This document is a Request for Quotations (RFQ) for the supply and installation of a photovoltaic (PV) system at the U.S. Embassy in Belgrade, Serbia. The project involves installing solar panels on 10 existing parking canopies, with a total PV-generated area of approximately 630 m2, peak power output of around 140 kWp (equivalent to 112 kW), using approximately 310 PV modules and 6 string inverters. The system will be grid-tied, connected to the embassy's existing electrical grid, and designed to not produce power in excess of on-site consumption.
The solicitation (RFQ No. 19RB1025Q0365) was issued on April 23, 2025, with quotations due by 17:00 local time on May 16, 2025. Interested vendors must be registered in the System for Award Management (SAM), provide proof of registration, and include Defense Base Act (DBA) insurance in their pricing. The contract will be a firm fixed-price purchase order, with the government evaluating offers based on lowest price for a responsive and responsible offeror. A site visit is scheduled for May 6, 2025, and potential bidders must pre-register to attend. All quotations must be submitted electronically to BLG-Procurement@state.gov in PDF format.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (Rev. 6-95)
Previous edition not usable Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER)
THIS RFQ [ ] IS [x] IS NOT A SMALL BUSINESS-
SMALL PURCHASE SET-ASIDE (52.219-4)
PAGE
OF
PAGES
1. REQUEST NO.
19RB1025Q0365
2. DATE ISSUED
April 23, 2025
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5A. ISSUED BY American Embassy, GSO
Bul. kneza A. Karadjordjevica 92, 11000 Belgrade, Serbia.
6. DELIVER BY (Date)
5B. FOR INFORMATION CALL: (Name and telephone no.) (No collect calls 7. DELIVERY
X FOB DESTINATION OTHER (See Schedule)
NAME
BLG-Procurement@state.gov
TELEPHONE NUMBER
AREA CODE
+38111
NUMBER
706-4384
8. TO: 9. DESTINATION
a. NAME b. COMPANY a. NAME OF CONSIGNEE
American Embassy
c. STREET ADDRESS b. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE c. CITY
Belgrade
d. STATE
Serbia
e. ZIP CODE
11040
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR
BEFORE CLOSE OF BUSINESS (Date)
17:00 Belgrade local time on
May 16, 2025
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5A. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Supply and installation of a Photovoltaic
System at the U.S. Embassy in Belgrade, Serbia in accordance with The Schedule.
Submit quotes to:
BLG-Procurement@state.gov job
12 DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS
b. 20 CALENDAR DAYS
c. 30 CALENDAR DAYS
d. CALENDAR DAYS
NUMBER %
NOTE: Additional provisions and representations [X] are [ ] are not attached.
13 NAME AND ADDRESS OF QUOTER 14 SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15 DATE OF QUOTATION
a. NAME OF QUOTER
b. STREET ADDRESS
16. SIGNER
c. COUNTY a. NAME (Type or print)
b. TELEPHONE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or print) AREA CODE
NUMBER
mailto:BLG-Procurement@state.gov mailto:BLG-Procurement@state.gov
U.S. Embassy Belgarde 19RB1025Q0365
TABLE OF CONTENTS
SECTION 1 - THE SCHEDULE
• SF - 18 cover sheet;
• Continuation To SF-18, RFQ Number 19RB1025Q0365, Prices, Block 23
• Continuation To SF-18, RFQ Number 19RB1025Q0365, Schedule Of
Supplies/Services, Block 11 Description/Specifications/Work Statement
• Attachment 1 to Continuation To SF-18, RFQ Number 19RB1025Q0365, Schedule
Of Supplies/Services, Block 11 Description/Specifications/Work Statement -
Feasibility Study for US Embassy Belgrade Solar Car Park – a study prepared by the local consulting engineering company (S.E.E.C. – South East Europe Consultants
Ltd.) covering the analysis of the available locations for solar panels in US Embassy
Belgrade compound.
• Attachment 2 to Continuation To SF-18, RFQ Number 19RB1025Q0365, Schedule
Of Supplies/Services, Block 11 Description/Specifications/Work Statement - US
Department of State Overseas Buildings Operations (OBO) Standard Specifications, Section 263105 – Solar Photovoltaic Systems. This section identifies specific requirements for installation of solar photovoltaic (PV) systems.
• Attachment 3 to Continuation To SF-18, RFQ Number 19RB1025Q0365, Schedule
Of Supplies/Services, Block 11 Description/Specifications/Work Statement - Layout
– P1 Canopy Locations.
• Attachment 4 to Continuation To SF-18, RFQ Number 19RB1025Q0365, Schedule
Of Supplies/Services, Block 11 Description/Specifications/Work Statement - Canopy details.
• Attachment 5 to Continuation To SF-18, RFQ Number 19RB1025Q0365, Schedule
Of Supplies/Services, Block 11 Description/Specifications/Work Statement - Canopy
Photo.
SECTION 2 - CONTRACT CLAUSES
• Contract Clauses
• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
SECTION 3 - SOLICITATION PROVISIONS
• Solicitation Provisions
• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in
Part 12
SECTION 4 - EVALUATION FACTORS
• Evaluation Factors
• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in
Part 12
SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS
• Offeror Representations and Certifications
• Addendum to Offeror Representations and Certifications - FAR and DOSAR
Provisions not Prescribed in Part 12
SECTION 1 - THE SCHEDULE
CONTINUATION TO SF-18
RFQ NUMBER 19RB1025Q0365 PRICES, BLOCK 11
I GENERAL
The United States Government (USG), Department of State (DoS), U.S. Embassy Belgrade, Serbia requires services to supply and install a Photovoltaic (PV) system at the Embassy compound in Belgrade. The Contractor shall provide complete supply and installation services, contract coordination, and supervision, including but not limited to management necessary to meet the requirements of this contract within the established schedules. The price shall include all costs associated with the supply and installation of the PV system in accordance with the manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-4 and 52.228-5), overhead and profit.
II CONTRACT TYPE
The contract type resulting from this solicitation will be a firm fixed price purchase order.
III PRICING
CLIN Description Price
Supply and installation of Photovoltaic System at the compound of U.S. Embassy Belgrade, Serbia including all labor, materials, equipment, services, overhead, other indirect costs, and profit.
Obtaining technical permitting for the installation of Photovoltaic System with the local authorities.
Obtaining Bureau of Overseas Buildings Operations (OBO) technical permitting for the installation of Photovoltaic System.
Defense Base Act (DBA) Insurance for CLIN 0001*
Total Firm Fixed Price (0001-0004):
* DBA insurance is a reimbursable expense, only the actual cost of the policy plus bank fees will be reimbursed up to the contracted amount
Tasks and Deliverables not identified with a CLIN designation fall under CLIN 0001.
IV PAYMENT
The Government will make payment in local currency in accordance with local laws and regulations.
Partial payments are allowed under this contract in accordance with FAR clause 52.232-16.
V VALUE ADDED TAX
Value Added Tax (VAT) is not applicable to this contract and shall not be included in the CLIN rates or Invoices because the U.S. Embassy has a tax exemption certificate from the host government.
VI QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)
This plan provides an effective method to promote satisfactory contractor performance. The
QASP provides a method for the Contracting Officer's Representative (COR) to monitor
Contractor performance, advise the Contractor of unsatisfactory performance, and notify the
Contracting Officer of continued unsatisfactory performance. The Contractor, not the
Government, is responsible for management and quality control to meet the terms of the contract.
The role of the Government is to monitor quality to ensure that contract standards are achieved.
Performance Objective Scope of Work Paragraphs
Performance Threshold
Services.
Performs all supply and installation services set forth in the scope of work.
1 thru 12
All required services are performed and no more than one
(1) one customer complaint is received per month.
1. SURVEILLANCE. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.
2. STANDARD. The performance standard is that the Government receives no more than one
(1) one customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212.4, Contract Terms and Conditions - Commercial Products and Commercial
Services (NOV 2023), if any of the services exceed the standard.
3. PROCEDURES.
(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.
(b) The COR will complete appropriate documentation to record the complaint.
https://www.acquisition.gov/far/52.212-4
(c) If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.
(d) If the COR determines the complaint is valid, the COR will inform the
Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.
(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.
(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.
(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.
(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the
COR will contact the Contracting Officer for appropriate action under the Inspection clause.
CONTINUATION TO SF-18,
RFQ NUMBER 19RB1025Q0365
SCHEDULE OF SUPPLIES/SERVICES, BLOCK 11
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
I PROJECT OVERVIEW
The United States Government (USG), Department of State (DOS), U.S. Embassy Belgrade, Serbia requires supply and installation of equipment for a Photovoltaic (PV) System at the compound in Belgrade, Serbia.
II PROJECT LOCATION AND DESCRIPTION
The project will take place on the U.S. Embassy Belgrade compound at following address:
United States Embassy in Belgrade, Serbia Boulevard Kneza Aleksandra Karadjordjevica 92, Belgrade.
The project encompasses installation of planned PV system on the existing canopy structures inside of the compound.
The PV system shall be connected to the existing compound electrical grid and shall not produce power in excess of what will be consumed at site.
III PROJECT OBJECTIVE
The Contractor shall provide complete supply and installation services, contract coordination, and supervision, including but not limited to the management necessary to meet the requirements of this contract within the established schedules.
IV PROJECT REQUIREMENTS
1. The contractor’s performance shall include the installation of solar panels on the existing parking canopies at the current embassy complex in Belgrade, meeting the following specifications: a total of 10 canopies, a PV (photovoltaic) generated area of approximately
630 m2, with a peak power output of around 140 kWp, equivalent to 112 kW.
2. The system shall be made using approximately 310 PV modules and 6 string inverters. The required installation and mounting equipment shall be included.
3. At this phase of the PV System shall not include the purchase and installation of energy storage equipment or batteries. However, the system shall be installed in such a way that, in the future batteries could be installed.
4. PV system output shall comply with the following requirement: where grid tied PV systems are acceptable to local utility company, PV system’s inverters shall match local utility company exactly in voltage, phase, and frequency to allow it to be grid-tied in accordance with local utility company’s safety and power quality requirements. PV system shall not produce power in excess of what will be consumed at site. Provide and arrange revenue meter where PV system generated energy is not registered on utility meter.
5. The system shall encompass electrical wiring needed to connect PV modules and inverters, as well as cabling from the locations of inverters to the existing low voltage switchgear of the embassy compound. Disconnect switches both on AC and DC sides of the system shall be included.
6. Appropriate trenching and cable protection shall be included within the installation portion of the PV system. The final connection of the PV system shall be to the Low Voltage switchboard/panelboard at the compound. It is the responsibility of the Contractor to determine a viable path for the power feeders wiring from the PV system. If using underground routing, use underground conduit and cabling with hand-holes and pull boxes.
The installation of these underground ducts may require selective removal and replacement of existing concrete, walkways, curbs, asphalt roadways, and penetration of existing concrete walls. The cutting of existing paved areas shall be limited to 90-degree crossings.
Additionally, the installation must include work on patching and re-striping curbs and gutters in affected paved areas to match existing adjacent conditions.
7. The system shall include measuring devices and respective software platform for collecting data from the PV modules – Data Acquisition System (DAS). All inverters and/or data acquisition system (DAS) components must be able to operate independently of internet connection. For the technical requirements for DAS, the Contractor shall refer to the documents provided in the Attachment.
The existing power monitoring system at the site is a stand-alone, non-internet-based
EcoStruxure Power Monitoring Expert by Schneider Electric. Monitoring the electricity production from the PV system shall be integrated into this system.
8. The system shall include an extension of the existing LV switchgear with a designated panel board section for the PV plant.
The existing Low Voltage Switchgear at the site is a Power-Zone 4 Switchgear, manufactured by SQUARE D. The PV plant panel board section shall be compatible with this equipment.
9. Power lines filtering of the inverters' output shall be included in the equipment listing to provide adequate protection from harmonics and power quality infractions in the existing electrical network at the compound.
10. Grounding, lightning protection and electrical safety measures shall be included in the installation, following the relevant codes, NFPA 780 and OBO design standards. All grounding and lighting protection system connections must be permanent and “irreversible”.
11. The Contractor must provide all equipment, labor, and materials necessary to complete the installation and activation of operational photovoltaic systems connected to and integrated with the existing compound electrical utility, in accordance with (1)-(10).
12. The specific requirements for installation of solar photovoltaic (PV) system are listed in the document provided in the Attachment – OBO Standard Specifications, Section 263105.
V PERMITS AND LICENSES
The Contractor is responsible for obtaining permits (both by OBO and local authorities) and associated fees and licenses required to execute the work.
1. The Contractor shall provide technical documents needed to obtain those permits and licenses for which they are responsible, and official translations as required to execute those permit actions.
2. The Contractor shall submit technical documents to the COR for approval prior to releasing to local permitting and licensing agencies for permits.
3. Permit documents shall be labeled by generic terminology (e.g., office, restroom, mechanical space).
4. Permit documents, drawings, specifications, and calculations shall be sealed and signed by the architect and engineers of record, or other professionals as required.
Documents submission procedures will be described in separate document and provided to the selected contractor.
No work may commence until all permit requirements are obtained.
VI CONTRACTOR’S RESPONSIBILITIES
1. The Contractor must coordinate with the Regional Security Officer (RSO), Management
Officer (MO) and Contract Officer Representative (COR) prior to commencement of work to determine security procedures and protocols for visits during project operations. The
Contractor must also follow all provisions identified in the Security Classifications
Guidelines for handling and marking of documents and materials.
2. Personnel Qualifications: The Contractor shall provide the proof of hiring Registered
Professionals:
a. Structural Engineering Personnel
b. Electrical Engineering Personnel
3. Provide the following specialist expertise with a minimum of five years of documented experience in the area of expertise:
a. Photovoltaic (PV) system installation Engineering Professional
4. All field conditions must be verified by the Contractor at the Contractor’s risk.
VII DOCUMENTS PROVIDED BY THE EMBASSY
The Contractor may refer to documents provided in the attachments:
1. Feasibility Study for US Embassy Belgrade Solar Car Park – a study prepared by the local consulting engineering company (S.E.E.C. – South East Europe Consultants Ltd.) covering the analysis of the available locations for solar panels in US Embassy Belgrade compound.
2. US Department of State Overseas Buildings Operations (OBO) Standard Specifications, Section 263105 – Solar Photovoltaic Systems. This section identifies specific requirements for installation of solar photovoltaic (PV) systems.
3. Layout – P1 Canopy Locations.
4. Canopy details.
5. Canopy Photo.
The above documents will be distributed to offerors at the site visit.
VIII PROJECT CODES REQUIREMENTS
All architectural and engineering work shall conform to the more stringent requirements of the following listed codes and standards.
1. Photovoltaic specifications (Specification Section 263105)
2. 2021 International Building Code (IBC) amended by the 2019 OBO Code Supplements
3. 2018 International Existing Building Code (IEBC)
4. 2023 NFPA 780
5. 2023 NFPA National Electrical Code (NEC)
IX PROJECT MANAGEMENT AND EXECUTION PLANS
The Contractor shall develop and maintain project management and execution plans in accordance with the project requirements. The point of contact (POC) on the Embassy side will be the Contracting Officer’s Representative (COR).
The Contractor will provide the Site Point of Contact five [5] days advance notice for the site visit.
X PROJECT CLOSEOUT
The Contractor shall provide following documents in the process of closing the subject project:
1. Provide four sets of approved manuals. The manuals shall be neatly bound with all written information necessary to properly maintain and adjustment of equipment. Supply two (2) hard copies in English, two (2) hard copies in the local language and one (1) electronic reproducible master in a PDF format.
2. Inclusive to the contract provide detailed ‘As Built’ drawings of all areas/disciplines affected by the scope of work. Provide both electronic and hard copies.
3. Provide copies of all testing procedures.
Attachment 1 to Continuation To SF-18, RFQ Number 19RB1025Q0365, Schedule Of
Supplies/Services, Block 11 Description/Specifications/Work Statement - Feasibility
Study for US Embassy Belgrade Solar Car Park – a study prepared by the local consulting engineering company (S.E.E.C. – South East Europe Consultants Ltd.)
covering the analysis of the available locations for solar panels in US Embassy Belgrade compound.
This attachment will be provided to attendees at the site visit
Attachment 2 to Continuation To SF-18, RFQ Number 19RB1025Q0365, Schedule Of
Supplies/Services, Block 11 Description/Specifications/Work Statement - US
Department of State Overseas Buildings Operations (OBO) Standard Specifications, Section 263105 – Solar Photovoltaic Systems. This section identifies specific requirements for installation of solar photovoltaic (PV) systems.
Attachment 3 to Continuation To SF-18, RFQ Number 19RB1025Q0365, Schedule Of
Supplies/Services, Block 11 Description/Specifications/Work Statement - Layout – P1
Canopy Locations.
Attachment 4 to Continuation To SF-18, RFQ Number 19RB1025Q0365, Schedule Of
Supplies/Services, Block 11 Description/Specifications/Work Statement - Canopy details.
Attachment 5 to Continuation To SF-18, RFQ Number 19RB1025Q0365, Schedule Of
Supplies/Services, Block 11 Description/Specifications/Work Statement - Canopy Photo.
Commented [SV1]: Zorane, mozda ne treba Attach.1 jer spisak svih ovih dok.stoji u SoW. Ja cu tu dodati da ce biti podeljeni vendorima na site visit-u
SECTION 2 - CONTRACT CLAUSES
52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS
(NOV 2023) IS INCORPORATED BY REFERENCE.
52.212-5 CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE
ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or
Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further
Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or
Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar
2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).
(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting
Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun
2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).
__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov
2021) (41 U.S.C. 3509)).
__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment
Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the
American Recovery and Reinvestment Act of 2009.)
__ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712);
this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).
_X_ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun
2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).
__ (6) [Reserved].
__ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.204-14#FAR_52_204_14
__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery
Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
_X_ (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of
Division R of Pub. L. 117-328).
__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply
Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec
2023) ( Pub. L. 115–390, title II).
__ (11)
(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec
2023) ( Pub. L. 115–390, title II).
__ (ii) Alternate I (Dec 2023) of 52.204-30.
_X_ (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors
Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025)
( 31 U.S.C. 6101 note).
__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility
Matters (Oct 2018) ( 41 U.S.C. 2313).
__ (14) [Reserved].
__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022)
( 15 U.S.C. 657a).
__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns
(Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer)
(15 U.S.C. 657a).
__ (17) [Reserved]
__ (18)
(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
__ (ii) Alternate I (Mar 2020) of 52.219-6.
__ (19)
(i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).
__ (ii) Alternate I (Mar 2020) of 52.219-7.
__ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)( 15 U.S.C. 637(d)(2) and
(3)).
__ (21)
(i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) ( 15 U.S.C. 637(d)(4)).
__ (ii) Alternate I (Nov 2016) of 52.219-9.
__ (iii) Alternate II (Nov 2016) of 52.219-9.
__ (iv) Alternate III (Jun 2020) of 52.219-9.
__ (v) Alternate IV (Jan 2025) of 52.219-9.
__ (22)
(i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).
__ (ii) Alternate I (Mar 2020) of 52.219-13.
__ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).
__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep
2021) (15 U.S.C. 637(d)(4)(F)(i)).
__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-
Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024)
(15 U.S.C. 657f).
https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 https://www.govinfo.gov/link/uscode/31/6101 https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27
__ (26)
(i) 52.219-28, Post award Small Business Program Representation (Jan
2025) (15 U.S.C. 632(a)(2)).
__ (ii) Alternate I (Mar 2020) of 52.219-28.
__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically
Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).
__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small
Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022)
(15 U.S.C. 637(m)).
__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar
2020) ( 15 U.S.C. 644(r)).
__ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).
__ (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
___(32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2025)( E.O.
13126).
__ (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
__ (34)
(i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).
__ (ii) Alternate I (Feb 1999) of 52.222-26.
__ (35)
(i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).
__ (ii) Alternate I (Jul 2014) of 52.222-35.
__ (36)
(i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).
__ (ii) Alternate I (Jul 2014) of 52.222-36.
__ (37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).
__ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations
Act (Dec 2010) (E.O. 13496).
_X_ (39) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and
E.O. 13627).
__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
__ (40) 52.222-54, Employment Eligibility Verification (Jan 2025) ( Executive Order 12989).
(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
__ (41)
(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items
(May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
__ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).
__ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and
Air Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).
__ (44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).
__ (45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).
https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-29#FAR_52_219_29 https://www.acquisition.gov/far/52.219-30#FAR_52_219_30 https://www.acquisition.gov/far/52.219-32#FAR_52_219_32 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section644&num=0&edition=prelim https://www.acquisition.gov/far/52.219-33#FAR_52_219_33 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.federalregister.gov/executive-order/13126 https://www.federalregister.gov/executive-order/13126 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-54#FAR_52_222_54 https://www.federalregister.gov/executive-order/12989 https://www.acquisition.gov/far/22.1803#FAR_22_1803 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim
__ (46) 52.223-23, Sustainable Products and Services (May 2024) ( E.O. 14057, 7 U.S.C.
8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).
__ (47)
(i) 52.224-3 Privacy Training (Jan 2017) ( 5 U.S.C. 552 a).
__ (ii) Alternate I (Jan 2017) of 52.224-3.
__ (48)
(i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).
__ (ii) Alternate I (Oct 2022) of 52.225-1.
__ (49)
(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19 U.S.C.
3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter
29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-
169, 109-283, 110-138, 112-41, 112-42, and 112-43.
__ (ii) Alternate I [Reserved].
__ (iii) Alternate II (Jan 2025) of 52.225-3.
__ (iv) Alternate III (Feb 2024) of 52.225-3.
__ (v) Alternate IV (Oct 2022) of 52.225-3.
__ (50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
_X_ (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the
Department of the Treasury).
__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United
States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for
Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).
__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007)
(42 U.S.C. 5150).
__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov
2007) (42 U.S.C. 5150).
_X_ (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While
Driving (May 2024) ( E.O. 13513).
__ (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).
_X_ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial
Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial
Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).
_X_ (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award
Management (Oct2018) ( 31 U.S.C. 3332).
__ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award
Management (Jul 2013) (31 U.S.C. 3332).
__ (61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
__ (62) 52.239-1, Privacy or Security Safeguards (Aug 1996) ( 5 U.S.C. 552a).
_X_ (63) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by
American Security Drone Act-Covered Foreign Entities (Nov 2024) (Sections 1821-1826, Pub.
L. 118-31, 41 U.S.C. 3901 note prec.).
__ (64) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).
https://www.acquisition.gov/far/52.223-23#FAR_52_223_23 https://www.federalregister.gov/executive-order/14057 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2112&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3805&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section4001&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-5#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://www.acquisition.gov/far/52.225-13#FAR_52_225_13 https://www.acquisition.gov/far/52.225-26#FAR_52_225_26 https://www.acquisition.gov/far/52.226-4#FAR_52_226_4 https://www.acquisition.gov/far/52.226-5#FAR_52_226_5 https://www.acquisition.gov/far/52.226-8#FAR_52_226_8 https://www.federalregister.gov/executive-order/13513 https://www.acquisition.gov/far/52.229-12#FAR_52_229_12 https://www.acquisition.gov/far/52.232-29#FAR_52_232_29 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3805&num=0&edition=prelim https://www.acquisition.gov/far/52.232-30#FAR_52_232_30 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3805&num=0&edition=prelim https://www.acquisition.gov/far/52.232-33#FAR_52_232_33 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3332&num=0&edition=prelim https://www.acquisition.gov/far/52.232-34#FAR_52_232_34 https://www.acquisition.gov/far/52.232-36#FAR_52_232_36 https://www.acquisition.gov/far/52.239-1#FAR_52_239_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552a&num=0&edition=prelim https://www.acquisition.gov/far/52.240-1#FAR_52_240_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section3901&num=0&edition=prelim https://www.acquisition.gov/far/52.242-5#FAR_52_242_5
__ (65)
(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) ( 46
U.S.C. 55305 and 10 U.S.C. 2631).
__ (ii) Alternate I (Apr 2003) of 52.247-64.
__ (iii) Alternate II (Nov 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
[Contracting Officer check as appropriate.]
__ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter67).
__ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price
Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and
41 U.S.C. chapter 67).
__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price
Adjustment (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).
__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to
Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements
(May 2014) (41 U.S.C. chapter 67).
__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to
Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
__ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan
2022).
__ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).
__ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020)
(42 U.S.C. 1792).
__ (10) 52.247-69, Reporting Requirement for U.S.-Flag Air Carriers Regarding Training to
Prevent Human Trafficking (Jan 2025) ( 49 U.S.C. 40118(g)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the
Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor
Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
https://www.acquisition.gov/far/52.247-64#FAR_52_247_64 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section55305&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section55305&num=0&edition=prelim https://www.acquisition.gov/far/52.247-64#FAR_52_247_64 https://www.acquisition.gov/far/52.247-64#FAR_52_247_64 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 https://www.acquisition.gov/far/52.222-42#FAR_52_222_42 https://www.acquisition.gov/far/52.222-43#FAR_52_222_43 https://www.acquisition.gov/far/52.222-44#FAR_52_222_44 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section206&num=0&edition=prelim https://www.acquisition.gov/far/52.222-51#FAR_52_222_51 https://www.acquisition.gov/far/52.222-53#FAR_52_222_53 https://www.acquisition.gov/far/52.222-55#FAR_52_222_55 https://www.acquisition.gov/far/52.222-62#FAR_52_222_62 https://www.acquisition.gov/far/52.226-6#FAR_52_226_6 https://www.acquisition.gov/far/52.247-69#FAR_52_247_69 https://www.govinfo.gov/link/uscode/49/40118 https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/52.215-2#FAR_52_215_2 https://www.acquisition.gov/far/subpart-4.7#FAR_Subpart_4_7
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the
Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)
(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1), in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509).
(ii) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712).
(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further
Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iv) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or
Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).
(v) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(vi) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of
Division R of Pub. L. 117-328).
(vii)
(A) 52.204–30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec
2023) ( Pub. L. 115–390, title II).
(B) Alternate I (Dec 2023) of 52.204–30.
(viii) 52.219-8, Utilization of Small Business Concerns (Jan 2025) ( 15 U.S.C. 637(d)(2) and
(3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in
FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(ix) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(x) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).
(xi) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).
(xii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).
(xiii) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).
(xiv) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec
2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xv) 52.222-41, Service Contract Labor Standards (Aug 2018) ( 41 U.S.C. chapter 67).
(xvi)
(A) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O
13627).
(B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xvii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to
Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements
(May 2014) (41 U.S.C. chapter 67).
https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/19.702#FAR_19_702 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-chapter67-front&num=0&edition=prelim https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-51#FAR_52_222_51
(xviii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to
Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).
(xix) 52.222-54, Employment Eligibility Verification (Jan 2025) ( E.O. 12989).
(xx) 52.222-55,…