Questions Answers.pdf
PDF 181 KB Posted
- Solicitation number
- 19MX5326Q0043
- Issued by
-
Department of State US Embassy Mexico
About this file
This is a Questions and Answers document for solicitation 19MX5326Q0043 concerning anti-climb bi-folding gate preventive maintenance services for an Embassy facility.
The document addresses technical specifications and contractual responsibilities for the gate system and related services. Electrically operated bi-folding gates operate at normal speed only without emergency speed capability and use backup generator power with approximately 15 seconds lag time to activation; no generator systems are included in the technical scope. The gates do not have warranty coverage. The contractor is not responsible for providing proprietary software tools or licenses, as the government will not furnish these items. For preventive maintenance consumables, the government supplies hose, oil, fluids, and filters as required, while the contractor must supply all other additional consumable parts needed for preventive maintenance; repair supplies resulting from damage beyond normal wear and tear remain outside the contractor's responsibility. The contract is structured as a preventive maintenance agreement with repairs quoted and procured separately. Vendors may maintain a limited inventory of spare parts on site. Labor rate pricing should reflect only the hourly rate per year with the "Total" field left blank or marked "N/A," as no estimated repair hours are provided for evaluation purposes. The existing gates received recent maintenance from the current builder, with cycle counter data available for vendor assessment; minor dents and scratches will be addressed through painting only, and post-modification misalignment exists on one gate unit (MCAP).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19MX5326Q0043 Anti-climb Bi-folding gates
SBU - CONTRACTING AND ACQUISITIONS
Questions & Answers
Diagrams:
Q1 Is the Embassy providing diagrams of the electric installation of the gates?
A1 We may submit diagrams subject to security assessment.
Operation speed:
Q2 Does it operate at a normal speed? Does it have an emergency speed?
A2 No, it operates at normal speed.
Energy back up:
Q3 Does the motors use batteries as a back up?.
A3 No, it uses a back up generator.
Q4 What is the lag time to enter the generator?
A4 Approximately 15 seconds
Storage:
Q5 Can vendor have an inventory of spare parts?
A5 Yes, we can accommodate a small amount of spare parts
Designs:
Q6 Does the gates have warranty?
A6 No, they don’t have warranty
Q7 RFP Section 8.1 and Section 8.2. The asset inventory in Attachment B lists only bi-folding gates, control panels, and gate backup UPS units. Can the Government please clarify if any generator systems are included under this contract's technical scope, or if these references are administrative errors?
A7 No, there is not any generator system included.
Q8 RFP Section 10 - Software, Licenses and Passwords states that copies of software and licenses needed to control or adjust the module must be given to post. Is the contractor expected to purchase new software licenses within the fixed-price base rate, or will the Embassy provide existing proprietary software tools to our technicians on-site?
A8 The government or embassy will not provide any proprietary software or tool.
Q9 RFP Section 1.6 - Pricing and Section 7.2 - Inventory, and Attachment A -indicate parts and materials must be built into the contractor's loaded rates, while Attachment A states that fluids, filters, and parts are provided at the expense of the U.S. Government. Please clarify which party is financially responsible for sourcing baseline preventive maintenance consumables.
A9 The government will supply, if required, hose, oil, fluids, and filters for preventative maintenance. The contractor must supply any other additional consumable parts required for preventative maintenance.
Supplies for repairs (damage not resulting from normal wear and tear) are not the contractor’s responsibility.
Q10 RFP Section 1.7.1 - Repair Labor Rates. The matrix requests a "Labor hour rate" and a "Total" per contract year. Since there are no estimated quantities of repair hours outlined for evaluation purposes, could the Government specify how offerors should calculate the "Total" row to ensure uniform evaluation?
A10 The 'Total' column in Section 1.7.1 does not require a calculated amount. Offerors shall provide only their current labor hour rate per year. No estimated repair hours are provided, as repairs are outside the scope of this Preventive Maintenance contract and will be quoted and procured separately per Section 7.3. Offerors should enter 'N/A' or leave the Total field blank.
Q11 Is the gate (MCAP) damaged?
A11 After the modification it was misaligned.
Q12 Some parts of the gates have small dents and scratches, are these going to be repaired
A12 No, just painted
Q13 Did the gate receive recent maintenance?
A13 Yes, by the current builder. We can share the cycles counter so vendors can assess wear.