Summary of Statement of Work: BPM Chassis - Group C
This is a Statement of Work (SOW) for the fabrication, assembly, inspection, and testing of Beam Position Monitor (BPM) electronics assemblies for the Advanced Light Source Upgrade (ALS-U) project at Lawrence Berkeley National Laboratory (LBNL). The work involves manufacturing five different printed circuit board (PCB) sub-assemblies: SPB2 Board (130 units), PMB Board (130 units), LBL208_PMOD Board (130 units), FPD Board (130 units), and AFE Backside Board (1,300 units). The contractor must procure components per approved bills of materials, perform PCB fabrication and population, execute soldering per IPC Class standards, conduct cleaning and conformal coating as required, perform in-process and final inspection, and provide comprehensive documentation including inspection and test results per IPC-9252.
Deliverables are structured in three phases: First Article units (25-130 units per assembly type, depending on type) due within 3-4 weeks after contract award, followed by Production Batch 1 (40-400 units) due 4 weeks after formal written approval, and Production Batch 2 (86-875 units) due 10 weeks after approval. All assemblies must be delivered with Certificates of Conformance, inspection and test reports, as-built configuration documentation, and component traceability documentation. The contractor shall maintain an effective QA program, complete the ALS-U Supplier Quality Evaluation Survey during the RFP phase, and submit deviation requests and nonconformance reports within specified timeframes. Communication requirements include a formal Kick-Off Meeting within one week of award, weekly status reports beginning two weeks after award, and immediate notification of any issues that could impact schedule, quality, or performance. All packaging must use ESD-safe materials, and the subcontract will be issued under Prime Contract No. DE-AC02-05CH11231 between the University and the U.S. Department of Energy.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK: BPM CHASSIS - GROUP C
RELEASE DATE : 2026-06-16
AUTHOR:
DOCUMENT NUMBER: AL-1918-8543 REVISION: A
DOCUMENT STATUS: RELEASED
DOCUMENT TYPE: REQUIREMENT
CATEGORY CODE: LS151400
O ffi ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
FM
Downloaded by: Windchill Watermarker
AL-1918-8543 REV.A Doc.Status:RELEASED Page 2 of 13
1 REVISION HISTORY 3
2 APPROVALS 3
3 Abbreviations and Acronyms 3 4 Introduction 4
4.1 Project Overview 4
4.2 Description of Items 4
4.3 Roles and Responsibilities 5
5 Scope of Work 5 6 Deliverables and Schedule 6
6.1 First Article Deliverables 6
6.2 Production Batch 1 & 2 Deliverables 7
6.3 Schedule 7
6.3.1 First Article Schedule 8
6.3.2 Production Schedule 9
7 Management 9
7.1 Reporting/Communication requirements 9
7.1.1 Kick-Off Meeting 9
7.1.2 Weekly Status Reporting and Coordination 10
7.1.3 Issue Notification and Escalation 10
7.2 Documentation requirements 10
8 Shipping, Handling, and Storage 10 9 Quality Assurance 11
9.1 Quality reporting requirements 11
9.1.1 Subcontractor Quality program 11
9.1.2 Deviation requests 11
9.1.3 Nonconformance reports 11
9.2 Factory Inspection and Test Plan 12
9.3 ACL upon receipt at LBL 12
9.4 TIP upon receipt at LBL 12
10 Applicable Documents 12 11 Reference Documents 12
Advanced Light Source
Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document Control
Center release information in the lower-left corner of the document's pages
Printed hard copies of this document are for reference only.
ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7 https://docs.google.com/document/d/1z-COCENNh6E_PVjiNGqzIhy0m3ca6JRrYzhNiXfELjo/edit?tab=t.0#heading=h.31idmo12afxy https://docs.google.com/document/d/1z-COCENNh6E_PVjiNGqzIhy0m3ca6JRrYzhNiXfELjo/edit?tab=t.0#heading=h.9obydzej3lfp https://docs.google.com/document/d/1z-COCENNh6E_PVjiNGqzIhy0m3ca6JRrYzhNiXfELjo/edit?tab=t.0#heading=h.zhal3t6plr5d
AL-1918-8543 REV.A Doc.Status:RELEASED Page 3 of 13
1 REVISION HISTORY
Rev. CM Number Description of Change A Initial Release
2 APPROVALS
The following individual(s) shall approve this document:
Approver Project Role Jonah Weber ALS-U Instrumentation Technical Lead Alessandro Ratti ALS-U Electrical System Manager Changchun Sun ALS-U Instrumentation CAM Jiani Niu ALS-U QA Manager
The following individual(s) approved this document:
Approved by: CCSUN,JIANINIU,ARATTI
3 ABBREVIATIONS AND ACRONYMS
ALS Advanced Light Source ALS-U Advanced Light Source Upgrade AFE Analog Front End BOM Bill of Materials BPM Beam Position Monitor ESD Electrostatic Discharge LBNL Lawrence Berkeley National Laboratory MBA Multibend Achromat PCB Printed Circuit Board PTM Pilot Tone Module RF Radio Frequency SOW Statement of Work TIP Test & Inspection Procedures University The Regents of the University of California
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
AL-1918-8543 REV.A Doc.Status:RELEASED Page 4 of 13
4 INTRODUCTION
4.1 Project Overview
ALS-U is an upgrade project to the LBNL Advanced Light Source (ALS). The ALS is a 1.9 GeV storage ring operating at 500 mA of beam current. It is optimized to produce intense beams of soft x-rays, which offer spectroscopic contrast, nanometer-scale resolution, and broad temporal sensitivity. The ALS facility includes an accelerator complex and photon delivery system that is capable of providing the foundations for an upgrade that will achieve world-leading soft x-ray coherent flux. The existing ALS provides a ready-made foundation, including conventional facilities and also includes extensive beamlines (up to 40 simultaneously operating beamlines) and instrumentation, an experimental hall, computing resources, ancillary laboratories, offices, and related infrastructure that will be heavily utilized in an upgrade scenario.
The ALS will be upgraded with a multibend achromat (MBA) lattice design that will provide a soft x-ray source that is orders of magnitudes brighter — an up to 100-1000 times increase in brightness and will provide a significantly higher fraction of coherent light in the soft x-ray region than is currently available at ALS.
Any resulting Subcontract will be between the University and the party identified as the Subcontractor and will be issued under Prime Contract No. DE-AC02-05CH11231 between the University and the United States Government (hereinafter “U.S. Government”), represented by the Department of Energy (hereinafter “DOE”) for the management and operation of LBNL and the performance of research and related work.
4.2 Description of Items
Beam Position Monitor (BPM) electronics assemblies provide signal conditioning, timing distribution, and processing necessary to measure the transverse position of the particle beam.
The assemblies consist of multiple printed circuit board (PCB) sub-assemblies grouped into major functional assemblies, including the Timing + Balun assembly, Analog Front End (AFE) assemblies, and Chassis-level electronics.
The required assemblies for this work package are summarized in the table below, which identifies the BPM major assembly, sub-assembly description, total required quantity, and the associated drawing number that defines fabrication and build requirements.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
AL-1918-8543 REV.A Doc.Status:RELEASED Page 5 of 13
Table 1
BPM Sub-Assembly Qty Part #
SPB2 Board 130 AL-1922-5262
PMB Board 130 AL-1888-0614
LBL208_PMOD Board 130 AL-1877-2689
FPD Board 130 AL-1635-0801
AFE Backside Board 1300 AL-1880-0239 Each assembly shall be fabricated in accordance with the latest released revision of the referenced drawings, schematics, bills of materials (BOMs), and applicable specifications.
4.3 Roles and Responsibilities
The subcontract will name two University specialists to oversee the contractual and technical aspects of the procurement:
• The University Procurement Specialist is responsible for contract administration from solicitation to subcontract award, and any contractual issues that arise
• The University Technical Representative is responsible for the technical aspects, beginning with the subcontract award through receipt and acceptance of deliverables.
The selected subcontractor must identify a project manager who will act as the single point of contact for the University representatives. The project manager must be available for the duration of the subcontract to resolve issues and provide technical, programmatic, and schedule updates as specified in this SOW and in the subcontract..
5 SCOPE OF WORK
The contractor shall fabricate, assemble, inspect, and test the AMI PCB, AFE RF A PCB and AFE RF B PCB assemblies identified above in accordance with released engineering documentation and applicable quality standards.
Scope includes:
● Procurement of components per the latest approved revision of the bills of materials:
○ SPB2 Board BOM, AL-1922-5262-C
○ PMB Board BOM, AL-1888-0614-C
○ LBL208_PMOD Board BOM, AL-1877-2689-C
○ FPD Board BOM, AL-1635-0801-C
○ AFE Backside Board BOM, AL-1880-0239-C
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
AL-1918-8543 REV.A Doc.Status:RELEASED Page 6 of 13
● PCB fabrication and population per the latest approved revision of the manufacturing packages:
○ SPB2 Board Manufacturing Package, AL-1922-5262-L
○ PMB Board Manufacturing Package, AL-1888-0614-L
○ LBL208_PMOD Board Manufacturing Package, AL-1877-2689-L
○ FPD Board Manufacturing Package, AL-1635-0801-L
○ AFE Backside Board Manufacturing Package, AL-1880-0239-L
● Soldering in accordance with applicable workmanship standards (e.g., IPC Class as specified)
● Cleaning, conformal coating (if required), and labeling per drawings
● In-process and final inspection
● Documentation of inspection and test results per IPC-9252 and manufacturing drawings included in the manufacturing packages
● Packaging and delivery in ESD-safe materials
All work shall comply with specified tolerances, configuration control requirements, and applicable laboratory or project quality assurance standards.
6 DELIVERABLES AND SCHEDULE
The Contractor shall provide the following deliverables for the AMI PCB, AFE RF A PCB and AFE RF B PCB assemblies as identified in this SOW.
Table 2: Deliverables
Item No. Name Qty Part Number Schedule
0001 SPB2 Board and Test Data- First Article 4 AL-1922-5262 3 weeks ARO
0002 SPB2 Board and Test Data - Production Batch 1 40 AL-1922-5262 4 weeks after Hold
Point approval
0003 SPB2 Board and Test Data - Production Batch 2 86 AL-1922-5262
10 weeks after Hold Point approval
0004 PMB Board and Test Data - First Article 4 AL-1888-0614 4 weeks ARO
0005 PMB Board and Test Data - Production Batch 1 40 AL-1888-0614 4 weeks after Hold
Point approval
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
AL-1918-8543 REV.A Doc.Status:RELEASED Page 7 of 13
0006 PMB Board and Test Data - Production Batch 2 86 AL-1888-0614
10 weeks after Hold Point approval
0007 LBL208_PMOD and Test Data
- First Article 4 AL-1877-2689 3 weeks ARO
0008 LBL208_PMOD and Test Data
- Production Batch 1 40 AL-1877-2689 4 weeks after Hold
Point approval
0009 LBL208_PMOD and Test Data
- Production Batch 2 86 AL-1877-2689
10 weeks after Hold Point approval
0010 FPD Board and Test Data - First Article 4 AL-1635-0801 3 weeks ARO
0011 FPD Board and Test Data - Production Batch 1 40 AL-1635-0801 4 weeks after Hold
Point approval
0012 FPD Board and Test Data - Production Batch 2 86 AL-1635-0801
10 weeks after Hold Point approval
0013 AFE Backside Board and Test Data - First Article 25 AL-1880-0239 3 weeks ARO
0014 AFE Backside Board and Test Data - Production Batch 1 400 AL-1880-0239 4 weeks after Hold
Point approval
0015 AFE Backside Board and Test Data - Production Batch 2 875 AL-1880-0239
10 weeks after Hold Point approval
6.1 First Article Deliverables and Schedule
For each PCB assembly type, the Contractor shall fabricate and deliver a First Article of fully assembled boards within three (3) weeks after ARO
● First Article units shall be delivered in a single batch per assembly type:
● These units shall be clearly identified as First Article material.
● Delivery shall include:
o Certificate of Conformance (CoC) o Inspection and test reports o As-built configuration documentation o Traceability documentation for components (as required) o Any deviations or waivers identified during fabrication
Any anticipated schedule deviation shall be communicated in writing immediately upon identification, along with a recovery plan.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
AL-1918-8543 REV.A Doc.Status:RELEASED Page 8 of 13
The First Article assemblies will be subject to inspection, testing, and formal approval by the Technical Representative (Hold Point). Written approval from the Technical Representative is required prior to commencement of full production quantities.
No production fabrication beyond the First Article quantities shall proceed without formal written authorization.
6.2 Production Batch 1 & 2 Deliverables and Schedule
A hold period of one (1) week is anticipated, in accordance with Section 7.3, to allow LBNL to perform inspection and testing. Following written approval of the First Article assemblies, the Contractor shall proceed with Production.
Production quantities for each PCB assembly type shall be delivered in two (2) batches within the schedule outlined below.
● Batch 1 delivery within four (4) weeks of the Hold Point approval
● Batch 2 delivery within ten (10) weeks of the Hold Point approval
Each production batch shall include:
● Completed PCB assemblies per drawing
● Certificate of Conformance
● Inspection and electrical test data
● Lot traceability documentation
● Serialized identification (if required by drawing)
All assemblies shall be packaged in ESD-safe materials and shipped in accordance with specified handling requirements.
All production units shall undergo 100% testing in accordance with Section 9.2.
Any anticipated schedule deviation shall be communicated in writing immediately upon identification, along with a recovery plan.
7 MANAGEMENT
7.1 Reporting/Communication requirements
Timely, transparent, and proactive communication between the Contractor and Technical and Procurement Representatives is essential to ensuring successful execution of this work. The Contractor shall maintain open lines of communication throughout the period of performance and promptly elevate any issues that could affect cost, schedule, or technical performance.
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
AL-1918-8543 REV.A Doc.Status:RELEASED Page 9 of 13
7.1.1Kick-Off Meeting
A formal Contract Kick-Off Meeting shall be conducted within one (1) week of contract award.
The meeting will be held virtually.
The purpose of the Kick-Off Meeting is to establish a clear and common understanding of:
● Technical scope and applicable engineering documentation
● First Article requirements and approval process
● Production quantities and batch cadence
● Quality standards, inspection requirements, and documentation expectations
● Delivery schedule and milestone expectations
● Points of contact, communication channels, and escalation procedures
The Contractor shall present the agreed upon production schedule per the contract award and associated execution plan at or prior to the Kick-Off Meeting.
7.1.2Weekly Status Reporting and Coordination
Beginning two (2) weeks after contract award and continuing through final delivery, the Contractor shall provide written weekly status reports. Reports shall be concise but sufficiently detailed to provide clear visibility into performance and risk.
At a minimum, weekly reports shall include:
● Production status by assembly type
● Progress against the approved delivery schedule
● First Article fabrication and testing status (if applicable)
● Completed and upcoming production batches
● Material availability and supply chain status
● Summary of quality issues or nonconformances
● Identification of any technical, manufacturing, or supply risks
● Assessment of any condition that could potentially hinder scheduled delivery dates
● Mitigation or recovery actions being implemented
The Contractor shall participate in recurring coordination meetings (weekly or as otherwise agreed) to review status, address risks, and ensure alignment on upcoming milestones.
7.1.3Issue Notification and Escalation
The Contractor shall notify the Technical and Procurement Representatives in writing within two
(2) business days of identifying any issue that may materially impact schedule, quality, or
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
AL-1918-8543 REV.A Doc.Status:RELEASED Page 10 of 13 performance. Early notification is required upon identification of potential risk, regardless of whether full root cause analysis has been completed.
The objective of this communication structure is to enable early visibility, collaborative problem-solving, and uninterrupted production flow to meet the required delivery cadence.
7.2 Documentation requirements
All required documentation shall be submitted to LBNL prior to or upon delivery. The preferred method is electronic format (pdf preferred) sent via email or shared on a secure website. Hard copies included with the deliverable shipment are also acceptable.
7.3 Hold points and what’s required
Written approval from LBNL is required to proceed beyond any identified hold points.
Hold Point : Production Batch Release
● Location: After the first article delivery completion, prior to the production Batch.
● Period: LBNL is expected to require up to one (1) week to inspect the first article
● Requirement: Written approval from the LBNL Technical Representative
8 SHIPPING, HANDLING, AND STORAGE
Packaging and delivery to be in ESD-safe materials.
9 QUALITY ASSURANCE
9.1 Quality reporting requirements
9.1.1Subcontractor Quality program
The subcontractor shall complete the ALS-U Supplier Quality Evaluation Survey (AL-1208-0209) during RFP.
The subcontractor shall maintain and apply an effective QA program for the design, manufacture, testing of all systems and equipment provided.
Post-award surveys may be required and shall be supported.
9.1.2Deviation requests
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
AL-1918-8543 REV.A Doc.Status:RELEASED Page 11 of 13
Any deviations from the dictating LBNL documents must be requested by the subcontractor and approved by LBNL prior to implementation. LBNL will provide a standard deviation request form however, a subcontractor’s existing or internal document may be utilized with LBNL approval.
Deviation requests apply to requests to modify processes or documented drawings. Deviation requests DO NOT apply to hardware that is built and does not conform to the specification.
9.1.3Nonconformance reports
A nonconformance report provides a summary for products or procedures which do not conform to the defined requirements. Nonconformances may be determined and reported by either the subcontractor or LBNL staff. LBNL will provide a standard nonconformance report form however, a subcontractor’s existing or internal document may be utilized with LBNL approval.
Nonconformance reports are to be submitted to LBNL within 3 business days of the identification.
Nonconformance reports apply to hardware that is built and does not conform to the specification(s). LBNL will provide a written disposition establishing a path forward for each nonconformance. No operations may be performed on the nonconforming item without LBNL’s written disposition or approval to proceed.
9.2 Factory Inspection and Test Plan
Factory inspection and test to be performed per fabrication and assembly instructions, as noted in the manufacturing packages as listed in Scope of Work (Section 5). Fabrication shall include electrical testing per IPC-9252.
9.3 ACL upon receipt at LBL
The acceptance criteria list, “Instrumentation PCB ACL” (AL-1567-1040), will be used by LBNL to evaluate and accept all deliverables.
The ACL must be released and placed under change control ahead of procurement award.
9.4 TIP upon receipt at LBL
The following Test & Inspection Procedures (TIPs) shall be used by LBNL as part of the acceptance process, according to the Instrumentation PCB ACL:
● SPB2 Board TIP (AL-1924-1520)
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
AL-1918-8543 REV.A Doc.Status:RELEASED Page 12 of 13
● PMB Board TIP (AL-1922-5291)
● LBL208_PMOD TIP (AL-1880-6071)
● FPD Board TIP (AL-1659-6993)
● AFE Backside Board TIP (AL-1880-6072)
10 APPLICABLE DOCUMENTS
This section identifies applicable documents that are considered to be a part of this document.
All information contained in an applicable document shall be valid to the full extent, unless specifically noted within this document. Applicable documents shall be obtained from the LBNL Document Control Center (DCC).
Table 3: Applicable Documents
Document Number Title AL-1922-5262-C SPB2 Board BOM AL-1922-5262-L SPB2 Board Manufacturing Package AL-1888-0614-C PMB Board BOM AL-1888-0614-L PMB Board Manufacturing Package
AL-1877-2689-C LBL208_PMOD BOM
AL-1877-2689-L LBL208_PMOD Manufacturing Package AL-1635-0801-C FPD Board BOM AL-1635-0801-L FPD Board Manufacturing Package AL-1880-0239-C AFE Backside BOM AL-1880-0239-L AFE Backside Manufacturing Package
11 REFERENCE DOCUMENTS
Documents listed in this section are considered reference documents that can be used to better describe, clarify intent, or provide information where the information was obtained from.
Table 4: Reference Documents
Document Number Title AL-1567-1040 Instrumentation PCB ACL
AL-1924-1520 SPB2 Board TIP AL-1922-5291 PMB Board TIP
AL-1880-6071 LBL208_PMOD TIP
AL-1659-6993 FPD Board TIP AL-1880-6072 AFE Backside Board TIP
AL-1265-6612 ALS-U BUILD TO SPECIFICATION CAD MODEL AND
DRAWING REQUIREMENTS
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
AL-1918-8543 REV.A Doc.Status:RELEASED Page 13 of 13
AL-1208-0209 ALS-U Supplier Quality Evaluation Survey
All officially released LBNL documents are watermarked and contain LBNL Document Control ci al ly R el ea se d
To th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: J un e th , 2
D C
C A ut h
K ey
: 7
K I0
Y7
| 1REVISION HISTORY |
| 2APPROVALS |
| 3ABBREVIATIONS AND ACRONYMS |
| 4INTRODUCTION |
| 4.1Project Overview |
| 4.2Description of Items |
| 4.3Roles and Responsibilities |
| 5SCOPE OF WORK |
| 6DELIVERABLES AND SCHEDULE |
| 6.1First Article Deliverables and Schedule |
| 6.2Production Batch 1 & 2 Deliverables and Schedule |
| 7MANAGEMENT |
| 7.1Reporting/Communication requirements |
| 7.1.1Kick-Off Meeting |
| 7.1.2Weekly Status Reporting and Coordination |
| 7.1.3Issue Notification and Escalation |
| 7.2Documentation requirements |
| 7.3Hold points and what’s required |
| 8SHIPPING, HANDLING, AND STORAGE |
| 9QUALITY ASSURANCE |
| 9.1Quality reporting requirements |
| 9.1.1Subcontractor Quality program |
| 9.1.2Deviation requests |
| 9.1.3Nonconformance reports |
| 9.2Factory Inspection and Test Plan |
| 9.3ACL upon receipt at LBL |
| 9.4TIP upon receipt at LBL |
| 10APPLICABLE DOCUMENTS |
| 11REFERENCE DOCUMENTS |
File details come from the government source that posted it. Updated .