1d. 52-D-6907_Engineering Change Order_21 Sheets.pdf

PDF 8 MB Posted

Attached to
Heavy Weight Fairlead Beams - FA481926Q0002
Solicitation number
FA481926Q0002
Issued by

About this file

This is an Engineering Order (ECO 20100002) dated July 16, 2010, for modifications to the Arresting Gear Fairlead Beam 3-Sheaves (Drawing 52-D-6907), used on BAK-12 and MAAS arresting systems. The order addresses compliance with UFC 3-260-01 (May 2008 edition) and implements five primary design changes across all USAF fairlead beams per WRALC/ENGS Job #2010-01.

The required modifications include: increasing the top plate (Detail -2) thickness to 0.5 inches; adding and welding 12 gussets (Detail -19) between each tube-stake; drilling inspection holes in the top plate directly over anchor rod locations; beveling the edges of the center plate (Detail -4) that contact the top plate; and redesigning the hand hole cover assembly (Details -20 through -23). The engineering order provides detailed technical drawings for all affected components and includes a material support table specifying required quantities of ASTM A36 hot-rolled steel plate for Details -18 through -23. Additional drawings support manufacturing and clarity for Details -5, -6, -13, and various views. The document contains comprehensive dimensional specifications and welding requirements for implementation by contractors manufacturing these components.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING ORDER

j1 ENGINE:::f:t�!NG ORDER NC

�t_t)_� �

DATE. 20 I (1(1716 PAGE 1 OF 21 PAGES

5 NEXT ASSY

52-W-2295

AHRESI l:\G GEAR FAIHLEAD BEAM 3-SIIL\\ ES

USCD ON

BAK-12 AND MAAS (ARRESTIKG SYSTEMS)

3 CV\.'G C1\GE CODE

21-139

7 OPR Ct-.GE CODC.

98752

< DWG NO

52-D-6907

DV\.'G SIZE DV\C SliE.£T(S) lATEST DWG F�E.V LTH D 3 B

8 TYPE OF HiGINEERING OPDFR 9 REASONS FOR CHANGE 11 DOCUMENTS ;\FFECTEO (TOrTCTOISPEC/0/her) ------,f--,A-, �COR1�os10N cor-n Mor, I SYMBOL l DA TE

ADVANCE CHANGE cHR0P. C0PHtC_ll_O_I ____ _, N/ A

DR/1.Vv'lt�G (';I.ABirlC.A l'ION UPGATED GRA\\1riG 12 E:0 PREPARED.

ITC 2-

r'<Cl!'�()R1-t-t- 1,-,o-0-

1F,-. --------1 TO ADDRESS

SCRAP ·--·- PIWG Al 06-03 Rf.Pl.ACE

-./jNIA

20. DESCRIPTION OF CHANGES/REMARKS

C

,G PPR SYMSOL

; GREVC

�Duffie (���;

J

ECO TO ADDRESS THE FOLLOWING: 3-9.1.1 of UFC 3-260-01 (ref May 2008 edition) jDAr!:

120100716

DATE

20100716

15. NOi ---·- lSYMBCff

.16 { .C.J :.·;/ _

SYMBOL /� ;.p<..):'-"',-,,.,-i GRVE

,S oV\'o ttiANGrn ev rsvMso"i: -

16. CHANGE CHECKED BY SYMBOL

PER WRALC/ENGS JOB# 2010-01, ALL USAF FAIRLEAD BEAMS SHALL INCORPORATE THE FOLLOWING CHANGES:

A. THE FAIRLEAD BEAM TOP PLATE (DETAIL -2) THICKNESS SHALL BE INCREASED TO .5-INCHES, DAT!:

DATE

20100716

DATE

DATE

B. ADDITION OF AND WELDING OF GUSSETS (12 TOTAL), SEE DETAIL -19 WITHIN THIS ECO, BETWEEN EACH 'TUBE-STAKE' (SEE DETAIL -8 ON SHEET 3 <

OF 52-D-6907 DRAWING),

C. HOLES SHALL BE DRILLED IN DETAIL -2, AT LOCATIONS DIRECTLY OVER DETAIL -17 ONCE ASSEMBLED, TO ALLOW ANCHOR ROD INSPECTION

ONCE FIELDED,

D. BEVEL EDGES OF CENTER-PLATE (DETAIL -4) THAT CONTACT TOP PLATE (DETAIL -2), AND

E. REDEISGN OF HAND HOLE COVER ASSEMBLY (SEE DETAIL -20 THROUGH -23).

THE FOLLOWING PAGES OF THIS ECO ADDRESSES THE ABOVE REQUIREMENTS AS WELL AS PROVIDES:

i. DRAWINGS OF ALL NEW AND REQUIRED CHANGES (DETAIL -2, -4, -18, 19, -20, -21, -22, -23 ANO ASSEMBLY DRAWINGS AS NECESSARY), AND -th···A90¼TIONAL···DRAWING··-FOR· MANUFACTIJR4NGANOG-bARH·¥-fSEE··E>ETAH"-5,-�.-1-3-ANO-\IARIOOS-VI-EWS·t-------------------t---

AF IMT 3925, 20030819, V1 REPLACES AF FORM 2600. 19940701, WHICH IS OBSOLETE

FairleadBeamDrawings