AMD1 Appendix A - Question and Answer.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- Functional Area (FA) 6, Vehicles, Multiple Award Contract for International Law Enforcement (INL)
- Solicitation number
- 19AQMM23R0287
About this file
This is a Request for Proposal for a Multiple Award Indefinite Delivery Indefinite Quantity contract issued by the Department of State's Bureau of International Narcotics and Law Enforcement Affairs to support its international law enforcement programs. The solicitation seeks proposals for a wide range of commercial supplies and services to enhance law enforcement capacity, regional partnerships, and information sharing. The contract has a minimum value of $10,000 and maximum value of $700 million over five years, with an option to extend an additional six months. Proposals are due on January 17, 2024 by 0900 ET for Phase I, with questions due by January 9, 2024 at 0900 ET. The source selection uses a phased approach with an advisory down-select. The RFP specifies delivery to locations outside the United States such as Colombia, Haiti, and Ukraine. Supplies and services must adapt to local conditions and utilize local warranty, maintenance and language support.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19AQMM23R0287 AMD1 - FA6 Vehicles INL MADOC.pdf | ||
| SECTION L-001 1-17-24.pdf | ||
| SECTION M-001 1-17-24.pdf | ||
| Attachment A - INL Blanket Waivers.pdf | ||
| Appendix B - Offeror Experience Project Data Sheet.docx | DOCX document | |
| DORP PR11587625_Att 1.docx | DOCX document | |
| DORP PR11587625_Att 3.docx | DOCX document | |
| Appendix D - Pricing.xlsx | XLSX spreadsheet | |
| Sample DORP PR12162571 AML Task Force Vehicles for CNP AGO INL Bogota.pdf | ||
| DORP PR12162571_Att 3.docx | DOCX document | |
| SECTION L-001.pdf | ||
| DORP PR12162571_Att 1.docx | DOCX document | |
| Appendix C - Past Performance Questionnaire.docx | DOCX document | |
| Seed DORP PR11587625 256 Armored Pickup Trucks for SBGS INL Kyiv.pdf | ||
| 19AQMM23R0287 FA6 Vehicles INL MADOC.pdf | ||
| Attachment B - NMR Class Waiver List June 2022.pdf | ||
| SECTION M-001.pdf | ||
| DORP PR12162571_Att 2.docx | DOCX document | |
| Appendix A - Question and Answer Template.xlsx | XLSX spreadsheet | |
| DORP PR11587625_Att 2.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Q&A for Solicitation 19AQMM23R0287 - AMD1 dated 1/17/2024
| Solicitation Reference | Technical Questions | DOS Technical Answers | AQM/Price Questions | DOS Price Answers |
| N/A | In previous INL solicitations, a clause has been incorporated to mitigate war risks for contractors, with the government assuming partial or total responsibility in cases of war-related loss or damages. Would INL consider including a similar clause in this solicitation? | |||
| No. Relevant FAR clauses are included. |
19AQMM23R0287 FA6 Vehicles INL MADOC
12.0 ADVANCE UNDERSTANDING
f) The Contractor agrees that the Government may, at its sole discretion, unilaterally issue delivery orders based on the technical specifications, price, and other terms submitted by the Offeror under seed delivery order 1 (Seed DORP Attachment 1) and seed delivery order 2 (Seed DORP Attachment 2). The Government must exercise its unilateral right no later than 120 days after award of the IDIQ contract. The Contractor understands that the seed delivery orders formed a partial basis for award of this contract. As such, failure to accept or fully comply with the unilateral delivery orders will result in termination of this IDIQ contract for cause.
Appendix D - Pricing Att 5_Pricing Table In clause f) section 12.0 of the RFP, the government refers to the two DORP as "seed", however, in Appendix D - Pricing, INL refers to PR12162571 as sample and PR11587625 seed. Could INL confirm which of the documents mentioned is correct?
| In addition, could INL clarify if both DORPs will be awarded upon contract award? | Correction made in AMD1. Seed - PR11587625. Sample - PR12162571. The government intends to award both DORPs at the time of award of the IDIQ, however the sample may receive a partial award for less units. |
| DORP PR11587625_Att 3 |
A. Minimum Specifications
Emissions - Emission level - Not lower than EURO 5, incompliance with Ukrainian standards.
Would INL accept US-manufactured vehicles? Please consider the following:
1) Although US-manufactured vehicles do not have the Euro 5 tag, there are similarities between US and European emission standards.
2) In some cases, the US emission standards are higher than Euopan’s -e.g: California LEV-III ULEV70 is higher than Euro 5.
| 3) Giving OEM production capacity, the 180-day delivery lead time may not be achivied for Euro 5 vehicles. | INL Kyiv will not be able to accept vehicles with lower emission level than euro 5. Certificate of conformoty shall be provided by the offeror. Additionally, keep in mind the make and model must be common locally. |
| Section L-001 |
| Tab D: Warranty Terms and Service Locations (Tab C for DORP No. PR12162571) | Under Tab D, the Government refers to the price proposal as factor 5. However, it is referred to as factor 4 everywhere else in the document. Can the Government please confirm which is correct? | Correction made in AMD1. Factor 4. | |||
| Appendix D - Pricing | |||||
| Att 5_Pricing Table | Please confirm if VAT should be added to the Delivery Orders' pricings. | Do not include tax. See paragraph 2.3 of each DORP. | |||
| Appendix D - Pricing | |||||
| Att 5_Pricing Table | Colombia legislation considers a consumption tax (8%) in addition to VAT. Please confirm if this tax should be included to DORP PR12162571 pricing. | All goods and services shall be provided with tax exemption, under no circumstance INL/DOS will be paying VAT, income, entrance, or any other related tax for this order. The U.S. Government (USG) will assist the contractor in obtaining customs clearance and tax exemption certificates from the Government of Colombia. | |||
| L.2, L.4 | Please confirm question due date and Phase I proposal due dates are in 2024. | Correction made in AMD1. 2024 is confirmed. | |||
| Appendix B | Please confirm offerors are allowed to use individual Task Order projects to demonstrate experience. | Confirmed. | |||
| L.7 | Will the government accept a brief executive summary to accompany Phase I, Volume I, Factor 1 -- Experience. | Yes, however it shall conform to the requirements of Section L, including the page limitation for Factor 1. | |||
| L.8 | Please confirm the government will accept one consolidated Appendix B that includes up to 10 individual citations. | Confirmed, IAW L.8. | |||
| RFP Para 39.0 page 29 | Will the contractor be required to submit procurement waivers for any non-US made vehicles for the sample task order? | No. | |||
| RFP Para 6.3 page 7 | Will the contractor be rquired to conduct any vehicle or motorycle maintenance repairs or maintenance training in Ukraine or Columbia? | This is not specified in either of the two DORPs. However, this is dependent on your proposed approach for tasks such as preventative maintenance, recalls, and warranty service. Training is not included in either of these DORPs, however, such services are in scope of the IDIQ and may be ordered by future DORPs. | |||
| RFP Para 6.3 page 7 | Will the contractor be allowed to send contract personnel to Ukraine as we understand US contractors are currently not allowed to operate in Ukraine | This depends on the security situation in Ukraine, which is evolving. In 2023, the U.S. contractors were allowed and able to travel to Ukraine to oversee deliveries and organize internal trainings. | |||
| RFP Para 6.3 page 7 | Will the government expect warranty services, if approved to be conducted in Ukraine? | Yes, warranty service is required locally. See DORP 4.5, Tab D. | |||
| RFP 43.0 pg 30-31 | Is it the government intent for the contractor to provide maintenance services or maintenance training for vehicles and motorcycles, even if they are not aware with how these vehicles will be operated, the skillset of the operators or how they are inspected daily? | The IDIQ's RFP citation provided is describing the scope and terms of the contract. The actual requirements of the items to be ordered is described by the DORPs. | |||
| RFP 43.0 pg 30-31 | Is the maintence requirement for the sample task order for Ukraine and Columbia or for future task order awards? | The IDIQ's RFP citation provided is describing the scope and terms of the contract. The actual requirements of the items to be ordered is described by the DORPs. | |||
| L.8 Instructions Phase I | For subcontractor past performance, where should the contractor insert the "Letter of Meaningful Involvement"? Does this document count against the 25 page limit? If a subcontractor is providing more than one past performance reference, is a LOM required for each reference, or just one LOM for the subcontractor? | Include it with Volume I. Per L.6.b, "Where included, the cover letter, title page, table of contents, table of figures, list of tables, glossary of abbreviations & acronyms, resumes, and commitment letters are not included in the page limitation." One executed Letter for each subcontracted effort is necessary to support your proposed experience mix. | |||
| Phase 1 Past Performance | When submitting task order performance under a prior IDIQ contract, is each task order submitted as a stand-alone reference? | Typically, contract ordering vehicles such as IDIQs or BPAs do not include performance. Performance, substantially, occurs on the orders. Therefore, yes, an order would constitute a stand-alone project reference. | |||
| DORP PR12162571 page 7 | Please define "reinforced" tinted windows. Is this tinting only, or physical reinforcement against breakage? | Tinted and reinforcement against breakage | |||
| DORP PR12162571 page 7 | Please explain "colors do not need to be in uniformity" | Vehicles provided by that line item do not all have to be the same color. | |||
| DORP PR12162571 page 5 | Is there a minimum emission control level requirement for CLIN 003? | The vehicles must meet the Colombian minimum requirements. | |||
| DORP PR12162571 page 7 | Is there a minimum emission control level requirement for CLIN 004? | The vehicles must meet the Colombian minimum requirements. | |||
| DORP PR11587625 Page 4 | Please define the contents required in the specified IFAK. | Standard civilian IFAK | |||
| DORP PR11587625 Page 4 | Is the requirement one IFAK per vehicle, or one IFAK per passenger? | One IFAK per vehicle | |||
| DORP PR11587625 Page 4 | DORP specifies "Run Flat Tires". These are not appropriate for the weight of a B6 armored vehicle. Did the Government intend to specify "Run Flat Inserts" which would be installed inside heavy duty tires of the OEM size? | Run Flat Inserts are acceptable for vehicles where "run flat tires" are not appropriate due to the weight of the vehicle. | |||
| DORP PR11587625 Page 4 | DORP specifies "Three Additional RFT Tires". What is the TOTAL number of tires and TOTAL number of wheels, and total number of Run Flat Inserts that the Government requires to be provided with this vehicle? | The government requires, in addition to the four wheels mounted on the vehicle: One spare wheel (rim) with a mounted run flat tire or tire with run flat insert and Two additional, spare, unmounted run flat tires or tires with run flat inserts. | |||
| DORP PR11587625 Page 10 pg 4.5.2 Vol II PRICE | DORP States "Armoring cost is requested to be separately priced, however deliver order will include only one CLIN for the total unit price including armoring." however, there is no provision on Appendix D to enter separate pricing for armoring. Where does the Government intend for contractors to list separate pricing? | Per Section L.10, offeror's are advised that they may include a price narrative. Additionally, offoror's may include their own tabs within Appendix D. | |||
| L.10 Phase II | L.10, Phase II – Volume II, Tab C – Can the Government please clarify, “Provide proof that the entity your firm proposes to source the vehicles from is an authorized distributor.” Can the Government please clarify what constitutes proof and who the authorization should come from? | It comes from whomever authorizes you to distribute the vehicles. Typically, this would come as a signed authorization from the manufacturer. | |||
| 6.3 Main Performance Areas | This contract appears to be heavily vehicle-centric in scope. Do you anticipate involving solutions outside of motor vehicles utilized in disaster management? | Products and services covered by a NAICS code listed in IDIQ Section 1, paragraph 6.6 are considered in scope of this IDIQ. | |||
| Section L.3 | Due to the short notice of the solicitation, would you be able to move the proposal due date? | Not for that reason. | |||
| Seed+DORP+PR11587625+256+Armor+Pickup+Trucks+for+SBGS+INL+Kyiv | Per Para 1.3 is there one single delivery location or multiple delivery locations | There will be at least two delivery locations in Kyiv for this DORP. | |||
| Seed+DORP+PR11587625+256+Armor+Pickup+Trucks+for+SBGS+INL+Kyiv | Per Para 1.3 will the delivery of the 256 vehicles have to be staggard over time to accommodate the physical storage space of receiving 256 vehicles | The end user can accommodate 256 vehicles at once. | |||
| Seed+DORP+PR11587625+256+Armor+Pickup+Trucks+for+SBGS+INL+Kyiv | Vehicle Equipment List (page 3 states IFAK is required. Does this mean one IFAP per passenger? | No, one IFAK per vehicle. | |||
| RFP 19AQMM23R0287 Page 7 of 70 | Para 6.2 is unclear regarding locaiton of maintenance support. | Correct, location is DORP specific. | |||
| RFP 19AQMM23R0287 Page 7 of 70 | Para 6.2 is unclear regarding responsibility for vehicle evacuation. | At this time, evacuation of vehicles is not required as part of this IDIQ or initial seed and sample order. Should the government have a need for vehicle evacuation services, the request would be issued specifically via DORP. | |||
| Seed+DORP+PR11587625+256+Armor+Pickup+Trucks+for+SBGS+INL+Kyiv | Given complexity and uncertainty in Ukraine, is the Government intending to provide a plug number for delivery costs to enable cost planning during Phase 2? | No. | |||
| RFP 19AQMM23R0287 Page 37 of 70 | Will the government consider Terms for Financing of Purchases of Commercial Products and Commercial Services IAW FAR 52.232-29 since this is a large deliverable quantitiy and deliveries will most likely be spread across multiple segments? | No, it is not in the government's best interest to finance these DORPs. | |||
| RFP 19AQMM23R0287 Page 37 of 70 | Will the government consider Installment Payments for Commercial Products and Commercial Services IAW FAR 52.232-30 since this is a large deliverable quantitiy and deliveries will most likely be spread across multiple segments? | No. | |||
| Seed+DORP+PR11587625+256+Armor+Pickup+Trucks+for+SBGS+INL+Kyiv | Is preventative maintenance required for this DO? | No. | |||
| Seed+DORP+PR11587625 and Sample+DORP+PR12162571 | Both DORPs mention a Business Volume, which is not included in Sections L and M. Would the Government plese clarify if a Business Volume is required? If yes, would the Government update their requirement in Section L? | Section L updated to include the Business Volume, which is to be submitted under IDIQ Volume II. Likewise, Section M is updated for this reason. | |||
| Seed+DORP+PR11587625 and Sample+DORP+PR12162571 | Section L will mention only one Price Narrative. But both DORPs stipulate that The cover page for this volume must include the company name, the DORP number, ….., Which implies a Price doucment for each DORP. Would the Government please clarify whether we need to have one or two Price volumes? | One price volume is preferred. | |||
| Appendix B | Will the Governemnt Allows us to insert Appendix B in their original format in pdf? | Yes, for Appendix B, PDF is preferred. | |||
| SF 1449 Page1 of 70 (Box 10) | The Box states 1.00% Set Aside. Is this a typo, should it be 100%? | Yes, 100% is correct. Corrected in AMD1. | |||
| SF 1449 Page1 of 70 (Box 10), & Page 8 of 70 | In Box 10 the NAICS size standard for this opportunity is listed as 1,500 employees. However on page 8 the size standard is showing as 500. Can the government clarify the NAICS code and employee size standard? | Reference the NAICS chart under Section 6.6 of Scope of IDIQ Contract. |
"This NAICS code corresponds to the 2017 NAICS code 336111, for which there is a class waiver of the Nonmanufacturer Rule (NMR). The size standard for nonmanufacturers is 500 employees.
FAR 52.219-33 NMR applies to this acquisition. Additionally, the current NMR Class Waiver from June 2022 is provided as Attachment B."
| Section L, Page 5 of 12 | Is a Letter of Meaningful Involvement excluded from the page count for Volume I? | Yes, question answered above. One executed Letter for each subcontracted effort is necessary to support your proposed experience mix. |
| Seed+DORP+PR11587625+256+Armored+Pickup+Trucks+for+SBGS+INL+Kyiv Page 9 | Tab B does not specify a page limit. Is there a page limit for Tab B – Armoring Experience and Certifications? Are there any exclusions? | There is no page limitation for this submission. |
| Section 10: The Acquisition is set-aside for 8a | Must the bidder be an 8a certified company to qualify for award? | The offeror must be 8a certified. |
| Pg. 34. Seed DORP Attachments: | Are bidders permitted to bid the vehicles in Attachment 1 – PR11587625 only and without the vehicles in Attachment 2 – PR12162571? Would this disqualify the bidder? | Yes. Per Section L.10 - "The offeror shall provide a comprehensive price proposal for all seed DORPs, see Attachments 1 and 2." And, "Both DOPRs will be included in one price submittal. Offeror’s are required to submit a price for both DORPs and for all items." |
| 1.4. Warranties |
Vehicle: Standard manufacturer or seller warranty is required. A 3-year or 100,000-kilometer extended warranty is preferred.
| Are bidders permitted to make an offer with an alternative warranty? The warranty listed is the 3-year or 100,000 kilometer warranty offered by the OEM vehicle manufacturer. Once the armoring is installed the OEM warranty on the vehicles would be voided and the warranty repairs would be at the discretion of the OEM on a case by case basis. | Yes, this is your proposal to offer, however the standard manufacturer's warranty is required at a minimum. Per DORP 1.4, "The armoring shall be complaint with the manufacturer or seller’s warranty." If the manufacturer's warranty is voided by the armoring, the seller shall offer their own warranty. | ||
| 1.4 Warranties Armor: Standard armorer’s warranty is required. The armoring shall be complaint with the manufacturer or seller’s warranty. The armoring warranty is preferred to be 7 years after acceptance. | Would an alternative warranty be acceptable for the bid or would it disqualify the bidder? Must the armoring warranty be at least 7 years? | This is your proposal to offer, no minimum or maximum is required. | |
| 1.3 Delivery: Contractor shall deliver the requested vehicles to Kyiv, Ukraine no later than 180 days after award of the delivery order. | Due to the limited availiblity of the truck chassis needed to build 256 armored trucks that would meet the specification are alternative delivery schedules acceptable? Delivery is largely dependent on the OEM chassis manufactures for an order of this magnitude. | Alternative delivery schedules are possible, as long as all units proposed are to be delivered within 180 days of award of the order. | |
| Section 38.0 Export Restrictions Page 28 |
“1. In the absence of available license exemptions, the Contractor shall be responsible for obtaining the appropriate licenses and other approvals for import and export of supplies, software, data, and for the provision of technical assistance;
2. The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract where the foreign person will have access to export-controlled technical data or software;
3. The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions;
4. Complying with any and all import and export restrictions imposed by the U.S., the host country, and any transport
| countries. | Will the contractor or USG be obligated to pay for any fees and licensing dictated by host nations? AND Will time required for new licensing be accounted for in DORP requirements? | Contractor is obligated to pay for logistical fees and licensing involved. "New licensing" is unclear. However, often DORPs are urgent, which may demand expedited delivery terms. The government attempts to be flexible, and requires offerors to propose delivery and logistical plans in most DORPs. | |
| Section 39.0 Foreign Assistance Act Procurement Restrictions Page 29 |
(a) Except as may be specifically approved by the contracting officer, the contractor must procure all commodities (e.g., equipment, materials, vehicles, supplies) and services (including commodity transportation services) in accordance with the requirements at 22 CFR part 228 “Rules on Procurement of Commodities and Services Financed by USAID.” Guidance on eligibility of specific goods or services, and applicable INL waivers, may be obtained from the contracting officer.
(b) Restricted goods. The contractor must obtain prior written approval of the contracting officer or comply with required procedures under an applicable waiver as provided by the contracting officer when procuring any of the following goods or services:
| (2) Motor vehicles; | Will there be an exception made for armored vehicle maintenance/warranties since the OEM (Toyota/Ford etc) will not warranty damage caused by aftermarket modifications (Armor add-ons)? | OEM is the company who manufactured the base vehicle. Base vehicle is the vehicle, in its entirety, prior to armoring modification. For warranty purposes, should the OEM warranty be nullified due to the amrmoring modifications, the armoring company will be required to provide the same warranty coverage, commonly provided by the OEM, for the new base vehicle (bumper to bumper, powertrain, emissions, rust / corrosion, plus a proposed warranty for the armoring modifications. Or the offeror may provide their own complaint warranty. |
| Section 42 Dealers and Suppliers Page 29 |
“When requested by the Contracting Officer, if other than the manufacturer, the offeror must submit prior to award of a delivery order,
| either (1) a letter of commitment from the manufacturer which will assure the offeror of a source of supply sufficient to satisfy the Government's requirements under the delivery order, or” | who is considered the OEM, The vehicle manufacturer or the armor modification company? | OEM is the company who manufactured the base vehicle. Base vehicle is the vehicle, in its entirety, prior to armoring modification |
| Seed+DORP+PR11587625+256+A- CLIN 001: ARMORED MID-SIZE PICKUP TRUCK, 4WD or FULL TIME AWD | ||
| Quantity: 256 EA Page 3 Minimum Requirements- Vehicle Classification “MID-SIZE PICKUP TRUCK” | Will the Government accept Full sized Pickup trucks manufactured in the US? | |
| Example: Ford 250 Super Duty, Chevrolet and General Motors 2500 Heavy Duty full size series pickup trucks. | Mid-size pickup trucks are required | |
| Seed+DORP+PR11587625+256+A- CLIN 001: ARMORED MID-SIZE PICKUP TRUCK, 4WD or FULL TIME AWD |
Quantity: 256 EA Page 3 - Intended Use “While a single make and model is preferred, a combination with a maximum of two different
| make or model vehicles is acceptable.” | Will the government accept a combination of American made and Foreign made pickup trucks? Example: Ford, Chevrolet and Toyota? | If they meet all technical requirements |
| Seed+DORP+PR11587625+256+A- CLIN 001: ARMORED MID-SIZE PICKUP TRUCK, 4WD or FULL TIME AWD | ||
| Quantity: 256 EA Page 4 Drive System “Left-hand Drive” | Will the government accept left-hand and right-hand drive pickup trucks? | Only left-hand |
| Seed+DORP+PR11587625+256+A- CLIN 001: ARMORED MID-SIZE PICKUP TRUCK, 4WD or FULL TIME AWD |
Quantity: 256 EA Page 4 Emissions “Emission level - Not lower than EURO 5, incompliance with Ukrainian standards.” Understanding that most vehicles meeting the EURO 5 emissions standards are higher end vehicles and demand a higher price of vehicles.
| Question: Will the government provide waivers to accept vehicles that have lower emissions? | On a regular basis the government will NOT accept vechiles with lower emissions than as required by the DORP. |
| Seed+DORP+PR11587625+256+A- CLIN 001: ARMORED MID-SIZE PICKUP TRUCK, 4WD or FULL TIME AWD |
Quantity: 256 EA Page 4, 1.3 Delivery “FOB Destination. Contractor shall deliver the requested vehicles to Kyiv, Ukraine no later than 180 days after award of the delivery order. Faster delivery is preferred.” Due to the quantity of this vehicle order, we expect to have complications in acquiring this number of pickup truck from the Original Vehicle Manufacturers, which could create complications in meeting the 180 -day timeline for completion of delivery. Most Dealers and Armoring manufacturers have a pre-arranged yearly procurement limits which may affect acquiring the stated number of pickup trucks required for this solicitation.
| Is the Government willing to extend the delivery timeline if it is determined the Original Vehicle Manufacturer limits the allotted number of pickups Armoring Manufacturers are allowed to procure within the allotted timeline? | Under unusual and compelling situations, the offeror may present an analysis of the current business environment in their proposal, when requesting a delivery term greater than required by the DORP. This is your competitve proposal to offer. |
| Seed+DORP+PR11587625+256+A- CLIN 001: ARMORED MID-SIZE PICKUP TRUCK, 4WD or FULL TIME AWD |
Quantity: 256 EA Page 4, 1.3 Delivery “-The Contractor shall provide full destination services (shipping, custom clearance, temporary warehousing, local delivery, loading/offloading at final destination). Cost of delivery is to be included / not separately priced (NSP). Full fuel tanks required unless prohibited. When prohibited during shipment, fuel supply shall be provided upon arrival.
| - Contractor shall coordinate all deliveries with the designated COR(s). Partial deliveries are acceptable if approved in writing by the COR. The Contractor shall provide an itemized commercial invoice of all cargo prior to delivery.” | Will the Government assist with the custom clearance, temporary warehousing, personnel for local delivery, loading/offloading at the final destination? |
| No. The COR will only provide project registration documents and general guidance on the overall delivery process. | |
| Seed+DORP+PR11587625+256+A- CLIN 001: ARMORED MID-SIZE PICKUP TRUCK, 4WD or FULL TIME AWD |
Quantity: 256 EA Page 4, 1.3 Delivery “-The Contractor shall provide full destination services (shipping, custom clearance, temporary warehousing, local delivery, loading/offloading at final destination). Cost of delivery is to be included / not separately priced (NSP). Full fuel tanks required unless prohibited. When prohibited during shipment, fuel supply shall be provided upon arrival.
| - Contractor shall coordinate all deliveries with the designated COR(s). Partial deliveries are acceptable if approved in writing by the COR. The Contractor shall provide an itemized commercial invoice of all cargo prior to delivery.” | Ther may be HAZMAT restrictions on shipping vehicles with full tanks of fuel. Is the Government willing to aid in the coordination of fueling vehicles at the port? | No. |
| SECTION L-001 |
| L.8 INSTRUCTIONS – PHASE I | Discussion: Paragraph indicates up to 10 project experiences may be submitted. However, the Government does not state if Multiple Award IDIQ contracts can be used at the IDIQ level or if we must use individual task orders under a multiple award IDIQ. Example, FA6 under the current contract is a Multiple Award IDIQ, however the CPAR is provided at the MA IDIQ level and not the individual task order level. | |
| Question: Please clarify if past performances at the IDIQ level can be included in Appendix B as a standalone project, or if Appendix B projects are exclusively task order level past performances. | Experience and Past Performance are seperate submittals and the terms should not be confused. In Appendix B, to demonstrate experience, cite projects or delivery orders that included actual performance and reference the order number and IDIQ number. One order constitutes one project. Regarding past performance, available CPARS assessments will be reviewed, wether it was provided at the IDIQ or ordering level. | |
| Seed DORP PR11587625 256 Armored Pickup Trucks for SBGS INL Kyiv |
Page 3.
| CLIN 001: ARMORED MID-SIZE PICKUP TRUCK, 4WD or FULL TIME AWD Quantity: 256 EA | Would INL consider a diesel vehicle that meets Euro 4 emissions standards? | No |
| Seed DORP PR11587625 256 Armored Pickup Trucks for SBGS INL Kyiv | ||
| CLIN 001: ARMORED MID-SIZE PICKUP TRUCK, 4WD or FULL TIME AWD Quantity: 256 EA | Would INL consider military-style finishes for the vehicle's interior? | INL will only accept factory or OEM provided provided interior finishes and they must meet minimum requirements. Vehicles will be used for law enforcement purposes and therefore interior finishes and materials provided for that purpose would be acceptable as long as they meet minumum requirements. |
| Seed DORP PR11587625 256 Armored Pickup Trucks for SBGS INL Kyiv |
Page 3.
CLIN 001: ARMORED MID-SIZE PICKUP TRUCK, 4WD or FULL TIME AWD Quantity: 256 EA Since RunFlat-type tires are not available for pickup trucks of the size requested, would INL accept tires with RunFlat inserts? If run flat tires are not abailable or appropriate for the vehicles requested, run flat inserts would be acceptable.
&"-,Bold"&16Appendix A - Questions & Answers &"-,Bold"&14 19AQMM23R0287