This is a comprehensive set of construction plan documents for the City of Salem Public Works Department's Pedestrian Safety Improved Crossings Project (Project Number 720503), involving three separate pedestrian crossing locations in Salem, Oregon. The project includes safety improvements at Riviera Drive NE, State Street, and Lancaster Drive NE, with specific enhancements including ADA-compliant ramps, crosswalk striping, traffic signals with rectangular rapid flashing beacons (RRFB), landscaping, and associated infrastructure modifications. The project is funded through federal aid (Federal Aid Number 6490(132)) and involves coordination with ODOT (Oregon Department of Transportation), with work to be completed across multiple intersections.
The project scope encompasses detailed civil engineering plans for pedestrian safety, including geometric design, traffic control, erosion prevention, storm drainage, traffic signalization, signing and striping, and landscaping. The plan set includes solar-powered pedestrian crossing signals, new curb and sidewalk installations, landscape restoration, and utility coordination. Construction will involve careful phasing to maintain traffic flow, with most lane closures restricted to nighttime hours between 9:00 PM and 5:00 AM. The total project area covers approximately 0.08 miles across the three locations, with specific improvements tailored to each intersection's unique geometric and traffic characteristics. The plan set suggests a comprehensive approach to improving pedestrian safety through infrastructure upgrades and traffic management strategies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CO
CO
G-01
TITLE SHEET
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
CITY OF SALEM - DEPARTMENT OF PUBLIC WORKS
555 LIBERTY STREET SE - SALEM, OREGON 97301
VICINITY MAP
PEDESTRIAN SAFETY
IMPROVED CROSSINGS
(SALEM)
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
8 9
8 96
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
E D
S
A F
E T
Y G
E
C
T C d w g
G t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H C
T
H
O
R
L
E
Y
J
U
L
Y
E
N
G
I N
E
E
R
099675PE
OREGON
CITY OF SALEM PN: 720503
ODOT KN: 21879
FEDERAL AID NO: 6490(132)
PROJECT
LOCATION #
S
T
A
L A
N C
A S
T E
R
D
R
N
E
M
I
S
S
I
O
N
I
C
O
M
M
E
R
C
I
#3
PEDESTRIAN CROSSING
LOCATION #1
RIVER RD N AT RIVIERA DR NE
LENGTH: 0.04 MILES
Call before you dig.
Know what's below.
ATTENTION:
UTILITY CONTACTS
PEDESTRIAN CROSSING
LOCATION #2
STATE ST AT 21ST ST SE
LENGTH: 0.02 MILES
PEDESTRIAN CROSSING
LOCATION #3
LANCASTER DR NE AT MANOR DR NE
LENGTH: 0.02 MILES
#1
#2
I
L A
N C
A S
T E
R
D
R
N
E
M
ANOR
DR NE
MARKET ST NE
C
EN
TER
ST N
E
R
I
V
R
M
K
J
P
W
RIVIERA
DR N
S
I
L
V
E
R
T
P
O
R
T
L
A
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
8 9
8 96
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
SHEET INDEX
NO. ID. DESCRIPTION
GENERAL
1 G-01 TITLE SHEET
2 G-02 SHEET INDEX
3 G-03 GENERAL CONSTRUCTION NOTES & LEGEND
4 G-04 PAGE LAYOUT SHEET
5 G-05
LEGEND
SURVEY CONTROL
LOCATION #1
6 G-06
SURVEY CONTROL
LOCATION #2 & #3
EPSC
7 EC-01 EPSC NOTES
8 EC-02
RIVIERA DR NE
EPSC & TREE PROTECTION PLAN
LOCATION #1
9 EC-03
STATE ST
EPSC & TREE PROTECTION
LOCATION #2
10 EC-04
LANCASTER DR NE
EPSC & TREE PROTECTION
LOCATION #3
TEMPORARY TRAFFIC CONTROL
11 TC-01
TEMPORARY TRAFFIC CONTROL
NOTES & SIGNS
12 TC-02
ADVANCE SIGNS
RIVIERA DR NE
TEMPORARY TRAFFIC CONTROL
LOCATION #1
13 TC-03
WEST SIDE
RIVIERA DR NE
TEMPORARY TRAFFIC CONTROL
LOCATION #1
14 TC-04
NORTH SIDE
RIVIERA DR NE
TEMPORARY TRAFFIC CONTROL
LOCATION #1
15 TC-05
EAST & NORTHEAST SIDE
RIVIERA DR NE
TEMPORARY TRAFFIC CONTROL
LOCATION #1
16 TC-06
SOUTH SIDE
RIVIERA DR NE
TEMPORARY TRAFFIC CONTROL
LOCATION #1
17 TC-07
NOTHEAST SIDE
STATE ST
TEMPORARY TRAFFIC CONTROL
LOCATION #2
18 TC-08
SOUTHWEST SIDE
STATE ST
TEMPORARY TRAFFIC CONTROL
LOCATION #2
19 TC-09
SOUTHEAST SIDE
STATE ST
TEMPORARY TRAFFIC CONTROL
LOCATION #2
SHEET INDEX
NO. ID. DESCRIPTION
20 TC-10
(PEDESTRIAN) WEST SIDE
LANCASTER DR NE
TEMPORARY TRAFFIC CONTROL
LOCATION #3
21 TC-11
(STREET) WEST SIDE
LANCASTER DR NE
TEMPORARY TRAFFIC CONTROL
LOCATION #3
22 TC-12
(PEDESTRIAN) EAST SIDE
LANCASTER DR NE
TEMPORARY TRAFFIC CONTROL
LOCATION #3
23 TC-13
(STREET) EAST SIDE
LANCASTER DR NE
TEMPORARY TRAFFIC CONTROL
LOCATION #3
24 TC-14
ISLAND
LANCASTER DR NE
TEMPORARY TRAFFIC CONTROL
LOCATION #3
25 TC-15
TEMPORARY TRAFFIC CONTROL
TEMPLATES
STREET SHEETS
26 ST-01
RIVIERA DR NE
OVERALL SITE PLAN
LOCATION #1
27 ST-02
WEST SIDE
RIVIERA DR NE
ADA RAMP DETAILS
LOCATION #1
28 ST-03
NORTH SIDE
RIVIERA DR NE
ADA RAMP DETAILS
LOCATION #1
29 ST-04
EAST SIDE
RIVIERA DR NE
ADA RAMP DETAILS
LOCATION #1
30 ST-05
NORTHEAST SIDE
RIVIERA DR NE
ADA RAMP DETAILS
LOCATION #1
31 ST-06
SOUTH SIDE
RIVIERA DR NE
ADA RAMP DETAILS
LOCATION #1
32 ST-07
STATE ST
OVERALL SITE PLAN
LOCATION #2
33 ST-08
NORTHEAST SIDE
STATE ST
ADA RAMP DETAILS
LOCATION #2
34 ST-09
SOUTHWEST CORNER
STATE ST
ADA RAMP DETAILS
LOCATION #2
35 ST-10
SOUTHEAST CORNER
STATE ST
ADA RAMP DETAILS
LOCATION #2
SHEET INDEX
NO. ID. DESCRIPTION
36 ST-11
LANCASTER DR NE
OVERALL SITE PLAN
LOCATION #3
37 ST-12
WEST SIDE
LANCASTER DR NE
ADA RAMP DETAILS
LOCATION #3
38 ST-13
EAST SIDE
LANCASTER DR NE
ADA RAMP DETAILS
LOCATION #3
39 ST-14
LANCASTER DR NE
ISLAND DETAILS
LOCATION #3
STORM DRAIN
40 SD-01
STATE ST
STORM DRAIN PLAN & PROFILE
LOCATION #2
TRAFFIC SIGNAL
41 TS-01
R.R.F.B.
STATE ST
TRAFFIC SIGNAL PLAN
LOCATION #2
42 TS-02
R.R.F.B.
LANCASTER DR NE
TRAFFIC SIGNAL PLAN
LOCATION #3
43 TS-03
TRAFFIC SIGNAL
DETAILS
44 TS-04
TRAFFIC SIGNAL
DETAILS
45 TS-05
TRAFFIC SIGNAL
R.R.FB. SOLAR POWERED DETAILS
STRIPING AND SIGNING
46 S-01
RIVIERA DR NE
STRIPING & SIGNING PLAN
LOCATION #1
47 S-02
STATE ST
STRIPING & SIGNING PLAN
LOCATION #2
48 S-03
LANCASTER DR NE
STRIPING & SIGNING PLAN
LOCATION #3
LANDSCAPING
49 LA-01
LANDSCAPING
SCHEDULE & NOTES
50 LA-02
RIVIERA DR NE
LANDSCAPING PLAN
LOCATION #1
51 LA-03
STATE ST
LANDSCAPING PLAN
LOCATION #2
52 LA-04
LANCASTER DR NE
LANDSCAPING PLAN
LOCATION #3
G-02
SHEET INDEX
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
WATER METER
WATER VALVE
RIGHT OF WAY
FIRE HYDRANT
SANITARY SEWER
STORM DRAIN
WATER
TELEVISION
ELECTRICITY
UNDERGROUND
10" ST. PIPE
UTILITIES AND TOPOGRAPHIC FEATURES
EXISTING
WATER METER
WATER VALVE
RIGHT OF WAY
FIRE HYDRANT
SANITARY SEWER
STORM DRAIN
WATER
N.W. NATURAL
TELEPHONE
TELEVISION
ELECTRICITY
UNDERGROUND
PROPERTY LINE
EDGE OF PAVEMENT
TO BE INSTALLED
WORK DONE BY OTHERS
CALLOUTS
WORK DONE BY CONTRACTOR
WORK DONE BY CITY FORCES
8" SS PIPE
SAWCUT
SIG
SIGNAL WIRE
FENCEFENCE
TEMPORARY
CONSTRUCTION EASEMENT
TRAFFIC SIGNAL EASEMENT
SIDEWALK EASEMENT
CURB & SIDEWALK
WITH DRIVEWAY
EXISTING PUBLIC UTILITY
EASEMENT
LIGHTING
INTERNET
NEW 8" D.I. W
LANDSCAPING
DECIDUOUS
EVERGREEN
DECIDUOUS
EVERGREEN
G-03
GENERAL
CONSTRUCTION
NOTES & LEGEND
PN: 720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
8 9
8 96
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
GENERAL CONSTRUCTION NOTES
1. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THESE PLANS, THE CITY OF SALEM "PUBLIC WORKS
DESIGN STANDARDS," OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION CURRENT EDITION, AND
SPECIAL PROVISIONS DEVELOPED FOR THE PROJECT.
2. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO SUPPORT, MAINTAIN, OR OTHERWISE
PROTECT EXISTING UTILITIES AT ALL TIMES DURING CONSTRUCTION.
3. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL AT ALL TIMES DURING CONSTRUCTION. ALL TRAFFIC
CONTROL MEASURES SHALL BE APPROVED AND IN PLACE PRIOR TO ANY CONSTRUCTION ACTIVITY.
4. UPON COMPLETION AT THE END OF THE WORK DAY, THE CONTRACTOR SHALL LEAVE THE PROJECT AREA FEE
OF DEBRIS AND UNUSED MATERIALS.
5. UTILITY COORDINATION:
A. THE LOCATION AND DESCRIPTION OF EXISTING UTILITIES SHOWN ARE COMPILED FROM AVAILABLE
RECORDS AND/OR FIELD SURVEYS. THE CITY OR UTILITY COMPANIES DO NOT GUARANTEE THE ACCURACY
NOR THE COMPLETENESS OF SUCH RECORDS.
B. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY
NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010THROUGH OAR 952-001-0090. YOU
MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: THE TELEPHONE NUMBER FOR THE
OREGON UTILITY NOTIFICATION CENTER IS (503)-232-1987).
C. PROVISIONS SHALL BE MADE BY THE CONTRACTOR TO KEEP ALL EXISTING UTILITIES IN SERVICE
AND PROTECT THEM DURING CONSTRUCTION.
D. UTILITIES, OR INTERFERING PORTIONS OF UTILITIES, THAT ARE ABANDONED IN PLACE SHALL BE
REMOVED BY THE CONTRACTOR TO THE EXTENT NECESSARY TO ACCOMPLISH THE WORK.
THE CONTRACTOR SHALL PLUG THE REMAINING EXPOSED ENDS OF ABANDONED UTILITIES.
6. THE CONTRACTOR SHALL BE EXPECTED TO VISIT THE SITE AND MAKE THEIR OWN DETERMINATION OF
TOPOGRAPHIC FEATURES REQUIRING RESTORATION.
7. DO NOT REMOVE TREES EXCEPT AS APPROVED BY THE ENGINEER. PROTECT ALL ROOTS TWO
INCHES AND LARGER IN DIAMETER. TRIM TREES, SHRUBS AND HEDGES ONLY AS DIRECTED BY THE ENGINEER.
GENERAL LEGEND
JB-2 JB-3 HD
HOLE
SPL
VLT
CNTRL
CAB
SRV
CAB
SIGNAL EQUIPMENT
JB-2 JB-3 HD
HOLE
SPL
VLT
CNTRL
CAB
SRV
CAB
RRFB
8. ALL DAMAGE CAUSED BY CONTRACTOR SHALL BE RESTORED TO AN 'AS GOOD OR BETTER' CONDITION.
9. ALL LANDSCAPING AND/OR SOD SHALL BE RESTORED TO AN 'AS GOOD OR BETTER' CONDITION.
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
8 9
8 96
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
G-04
PAGE LAYOUT
SHEET
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
S
T
A
L A
N C
A S
T E
R
D
R
N
E
LOCATION #1
MANOR DR NE
LOCATION #2
LOCATION #3
W
EATHERS ST NE
F
E
R
ST-08
ADA
ST-13
ADA
ST-14
ISLAND
ST-07
OVERALL
ST-11 OVERALL
ST-10
ADA
ST-09
ADA
ST-12
ADA
S-03
STRIPE
S-02
STRIPE
C O
M M
E R
C I A
L
S
T
N
E
R
I
V
RIVIERA DR N
L I B
E R
N
E
ST-01
OVERALL
ST-02
ADA
ST-06
ADA
ST-05 ADA
S-01
STRIPE
ST-03
ADA
ST-04 ADA
LIMIT WORK TO ONE LOCATION AT A TIME.
OBTAIN ENGINEER'S APPROVAL FOR EXCEPTION.
B
LILE
R A
V N
E
L I B
E R
N
E
R
I
V
R
O
C O
M M
E R
C I A
L
S
T
N
E
D
R
E
A
M
E
R
I
S
L A
V
E
W
D
R
N
RIVIERA DR N
G-05
LEGEND
SURVEY CONTROL
LOCATION #1
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
8 9
8 96
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
10156
10155
10045
10043
10047
SURVEY CONTROL POINTS - LOCATION #1
TEMPORARY SURVEY CONTROL POINTS
PT# NORTHING EASTING ELEVATION DESCRIPTION
1 484929.126 7546996.57 139.23 PK FD
2 485106.505 7546922.961 140.16 PK SET
3 484851.394 7546768.264 140.01 PK SET
FOUND SURVEY CONTROL POINTS
20 485197.463 7546993.631 139.96 BM COS BRASS 3INCH - 81
50 484974.764 7546981.103 138.76 IR W/YPC
51 484920.406 7546988.799 138.56 IR W/YPC
52 484712.793 7547005.652 138.65 IR W/YPC - WH PACIFIC
MORE - FOUND SURVEY CONTROL POINTS
PT# NORTHING EASTING ELEVATION DESCRIPTION
53 485200.07 7546998.803 140.24 IR 3/4INCH NO CAP - UP .1
54 485216.726 7546934.066 140.6 BP - WESTLAKE
55 484811.545 7546999.66 137.73 PK FD
56 484713.046 7547001.623 138.6 IR W\YPC - COFFMAN
10043 484886.591 7546814.872 140.13 T+L - 43
10045 484932.616 7546907.668 139.14 T+L - 45
10047 484726.455 7546941.577 138.14 IP FD - FLUSH - 47
10155 485034.782 7546788.183 138.22 IR DN .3 - BENT N - TIED AT BEND - 155
10156 485135.547 7546722.98 139.46 IP DN .2 - 156
LEGEND
TEMPORARY SURVEY CONTROL POINT
FOUND MONUMENT
AC ALUMINUM CAP
IP IRON PIPE
PK SURVEYOR'S NAIL
YPC YELLOW PLASTIC CAP
HORIZONTAL DATUM:
OREGON STATE PLANE COORDINATE SYSTEM ('83) NORTH
ZONE, EPOCH (CURRENT VERSION)
VERTICAL DATUM:
NATIONAL GEODETIC VERTICAL DATUM OF 1929 ('47)
SURVEY MONUMENT PRESERVATION:
1. THE SHOWN SURVEY CONTROL IS NOT ALL INCLUSIVE OF
ALL SURVEY MONUMENTS WITHIN THE WORK AREA. THE
CONTRACTOR IS REQUIRED BY ORS 209.150 TO REPLACE ALL
SURVEY MONUMENTS DISTURBED OR DESTROYED BY
CONSTRUCTION ACTIVITIES.
2. THE CONTRACTOR SHALL NOTIFY THE CITY INSPECTOR OR
PROJECT ENGINEER WITHIN 24 HOURS OF ANY SURVEY
MONUMENT DISTURBED/DESTROYED BY CONSTRUCTION
ACTIVITIES.
LOCATION #1
G-06
SURVEY CONTROL
LOCATION #2 & #3
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
8 9
8 96
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
T
A
L A
N C
A S
T E
R
D
R
N
E
MANOR DR NE
LOCATION #2
LOCATION #3
W
EATHERS ST NE
SURVEY CONTROL POINTS - LOCATION #2
TEMPORARY SURVEY CONTROL POINTS
PT# NORTHING EASTING ELEVATION DESCRIPTION
3 472239.105 7550554.853 176.49 PK SET - 21ST DW W
FOUND SURVEY CONTROL POINTS
20 472243.799 7550622.106 176.59 IR MON BOX
28 472226.146 7550581.955 176.63 TONE - NE COR OREGON MARKET
30 472261.76 7550489.015 175.4 IP - BENT NORTH - BEND TIED DN 1.2
31 472263.035 7550489.549 176.61 GS - IP TOP - @ SURFACE - NORTH OF BEND TIE
32 472309.173 7550378.01 176.16 TONE - NE COR HABANEROS
33 472329.227 7550492.039 176.04 IR W/YPC - ANDREWS - UP .5 - BENT - SPINS - TIED @ SPIN
34 472289.119 7550584.282 176.27 IP 3/4 - FLUSH
35 472255.378 7550668.775 176.54 IP 3/4 - FLUSH
36 472172.386 7550871.743 177.09 IR W/YPC - LANDMARKERS - FLUSH
37 472142.102 7550945.89 178.18 IR W/YPC - LANDMARKERS - UP .1
SURVEY CONTROL POINTS - LOCATION #3
TEMPORARY SURVEY CONTROL POINTS
PT# NORTHING EASTING ELEVATION DESCRIPTION
1 476146.146 7559231.398 204.74 PK SET - CASA
FOUND SURVEY CONTROL POINTS
20 476148.996 7559187.548 203.38 Mon
21 476231.6 7559183.66 203.27 Mon
50 476080.179 7559231.041 205.01 IR FD UP .1 BENT EAST - TIED AT BEND
51 475961.723 7559236.503 206.85 IR W\YPC 636
52 475923.52 7559238.534 205.95 IR AC
53 475920.215 7559361.552 206.39 IR W\YPC - WILSON
54 475954.332 7559362.471 206.16 IR W\YPC - WILSON
EC-01
EPSC
NOTES
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
8 9
8 96
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) NOTES
1. THE CONTRACTOR SHALL PROVIDE DAILY MEASURES TO ENSURE
SEDIMENT CONTROL DURING NON-WORK HOURS.
2. THE CONTRACTOR SHALL PROVIDE PROTECTION AS REQUIRED ON
PRIVATE INLETS TO ENSURE SEDIMENT CONTROL WITHIN THE WORK AREA.
3. THE PROJECT SITE SHALL HAVE A CONCRETE WASHOUT BASIN
AVAILABLE PER STD. PLAN 917 OR APPROVED EQUAL.
4. ALL TEMPORARY STOCKPILES AND CONCRETE MANAGEMENT
FACILITIES SHALL BE LOCATED A MINIMUM OF 50 FEET FROM ANY
DRAINAGE INLET OR WATERCOURSE.
5. THIS EROSION CONTROL PLAN REPRESENTS MINIMUM EROSION
CONTROL MEASURES. ADDITIONAL COORDINATION AND WORK WITH THE
CITY OF SALEM MAY BE REQUIRED.
GENERAL EPSC NOTES
(a) Pre-Construction
(1) Prior to any land disturbing activities, the boundaries of the clearing and grading limits, vegetated buffers, and any sensitive areas shown on this plan shall be clearly delineated in the field. Unless otherwise approved, no disturbance is permitted beyond the clearing limits. The contractor must maintain the delineation for the duration of the project. Note: vegetated corridors to be delineated with orange construction fence or approved equal.
(2) BMPS that must be installed prior to land disturbing activities are construction entrance, perimeter sediment control, and inlet protection.
(3) Hold a preconstruction conference to review the EPSC and with the city’s project manager and inspector.
(b) Construction
(1) All sediment is required to stay on site. Sediment amounts greater than ½ cubic foot which leave the site must be cleaned up within 24 hours and placed back on the site and stabilized or properly disposed. Vacuuming or dry sweeping must be used to clean up released sediment and it must not be swept or washed into storm sewers, drainage ways, or water bodies. The cause of the sediment release must be found and prevented from causing a recurrence of the discharge within the same 24 hours. Any in-stream clean up of sediment shall be performed according to the DSL required time frame.
(2) Construction, maintenance, replacement, and upgrading of erosion prevention and sediment control facilities is the sole responsibility of the contractor until all construction is completed, approved, and permanent erosion control
(i.e., vegetation/landscaping) is established on all disturbed areas.
(3) All recommended erosion prevention and sediment control procedures are dependent on construction methods, staging, site conditions, weather, and scheduling.
During the construction period, erosion control facilities shall be revised, upgraded, replaced, or added, to comply with SRC and State and Federal regulatory requirements.
(4) The contractor is solely responsible for protection of all adjacent property and downstream facilities from erosion and siltation during project construction. Any damage resulting from such erosion and siltation shall be corrected at the sole expense of the contractor.
(5) When saturated soil is present, water-tight trucks must be used to transport saturated soils from the construction site. Soil may be drained on site at a designated location, using appropriate BMPs. Soil must be drained sufficiently to drip less than one gallon per hour prior to leaving the site.
(6) All materials spilled, dropped, or washed into storm drains must be removed immediately, and the contractor shall provide protection of downstream inlets and catch basins to ensure sediment-laden water does not enter the storm drain system.
(7) All discharge of sediment-laden water must be treated with an appropriate bmp to remove sediment from discharge waters and to comply with SRC and State and
Federal regulatory permits.
(8) In areas subject to wind erosion, appropriate BMPs must be used which may include the application of fine water spraying, plastic sheeting, mulching, or other approved measures.
(9) The EPSC measures and BMPs shown on this plan are the minimum requirements for anticipated site conditions. During the construction period, these measures shall be upgraded as needed to maintain compliance with all regulations.
(10) The contractor shall provide onsite water or other appropriate BMPs to prevent dust and wind erosion of fine grain soils.
(11) Disturbed areas must be stabilized after 14 days of inactivity, or immediately if rain is forecasted. See subsection 7A.1(d)-Wet Weather Period.
(12) During the wet weather work period or when rain is forecasted, all active and inactive soil stock piles must be covered with appropriate plastic sheeting. Plastic sheeting must cover the entire stock pile and be sufficiently anchored.
(c) Pollutants, Solid Waste and Hazardous Materials Management
(1) Any use of toxic or other hazardous materials must include proper storage, application, and disposal.
(2) The contractor is solely responsible to properly manage pollutants, hazardous wastes, used oils, contaminated soils, concrete waste, sanitary waste, liquid waste, or other toxic substances discovered or generated during construction to prevent leakage, spills or release of pollutants to the environment and surface waters.
(3) Contractor shall develop a project specific written spill prevention and response procedures that includes employee training on spill prevention and proper disposal procedures; regular maintenance schedule for vehicles and machinery; and material delivery and storage controls, signage, material use, and use of covered storage areas for waste and supplies. The plan shall comply with SRC and Federal and
State requirements, and shall be available on site at all times.
(d) Wet Weather Period (October 15 through April 30)
(1) Construction activities must avoid or minimize the duration of disturbed areas.
(2) Temporary stabilization of the site including covering of bare soils with approved BMPs, must be installed at the end of the shift before a holiday or weekend, or at the end of each workday if rainfall is forecast in the next 24 hours.
(3) Temporary stabilization or covering of soil stockpiles and protection of stockpiles located away from construction activity must occur at the end of each workday.
(e) Maintenance
(1) Erosion control measures shall be maintained in such a manner as to ensure that erosion is prevented and sediment-laden water does not enter a drainage system, roadway, or violate applicable water quality standards.
(2) Sediment shall not be washed or swept into storm sewers, drainage ways, or water bodies.
(3) Sediment must be removed from behind all sediment control measures when it has reached a height of 1/3 the barrier height, and prior to the control measures removal.
(4) Removal of trapped sediment in a sediment basin or sediment trap or catch basins must occur when the sediment retention capacity has been reduced by 50 percent; is not functioning properly and/or at the completion of project.
(5) Cleaning of all structures, inlet protection BMPs, and sump pumps must be completed regularly and as required to ensure structures and inlets function properly and flow freely.
(6) Construction site exits shall be maintained in a condition that will prevent tracking or flow of mud onto the row or approved access point. The entrance may require periodic top dressing as conditions demand, and repair and/or cleanout of any structures used to trap sediment. Wheel washing shall be required to prevent sediment and material tracking on road surfaces if passive BMPs are not effective.
(f) Inspection
(1) The EPSC must be kept onsite at all times. All measures shown on the plan must be installed properly to ensure compliance with SRC and State and Regulatory permits, and that sediment does not enter a surface water system, roadway, or other properties.
(2) Written EPSC inspection logs shall be maintained onsite and available to city inspectors upon request.
(3) All BMPs shall be inspected at least every week. When a rainfall event exceeds ½" in a 24-hour period, daily inspection of the erosion controls, sediment controls, and discharge outfalls must be conducted and documented. Inspections shall be done by a representative of the permit registrant who is knowledgeable and experienced in the principles, practices, installation, and maintenance of erosion and sediment controls.
(g) Inactive Construction Periods and Post-Construction
(1) Should work cease in any area for 14 days, the inactive area must be stabilized with appropriate soil stabilization BMPs. If all construction activity ceases the entire site must be temporarily stabilized using vegetation, heavy mulch layer, temporary seeding, or other method.
(2) All temporary erosion prevention and sediment control facilities shall be removed by the contractor within 30 days after permanent landscaping/vegetation is established and the threat of erosion and sediment transport has been mitigated.
(3) Temporary grass cover measures must be fully established by October 15 or other cover measures (i.e., erosion control blankets with anchors, one-inch of straw mulch, six mil HDPE plastic sheet, etc.) shall be in place over all disturbed soil areas until April 30. To establish an adequate grass stand for controlling erosion by October
15, it is recommended that seeding and mulching occur by September 1.
(4) Permanent erosion control vegetation on all embankments and disturbed areas shall be re-established as soon as construction is completed.
(h) Specifications
(1) Soil preparation. Topsoil should be prepared according to the landscape plans, if available, or recommendations of the grass seed supplier. Slopes shall be textured before seeding by rack walking (i.e., driving a crawling tractor up and down the slopes to leave a pattern of cleat imprints parallel to slope contours) or other method to provide stable areas for seeds to rest.
(2) Seeding. Erosion control grass seed mix shall be as follows: Dwarf grass mix
(low height, low maintenance) consisting of dwarf perennial ryegrass (80 percent by weight), creeping red fescue (20 percent by weight). Application rate shall be 100 pounds per acre minimum.
(3) Grass seed shall be fertilized at a rate of ten pounds per 1,000 square feet with 16-16-16 slow release type fertilizer. Disturbed areas within 50 feet of water bodies and wetlands must use a non-phosphorous fertilizer.
(4) The application rate of fertilizers used to reestablish vegetation shall follow manufacturer's recommendations. Nutrient releases from fertilizers to surface waters shall be minimized. Time release fertilizers shall be used. Care shall be made in the application of fertilizers within any waterway riparian zone to prevent leaching into the waterway.
(5) When used, hydromulch shall be applied with grass seed at a rate of 2,000 pounds per acre between April 30 and June 10, or between September 1 and October
1. On slopes steeper than ten percent, hydroseed and mulch shall be applied with a bonding agent (tackifier). Application rate and methodology shall be in accordance with seed supplier recommendations.
(6) When used in lieu of hydromulch, dry, loose, weed-free straw used as mulch shall be applied at a rate of 4,000 pounds per acre (double the hydromulch application requirement). Anchor straw by working in by hand or with equipment (rollers, cleat trackers, etc.). Mulch shall be spread uniformly immediately following seeding.
(7) When conditions are not favorable to germination and establishment of the grass seed, the Contractor shall irrigate the seeded and mulched areas as required to establish the grass cover.
(8) Sediment fences shall be constructed of continuous filter fabric to avoid use of joints. When joints are necessary, filter cloth shall be spliced together only at a support post, with a minimum six-inch overlap, and both ends securely fastened to a post.
(9) The standard strength filter fabric shall be fastened securely to stitched loops installed on the upslope side of the posts, and six inches of the fabric shall be extended into the trench. The fabric shall not extend more than 30 inches above the original ground surface. Filter fabric shall not be stapled to existing trees.
(10) Bio-filter bags shall be clean 100 percent wood product waste. Bags shall be 18-inch x 18-inch x 30-inch, weigh approximately 45 pounds, and be contained in a bag made of ½ inch plastic mesh.
(11) Minimum wet weather slope protection. For 3H:1V or steeper slopes use
Bon Terra Type C2 or North American Green Type C125 erosion control blankets. Use a minimum of two inches straw mulch or North American Green Type S150 for slopes flatter than 3H:1V and greater than 6H:1V. Slopes flatter than 6H:1V use one inch straw mulch, hydroseed with hydromulch and tackifier. Slope protection shall be placed on all disturbed areas immediately after completion of each section of construction activity, until the erosion control seeding has been established. As an option during temporary or seasonal work stoppages, a six-mil HDPE plastic sheet may be placed on exposed slopes. The plastic sheet shall be provided with an anchor trench at the top and bottom of the slope, and shall be sandbagged on the slopes as required to prevent damage or displacement by wind.
DESIGN STANDARDS NOTES
V
I
E
DREAM
ERIE
L N N
E
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
EC-02
RIVIERA DR NE
EPSC & TREE
PROTECTION PLAN
LOCATION #1
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
THIS EROSION CONTROL PLAN PROVIDES
GUIDANCE FOR PLACEMENT OF
RECOMMENDED MEASURES, CERTAIN
CONSTRUCTION ACTIVITIES MAY REQUIRE
ADDITIONAL EROSION CONTROL MEASURES.
RIVER R
D N
L
I
B
E
R
R I V
I E
N
E
2981-2999
DREAMERIE LN N
EROSION CONTROL WORK LIMITS
WL
FLOW ARROW
(EXISTING CONDITIONS PRIOR TO
CONSTRUCTION)
NOTE: THIS IS REQUIRED ON ALL
INLETS RECEIVING FLOW FROM THE
PROJECT, INCLUDING EXISTING
INLETS TO BE REMOVED AND NEW
INLETS ONCE INSTALLED.
INSTALL INLET PROTECTION SILT SACK
PER STD. PLAN 913.
EXISTING NEW
INSTALL WORK ZONE FENCING FOR
TREE PROTECTION PER STD. PLAN 820.
CONTOURS ARE FROM TOPOGRAPHIC
SURVEY ON OCTOBER 2022 AND MAY NOT
REPRESENT EXACT TOPOGRAPHICAL
CONDITIONS PRIOR TO CONSTRUCTION.
WL
WL
WL
WL
WL
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
CONTOURS ARE FROM TOPOGRAPHIC
SURVEY ON OCTOBER 2022 AND MAY NOT
REPRESENT EXACT TOPOGRAPHICAL
CONDITIONS PRIOR TO CONSTRUCTION.
EC-03
STATE ST
EPSC & TREE
PROTECTION PLAN
LOCATION #2
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
S
E
STATE ST
THIS EROSION CONTROL PLAN PROVIDES
GUIDANCE FOR PLACEMENT OF
RECOMMENDED MEASURES, CERTAIN
CONSTRUCTION ACTIVITIES MAY REQUIRE
ADDITIONAL EROSION CONTROL MEASURES.
WL
WL
WL
EROSION CONTROL WORK LIMITS
WL
FLOW ARROW
(EXISTING CONDITIONS PRIOR TO
CONSTRUCTION)
NOTE: THIS IS REQUIRED ON ALL
INLETS RECEIVING FLOW FROM THE
PROJECT, INCLUDING EXISTING
INLETS TO BE REMOVED AND NEW
INLETS ONCE INSTALLED.
INSTALL INLET PROTECTION SILT SACK
PER STD. PLAN 913.
EXISTING NEW
INSTALL WORK ZONE FENCING FOR
TREE PROTECTION PER STD. PLAN 820.
INSTALL BIOFILTER BAG CHECK DAM
PER STD. PLAN 914 WHEN TRAFFIC
CONTROL IS IN PLACE. REMOVE PRIOR
TO OPENING LANE TO VEHICLE TRAFFIC.
EX CB
EX CB
NEW CB
NEW CB
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
EC-04
LANCASTER DR NE
EPSC & TREE
PROTECTION PLAN
LOCATION #3
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
WL
EROSION CONTROL WORK LIMITS
WL
FLOW ARROW
(EXISTING CONDITIONS PRIOR TO
CONSTRUCTION)
NOTE: THIS IS REQUIRED ON ALL
INLETS RECEIVING FLOW FROM THE
PROJECT, INCLUDING EXISTING
INLETS TO BE REMOVED AND NEW
INLETS ONCE INSTALLED.
INSTALL INLET PROTECTION SILT SACK
PER STD. PLAN 913.
EXISTING NEW
INSTALL WORK ZONE FENCING FOR
TREE PROTECTION PER STD. PLAN 820.
LANCASTER DR NE
M A
N O
R
D
R
N
E
THIS EROSION CONTROL PLAN PROVIDES
GUIDANCE FOR PLACEMENT OF
RECOMMENDED MEASURES, CERTAIN
CONSTRUCTION ACTIVITIES MAY REQUIRE
ADDITIONAL EROSION CONTROL MEASURES.
3980 1251
CONTOURS ARE FROM TOPOGRAPHIC
SURVEY ON OCTOBER 2022 AND MAY NOT
REPRESENT EXACT TOPOGRAPHICAL
CONDITIONS PRIOR TO CONSTRUCTION.
WL
WL
WL
W E
A T
H E
N
E
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
8 9
8 96
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
TC-01
TEMPORARY
TRAFFIC CONTROL
NOTES & SIGNS
PN: 720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
TRAFFIC CONTROL NOTES:
9.) ALL FLEXIBLE SIGNS AND PORTABLE SIGN SUPPORTS SHALL BE CRASHWORTHY.
8.) SIGNS PLACED CONTINUOUSLY FOR LONGER THAN THREE DAYS SHALL BE
POST-MOUNTED.
10.) RIGID SIGNS MAY BE USED ON BARRICADES WHEN APPROPRIATELY CRASH TESTED.
7.) SIGN LOCATIONS SHOWN ARE APPROXIMATE AND SHOULD BE ADJUSTED IN THE FIELD FOR
CONFLICTS SUCH AS SIGHT DISTANCE, DRIVEWAYS, LANDSCAPING, UTILITIES, ETC.
6.) CONTRACTOR SHALL PROTECT TRAFFIC AND SHALL PROVIDE TRAFFIC CONTROL
AT ALL TIMES DURING CONSTRUCTION.
5.) MAINTAIN LOCAL ACCESS AT ALL TIMES.
4.) SEE SPECIAL PROVISIONS FOR WORK HOURS AND SPECIAL RESTRICTIONS.
3.) USE FLAGGERS AND TEMPORARY TRAFFIC CONTROL AS REQUIRED WITH APPROVED PERMIT.
REFER TO THE MUTCD AND THE OTTCH.
2.) REFER TO THE MUTCD AND THE OREGON TEMPORARY TRAFFIC CONTROL
HANDBOOK (OTTCH) FOR DISTANCES BETWEEN SIGNS AND CONES,
UNLESS OTHERWISE NOTED.
1.) CONTRACTOR TO COMPLY WITH ALL FEDERAL, STATE AND LOCAL GUIDELINES FOR
TRAFFIC CONTROL.
11.) TEMPORARY SIGNS SHALL NOT BE MOUNTED ON THE SIDEWALK AT ANY LOCATION.
PEDESTRIAN NOTES:
1.) CONTRACTOR TO PROVIDE PROPER SIGNAGE AND MAINTAIN ONE SAFE ACCESSIBLE
ROUTE FOR PEDESTRIAN TRAFFIC AT ALL TIMES DURING CONSTRUCTION.
AT INTERSECTIONS, EACH DIRECTION SHALL HAVE A ROUTE.
2.) CONTRACTOR TO PROVIDE SAFE ACCESSIBLE ROUTES TO THE PEDESTRIAN
PUSHBUTTONS AT ALL TIMES DURING CONSTRUCTION.
3.) A SIDEWALK CLOSURE REQUIRES ADVANCE SIGNING.
4.) AN ADA DETECTABLE SIDEWALK BARRIER SHALL BE PLACED ACROSS THE FULL WIDTH
OF A CLOSED SIDEWALK.
13R
13L
60" x 24"
G20-2
END
CONSTRUCTION
TEMPORARY TRAFFIC CONTROL SIGNS
R9-11
24" x 12"
R9-11
24" x 12"
R9-9
24" x 12"
SIDEWALK
CLOSED
18C
18D
18A
SIDEWALK CLOSED
CROSS HERE
AHEAD
SIDEWALK CLOSED
CROSS HERE
AHEAD
18E
24" x 12"
23 ON
ROADWAY
36" x 36"
CW11-1
W20-5
36" x 36"
W4-2
36" x 36"
W20-5
36" x 36"
W4-2
36" x 36"
2R 2L 3R
3L
15L
W20-1
36" x 36"
R4-7A
24" x 30"
CUSTOM
M4-9B
30" x 24"
M4-9B
30" x 24"
41R 41L q q
17L
DRIVEWAY
CLOSED
60" x 24"
CUSTOM
SIDEWALK
CLOSED
AHEAD
OW 23-3
BE
PREPARED
TO
STOP
W20-7
TYPE W1
36" x 24"
FINES
DOUBLE
R11-2
48" x 30"
R3-1
24" x 24"
R3-2
24" x 24"
W1-7
48" x 24"
W20-3
36" x 36"
W1-4
30" x 30"
18F
OR22-7
24" x 12"
CROSSWALK
CLOSED
THRU TRAFFIC
TO
STREET CLOSED
R11-4
60" x 30"
24" x 30"
LOCAL
ONLY
ACCESS
I
L
L
I
B
E
R
C
O
M
M
E
R
C
I
F
R
O
R
I
V
I
E
RIVER RD N
T
R
Y
T
A
Y
L
TC-02
ADVANCED SIGNING
RIVIERA DR NE
TEMPORARY
TRAFFIC CONTROL
LOCATION #1
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
W
S
E
N
NE
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY. STAGES MAY BE
COMPLETED IN ANY ORDER AT THE
CONTRACTOR'S DISCRETION.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
N
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
ADA IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY/BUSINESS
(MAINTAIN ACCESS AS PRACTICABLE)
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
PEDESTRIAN CHANNELIZING DEVICE
TEMPORARY BARRIER
TC-03
WEST SIDE
RIVIERA DR NE
TEMPORARY
TRAFFIC CONTROL
LOCATION #1
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
PEDESTRIAN
STREET
WEST SIDE
RIV
ER R
D N
R I V
I E
N
L
I
B
E
R
FRONT ST NE
2981-2999
18A
18D
R
I
V
I
E
RIVER RD N
2981-2999 q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q
15L 23
17L
1 35
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY. STAGES MAY BE
COMPLETED IN ANY ORDER AT THE
CONTRACTOR'S DISCRETION.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
N
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
ADA IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY/BUSINESS
(MAINTAIN ACCESS AS PRACTICABLE)
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
PEDESTRIAN CHANNELIZING DEVICE
TEMPORARY BARRIER
W
W
D D
ADDITIONAL SIDEWALK
CLOSED AHEAD SIGN AT
PARK SIDEWALK.
SEE BELOW.
q q q q q q q q q q q q
41R
41L
18F
TC-04
NORTH SIDE
RIVIERA DR NE
TEMPORARY
TRAFFIC CONTROL
LOCATION #1
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
NORTH SIDE
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY. STAGES MAY BE
COMPLETED IN ANY ORDER AT THE
CONTRACTOR'S DISCRETION.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
N
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
ADA IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY/BUSINESS
(MAINTAIN ACCESS AS PRACTICABLE)
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
PEDESTRIAN CHANNELIZING DEVICE
TEMPORARY BARRIER
PEDESTRIAN
R
I
V
18F
2981-2999
R
I
V
I
E
R
A
W
S
E
FM
18A
18F
18E q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q
TC-05
EAST & NORTHEAST SIDE
RIVIERA DR NE
TEMPORARY
TRAFFIC CONTROL
LOCATION #1
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
EAST & NORTHEAST SIDE
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY. STAGES MAY BE
COMPLETED IN ANY ORDER AT THE
CONTRACTOR'S DISCRETION.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
N
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
ADA IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY/BUSINESS
(MAINTAIN ACCESS AS PRACTICABLE)
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
PEDESTRIAN CHANNELIZING DEVICE
TEMPORARY BARRIER
PEDESTRIAN
R
I
V
2981-2999
R
I
V
I
E
R
A
W
S
E
NE
FM
18F
18A
18F
18D
18D
41R q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q
TC-06
SOUTH SIDE
RIVIERA DR NE
TEMPORARY
TRAFFIC CONTROL
LOCATION #1
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
SOUTH SIDE
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY. STAGES MAY BE
COMPLETED IN ANY ORDER AT THE
CONTRACTOR'S DISCRETION.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
N
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
ADA IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY/BUSINESS
(MAINTAIN ACCESS AS PRACTICABLE)
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
PEDESTRIAN CHANNELIZING DEVICE
TEMPORARY BARRIER
STREET
L
IB
E R
T Y
S T
N E
R
I
V
I
E
I
V
2981-2999
S
MAINTAIN 10' LANES
AT ALL TIMES
R
I
V
R
Y O
N
A
V
N
E
COMMERCIAL ST NE
LIBERTY ST NE
B L I L E
R
A
V
N
E
18E
41L
PEDESTRIAN
D
18A
18A
18E41R
18F
18F q q q q q q q q q q q q q q q q q q q q q q q q qqqqqqqqqqqqqqqqqqqqqqqqq q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q
PB
PB
TEMPORARY PAVEMENT BAR
BUS
BUS
BUS
TC-07
NORTHEAST SIDE
STATE ST
TEMPORARY
TRAFFIC CONTROL
LOCATION #2
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
18A
PEDESTRIAN
STREET
NORTHEAST SIDE
STATE ST
S
T
S
T
S
E
T
H
S
T
S
E
T
H
S
T
N
E
18A
22901800 1890
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY. STAGES MAY BE
COMPLETED IN ANY ORDER AT THE
CONTRACTOR'S DISCRETION.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
N
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
ADA IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY/BUSINESS
(MAINTAIN ACCESS AS PRACTICABLE)
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
PEDESTRIAN CHANNELIZING DEVICE
TEMPORARY BARRIER
COURT ST NE
S
T
S
T
N
E
CADMUS CT NE
18E
18E q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q
STATE ST
S
T
S
T
S
E
T
H
S
T
S
E
T
H
S
T
N
E
S
T
S
T
N
E
1 35
1 35
12R3R
41R
41R
41L
41L
41R
41L
NE
NE
COURT ST NE
D
D
D
D
D
18F
D
D
D
3L2L1
17L
TWO LANE CLOSURES ON
STATE STREET WILL BE
NIGHT TIME HOURS OF
9:00 PM TO 5 AM
BUS
BUS
TC-08
SOUTHWEST SIDE
STATE ST
TEMPORARY
TRAFFIC CONTROL
LOCATION #2
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
PEDESTRIAN
SOUTHWEST SIDE
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY. STAGES MAY BE
COMPLETED IN ANY ORDER AT THE
CONTRACTOR'S DISCRETION.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
N
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
ADA IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY/BUSINESS
(MAINTAIN ACCESS AS PRACTICABLE)
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
PEDESTRIAN CHANNELIZING DEVICE
TEMPORARY BARRIER
STREET
STATE ST
S
T
S
T
S
E
T
H
S
T
S
E
T
H
S
T
N
E
S
T
S
T
N
E
18A
18A qqq q q qqqqqqqqqqqqqqqqqqq q q q q q q q q q q q q
FERRY ST SE
18E
41R
41L
41R
41R
41R
41L
41R
18E
18F 41L
SW
STATE ST
S
T
S
T
S
E
T
H
S
T
S
E
1 13L
2R 3R
SW
D
D
D
D
S
T
D
13R
41R q q q q q q q q q q q q q q
D
D
8 11 25
FERRY ST SE
13R 1
13L
1 35
PB
TEMPORARY PAVEMENT BAR
BUS
BUS
TC-09
SOUTHEAST SIDE
STATE ST
TEMPORARY
TRAFFIC CONTROL
LOCATION #2
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
PEDESTRIAN
SOUTHEAST SIDE
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY. STAGES MAY BE
COMPLETED IN ANY ORDER AT THE
CONTRACTOR'S DISCRETION.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
N
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
ADA IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY/BUSINESS
(MAINTAIN ACCESS AS PRACTICABLE)
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
PEDESTRIAN CHANNELIZING DEVICE
TEMPORARY BARRIER
STATE ST
S
T
S
T
S
E
T
H
S
T
S
E
T
H
S
T
N
E
S
T
S
T
N
E
18A
18A q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q q
FERRY ST SE
18E
41R
18E
41L
SE
q q q q q q q q q q q q q q q q q
18F
41R
18F
STREET
STATE ST
S
T
S
T
S
E
T
H
S
T
S
E
SE
D
D
D
D
S
T
S
T
N
E
D
D
D
81125
FERRY ST SE
13R
13L
1 35
T
H
S
T
N
E
2L3L
3R
2R1
TWO LANE CLOSURES ON
STATE STREET WILL BE
NIGHT TIME HOURS OF
9:00 PM TO 5 AM
17L
PB
TEMPORARY PAINTED
PAVEMENT BAR
U
S
B U
S
B U
S
B U
S
TC-10
(PEDESTRIAN) WEST SIDE
LANCASTER DR NE
TEMPORARY
TRAFFIC CONTROL
LOCATION #3
PN:720503
NAD 83-SPCS
NGVD 1929(47)
AS SHOWN
AS SHOWN
ECT
J.KUENZI
7654321
F
E
D
C
B
A
7654321
SHEET OF
SHEET TITLE
HORIZ DATUM:
VERT DATUM:
HORIZ SCALE:
VERT SCALE:
DESIGN:
DRAWN:
CHECKED:
APPROVED:
NO. DATE BYDESCRIPTION
REVISIONS
S
A
L
E
M
P
U
B
L
IC
WORK
S
D
E
P
A
R
T
M
E
N
T
N
O I
S I
V I
D
GNI
R
E
E
N
N I
G
E
A
M
G G r o u p
E n g i n e e r i n g P r o j e c t s C
I P
P e d e s t r i a n
S a f e t y
I m p r o v e d
C r o s s i n g
C
A D
S
H E
E T
S E
T
P
F
E T
Y G
E
C
T C d
C t a b
PEDESTRIAN
SAFETY IMPROVED
CROSSINGS
(SALEM)
GENERAL NOTES
EXPIRES: 06-30-2026
R
E
G
I
S
T
E
R
E
D
PR
O
F
E
S
S
I
O
N
A
L
E
L
I
Z
A
B
E
T
H
O
R
L
E
Y
J
U
E
N
G
I N
E
E
R
099675PE
OREGON
PEDESTRIAN
W E
A T
H E
N
E
WEST SIDE
1. STAGES MUST BE COMPLETED
SEPARATELY AS TO NOT CLOSE BOTH
LANES OF TRAVEL IN ANY DIRECTION
OR CLOSE BOTH SIDEWALKS
SIMULTANEOUSLY. STAGES MAY BE
COMPLETED IN ANY ORDER AT THE
CONTRACTOR'S DISCRETION.
2. DO NOT OBSTRUCT TRAFFIC VISIBILITY.
N
SIGN REFERENCE NUMBER
(SEE SHEET TC-01)
PEDESTRIAN CHANNELIZING DEVICE
TYPE II BARRICADE MEETING ADA
ACCESSIBILITY STANDARDS
(MIN. 24" WIDE - REFER TO
THE OTTCH, PAGE 36)
28" TUBULAR MARKERS
(SPACING = AS SHOWN)
q q
TEMPORARY PEDESTRIAN
ACCESSIBLE ROUTE (TPAR)
TEMPORARY AC RAMP WITH
DETECTABLE WARNING SURFACE.
PROVIDE MIN. 5'x5' ADA TURNING
SPACE
PORTABLE (ROLLUP) SIGN
POST MOUNTED SIGN
· INSTALL TEMPORARY TRAFFIC
CONTROL MEASURES
· EXCAVATE AND CONSTRUCT
IMPROVEMENTS PER PLANS AND
TYPICAL SECTIONS.
ADA IMPROVEMENTS WORK ZONE
SHEET KEYNOTES
D
DRIVEWAY/BUSINESS
(MAINTAIN ACCESS AS PRACTICABLE)
FLAGGER
SPOTTER
CHERRIOTS BUS STOPBUS
TYPE III BARRICADE
(MIN. 8' WIDE - REFER TO
THE OTTCH, PAGE 36)
PEDESTRIAN CHANNELIZING DEVICE
TEMPORARY BARRIER
18E
M A
N O
R
D
R
N
E
W E
A T
H E
N
E
18E
18A
18F
W
18A
M A
N O
R
D
R
N
E
T
H A
V N
E
D
S
T
N
E
A N
I T
A
D
R
N
E
M A
R K
N
E
C Y
P R
E S
S
S
T
N
E
CLAY ST NE
A N
I T
A
D
R
N
E
L A
N C
A S
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .