1j. Sheave Roller Cast Billet_Engineering Change Order_1 Sheet.pdf
PDF 2 MB Posted
- Attached to
- Heavy Weight Fairlead Beams - FA481926Q0002
- Solicitation number
- FA481926Q0002
About this file
This is an AFMC Form 3925 Engineering Order for a Sheave Casting component. The document is an Advance Engineering Change Order (AECO) against Air Force owned drawings, classified as an updated drawing. The engineering order pertains to drawing number 201018857, with CAGE code 98752, affecting the next higher assembly 201018858-10 used on BAK-12 AAS equipment. The drawing size is C, consisting of 1 of 1 sheet.
The primary change documented in this engineering order modifies material specifications at Location D4. The revision changes the casting material requirement from aluminum alloy A356-T6 sand cast per ASTM B26/B26M with Grade B or C per AMS 2175 to aluminum alloy A356-T6 sand cast per ASTM B26/B26M or billet 6061-T6, maintaining Grade B or C per AMS 2175 specifications. Both versions specify Class 1 casting inspection per AMS 2175. The distribution statement indicates this document contains material-related information requiring handling per DoD Instruction 5230.24. The form includes signature blocks for configuration management, materials engineer, checker, corrosion control, project engineer, engineering approval, and Air Force authentication and release, though specific names and approval dates are not fully populated in this version.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEERING ORDER
1. ENGINEERING ORDER NO.
ENGINEERING ORDERAFMC Form 3925, 20150402
2. RELEASE DATE:
PAGE 1 OF PAGES
3. DWG TITLE 4. DWG ODA CAGE CODE 5. DWG NO. 6. DOC TYPE
7. NEXT HIGHER ASSY 8. USED ON 9. OPR CAGE CODE 10. DWG SIZE 11. DWG SHEET(s) AFFECTED 12. LATEST DWG REV
13. TYPE OF ENGINEERING ORDER 14. REASONS FOR CHANGE
ADVANCE ENGINEERING CHANGE ORDER (AECO)
AGAINST AIR FORCE OWNED DRAWINGS
DEVIATION AUTHORIZED
CHANGE NOTICE ENGINEERING ORDER (CNEO)
AIR FORCE CHANGES BEING INCORPORATED
INFORMATION "NON-TECHNICAL"
ADVANCED ENGINEERING SUPPLEMENTAL ORDER (AESO)
AIR FORCE REQUIREMENTS AGAINST A VENDOR OWNED DRAWING
ERROR CORRECTION
DESIGN CHANGE
DRAWING CLARIFICATION
UPDATED DRAWING
CRITICAL SAFETY ITEM (CSI)
15. EO PREPARED BY
16. CONFIG MANAGEMENT
17. DWG CHANGED BY
18. MATERIALS ENGINEER
19. CHECKER 20. CORROSION CONTROL
21. PROJECT ENGINEER 22. HCI / HARDNESS
24. ENG APPROVAL 25. NDI
23. DISPOSITION OF SPARES
N/A REWORK SCRAP REPLACE
27. AF AUTHENTICATION 28. SYSTEM SAFETY
26. DOCUMENTS AFFECTED (TO/TCTO/SPEC/OTHER)
30. AF RELEASE
29. OTHER COMMENTS
32. DESCRIPTION OF APPROVED CHANGES/REMARKS
33. DISTRIBUTION STATEMENT: (REQUIRED PER DoDI 5230.24)
SIGNATURE OFFICE SYM / PHONE OFFICE SYM / PHONESIGNATURE
31.
AFMC Form 3925, 20150402
PAGE
OF
PAGES
13. TYPE OF ENGINEERING ORDER
14. REASONS FOR CHANGE
AGAINST AIR FORCE OWNED DRAWINGS
AIR FORCE CHANGES BEING INCORPORATED
"NON-TECHNICAL"
AIR FORCE REQUIREMENTS AGAINST A VENDOR OWNED DRAWING
23. DISPOSITION OF SPARES
SIGNATURE
OFFICE SYM / PHONE
OFFICE SYM / PHONE
SIGNATURE
31.
11.0.1.20130826.2.901444.899636
| TextField1: Sheave Casting |
| TextField1: 98752 |
| TextField1: 201018857 |
| TextField1: 201018858-10 |
| TextField1: BAK-12 AAS |
| TextField1: 98752 |
| TextField1: C |
| TextField1: 1 of 1 |
| TextField1: Location D4: |
WAS "MATERIAL SHALL BE ALUMINUM ALLOY A356-T6 SAND CASTED PER ASTM B26/B26M.
GRADE SHALL BE GRADE B OR C PER AMS 2175. CASTING INSPECTION SHALL BE CLASS 1 PER AMS 2175."
IS "CAST MATERIAL SHALL BE ALUMINUM ALLOY A356-T6 SAND CASTED PER ASTM B26/B26M OR BILLET 6061-T6.
GRADE SHALL BE GRADE B OR C PER AMS 2175. CASTING INSPECTION SHALL BE CLASS 1 PER AMS 2175. "
| TextField1: material |
| DateField1: |
| TextField2: |
| DropDownList1: |
| CheckBox1: 1 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CheckBox2: 0 |
| CheckBox2: 0 |
| CheckBox2: 0 |
| CheckBox2: 1 |
| CheckBox2: 0 |
| CheckBox2: 0 |
| CheckBox2: 0 |
| TextField3: (EDITABLE FIELD) |
| TextField3: (EDITABLE FIELD) |
| TextField3: (EDITABLE FIELD) |
| SignatureField1: |
| SignatureField2: |
| SignatureField3: |
| SignatureField4: |
| SignatureField5: |
| SignatureField6: |
| SignatureField7: |
| SignatureField8: |
| SignatureField9: |
| SignatureField10: |
| SignatureField11: |
| SignatureField12: |
| SignatureField13: |
| SignatureField14: |
File details come from the government source that posted it. Updated .