2-19-20 COS & PUB Janitorial_Consolidated SOW - Approved.pdf

PDF 703 KB Posted

Attached to
Denver, CO - Janitorial Services Federal contract opportunity
Solicitation number
697DCK-20-R-00117
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This consolidated statement of work outlines janitorial services requirements at six Federal Aviation Administration locations in Colorado. Services include emptying wastebaskets, vacuuming carpets, mopping floors, cleaning restrooms, washing windows, dusting surfaces, and other janitorial tasks. The locations are the Colorado Springs and Pueblo air traffic control towers, Pueblo work center, Centennial and Arapahoe air traffic control towers, and Denver air route traffic control center. Offerors must submit bids by March 30, 2020 and include quality control plans covering all scope of work aspects. The contract will be awarded to one or more contractors providing services five to six days a week, excluding holidays, at the various locations.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSOLIDATED

STATEMENT OF

WORK FOR

Services at Multiple District Facilities

1. SCOPE: This document outlines the requirements for janitorial service at Federal Aviation

Administration (FAA) buildings and offices in the following locations:

1. Colorado Springs Air Traffic Control Tower

460 Kincheloe Loop A

Peterson Air Force Base

Colorado Springs, CO 80914

2. Pueblo Air Traffic Control Tower

31385 Bryan Circle

Pueblo, CO 81001

3. Pueblo Work Center

31201 Bryan Circle Suite 110

**Facilities may be added or removed upon mutual agreement of the Government and Contractor.

2. GENERAL INFORMATION

Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. A draft Quality Control Plan will be provided with the offer and once selected for award, the contractor will provide the final plan within 30 days after award. After acceptance of the quality control plan, the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system. The plan shall include, but not be limited to:

(a) A work scheduling system, based on the services indicated in the task and frequency charts for cleaning and the indicated time frames shown in the remarks column. The schedule shall show, by building and area, the day and shift when tasks will be accomplished. The contractor shall comply with the submitted schedules as approved by the Contracting Officer/COR.

(b) An inspections system, covering all the services listed in the Scope of Work and Frequency

Schedule must specify the areas to be inspected on either a schedule or unscheduled basis, how often inspections will be accomplished, and the title of the individual(s) who will perform the inspection.

(c) The methods used for identifying and preventing deficiencies in the quality of services performed before the level of performance becomes unacceptable.

(d) On-site records of all inspections conducted by the contractor, and necessary corrective actions taken, shall be made available to the government during the term of the contract.

Interference with Government Business: The Contractor shall schedule and arrange work so as to cause the least interference with the normal occurrence of Government business and mission. In those cases where some interference may be essentially unavoidable, the Contractor shall be responsible to make every effort to minimize the impact of the interference, inconvenience, customer discomfort, etc.

Protection of Government Property: During execution of the work, the Contractor shall take special care to protect Government property including furniture, walls, baseboards, and other surfaces from materials not intended. Accidental splashes shall be removed immediately. The Contractor shall return areas damaged as a result of work under this contract to their original condition, to include painting, refinishing, or replacement, if necessary.

Safety and Fire Prevention: The Contractor shall be responsible for instructing their employees in appropriate safety measures. Housekeeping employees must not place mops, brooms, machines and other equipment in traffic lanes or other locations in such a manner as to create safety hazards.

Appropriate, neat appearing, well-kept signs shall be provided by the Contractor to indicate, “Danger

Hazardous Floors, Walk Left or Walk Right”, as applicable, and approved by the COR prior to use.

Such signs shall be displayed at all times in all areas where cleaning operations are in progress that necessitate use of any equipment or supplies such as buckets, wires, ladders, water, wax, etc., which may impose a traffic obstruction or personnel hazard. Contractor's employees will be required to interrupt their work to allow passage of personnel, equipment, or carts. When cleaning of a public traffic area (i.e., lobbies or corridors) results in a temporary hazard of wet/slippery floors, housekeeping personnel will use parallel wet mopping or cleaning procedures.

Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the

Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

(a) Performance Evaluation Meetings: The project manager or company representative shall meet with the

Quality Assurance Employee (QAE)/COR weekly during the first month of the contract. Meetings will be held as often as necessary thereafter, as determined by the QAE/COR, and whenever a Contract

Discrepancy Report is issued. A mutual effort will be made to resolve all problems identified and written minutes of these meetings will be signed by the Contractor's project manager and QAE/COR.

Should the contractor not concur with the decisions in the minutes, the contractor shall state areas of non-concurrence to the Contracting Officer in writing.

(b) Withholding of Payment for Non-Performance: The Government reserves the right to withhold not more than I 0% of the contractors monthly invoice for services not received. The contractor shall be notified in writing by the Contracting Officer prior to any withholding of payment. The contractor will be given 24 hours to correct the deficiency. If the deficiency is not corrected within that timeframe the amount equal to the non- performance of work shall be deducted from the contractor’s monthly invoice.

Recognized Holidays: The contractor will BE required to perform services on some of these

Holidays:

New Year’s Day Labor Day

Martin Luther King Jr.’s Birthday Columbus Day

President’s Day Veteran’s Day

Memorial Day Thanksgiving Day

Independence Day Christmas Day

3. GOVERNMENT FURNISHED ITEMS AND SERVICES

Facilities: The Government will furnish or make available to the Contractor the facilities described in herein. The Contractor will be responsible and accountable for such facilities accepted for use and shall take adequate precautions to prevent fire hazards, odors, and vermin. Custodial services for Government furnished facilities will be provided by the Contractor. The Contractor will obtain written approval from the Contracting Officer prior to making any modifications or alterations to the facilities. Any such modifications or alterations approved by the Government will be made at the expense of the Contractor. At the completion of the contract, all facilities will be returned to the Government in the same condition as received, except for reasonable wear and tear. The

Contractor will be held responsible for the cost of any repairs caused by negligence or abuse on his/her part, or on the part of his/her employees.

Utilities: The Government will furnish utility services at existing outlets, for use in those facilities provided by the Government and as may be required for the work to be performed under the contract: electricity, steam, natural gas, fresh water, sewage service, and refuse collection (from existing collection points). Information concerning the location of existing outlets may be obtained from the Contracting Officer Representative. The Contractor will provide and maintain, at his/her expense, the necessary service lines from existing Government outlets to the site of work.

The Contractor will be responsible for instructing employees in utilities conservation practices.

The Contractor will be responsible for conserving utilities, which shall include, but not necessarily be limited to:

Lights shall be used only in areas where and at the time when work is actually being performed unless otherwise directed by the COR.

Mechanical equipment controls for heating, ventilation and contract employees will not adjust air conditioning systems.

Water faucets or valves will be turned off after the required usage has been accomplished. To conserve water, only the minimum quantity of water needed for the required usage will be expended.

Any/all hazardous conditions and items in need of repair (flickering or non-operating lights, leaky faucets, toilet stoppage, etc.) shall be reported to COR or on duty personnel at the time of discovery.

Key Control: The contractor shall establish and implement methods of ensuring that all keys issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons, and shall maintain records of authorized persons responsible for keys. No keys issued the contractor by the government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the quality control plan. Such procedures shall include turn-in of any issued.

1) The contractor shall report the occurrences of a lost or duplicated key immediately to the

Contracting Officer (CO), Contract Administrator, and COR.

2) In the event keys, other than master keys, are lost or duplicated, the government will replace the affected lock or locks or perform re- keying. The total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys from that system will be replaced by the government and the cost deducted from the monthly payment due.

3) The contractor shall prohibit the use of keys issued by the government by any persons other than the contractor’s employees to permit entrance of persons other than personnel authorized entrance by the Contracting Officer (CO).

Janitorial Closets: Janitorial closets may be assigned, if available, to the contractor by the

Contracting Officer’s Representative for the storage of bulk supplies inside the building. No other supplies or equipment may be stored on site. The Government will not be responsible for loss and/or damage to contractor’s stored supplies, materials, equipment, or other personal belongings caused by fire, theft, accident, or otherwise. Failure to keep these facilities in a clean and orderly condition may result in the withdrawal of the use of such facilities.

Physical Security: The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, equipment and materials shall be secured.

4. CONTRACTOR PERSONNEL:

Project Manager:

a. The Contractor shall provide a Project Manager/Supervisor who shall be responsible for the performance of the work. The name of this person and an alternate(s), who shall act for the contractor when the manager is absent, shall be designated in writing to the Contracting Officer

(CO) prior to contract start date. The manager and assistant manager shall be knowledgeable and in complete control of the contract office files and records.

1) The project manager shall have full authority to act for the contractor on all matters relating to daily functions of the contract.

2) The project manager or alternate shall be available during normal duty hours to meet with COR to discuss immediate problems. The project manager or alternate shall respond within 2 hours after notification. The Contractor shall provide a telephone number of the project manager.

3) The project manager shall be able to clearly read, write, speak and understand the English language.

Contractor Employees:

b. Within 24 hours after contract award, the Contractor shall submit to the COR, a list of names of his/her employees who will be working at this facility and required completed security clearance forms. List shall include a supervisor’s name appointed by the Contractor. Thereafter, the

Contractor shall notify the COR of any additions and terminations with 24 hours of such action.

1) The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest.

2) Contractor employees shall not disturb papers on desks, or open desk drawers or cabinets. No boxes shall be removed unless clearly marked “TRASH”.

3) Open safes shall be reported to the Contracting Officer’s Representative (COR).

Security Requirements:

c. All personnel entering or working on the facility must submit to drug screening. The Contractor is required to comply with all security regulations and directives as identified here in and other security requirements as shown elsewhere in this contract. See also section 8, Special Instructions.

1) Employees without properly executed forms will not be allowed to work at the designated Federal

Aviation Administration facilities.

2) Contractor personnel are not authorized access to any area where classified information is used, stored, or processed. If visual, aural, or physical access to classified material is made, even inadvertently, by contractor personnel, they are required to be debriefed by the control point manager.

5. CONTRACTOR FURNISHED ITEMS AND RESPONSIBLITIES

The Contractor will furnish all materials, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this Statement of Work.

a. The Contractor must furnish all supplies, including bathroom supplies, waste bin liners, toilet tissue, hand soap, hand sanitizer, paper towels, dishwashing powder or liquid, deodorizers, disinfectants, dish soap, dinner napkins, hand towels, and hand soap for the break room, in sufficient quantities necessary to meet the requirements of this contract and walk-off mats. The

Contractor is responsible for placing these items in their normal place of use. NOTE: ALL toilet tissue supplied under this contract must be no less than 2-ply. There will be a sufficient stock of supplies such as toilet tissue and paper towels to ensure the facilities does not run out, especially over a weekend or Holiday.

b. The Contractor must furnish all tools, equipment, and janitorial supplies, including cleaning compounds, soap, non-slip buffers, power industrial vacuum cleaners, buckets, polishing compounds, flashlight, disinfectants, shampoos, steel wool, mop buckets with ringer and casters, degreasers, wiping rags, lint free glass cleaning rags, glass cleaning products, rubber gloves, detergents, sponges, squeegees, of acceptable commercial grade and quality, and in sufficient quantities necessary to meet the requirements of this contract. Contractor-provided tools (i.e. vacuum cleaner, buffing machines etc.) must be commercial grade and must not generate excessive noise that disrupts the work in progress. Vacuum bags must be replaced on a weekly basis or sooner if needed. The Contractor must use cleaning agents of synthetic detergent that are odor counteracting and have germicide properties.

c. All power equipment and attachments, including power cable and extension cords, must be free from any defects. The Contractor must use only the FAA furnished power outlets designated by the COR or CO.

d. No contractor furnished or owned commodity must be kept on FAA owned or leased space or property without approval in writing by the COR or CO. The Contractor must keep pilfer-able items under lock and key at all times and must provide the COR with a key in the event of an emergency.

e. The Contractor will provide the COR and Facility a binder with the complete list of

Material Safety Data Sheets (MSDS) for ALL CHEMICALS being utilized to sanitize and clean the facility. The Contractor will also ensure that this list is updated whenever there are Chemical / Product changes.

6. CLEANING SERVICES:

Performance requirements for satisfactory performance

a. Furniture or other equipment (including waste bins) moved while performing cleaning services must be returned to their original position.

b. Sweeping/Dust Mopping. All areas not having carpet (including floor, hallways, stairways and elevators) or not specified elsewhere as having special flooring, shall receive regular floor maintenance. Floor maintenance includes sweeping, dust mopping, damp mopping, dry buffing, spray buffing, stripping and waxing as required, to achieve a uniform glossy appearance and be free of scuff marks, heel marks, streaks, detergent residue and other stains or discoloring. All floor maintenance solutions shall be removed from baseboards, walls, furniture, trash receptacles, etc. Chairs, desks, trash receptacles, and easily moveable items shall be tilted or moved to perform floor maintenance underneath. All moved items shall be returned to their proper position when all operations have been completed. Wet floors shall be identified with appropriate signs for employee safety.

c. Concrete/quarry tile, terrazzo, metal, wood, and resilient flooring must be swept or dust mopped to remove all loose dirt, dust, and debris.

d. Vacuuming Carpets and Rugs. Carpeted areas, rugs, and mats must be vacuumed free of all loose soil and debris.

e. Shampooing Carpets and Rugs. Carpets will be shampooed on a call out basis not to exceed

2 X times per contract year. Vendor will provide these services within 15 days upon mutually approved schedule with site representative for location.

f. Emptying Waste Bins. All waste bins must be emptied and plastic liners replaced. Any plastic liner with food wastes or that is soiled or leaking must be replaced with a new plastic liner.

Waste bins must be washed inside and outside utilizing a disinfectant as needed to remain free of odors. After washing, bins must be wiped dry and new plastic liners installed. All ashtrays and ash receptacles must be emptied and cleaned free of tobacco residue. Boxes, cans, bottles, and other items placed adjacent to waste bins and marked "TRASH" must also be removed and disposed of. All waste collected must be disposed of in the nearest outside trash collection point. Waste that falls on the floor and outside grounds during the waste removal must be picked up and disposed of by the Contractor. including cigarette butt receptacles, within the building and outside the building

g. Dusting/Cleaning. All furniture, partitions, radiators, equipment, hand railings in stairways, grills, horizontal ledges, and sills must be dusted. Walls, doors, and partitions must be wiped clean (including glass in partitions and doors) to a height of 7’0" above the floor level.

Electronic equipment must be dusted with an industry standard approved dusting tool. If present, chalk and marker trays, and erasers must be cleaned. The contractor must verify with the COR that the chalkboards and dry erase boards can be cleaned before cleaning. All dry erase boards must be cleaned with a cleaning solution designed for dry erase boards.

Corridor, lobby, and entrance walls and doors must be cleaned. Miscellaneous hardware and bright metalwork must be wiped clean. Drinking fountains/dispensers must be cleaned and disinfected. All surfaces of drinking fountains/dispensers must be free of stains, smudges, and scale.

h. Cleaning Walk-off Mats. Each time floors are swept/dust mopped or vacuumed, walk-off mats in that area must be cleaned. Soil and moisture underneath mats must be removed and the floor must be cleaned as appropriate along with the rest of the floor. The mats must be returned to their original locations afterwards. The Contractor must report, in writing to the Contracting

Officer (CO), all walk- off mats worn out to the point of being ineffective.

i. Damp Mopping. Prior to damp mopping, floors must be swept/dust mopped. Floors must be damp mopped with an industry standards cleaning solution to remove dirt, streaks, smears, and stains.

j. Spray Cleaning and Buffing. Prior to spray cleaning and buffing, floors must be damp mopped as specified above. Floors must be spray cleaned and buffed to remove traffic marks, heavy soil, etc. The material used for spray cleaning and buffing must contain a blend of detergents and polymers to emulsify surface soil and repair traffic areas. If loose residue is produced by buffing, it must be removed in a manner that must leave the floor clean without destroying the high gloss produced by buffing. When completed, a spray cleaned and buffed floor must have a uniform, high-gloss finish, free of scuff and heel marks. The floor finish must be uniform from wall to wall, including corners.

k. Waxing and Buffing. In the event that spray cleaning and buffing is not sufficient to maintain a uniform high-gloss finish, floors must be completely waxed and buffed. The Contractor must use a liquid wax system containing not less than 18% solids. The floors must be damp mopped as specified above immediately prior to application of wax. Floors must be buffed, if required, to a uniform gloss finish free from dirt, traffic marks, and stains. Do not use wax on rubber tiles or sealed concrete surfaces.

l. Restrooms. Restroom fixtures, including water closets, urinals, lavatories, and sinks must be washed inside and outside utilizing a disinfectant, and must be free of stains and odors. Pumice sticks and toilet bowl cleaner must be used to remove stains from urinals and water closets.

Brushes, sponges, and cloths that have been used to clean any other part of the restroom

(including water closets, urinals, walls, floors, and partitions) must not be used to clean lavatories or sinks. Floors must be swept/dust mopped free of dirt and mopped with a disinfectant.

Wainscoting, partitions, walls, and doors must be cleaned free of dirt, stains, and graffiti. Mirrors must be cleaned and polished. All metal fixtures and hardware must be cleaned. Waste bins must be emptied, disinfected, and plastic liners replaced. If present, shower stall rooms and locker/dressing rooms must be considered part of the restrooms, and cleaned accordingly.

Restroom supply dispensers (paper towels, toilet tissue, soap, and hand sanitizer) must be replenished. The Contractor must stock restrooms with sufficient supplies to ensure that the supplies must last until the next scheduled service. If dispensers become empty before the next scheduled servicing, the Contractor must replenish them at no additional cost to the Government.

m. Stripping and Waxing Floors. Resilient flooring must be swept/dust mopped and stripped to remove all built-up wax and imbedded dirt prior to waxing. After application of wax, areas must be buffed (if required) sufficiently for maximum gloss and uniform sheen from wall to wall, including corners. The waxed floor must present a clean appearance free from scuffmarks or dirt smears. Furniture or other equipment moved during floor stripping and waxing must be returned to their original positions.

n. Shampooing Carpets and Rugs. Prior to shampooing, carpets and rugs must be vacuumed free of all loose soil and debris. Carpets and rugs must be shampooed free of streaks, stains, and spots, and must have a bright uniform color. Shampooing must be done by the water extraction method. After drying, furniture or other equipment moved for the shampooing must be returned to their original positions.

o. Glass & Mini Blind Cleaning. Includes all glass partitions, interior and exterior glass doors, display cases, directory boards, tower windows (inside and out curtain wall glass and cab glass), mirrors and adjacent trim. Glass windows shall be washed inside and outside using such instruments as to assure the cleaning is thorough. Windows including frames, casings and sills, shall be free of all traces of film, dirt, smudges, water deposits and other foreign matter.

p. High Cleaning. The contractor shall remove all dust, lint, litter, and soil from all surfaces above 7’

0” from the floor surface with the frequency indicated in Technical Exhibits. This includes but is not limited to tops of lockers and cabinets, windows and window ledges, exit signs, clocks, overhead piping, ducts, intake/exhaust louvers, intake/exhaust fans, light fixtures, Venetian blinds, wall fabric coverings, etc. Cleaning of sensitive or operational equipment shall be coordinated with the COR.

q. Common Dining Areas. The contractor shall clean the interior and exterior of microwave ovens, refrigerators, wipe down tables and chairs, damp mop, and wax floors located in common dining areas, break areas, and vending machine areas to remove handprints, soil, and food particles. The drain area and exterior area of ice/water dispenser shall be cleaned.

r. PERFORM SPOT CLEANING: The contractor shall perform spot cleaning on carpets by using an approved carpet spot remover. The contractor shall also perform spot cleaning by removing smudges, fingerprints, marks, steaks, etc., from washable surfaces of walls partitions, doors, drinking fountains and fixtures. The contractor shall use germicidal detergent in restroom, locker rooms, break areas, and drinking fountains. After spot cleaning by the contractor, the surface shall have a clean, uniform appearance, free of streaks, spots, and other evidence of removed soil.

s. Entrance Areas & Loading Docks: Outside entrances will be free of debris, leaves, and other trash.

Carpet-type entrance mats shall be vacuumed to remove soil, snow melt/de-icing chemicals, and grit and to restore resiliency of the carpet pile. Entrance mats shall be swept, vacuumed, or washed to remove soil, grit and snow melt/de-icing chemicals.

t. Deep Cleaning of Restrooms: All tiles and grout shall be cleaned/scoured free of dirt, smudges, swirls, streaks, stains, detergent residue, discoloration and scuff marks using TSP or equivalent type of cleaner. This will include the entire floor surface and corners. Tile floors shall be waxed/sealed. The sealer for tile shall be approved by the COR prior to use. All floor maintenance solutions shall be removed from baseboards, walls, furniture, trash receptacles, etc. Restroom walls shall be cleaned/scoured of all dirt, film, marks, scuffs and any other residue resistant to regular cleaning, using TSP or equivalent type of cleaner.

u. Deep Cleaning of Tower Cabs: Inspect quarterly with the COR to validate that annual deep cleaning is adequate. This may become a semi-annual task as deemed by the COR. Vacuum, wipe down, and dust entire area from top to bottom to thoroughly cleanse as per directed by COR. FAA technicians will complete moving of equipment (computers, displays, CRT’s, MDT’s, etc.)

7. SPECIAL PRECAUTIONS: FAA employees performing official duties during the time contract work is being conducted must occupy some areas. Therefore, the contractor must give special attention while conducting work in these areas. These areas contain critical and specialized power for the operation of equipment used by the FAA. At no time may the Contractor’s power-driven equipment be plugged into any electrical outlet used by FAA equipment or racks. Care must be exercised to prevent vacuum cleaners, buffers, mops, etc., from striking FAA electronics equipment and racks. The COR must assist the Contractor in working out the best and safest methods for the proper cleaning of these areas.

8. SPECIAL INSTRUCTIONS:

a. The Contractor must provide the COR with a monthly work schedule. The schedule must include work hours, employees involved, and any special services to be performed during the monthly cycle, I.E. buffing floors, etc. The schedule must be submitted to the COR every fourth Tuesday of the preceding month for it to be effective. The Contractor shall provide the COR with a signed and dated checklist documenting the completion of the various services. Any changes to the schedule require prior approval of the COR. Tasks must not be scheduled using the fiscal year as a basis

(October through September). Tasks must not be scheduled during the last week of the month, last month of the quarter, or the last month of the semi-annual period.

b. The Contractor must arrange for satisfactory supervision of the contract work. The contractor or his/her supervisors must be available at all times. The name of the supervisor must be submitted in writing through the COR to the CO. Where weekly services are required, such supervisor must meet with the COR once each week to inspect contract performance. Where services are performed no more than biweekly (every other week) or monthly, such meeting must be conducted once each month.

c. Prior to the commencement of the contract, the CO/COR and the Contractor must meet and review the total workload and working methods proposed by the Contractor. The Contractor must submit prior to the contract starting date an annual schedule of all periodic work by dates and areas. The Contractor must be required to submit a work report of the periodic jobs performed for comparison with the schedule requirements.

d. Employee Training -The Contractor will be responsible for training his/her employees on the following subjects:

Proper use and handling specified and approved detergents, supplies, and equipment.

Care and maintenance of Contractor and Government furnished property.

Familiarization with fire prevention and safety procedures. This will include fall protection if applicable for cleaning in high areas and proper use of ladders.

Familiarization with applicable FAA policies/regulations and their effect on housekeeping services.

Documentation of this training will be made available to the Contracting Officer and/or their

Representative upon request.

e. The Contractor must ensure each employee completes the appropriate security forms required by

FAA, Chad Painter Personnel Security Division, in order to conduct local background checks and appropriate national agency checks. If the background security checks reveal the employee does not meet FAA’s suitability standards, he/she must not be allowed to work at the FAA facility. Security must notify the CO prior to notifying the Contractor to remove the employee from the facility. The

Contractor must submit to the COR a list of all employees by name who are to work at this facility not later than ten (10) days after receipt of contract award. The Contractor must likewise notify the

COR in writing of any deletions or additions of employees performing under this contract immediately. The Contractor and his/her employees must be subject to all rules and regulations relative to entering and leaving the buildings and grounds for security purposes.

f. Badges-All employees shall wear FAA supplied security badges above the waist, on the front of the body, and on their outermost clothing at all times while on the premises. Upon termination of employment, security badges shall be turned in to the Contracting Officer’s Representative

g. The contractor is responsible for all government-furnished keys and access cards. The contractor must bear the cost of replacement keys and re-coring and all applicable locks if the keys and/or access cards become lost or destroyed.

9. SERVICES SPECIFIC TO EACH LOCATION.

Please Note: Facility-specific requirements contained in this section are in addition to all other requirements contained in the SOW, and to the extent that there are any inconsistencies, the facility specific requirements will take precedent.

1. Colorado Springs Air Traffic Control Tower

460 Kincheloe Loop A

Peterson Air Force Base

Colorado Springs, CO 80914

Hours of Operation:

The facility is in operation 24 hours per day, seven days a week, 365 days per year, including Federal holidays. The contractor shall perform janitorial services between the hours of 10:00 pm and 5:00 am, all work being complete by 5:00 am. No work will be performed outside those hours without written authorization from the Contracting Officer, with the exception of window cleaning and deep cleaning.

Times for appropriate window cleaning and deep cleaning will be coordinated with the COR.

1) Within five (5) calendar days after receipt of contract award, the contractor will submit to the

Contracting Officer’s Representative for approval, a complete schedule of his intended work, identifying both day and month work is scheduled to be accomplished.

2) Holidays observed by Government employees during the term of this contract are as follows: New

Year’s Day, Martin Luther King’s Birthday, President’s Day, Memorial Day, Fourth of July, Labor

Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day.

3) Any holiday as declared by the President shall also be observed. A skeleton crew of on- site FAA personnel will consist of essential safety related positions only on the holidays listed above.

Emergency Services:

On occasion, services may be required to support the 24-hour-per-day, 7 day-per-week operation of the described facilities. If such services are perceived to be a change requiring additional cost, the contractor shall notify the Contracting Officer and submit the supporting documentation with a request for equitable adjustment in accordance with the Changes-fixed Price Clause.

COS ATCT

JANITORIAL FREQUENCY SCHEDULE

ADMINISTRATIVE AREA – INCLUDES SUPERVISORY

OFFICES

ITEM # REQUIREMENT FREQUENCY

1 Empty Wastebaskets (replace liner if necessary) 5 days per week (M-F)

2 Vacuum carpet 5 days per week (M-F)

3 Shampoo or steam clean carpets 2 times per year

4 Dust all furniture 1 day per week (M-F)

5 Wash furniture/polish wooden areas 2 times per year

6 Wash windows inside and outside 1 time per month

7 Wash drinking fountains and surrounding wall area 5 days per week (M-F)

8 Dust ledges and other flat surfaces 1 day per week

9 Wash front glass entrance doors 1 day per week

10 Vacuum entrance area carpet/mat and lobby rug 5 days per week (M-F) or as needed

11 Spot clean woodwork, wall, and doors 1 time per month

12 Clean light fixtures 2 times between Sept-Mar, 1 time per week Apr-Aug

13 High cleaning 1 time per year

APPROACH/DEPARTURE CONTROL ROOM

ITEM # REQUIREMENT FREQUENCY

1 Empty wastebaskets (replace liner if necessary) 7 days per week

2 Wash wastebaskets 2 times per year unless plastic liners are used

3 Shampoo or steam clean carpets 2 times per year

4 Dust all furniture 1 day per week

5 Dust ledges and other flat surfaces 1 day per week

KITCHEN/BREAKROOM and ATCT LOCKER AREA

ITEM # REQUIREMENT FREQUENCY

1 Empty wastebaskets (replace liner if necessary) 7 days per week

2 Wash wastebaskets 2 times per year unless plastic liners are used

3 Vacuum carpet 7 days per week

4 Dust mop tuff-flex floors 7 days per week

5 Wet mop and machine buff tuff-flex floors 1 day per week

6 Clean kitchen sinks, counters, and dining tables 7 days per week

7 Clean microwave oven, interior and exterior 7 days per week

8 Clean refrigerator exterior 4 times per year

9 Dust ledges and other flat surfaces 1 time per week

10 Spot clean woodwork, walls, and door 1 time per week

11 Clean light fixtures 2 times between Sept-Mar and

1 time per week Apr-Aug

12 High Cleaning 1 time per year

EQUIPMENT ROOMS, HALLWAYS, STORAGE AREAS,

and MECHANICS WORKSHOP

1 Empty wastebaskets (replace liner if necessary) 5 days per week (M-F)

2 Dust mop tile floors 5 days per week (M-F)

3 Wet mop and machine buff waxed floors (including hallway) 1 day per week

4 Sweep floors 5 days per week

5 Strip, rewax, and machine polish floors 2 times per year

6 Dust all furniture 1 day per week

7 Dust ledges and other flat surfaces 1 time per week

8 Clean light fixtures (in hallway only) 2 times between Sept-Mar and 1 time per week Apr-Aug

9 High cleaning 1 time per year

TRAINING/CONFERENCE ROOMS AND

RECORDER/PLAYBACK ROOM (includes small conference room)

1 Empty wastebaskets (replace liner if necessary) 5 days per week (M-F)

2 Vacuum carpet 5 days per week (M-F)

3 Shampoo or steam clean carpets 2 times per year

4 Dust all furniture 1 day per week

5 Dust ledges and other flat surfaces 1 time per week

6 Clean light fixtures 2 times between Sept-Mar and

7 Clean microwave oven 5 times per week (M-F)

8 Clean windows inside and outside 1 time per month

RESTROOMS

ITEM # REQUIREMENT FREQUENCY

1 Empty waste baskets (replace liners) 7 days per week

2 Strip, rewax, and machine buff floors 2 times per year

3 Wash and clean restroom fixtures and floors 7 days per week

4 Check restroom dispensers, clean and refill as necessary 7 days per week

5 Wash restroom walls and doors 7 days per week

6 Clean all metal hardware and handrails 7 days per week

7 Dust ledges and other flat surfaces 1 time per week

8 Clean air vents 1 time per month

9 Clean light fixtures 2 times between Sept-Mar and

10 Deep Clean 1 time per year

FIRST, SEVENTH, and EIGHTH FLOOR

1 Empty wastebaskets (replace liner if necessary) 7 days per week

2 Empty and refill moth buckets 7 days per week (May-Aug)

3 Dust mop tile floors 7 days per week

4 Wet mop and machine buff waxed floors 1 time per month

5 Strip, rewax, and machine polish floors 2 times per year

6 Clean kitchen sinks, counters, and dining tables 7 days per week

7 Clean microwave oven 7 days per week

8 Dust all furniture 1 day per week

9 Wash furniture, polish wooden areas 2 times per year

10 Dust ledges and other flat surfaces 1 time per week

11 Spot clean woodwork, walls, and doors 1 time per year

12 Clean light fixtures 2 times between Sept-Mar and 1 time per week Apr-Aug

13 High cleaning 1 time per year

TOWER CAB

ITEM # REQUIREMENT FREQUENCY

1 Empty waste baskets (replace liner if necessary) 7 days per week

2 Vacuum carpet 7 days per week

3 Shampoo or steam clean carpets 4 times per year

4 Clean kitchen sink, counters, and dining tables 7 days per week

5 Wash windows inside and outside 2 times per month between Sept-

Mar and 2 times per week Apr-

Aug

6 Dust ledges and other flat surfaces 7 days per week

7 Clean tower cab shades 1 time per quarter Sept-Mar and

1 time per month Apr-Aug

8 Spot clean cab shades As required/necessary

9 Deep Clean 1 time per year

ELEVATOR

ITEM # REQUIREMENT FREQUENCY

1 Dust mop tile floors 7 days per week

2 Wet mop 1 time per week

3 Spot wash elevator doors/panels 2 times per month

TOWER STAIRWELL

ITEM # REQUIREMENT FREQUENCY

1 Sweep and wet mop stairways 1 time per week

2 Dust ledges and other flat surfaces 1 time per week

3 Clean handrails 1 time per week

ALL AREAS

1 Inspect and replace light bulbs As necessary

2. Pueblo Air Traffic Control Tower

31385 Bryan Circle

a. The Pueblo Air Traffic Control Tower (ATCT) consists of a total approximately 5700 square feet (sf) of space in hallways and stairs. The Work Center consists of approximately 1230 square feet of office floor space.

b. The ATCT has 6 levels, including the Ground and Cab levels. The first 3 levels contain approximately 1200 sf each. The 4th and 5th Levels each contain about 100 sf and 300 sf each respectively. The 6th floor of the ATCT cab has approximately 900 sf. The ATCT has a stairwell running from the Ground Level to the Cab Level.

c. Access for the Contractor, sub-contractors, employees, deliveries, etc., shall be coordinated with the on-site Resident Engineering Staff.

3. Pueblo Work Center

31201 Bryan Circle

HOURS SERVICE IS TO BE PEFORMED AT BOTH LOCATIONS (ATCT & W/C):

The facility areas will require service, per the attached schedule (below). Janitorial service is required five days a week (Monday through Friday (excluding holidays) – hours to be determined- in some areas and six days a week (excluding Sundays) in other areas – as per attached Frequency

Schedule. 6th day frequency requirement will be completed anytime between 3:00pm-10:00pm on the 6th day (Saturday). The schedule for window cleaning services shall be coordinated with the

Contracting Officer’s Representative.

** Please note that Holidays observed during the term of this contract are as follows: New Year’s Day, Fourth of July, Thanksgiving Day, and Christmas Day. If the holiday falls on a Saturday, it is observed on Friday. If the holiday falls on Sunday, it is observed on Monday. No work shall be performed on the holidays listed above. On Martin Luther King's Birthday, Presidents Day, Memorial Day, Labor

Day, Columbus Day and Veterans Day, 6th Day frequency schedule only needs to be completed.

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The following schedule outlines the Government’s plan for ensuring contract performance;

including maximum deductions which may be taken should deficiencies be found for the noted services. The Government shall, at its option, require corrective action or take a deduction from the monthly invoice. The contractor will be notified of any discrepancies found, and shall have an opportunity to respond to the deficiencies. The Government has the right to inspect services at any time. Any random inspection shall take into consideration the normally scheduled times and frequencies required for service performance. The Contractor is entitled to a joint monthly inspection each month. The Contractor shall coordinate with the Contracting Officer’s

Representative (COR) when a joint inspection is needed. The COR also may initiate a joint inspection, which will be coordinated with the Contractor Quality Control Representative or his/her designee.

Upon request the COR is entitled to review the results of the contractor’s quality control program and internal inspections.

REQUIRED

SERVICE

PERFORMANCE

STANDARD

ALLOWABLE

DEVIATION

METHOD OF

SURVEILLANCE

MAXIMUM

DEDUCTION

FOR

DEVIATION

Empty wastebaskets

Accomplish per specifications and frequency schedule none

Random

Sampling

6%

Clean entrance carpets/rugs/mats

Accomplish per

3%

Clean & Disinfect wastebaskets

Accomplish per

High cleaning Accomplish per

5%

Low cleaning Accomplish per

5%

Sweep floors, hallways, and stairs

Accomplish per

6%

Clean restroom fixtures and floors

Accomplish per

7%

Clean drinking fountains

Accomplish per

Clean light fixtures Accomplish per

Wash restroom walls and doors

Accomplish per

4%

Clean restrooms and refill dispensers

Accomplish per

9%

Floor maintenance Accomplish per

8%

Vacuum carpet Accomplish per

Shampoo/steam clean carpet

Accomplish per

Glass Cleaning Accomplish per

2%

Window Cleaning Accomplish per

Clean cab shades Accomplish per

Clean refrigerator Accomplish per

Clean microwave ovens

Accomplish per

Clean counters, sinks, fixtures, kitchen appliances

Accomplish per

File details come from the government source that posted it. Updated .