RFP 19AQMM24R0106 QandA WET dated 27 Aug 24.pdf

PDF 149 KB Posted

Attached to
VERIFICATION OF WINGARD EVALUATION AND TESTING (WET) at REDUCED SETBACKS
Solicitation number
19AQMM24R0106
Issued by

About this file

This document is a set of Questions and Answers (Q&A) related to RFP 19AQMM24R0106 for the "VERIFICATION OF WINGARD EVALUATION AND TESTING (WET) at REDUCED SETBACKS" contract opportunity.

The Q&A provides details on the charge size referred to as "W3" in the test matrix, stating that it may be represented by three pressure/impulse/duration combinations, with the highest being 98 psi/426 psi-msec/8.7 msec. This suggests the contract requires testing of structural systems, facades, windows, and blast effect mitigation technologies using the specified loading conditions, which differ from historic Department of State Design Basis Threat (DBT) conditions. The purpose is to verify that forced entry/ballistic and blast resistant (FE/BBR) and blast resistant glazing layup designs using the WINGARD design software perform within predicted response limits when exposed to these non-standard loading conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VERIFICATION OF WINGARD EVALUATION AND TESTING (WET) at REDUCED SETBACKS

RFP - 19AQMM24R0106

Question and Answers dated 27 Aug 24

Ques�on:

Can you provide more informa�on on the charge size referred to as W3 in the test matrix? Is this the full DBT charge size?

Response: The loading may be represented by the following P/I/Td

i. 42 psi/298 psi-msec/14.1

ii. 98 psi/426 psi-msec/8.7 msec

iii. 83 psi/251 psi-msec/6 msec

File details come from the government source that posted it. Updated .