This is a Price Quotation Breakdown template for a Firm Fixed Price construction project to replace roofing at the Deputy Chief of Mission Residence (DCMR) in Cairo, Egypt under RFQ solicitation 19GE5026Q0115. The template is structured to allow quoters to populate material costs, labor and equipment costs, and subtotals for three distinct roof replacement scopes of work.
The first scope covers the DCMR and CAC Plaza Deck (Roof Areas 1, 2, 3, 11) totaling 3,300 square feet, including demolition, substrate repairs, two-ply modified bitumen membrane installation, mortar setting bed, stone tile application, flashings, roof drains, scuppers, sealant, and painting. The second scope addresses DCMR and CAC Clay Tile areas (Roof Areas 4, 5, 6, 12) totaling 1,800 square feet, requiring demolition, tile salvage, new wood deck and underlayment installation, battens, new clay tiles, insulation, metal flashings, fascia and soffit repairs, and painting. The third scope covers the Generator Building (Roof Area 10) at 200 square feet with elastomeric coating work including demolition, concrete deck repairs, base coat with fabric, and finish coats. Quoters must provide itemized pricing for materials and labor, then calculate indirect costs including shipping, Prevailing Wage Act (DBA) compliance, taxes and insurance (percentage), labor overhead (percentage), and profit (percentage) to arrive at the total estimated project cost. This breakdown is associated with Amendment 0001, which extended the quotation submission due date to August 28, 2026 by 15:00 hours Central European Summer Time.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation 19GE5026Q0115 - DCMR Roof Replacement, Cairo, Egypt |
| AMENDMENT 01 |
| The quoter shall adjust this breakdown as desired to correspond with the Firm Fixed Price required for this project. See Section B.5. of solicitation. |
| COST QUOTATION BREAKDOWN | |||||||
| ITEM OF WORK | QUANTITY | UNITS | MATERIAL COST | LABOR & EQUIPMENT COST | TOTAL | ||
| PER UNIT | SUBTOTAL | PER UNIT | SUBTOTAL | ||||
| DCMR & CAC PLAZA DECK (ROOF AREAS 1 ,2, 3, 11) | |||||||
| Mobilization / Demobilization | 1 | Lump Sum | $ - 0 | ||||
| Demolition / Disposal | 3,300 | Square Feet | $ - 0 | ||||
| Minor Repairs to Existing Substrate | 3,300 | Square Feet | $ - 0 | ||||
| Two-Ply Modified Bitumen Membrane | 3,300 | Square Feet | $ - 0 | ||||
| Mortar Setting Bed | 3,300 | Square Feet | $ - 0 | ||||
| Stone Tile | 3,300 | Square Feet | $ - 0 | ||||
| Base Flashings | 500 | Linear Feet | $ - 0 | ||||
| Metal Counterflashing | 500 | Linear Feet | $ - 0 | ||||
| Equipment / Curb Flashing | 500 | Linear Feet | $ - 0 | ||||
| Penetration Flashing | 25 | Each | $ - 0 | ||||
| Roof Drains | 5 | Each | $ - 0 | ||||
| Overflow Scuppers | 5 | Each | $ - 0 | ||||
| Sealant | 500 | Linear Feet | $ - 0 | ||||
| Painting | 1 | Lump Sum | $ - 0 | ||||
| Subtotal - Materials and Labor | $ - 0 | $ - 0 | $ - 0 | ||||
| DCMR & CAC CLAY TILE (ROOF AREAS 4, 5, 6, 12) | |||||||
| Demolition / Disposal | 1,800 | Square Feet | $ - 0 | ||||
| Salvage of Existing Tiles for Re-Install | 1,000 | Square Feet | $ - 0 | ||||
| New T&G Wood Deck | 1,800 | Square Feet | $ - 0 | ||||
| New Underlayment | 1,800 | Square Feet | $ - 0 | ||||
| New 2-Way Wood Battens | 1,800 | Square Feet | $ - 0 | ||||
| New Clay Tiles | 1,800 | Square Feet | $ - 0 | ||||
| New Insulation | 1,800 | Square Feet | $ - 0 | ||||
| Metal Flashings | 1,000 | Linear Feet | $ - 0 | ||||
| Penetration Flashing | 10 | Each | $ - 0 | ||||
| Wood Fascia, Soffit Repair/Replace | 1 | Lump Sum | $ - 0 | ||||
| Painting | 1 | Lump Sum | $ - 0 | ||||
| Subtotal - Materials and Labor | $ - 0 | ||||||
| GENERATOR BUILDING (ROOF AREA 10) - Elastomeric Coating | |||||||
| Demolition / Disposal | 200 | Square Feet | $ - 0 | ||||
| Minor Repairs To Concrete Deck | 200 | Square Feet | $ - 0 | ||||
| Base Coat w/ Fabric | 200 | Square Feet | $ - 0 | ||||
| Finish Coats | 200 | Square Feet | $ - 0 | ||||
| Subtotal - Materials and Labor | $ - 0 | $ - 0 | $ - 0 |
SUBTOTAL - ALL ROOF AREAS (M&L) $ - 0 $ - 0 $ - 0
| INDIRECT COSTS | ||
| Shipping | 1 | Lump Sum |
| DBA | 1 | Lump Sum |
| Taxes & Insurance | ____% | Labor |
| Overhead | _____% | Subtotal - M&L |
| Profit | ______% | All |
| Subtotal - Indirect Costs |
TOTAL - ESTIMATED PROJECT COST (M&L + IND.Costs) $ - 0