
.0
3.70 23.13 8.00 37.09 8.00 24.38 3.70
5.
108.00
1.50" Radius, 0.50" Border, White on Green;
"Pony Express Pkwy", B 80% spacing;
4.
.0
1.00
10.00 1.00
4.
.0
12.00
Eagle Mountain Logo;
1.50" Radius, No border, White on White;
120.00
DS3-3 Single Street Name Sign Mast Arm Connection;
O
4.
.0
1.00 10.00
1.00
4.
.0
12.00
Eagle Mountain Logo;
1.50" Radius, No border, White on White;
4.
.0
3.71 56.09 8.00 12.49 3.71
4.
84.00
1.50" Radius, 0.50" Border, White on Green;
"TrailheadRd", C;
96.00
DS3-3 Single Street Name Sign Mast Arm Connection;
O
5.
4.
11.78 6.44
3.
4.
8.44
3.
4.
5.03
3.
4.
11.78
5.
.0
1.88" Radius, 0.75" Border, 0.50" Indent, Black on White;
"NO", D; "TURN", D;
"ON RED", D; "ARROW", D;
13.12 8.44
6.44 9.50 5.03 4 00
18.22 5.895.89
30.00
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
R
EV
IS
IO
N S
R
EU
SE
O
F D
R A
W
IN
G S
TH
IS
D O
C U
M
EN
T
AN
D T
H E
ID
EA
S H
ER
EI
N A
R E
TH
E
PR
O
PE
R
TY
O
F C
IV
IL
S C
IE
N
C E, IN
C
. A N
D
IS
N O
T
TO
B E
R
EP
R O
D U
C
ED
, M O
D
IF
IE
D
O R
U
SE
D
IN
W H
O
LE
O R
IN
PA
R T, F O
R A
N Y
O
TH
ER
P
R O
JE
C
T O
R E
XT
EN
SI
O
N O
F
TH
IS
P
R O
JE
C
T
EX
C
EP
T
BY
W R
IT
TE
N A
U
TH
O R
IZ
AT
IO
N
O F
C
IV
IL
S
C
IE
N C
E, IN
C
PROJECT NO:
DATE:
DESIGN BY:
CHECKED BY:
FI
LE
N
AM
E:
L:
\U ta h\ Pr oj ec…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .