QUESTIONS AND ANSWERS 2 with Response - POST.pdf
PDF 658 KB Posted
- Attached to
- ISN/ECC SERVICE IDIQ Federal contract opportunity
- Solicitation number
- 19AQMM23R0140
About this file
This solicitation seeks proposals for an Indefinite Delivery/Indefinite Quantity contract to provide export control and border security program support services to the Department of State's Bureau of International Security and Nonproliferation. The selected contractor(s) will assist with strategic trade control programs including curriculum development, training delivery, logistical support, information technology services, and program evaluation. The period of performance is five years with four optional one-year extensions. Pricing will be fixed-price for labor and cost-reimbursable for travel and materials. The solicitation requires proposals by January 19, 2024 and includes sample task orders for curriculum development, conference support, and logistics.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP QUESTION FORM
QUESTIONS AND ANSWERS FOR SOLICITATION NUMBER: 19AQMM23R0140
QUESTI
ON NO.
QUESTION SPECIFIC RFP
TEXT FOR REFERENCE
RFP SECTION
RFP SUB
SEC- TION
NO.
RFP
PAGE
NO.
SUGGESTED EDITS AND/OR
RESOLUTION
Response
Is the pricing proposal volume number III?
Table shows Volume III as Price
Proposal.
General Instructions and Formatting
L.3
Please correct L.6 to read Volume III.
The price, small business plan, and representations and certifications (Volume III) shall also be separated by a divider page and corresponding tabs. There are no page restrictions for
Volume III; however, page submission shall be reasonable. 1 original 5 copies in pdf. Format.
Volume II shall consist of
Pricing Information and a complete Section K.
Pricing Proposal and
Section K (Volume II)
L.6
Does the pricing proposal volume have no page limit?
General instructions state there are no page restrictions for
Volume III.
Please correct L.6 to read this volume does not have any page restrictions.
There are no page restrictions for
Volume III; however, page submission shall be reasonable.
The proposal shall be provided on 8.5” x 11”-sized electronic format using 10-12 point font, with 1 inch margins, and pages shall be numbered consecutively.
Volume II shall consist of
Pricing Information and a complete Section K; this volume shall not exceed twenty-five (25) single-sided pages.
Pricing Proposal and
Are proposal submissions electronic or hard copy?
General Instructions and
Formatting Table shows Hard copies and soft copies for submission.
Delivery Addresses: Proposals delivered by email to Pete W.
Jones and Conelius Stevenson.
Proposal Submittal
Delivery Addresses
L.16.2
Please remove the references in section
L.3 to hard copies and soft copies (CD-
ROMs).
Please provide the proposal electronically.
4 Please provide Section B Offerors must include unit prices for each Firm Fixed Price CLINS listed in Section B for the Basic period and all option periods.
Cost reimbursable CLIN values as provided in Section B of the
Solicitation will be included in the
Total Evaluated Price.
Basis for Award
M.2.1.3 65 Please confirm that Supplies or Services
& Prices or Costs Attachment A is considered by the government to be
Section B CLIN structure for Sample
Task orders.
If cost reimbursable CLIN values are to be included in the Total Evaluated Price, please provide those CLINS.
Please confirm that all Post Differential and Danger Pay will be priced at the task order level and awarded as a Cost reimbursable CLIN.
Please confirm that upon award of
Sample Task Orders, the CLINs for cost-
This was corrected. Pricing Structure is in
Attachment A
QUESTI
ON NO.
QUESTION SPECIFIC RFP
NO.
RFP
PAGE
NO.
SUGGESTED EDITS AND/OR
RESOLUTION
Response reimbursable amounts will be provided.
5 Are there Base IDIQ labor categories? If so, please provide.
Price evaluations will be based on the completeness, accuracy, and reasonableness of each offeror’s proposed price for labor categories on the base IDIQ and each of the sample task orders.
Price Evaluation M.7 72 If labor categories are not provided at the
IDIQ level, how can a price comparison be fairly reviewed? Please provide a list of labor categories for the IDIQ level.
Please refer to H.5 Labor Category
Description.
Please provide the pricing schedules that contain the valuation quantities.
The Government will review the proposed price schedules for completeness and accuracy. A determination will be made as to whether the Offeror has properly understood the price proposal instructions and properly completed the price schedules.
Changes to the evaluation quantities, blanks or zeros in the pricing columns, and/or mathematical mistakes are subject to clarification for confirmation of the Offerors’ intent
Price Completeness and
Accuracy
M.7.1 72 Please provide the pricing schedule and the valuation quantities.
Our quantity will be provided at each tasker.
As per Attachment A.
7 Attachment A has CLINs for FFP pricing and notes that Cost Reimbursable
CLINS for Travel and
Material will be available.
Please clarify the CLIN structure and evaluation amounts for Travel and
Material.
Please clarify that the hourly rates for all applicable labor categories apply to the IDIQ level.
The Pricing portion of the proposal shall consist of a completed Attachment A, “Schedule of Supplies/Services and Price/Cost” and the hourly rates for all applicable labor categories completed for the Base
Year plus all four Option Periods.
Pricing Proposal and
Section L (Volume II)
L.6(a) 63 Please provide Attachment A with Labor, Travel, and Material CLINS.
Please provide an IDIQ labor category list.
Please refer to Price Schedule Attachment
A.
8 What are the four parts of the technical proposal?
The technical proposal (Volume I) shall consist of four (4) parts
General Instructions L.3 60 As listed in L.4 of the TECHNICAL
PROPOSAL
QUESTION SPECIFIC RFP
NO.
RFP
PAGE
NO.
SUGGESTED EDITS AND/OR
RESOLUTION
Response
9 Attachments D, E and F are not included
Technical proposals in response to
Sample Task Order Requests for
Proposals (see Attachments D, E and F).
Technical Proposal L.4 61 Please provide Attachments D, E and F.
Attachment(s) D, E, and F Removed
10 Are the Technical Proposal responses for the Sample
Task Order Requests included in the 35 page limit for the Technical volume?
Technical proposals in response to
Sample Task Order Requests for
Proposals (see Attachments D, E and F).
Technical Proposal L.4 61 No. The entire technical proposal shall not exceed thirty five (35) pages. The Past
Performance (Volume II) shall not exceed fifteen
(15) pages per citations The price, small business plan, and representations and certifications (Volume III) shall also be separated by a divider page and corresponding tabs.
11 Blank.
12 Please confirm that all lodging, meals, and transportation will be provided by EXBS-Tbilisi at no cost to the contractor.
EXBS-Tbilisi will make all other local logistical arrangements necessary for conduct of the course.
Sample Task Order 1
II Requirements
7 (c.) 3
EXBS-Tbilisi will make all other local logistical arrangements necessary for the conduct of the course, including local transportation, lodging, and meals, at no cost to the Contractor.
YES, actual Cost will be reimbursable to the
Contractor. The Contractor shall solely be responsible for making arrangements for its instructors to travel to Tbilisi. EXBS-Tbilisi will make all other local logistical arrangements necessary for conduct of the course.
13 Once the course and completion certificate design have been approved for use, will the Contractor be responsible for the production of course materials?
Within five (5) months of task order award, the Contractor shall furnish ISN/ECC with Electronic and paper copies of course completion certificate design.
Sample Task Order 1
III Deliverables
1 (f) 3 g. After final approval of course material and course completion certificate, the
Contractor will be responsible for the production of all course materials. These costs will be cost-reimbursable and will not be subject to profit or fee.
YES
14 Will this task order have a
CLIN for FFP labor and cost reimbursable CLINs for travel and Material?
All invoices shall be submitted in accordance with the terms and conditions specified in the base contract and task order award document.
Sample Task Order 1
X. Invoicing
7 The government will issue an FFP CLIN for labor and cost reimbursable CLINS for Travel and Material.
15 Please confirm that travel and per diem charges are authorized for travel required from time to time at the ISN/ECC
Washington, DC office.
Travel and per diem charges are authorized for CONUS travel beyond a 50-mile radius of the
Contractor employee's local place of performance whenever a task assignment requires work to be accomplished at a remote work site.
Sample Task Order 2
B. Parameters
2. Sanctions and Trade
Controls Experts
2.b,vii 4 Travel and per diem charges are authorized for CONUS travel beyond a
50-mile radius of the Contractor employee's local place of performance whenever a task assignment requires work to be accomplished at a remote work site and required meetings at
ISN/ECC Washington, DC office.
YES only if beyond a 50 miles radius.
Formatted: Line spacing: Multiple 1.08 li
QUESTION SPECIFIC RFP
NO.
RFP
PAGE
NO.
SUGGESTED EDITS AND/OR
RESOLUTION
Response
16 Please confirm that transportation, lodging, and meals are included in all the logistics arrangements associated with in-country consultations, course deliveries, mentoring, assessments, etc.
EXBS Field Staff will make all the logistics arrangements associated with in-country consultations, course deliveries, mentoring, assessments, etc.
Sample Task Order 2
C. Process
C. 5 5 EXBS Field Staff will make all the logistics arrangements (including local transportation, lodging, and meals) associated with in-country consultations, course deliveries, mentoring, assessments, etc.
YES.
17 Please provide Attachment
C
SMEs will administer a training survey provided by ISN/ECC
(Attachment C) at the end of each course delivery and contribute to
EXBS Impact Assessment Tool following each engagement.
Sample Task Order 2
C. Process
C. 6 5 Please provide Attachment C. Please see attachment C that is now provided.
18 Please provide Attachment
D
Once the training activity is completed, SMEs will accomplish an after action report in the format directed by ISN/ECC (template at
Attachment D.) and …
Sample Task Order 2
C. Process
C. 7 5 Please provide Attachment D
Attachment D deleted.
19 Please provide a period of performance
Base Year: TBD
Option Year 1: TBD
Option Year 2: TBD
Option Year 3: TBD
Option Year 4: TBD
Sample Task Order 2
5. Period of
Performance
5 8
Add the following: The dates for the period of performance (PoP) of this
Sample Task Order match the PoP dates in the IDIQ contract.
TBD.
20 Please provide a CLIN structure for this task order.
For each EXBS Trainer Request
Form that ISN/ECC submits, the
Contractor will provide a cost proposal
Sample Task Order 2
C. Process
C. 3 5 Suggested CLIN Structure:
Labor CLIN – T&M with hourly rate based on IDIQ rates
Travel – Cost reimbursable
ODC (including Post Differential, Danger Pay, materials) – Cost reimbursable
Please refer to attachment A.
21 Please provide a list of partner countries for estimating purposes
There will be approximately 30 events involving at least 15 partner countries
Sample Task Order 2
C. Process
C. 1 5 Please provide a list of partner countries for estimating purposes.
Please refer to attachment Sample Task
Order 2. This is a sample task order, not a real event. Please choose 15 countries at random.
22 Please provide Attachment
C – EXBS Travel and
Logistics Request Form
An example of this form is included as Attachment C – EXBS
Travel and Logistics Request
Form.
Sample Task Order 3
F 5 Please provide Attachment C – EXBS
Travel and Logistics Request Form
Please see Attachment C.
QUESTION SPECIFIC RFP
NO.
RFP
PAGE
NO.
SUGGESTED EDITS AND/OR
RESOLUTION
Response
23 For pricing purposes, will the government please provide the PoP dates for all sample task orders?
If a 5-year task order is awarded in the last year of the contract, will the IDIQ
PoP be extended to accommodate these dates?
Base Year: TBD
Option Year 1: TBD
Option Year 2: TBD
Option Year 3: TBD
Option Year 4: TBD
Sample Task Order 3a
5. Period of
Performance
5 8
Add the following: The dates for the period of performance (PoP) of this
Sample Task Order match the PoP dates in the IDIQ contract.
TBD
24 As the location of employees is unknown and will be determined by
EXBS programmatic needs and Contractor ability to support, please clarify that the value in Sample Task
Order 3b of $100,00 is an estimate and will be monitored and adjusted as needed.
The Contractor will provide full-time, EXBS-dedicated employees stationed overseas.
The Contractor will provide full-time, EXBS-dedicated employees stationed overseas.
$100,000 estimated labor over a
12 month period of performance
Sample Task Order 3a
C. Conference and
Logistics Support
Services
Sample Task Order 3b
II. Requirements
C. s
Sample Task Order 3b
19. The Contractor will provide full-time, EXBS-dedicated employees stationed overseas.
i. $100,000 estimated labor over a 12-month period of performance.
ii. This amount will be monitored and adjusted as needed.
iii. What is the anticipated location of these employees?
Yes, $100,000 is an estimate and will be monitored and adjusted as needed.
25 Please provide a complete
DPAS rating
RFP Amendment 0001 Rating shows as DO
Amendment 0001 Rating block 1 Please provide a complete DPAS rating. Please see M.6
26 Please clarify if a narrative is required to explain the build-up of costs?
Volume II shall consist of /Pricing information and a completed
Section K
Pricing Proposal and
Section K (Volume II)
L.6. a-d 63
YES
27 Will each Task Order require all sub-elements under each Activity? For example, does Sample Task
Order 1 - Curriculum
Development require
CONUS delivery, International delivery, Train-the trainer, and
Instructor Development
Course (IDC)?
While each task order will contain some task specific performance standards, this IDIQ contains a generic group of performance standards in each activity that shall be applied to all task orders.
C.3 Work Activities Paragraph 1 11 While each task order will contain some task-specific performance standards, this
IDIQ contains a generic group of performance standards in each activity that shall be applied to all task orders if the Performance Objective is required on the task order.
YES. Provide sub-elements under activity that shall be applied to all task orders.
28 Does “representative work tasks” refer to the Sample
Activities covered by this contract and representative work tasks
C.3 Work Activities Paragraph 1 11 Activities covered by this contract and representative Sample Task Orders are
YES. Please see Sample Task Orders
QUESTION SPECIFIC RFP
NO.
RFP
PAGE
NO.
SUGGESTED EDITS AND/OR
RESOLUTION
Response
Task Orders? follow. provided as attachments to this RFP. attachments.
29 Will the Contractor provide
SME personnel, not just the logistics support for SMEs?
Consultations: Arrange for subject matter experts (SMEs) to travel to partner country capitals….
Activity 1: Training
Delivery and Exchange
Support
Paragraph e 12 Add the following: SME labor is (or is not) to be provided by the Contractor as required by individual task orders.
YES, Contractor shall provide SME personnel.
30 Will the government provide the type of contract in accordance with FAR
52.216-1?
The Government contemplates award of a ________________
[Contracting Officer insert specific type of contract] contract resulting from this solicitation.
Section K 52.216-1 58
IDIQ
31 Please confirm Offerors required to price all Sample
Task Orders.
The Pricing portion of the proposal shall consist of a completed Attachment A….
L.6 (a) 63 The Pricing portion of the proposal shall consist of a completely priced
Attachment A….
YES, confirmed to provide price for all
Sample Task Orders.
32 Since Sample Task Order 1 must be completed within
12 months of award, would the government revise
Attachment A to remove
Items 1001, 2001, 3001, and
4001?
All course work on this task order, to include course development, proof of concept delivery and final refinement, shall be completed within twelve (12) months of award.
Sample Task Order 1 VI. 6 NO.
33 Are the estimated costs annual amounts?
Estimated costs: Sample Task Order 3B II (a), items 1-
1-3 Please add: All estimated costs are annual amounts.
NO.
34 Would the government please correct “Total
Estimated Logistics Costs:
$1,500,000.00?”
21. TOTAL ESTIMATED
LOGISTICS COSTS:
$1,500,000.00.
Sample Task Order 3B II (a), 21 3 21. TOTAL ESTIMATED LOGISTICS
COSTS: $3,893,408.17.
Figure has been corrected.
35 Are Contractors to add a worksheet to Attachment A to provide the hourly rates for all applicable labor categories for each year of the contract?
The Pricing portion of the proposal shall consist of a completed Attachment A, “Schedule of Supplies/Services and Price/Cost” and the hourly rates for all applicable labor categories completed for the Base
Year plus all four Option Periods.
Pricing Proposal and
Section K (Volume II)
L.6 (a) 63 Please provide a list of IDIQ labor categories.
Please confirm that Contractors can add a worksheet to Attachment A to provide
IDIQ hourly rates.
YES, Worksheet shall be provided with breakdown.
36 Are the IDIQ ceiling rates to be discounted at the Task
Order level?
Each Contractor shall be provided a fair opportunity to compete for each task order for requirements that are not satisfied by direct orders under paragraph (d) above.
Ordering Procedures
(11/96)
G.3 (e.) 25 Contractors will be able to discount IDIQ rates at the task order level.
37 Please clarify that
Section B.4 Cost
Reimbursable Travel and Section B.36
Travel are the same
Section B.4 Cost Reimbursable
Travel
Section B.6 Travel
RFP Section B B.4
B.6
9 and 10 Please remove Section B.6
YES, Travel Cost reimbursable.
38 What does the Proposal certification letter consist of?
L.3 General Instructions: Proposal
Certification Letter
L.3 60
Your information detailing your proposal submission
39 Does the entire Past
Performance volume have a 15-page limit or is it a 15 page limit for each past performance citation?
L.3 General Instructions: The Past
Performance (Volume II) shall not exceed fifteen (15) pages per citations
L.3 60
YES. 15 pages limit for each citation
40 Will each task order contain a requirement to perform all 5 activities? For
Example – Task 3A is for logistics support and requires no curriculum development. This seems to contradict the
PWS statement that each activity will be applied to all task orders.
The task orders will define specific work activities and tasks to be performed. While each task order will contain some task specific performance standards, this IDIQ contains a generic group of performance standards in each activity that shall be applied to all task orders.
C.3 Work Activities C.3 11 Will the Government clarify on each task order which activities apply to that task order?
No, each task order is separate.
41 Activity 1 Training
Delivery and Exchange
Support section e
Consultation appears to be logistical support.
Will each activity contain parts of other activities within the requirements?
Consultations: Arrange for subject matter experts (SMEs) to travel to partner country capitals and support the efforts of governments to develop comprehensive strategic trade control (STC) systems that meet international requirements.
C.3 Work Activities Activity 1 (e.) 11
Please clarify if arranging for SMEs to travel to partner country capitals and support the efforts of governments to develop comprehensive STC systems will be provided under Activity 3
Logistical Support
Question is unclear. Each activity is distinct.
42 Please confirm resumes are not included in the
35 page limit for the
Technical Volume
The entire technical proposal shall not exceed thirty-five (35) pages
L.3 General
Instructions and
Formatting
General
Instructions
60 The entire technical proposal shall not exceed thirty-five (35) pages. Proposal certification letter, table of contents, divider pages, resumes, and other standard forms will not count against the page limitations.
NO, they are not.
43 Will the Government provide a CR CLIN for
Post Differentials, Danger Pay, DBA for
This is a multiple award indefinite delivery/indefinite quantity
(IDIQ) contract, with at least one
Small Business. As defined in
B.2 TYPE OF
CONTRACT
B.2 8 CR CLIN will also be provided to cover Post Differentials, Danger Pay, DBA, etc., for work performed in
OCONUS locations.
DBA is reimbursable work performed in
OCONUS Locations?
FAR Part 16, Type of Contract.
Fixed Price with Cost
Reimbursable CLINs for Travel and Material.
44 Will the Contractor provide any hardware?
Provide IT services in support of implementing the EXBS program that include but are not limited to the following…
C.3 Activity 4:
(IT) Support
17 Confirm that any hardware to be provided may be billed as an ODC as a cost-reimbursable item with indirects applied to the cost.
Yes. Hardware may be billed as ODC.
45 Will the Contractor provide any licenses?
Assist partner governments in developing and implementing automated licensing review processes that enhance interagency coordination and promote transparency of decision making
C.3 Activity 4:
Information
Technology
(IT) Support d.
17 Confirm that any licenses provided by the Contractor may be billed as an
ODC as a cost-reimbursable item with indirects applied to the cost.
Yes. ODC Cost reimbursable.
46 Is the referenced “site” an internet site or a geographical location?
Establish temporary sites for training/conference registration, exchange of materials, and storing information
C.3 Activity 4:
Information
Technology
(IT) Support h.
17 The site referenced here is online only and does not require a physical location.
Yes, Geographical Locations
47 For which countries does the Contractor provide a discussion regarding VAT?
A discussion of the issues surrounding value added taxes
(VAT) and customs duties, and a strategy for mitigating VAT and customs duties impact on the costs of supplies and equipment ordered under this contract.
L.4 TECHNICAL
PROPOSAL (Volume I
Pass/Fail):
L.4 fourth bullet point
61 Please provide a list of most likely countries to consider for VAT.
Please refer to L.4.
48 Section M.4 is FAR
52.217-05 Evaluation of Options (July 1990).
Please confirm that the evaluation factors are in Section M.5.
See the “Past Performance” evaluation factor (TC4) contained in Section M4.
L.5 Last sentence of L.5
63 See the “Past Performance” evaluation factor (TC4) contained in Section M.5.
Yes, all evaluation criteria are in Section M.5
49 Section M.4 does not contain the evaluation factor TC4. Is there a
Page missing from the
RFP?
See the “Past Performance” evaluation factor (TC4) contained in Section M4.
L.5 Last sentence of L.5
63 Please provide evaluation factor TC4.
See section M.5 for details.
50 Please provide Section
B with Cost reimbursable CLINs and the values assigned to those CLINS.
Offerors must include unit prices for each Firm Fixed Price CLIN listed in Section B for the basic period and all option periods.
Failure to do so may be cause for rejection of the entire offer. Cost reimbursable CLIN values as provided in section B of the solicitation will be included in the Total Evaluated Price. All
Offerors will be evaluated equally for Cost CLINs.
M.2 Basis for Award M.2 1.3 65 Please provide Section B with Cost reimbursable CLINs and the values assigned to those CLINS.
See attachment A.
51 Does the evaluation of
Sample Task Order 3
Conference and
Logistics include both
Task order 3A and 3B?
Covers factors TC1, TC2, and
TC3
M.5 Evaluation Factors and Criteria
M.5.1.4
Sample Task
Order 3
68 Please clarify that M.5.1.4 Sample
Task Order 3: Conference and
Logistics (included Sample Task Order
3A and 3B).
YES.
52. There is no attached
Past Performance
Questionnaire.
Offerors will send out the attached
Past Performance
Questionnaire (excluded from page limitation) to each reference identified in the Past Performance
Volume.
L.5 Past Performance
Information
(2) Past
Performance
Questionnaires
61 and 62 Please provide Past Performance
Questionnaire attachment.
YES, please refer to attachment B.
53. Attachments B, H, and I were not provided in the solicitation package.
Will the Government provide missing
Attachments B, H and I?
Section A -
Solicitation/Contract Form
Table
See below:
Section A -
Solicitation/Contract
Form Table, Identifiers 1, 6 and 7.
N/A 3 Please provide missing Attachments.
Refer to Attachment B relabeled as
Attachment A
Attachment H & I deleted
54. Identifier Title Date Number of Pages
1 Attachment B- Past Performance 04/20/2023 5 6 Attachment H - Participant Course Evaluation Form 04/20/2023 7 Attachment I - Observer Evaluation Form 04/20/2023 10 Sample Task Order 1 (FY23 SMEs and Trainers).docx 04/20/2023 11 Sample Task Order 2.A (FY23 Conference and Logistics).docx 04/20/2023 12 Sample Task Order 2.B (Attachment B- Proposed Events List).docx 04/20/2023 13 Sample Task Order 3 (FY23 Curriculum Development).docx 04/20/2023
Attachment B provided
Attachment H & I removed
55. Section details proposal submittal items for Key
Personnel. The sentence that follows the English language
H.6 – Key Personnel
“All of the above are considered to be key personnel and are required to be able to
H.6 – Key Personnel
(Section 1 that follows the Key
Personnel Table)
N/A 28 Please confirm if proof is required for native English speakers.
If yes, what proof is required and acceptable?
Yes, all key personnel need to read, write, speak and understand English. Native speakers are NOT required.
requirement states:
“The Contractor shall provide proof with their submittal, to be submitted with original offer.”
Is EXBS requesting proof that all key personnel are able to read, write, speak and understand
English?
If yes, what kind of proof is expected and acceptable?
Is this a requirement if the Key Personnel is a native English speaker?
read, write, speak and understand English.
The Contractor shall provide proof with their submittal, to be submitted with original offer.”
56. Is the contract manager a Key
Personnel position?
If yes, are the minimum qualifications for this position to be offeror defined? If not, provide minimum qualifications for this position.
How does the
Government define
‘on-site’ in this RFP?
H.6 – Key Personnel
Other Key Personnel section
“The contractor shall assign and identify an on-site contract manager to provide management and administrative and technical interaction with
Government members in the day-to-day accomplishment of support services.”
H.6 Key Personnel H.6 Key
Personnel
Other Key sub-section
29 Confirm if the contract manager is a key personnel position.
Provide minimum qualifications for this position if yes.
Define ‘on-site’.
NO
57. Will the Government clarify the Security
Clearance requirements for this program?
RFP Section H.11(b)
“Since it may be necessary for
Contractor personnel to have access to classified material and/or to enter into areas requiring a security clearance, the Program Manager and all
Project Managers shall possess
RFP Section H.11(b), Security
Requirements
DD 254, Section 13
H.11.(b)
H.11(b) –
DD254 –
Attachment
Please confirm that SECRET clearance requirement applies only to Program Manager and Project
Manager(s).
Program Manager and Project Manager shall have SECRET clearances.
an active SECRET personnel security clearance prior to performance under this contract.”
DD 254, Section 13
“Contractor personnel assigned to this contract shall possess a
SECRET personnel security clearance issued by the Defense
Counterintelligence and
Security Agency (DCSA) prior to contract performance.”
58. Will the Government please confirm that proposal submission is only electronic submission via email and there are no hard copy or CD submission requirements?
Will the government remove the conflicting requirement in
L.10.1 that currently states “No proposals will be accepted via facsimile or electronic mail.”?
Section L.3 – General
Instructions and Formatting
Submission Requirements
“General Instructions:
(SEE TABLE BELOW)
Each paper volume shall be submitted in a separate three ring binder. Proposal certification letter, table of contents, divider pages and other standard forms will not count against page limitations. The technical proposal (Volume I) shall consist of four (4) parts and the four parts must be separated by a divider page with a corresponding divider tab; each of the four divider tabs shall be marked to identify what part is contained in that particular section.
Paper copies of the proposal shall be printed on white, 8.5” x 11” paper and printed using
10-12 point font, with 1 inch margins, and pages shall be numbered consecutively.
L.3 General
L.10 – Proposal
Submittal
L.10.1 Proposal Due
Date
L.16.2 Delivery
Addresses
Electronic submission via email only.
Electronic Submission is Accepted and preferred
Electronic versions (CD) of the proposal shall be prepared using Microsoft
Office 2000 or a compatible format, Adobe PDF formats are also acceptable.”
L.10 – Proposal Submittal
L.10.1 Proposal Due Date
“No proposals will be accepted via facsimile or electronic mail.”
L.16.2 Delivery Addresses
“Proposals delivered by email to Pete W. Jones
(jonespw@state.gov) and
Conelius Stevenson
(stevensonc@state.gov)”
Volume Title Hard Copies
Required
Soft Copies
(CD-ROMs) Required
Soft Copy File
Name(s) I Technical Proposal 1 Original
5 Copies
1 Original
5 Copies
Technical VolI_
Company.pdf
II Past Performance 1 Original 5
Copies
1 Original
5 Copies
Past Peformamce Vol II_
Company.pdf III Price Proposal 1 Original
5 Copies
1 Original
5 Copies
Price Vol III_
Company.pdf
59. Will the Government provide the PPQ form to be sent to references? It was not ‘attached’ as stated.
Absent the ‘attached
Past Performance
Questionnaire’, does the Government intend for offeror to create the PPQ form to send to references using the format provided in RFP section L.5 ?
L.5 Past Performance
Information
L.5.1 Past Performance
Questionnaires and Point of
Contact Listing
“Offerors will send out the attached Past Performance
Questionnaire (excluded from page limitation) to each reference identified in the Past
Performance Volume.”
Using the Past Performance
Questionnaire, the Offeror shall provide detailed
L.5 Past Performance
Information
L.5.1
L.5.2
55 Provide missing PPQ form.
Confirm PPQ requirements for prime and sub relative to inclusion in Relevancy Matrix.
refer to attachment B. Form has now been provided mailto:stevensonc@state.gov
Does ‘each reference identified in the Past
Performance
Volume’ refer to every program that is listed in the
Relevancy Matrix?
Are offerors required to submit a PPQ for every program listed in the Relevancy
Matrix?
Are offerors required to submit a PPQ from every subcontractor and/or teammate?
information on a minimum of two (2) (prime contracts or subcontracts with the
Federal Government, state or local governments, or private industry over the past five (5) years.
Required information shall be presented in the Past
Performance Questionnaire format as follows:
PAST PERFORMANCE
QUESTIONNAIRE
Company Name:
Program Manager Name:
Contract Number/Task Order
Number:
Period of Performance:
Name of Contracting Activity or Commercial Customer:
Prime or Subcontractor?
Total Contract Dollar Value:
Total Contract Dollar Value
Expended to date:
Contract Type:
Was this Contract
Performance Based?
Average Number of FTE
Assigned:
Maximum Number of FTE
Assigned:
REFERENCES
Provide the name, telephone number, and verified e-mail address of the following personnel:
Contracting Officer:
Administrative Contracting
Officer, if different from above:
Contracting Officer
Representative:
Government Technical
Monitor:
Describe the work performed:
How is the contract work similar in size and complexity to the services required by this solicitation? If relevant, provide additional details:”
60. Will the Government confirm the following:
1) Volume III is the
Pricing Volume.
2) Pricing Volume is not page limited.
3) L.6 should reference Volume III in the title and text (it currently states
Volume II)
4) Small Business
Subcontracting Plan should be submitted as part of Volume
III.
L.3 General Instructions
“There are no page restrictions for Volume III; however, page submission shall be reasonable.”
L.6 Pricing Proposal and
“Volume II shall consist of
Pricing information and a completed Section K –
Representations and
Certifications, this volume shall not exceed twenty-five
(25) single-side pages.”
Volume III , shall consist of the above small business goals and the corresponding subcontracting plan, if applicable. -This volume has no page limitations, but page submission should be reasonable.
L.3 – General
L.6 Pricing Proposal and Section K
N/A 57 Confirm the following:
1) Pricing Volume is Volume III
2) Volume III is unlimited page count
3) Small Business Subcontracting plan is part of Volume III.
Confirmed.
61. There appears to be requirement text missing in “Section
2. Sanctions and
Trade Control
Experts. a.”
Will the Government provide the missing text?
Sample Task Order 2:
Section B. Parameters
2.Strategic Trade Control
Experts a.
There is a heading but no text following.
Sample Task Order 2
Section B Parameters
Sample Task
Order 2:
Section B.
Parameters
2.Strategic
Trade
Control
Experts a.
STO2 –
Provide missing text.
Please see attachment Sample Task Order 2, Section 2. Requirement, B. Parameters, 1.
Subject Matter Expert.
62. Will the Government provide the training survey (Attachment
C) and after action report (Attachment
D) referenced in paragraph 2.C.6 and
2.C.7?
Section C. Process
6. SMEs will administer a training survey provided by
ISN/ECC (Attachment C) at the end of each course delivery and contribute to EXBS Impact
Assessment Tool following each engagement
7. Once the training activity is completed, SMEs will accomplish an after action report in the format directed by
ISN/ECC (template at
Attachment D.)
Sample Task
Order 2:
Section C.
Process
Sub paragraphs 6 and 7
STO2 -
Provide missing Attachments C and
D.
Office will supply after action report after contract is awarded.
Language of “template at Attachment D” has been removed.
63. Will the Government provide the
Attachment C -
EXBS Travel and
Logistics Form
Sample Task Order 3.
Subparagraph F.
“F. For each event, ISN/ECC will complete an “EXBS Travel and Logistics Request form” and provide it to the
Contractor for pricing. An example of this form is included as Attachment C –
EXBS Travel and Logistics
Request Form.”
Sample Task Order 3.
Sample Task
Order 3.
Subparagraph
F.
STO3-5 Provide missing Attachment C.
Yes, please refer to Attachment C.
64. There is inconsistent information about the price volume and page limits. Will the government please confirm that the Price
Volume III is not subject to page limits?
“The price, small business plan, and representations and certifications (Volume III) shall also be separated by a divider page and corresponding tabs.
There are no page restrictions for Volume III; however, page submission shall be reasonable.”; and “L.6
PRICING PROPOSAL AND
SECTION K (Volume II):
Volume II shall consist of
/Pricing information and a completed Section K –
Representations and
Certifications, this volume shall not exceed twenty-five (25) single-side pages.”
L.3 General Instructions and
Formatting;
L.6 Pricing Proposal and
Section K
54, 57 Suggest no page limits;
Section K is large and takes up much of the page limit.
Confirmed.
65. There are several references to hard copies. Can the
Government clarify if hard copies are required, and if so, how many?
SF-33: 1 original and 1 copy
L.3: 1 original and 5 copies
L.16.2: no reference to hard copies
SF-33, Block 9
Section L.3 General Instructions and Formatting
L.16.2 Delivery Address
1, 54, 58 Remove the requirement for hard copies.
No, hard copies required please submit electronically.
66. What are Offerors required to prove?
And what constitutes sufficient proof?
All of the above are considered to be key personnel and are required to be able to read, write, speak and understand
English. The Contractor shall provide proof with their submittal, to be submitted with original offer.
Section H.6 Key
Candidate’s Resume
67. This appears to be an extraneous requirement.
Other Key Personnel as proposed by the Contractor.
Unless otherwise noted all additional key personnel identified by the contractor shall have, at a minimum, a
Secret security clearance. The contractor shall assign and identify an on-site contract manager to provide management and administrative and technical interaction with
Government members in the
Section H.6 Other Key
Personnel
28 Remove or replace with language that suggests additional key personnel may be required at the task order level.
Additional key personnel maybe required.
See page 28 ‘key personnel positions’ day-to-day accomplishment of support services. The contractor shall designate and identify contractor employees who will be considered key to operations for efforts under this task order.
These key personnel must have an in-depth understanding of the requirements and their responsibilities as well as the ability, knowledge, experience, and skills to perform the requirements. They shall be fully committed to the success of the mission
68. The minimum qualifications for the
Key Personnel required at the IDIQ do not contain any security clearance references; however, the Other Key
Personnel and DD-
254 do. Can the
Government clarify security clearance requirements for the
IDIQ positions?
Contractor personnel assigned to this contract shall possess a
SECRET personnel security clearance issued by the Defense
Counterintelligence and
Security Agency (DCSA) prior to contract performance.
Section H.6
DD-254
Key
Personnel
Recommend removing the security clearance requirement for all positions other than the Program
Manager. Add language that suggests security clearances for other personnel may be required at the task order level and specify the requirement within the sample task orders.
Project Manager and Program Manager shall possess a Secret Personnel security clearance.
69. Are technical proposals in response to the sample Task
Order requests subject to the 35 page limit of the Volume I
Technical Proposal?
Or is the 35-page limit specifically for the Base Contract technical proposal and are the Sample
Task Order proposals separate?
L.3 - The entire technical proposal shall not exceed thirty five (35) pages.
L.4 Offerors' proposals must include, at a minimum, a description of the technical approach, methodology, technique, or plan to accomplish the requirements within the base contract and all three (3) sample task orders including:
Technical proposals in response to Sample Task Order Requests for Proposals (see Attachments
D, E and F).
L.3 General Instructions and
Formatting;
L.4 Technical Proposal
60, 61 Clarify whether the 35-page limit is inclusive of Offerors responses to both the “Base
Contract” and the three sample task orders. Add language If there is a separate page limitation for the sample task orders.
35 pages limit to Volume. Does not include Sample Task Orders.
70. Are key management and personnel resumes excluded from the Volume I
Technical Proposal
35-page limit?
Resumes of proposed key management staff and key personnel who will be performing support functions under this contract.
L.4 Technical Proposal 61 Exclude resumes from page limits.
No. Resumes are no included in page limit.
71. Can the government confirm that the
Sample Task Order 3 file labeled
“Sample+Task+Order
+3.B+(Attachment+B
+Proposed+Events+L ist).pdf” is a supplement to the
Sample Task Order 3 file labeled
“Sample+Task+Order
+3.A+
(FY23+Conference+a nd+Logistics)”?
Attachments:
1. Attachment B – Proposed
Events List
Sample Task Order 3: EXBS
Logistics and Conference
Support
Sample+Task+Order+3.A+(FY2
3+Conference+and+Logistics)
YES, Please refer to Attachment B. TLR form has been provided.
72. Can the government clarify what specific information is required for each citation in Volume II
Past Performance?
The five items under
L.5 do not explicitly state what information is required for the citations.
L.3 The Past Performance
(Volume II) shall not exceed fifteen (15) pages per citations;
L. 5 Past Performance
Information (Volume II)
(1) Relevancy Matrix. Provide a completed relevancy matrix for your company, including each subcontractor and/or teaming partner. Develop a matrix based on proposed team composition and number of citations provided for each.
L.3 General Instructions and
Formatting
L. 5 Past Performance
Information (Volume II)
60, 61
No, please refer to Attachment B.
73. Is there a total page limit for Volume II considering the L.5
Past Performance
Information instructions ask for five other items in addition to citations, including a
Relevancy Matrix, Points of Contact
L.3 The Past Performance
(Volume II) shall not exceed fifteen (15) pages per citations;
L.3 General Instructions and
Formatting
60 Exclude these other items from page limits.
Past Performance (Volume II) shall not exceed fifteen (15) pages per citations listing, and Consent
Letters?
74. Regarding the question in the Past
Performance
Questionnaire template asking to compare previous experience with the current solicitation requirements, are offerors expected to write a response to this question for previous clients? Or are the clients supposed to write a response using the current solicitation?
How is the contract work similar in size and complexity to the services required by this solicitation? If relevant, provide additional details:
Past
Performance
Questionnaire
63 Clarify the responsibilities of what the Offeror is expected to provide to their Customer
POCs and what questions the
Customer POCs are then required to provide to the
Contracting Officer and
Contract Specialist for this solicitation.
Please refer to Attachment B. Form has now been provided
75. Is there any additional way for previous clients to evaluate and/or rate our past performance using the Past Performance
Questionnaire template besides responses to these two items?
How is the contract work similar in size and complexity to the services required by this solicitation? If relevant, provide additional details:
Questionnaire
63 Clarify the responsibilities of what the Offeror is expected to provide to their Customer
POCs and what questions the
Customer POCs are then required to provide to the
Contracting Officer and
Please refer to Attachment B.
76. Activity 2 has two items labeled “a” and
Activity 3 similarly has two items labeled
“a”.
a. Assessment; a. Performance
Measurement; a. Exchange
Support; a.
Conference/seminars
C.3 Work Activities Activity 2:
Analysis and
Evaluations;
Activity 3:
Logistical
Support
13, 14, Relabel the mislabeled items as “c” and “b”, respectively.
Yes, Evaluation is similar to Activity 2 and 3.
77. Will the government provide instructions on completing
Attachment A?
Pricing - General breakdown on completing Attachment A
Pricing Attachment A
Yes, please refer to Attachment A.
78. Please clarify whether or not the Government would like hard and soft copies of the proposal.
Hard Copies
Required
1 Original
5 Copies
Soft Copies
(CD-ROMs) Required
Each paper volume shall be submitted in a separate three ring binder. Proposal certification letter, table of contents, divider pages and other standard forms will not count against page limitations. The technical proposal
(Volume I) shall consist of four (4) parts and the four parts must be separated by a divider page with a corresponding divider tab; each of the four divider tabs shall be marked to identify what part is contained in that particular section.
L.3 GENERAL
INSTRUCTIONS AND
FORMATTING
containing
Hard and Soft
Copy requirements.
General
Instructions:
60-61 Remove requirements for the following within the table:
Hard Copies Required
Soft Copies (CD-ROMs)
Required
Remove the following text from
General Instructions:
“Each paper volume shall be submitted in a separate three ring binder. Proposal certification letter, table of contents, divider pages and other standard forms will not count against page limitations. The technical proposal (Volume I) shall consist of four (4) parts and the four parts must be separated by a divider page with a corresponding divider tab; each of the four divider tabs shall be marked to identify what part is contained in that particular section.”
The price, small business plan, and representations and certifications (Volume III) shall also be separated by a divider page and corresponding tabs.
Paper copies of the proposal shall be printed on white, 8.5” x
11” paper and printed using 10-
12 point font, with 1-inch margins, and pages shall be numbered consecutively.
Electronic versions (CD) of the proposal shall be prepared using
Microsoft Office 2000 or a compatible format, Adobe PDF formats are also acceptable.
Electronic copy is accepted and preferred.
79. If the Government wants hard copies delivered, to what physical address should the contractor use?
Proposals shall be submitted to the location set forth below no later than 3:00 p.m.
Eastern Standard Time (EST), January 10, 2024. No proposals will be accepted via facsimile or electronic mail.
However, Delivery Addresses
Proposals delivered by email to
Pete W. Jones
(jonespw@state.gov) and Conelius
Stevenson (stevensonc@state.gov)
L.10 PROPOSAL SUBMITTAL
L.10.1
Proposal Due
Date
L.16.2
Delivery
Addresses
64 Remove the requirement for hard and soft copies or provide instructions for how and where to deliver the printed copies and
CD ROMs.
If removing requirement for hard and soft copies, and keeping instructions to submit the proposal via email, please remove the following:
No proposals will be accepted via facsimile or electronic mail.
80. Does the Government intend for contractors to deliver hard and softcopies of their proposal?
If there are any discrepancies between the electronic version
(i.e., CD) and the hardcopy version of the Offeror’s proposal, the hardcopy shall take precedence.
M.3.ORDER OF
PRECEDENCE
M3 65 Remove requirement for hard and soft copies and remove the following text from the solicitation:
If there are any discrepancies between the electronic version
(i.e., CD) and the hardcopy version of the Offeror’s proposal, the hardcopy shall take precedence.
81. Will the Government please clarify if 10-point font may be used for
Tables and Graphics?
GENERAL INSTRUCTIONS
AND FORMATTING
L.3 60-61 Provide the following statement within the RFP:
A 10-point font may be used for
Tables and Graphics.
YES, 10-point font may be used and accepted.
82 Clarification on key personnel
Section H5 lists minimum employee qualifications for a
Program manager, Project manager, Senior IT Certified
Professional, Intermediate IT
Certified Professional, and
Systems Administrator. However, the key personnel identified in the table in section H6 includes only
Program Manager, Project
Manager, Strategic Controls
Subject Matter Expert, and Export
Control Enforcement Subject
Matter Expert. Should we consider the personnel mentioned in H5 as key also or is that information for
H5, H6 26-28 26-28
Please include H5 and H6 key personnel.
Only Program Manager and Project
Manager are Key Personnel.
reference only?
83. Is a Subcontracting Plan required if the bidder is a small business?
Section L.6 (d) Subcontracting
Goals
L.6 L.6 (d) 57 Because the bidder is already a small business, supply the following text within section L.6:
If the bidder is a small business, a small business subcontracting plan is not required.
Please refer to L.6.
84. Will the labor categories and descriptions referenced in Attachment
A be provided for the pricing volume?
L.6 (a) The Pricing portion of the proposal shall consist of a completed Attachment A, “Schedule of Supplies/Services and Price/Cost” and the hourly rates for all applicable labor categories completed for the Base
Year plus all four Option Periods.
Failure to complete the entirety of
Attachment A (Base, plus options) will mean that the prices proposed for the Base year applies to all of the option years.
L.6 L.6 (a) 57 Add Labor Categories and
Descriptions for the Base IDIQ so the bidder can provide fully burdened labor rates for evaluation purposes. These labor categories should be applied to the sample tasks.
Please see Attachment A.
85. What work at the Task
Order level would be set aside for the small business awardee(s)?
This is a multiple award indefinite delivery/indefinite quantity (IDIQ) contract, with at least one Small
Business. As defined in FAR Part
16, Type of Contract. Fixed Price with Cost Reimbursable CLINs for
Travel and Material.
B.2 8 Clarify if small business IDIQ awardee(s) would expect a percentage of the task orders to be set aside.
One of the awarded contract should be
100% small business
86. To provide a more equal competition field for small businesses, and to align with the type of work to be performed by a small business, would the Government please consider changing the
NAICS code for the one small business award from 541519 (500 employees or 150 employees for information technology) to:
541611 Administrative
Management and General
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code
541519.
K.2. 52.204-8 -
Annual
Representation s and
Certifications
(Mar 2023)
49 Update the following text within the RFP:
(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or
150 employees for information technology value-added resellers under NAICS code 541519.
No.
Management Consulting
Services $24.5M
(or)
541990 All Other
Professional, Scientific and Technical Services
$19.5M
87. Strategic Controls
Subject Matter Expert and Export Control
Enforcement Subject
Matter Expert are called out as key personnel in the key personnel table in section H.6. Why does
EXBS want us to identify specific personnel for these two positions when the requirement will potentially involve dozens of experts in a wide range of domains?
Are these positions full time equivalents?
Key Personnel
1. The Contractor shall assign the following key personnel to the identified position/function on this contract:
Key Personnel Position Name
Program Manager
Project Manager
Strategic Controls Subject Matter
Expert
Export Control Enforcement
Subject Matter Expert
[Additional Key Personnel
Positions and Name(s) may be inserted by Offeror at time of proposal submission.]
1. The Contractor shall provide a detailed resume and the experience of these individuals. If these individuals are not current employees provide a letter of intent. All of the above are considered to key personnel and are required to be able to read, write, speak and understand
English. The Contractor shall provide proof with their submittal, to be submitted with original offer.
2. During the entire performance period of this contract, the
Contractor shall make no substitutions of key personnel
H.6 Minimum Key Personnel
Qualifications
H.6 28 Eliminate SMEs as key personnel and stipulate only
Program Manager and Project
Manager as key personnel.
SMEs are not key personnel. They are not full-time equivalents.
unless the substitution is necessitated by illness, death, or termination of employment.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .