CLIN
| Description |
| Unit |
| Base Yr. |
| Opt. Period |
| Opt. Period |
| Opt. Period |
| Opt. Period |
Health and Use Monitoring Systems (HUMS) for the single and twin engine UH-1 platforms in the Bureau of International Narcotics and Law Enforcement (INL/A) Affairs.
| TBD 2020 – TBD 2021 |
| TBD 2021 – TBD 2022 |
| TBD 2022 – TBD 2023 |
| TBD 2023 – TBD 2024 |
| TBD 2024 – TBD 2025 |
| X001 |
| Phase I Proof of Concept and delivery for prototype installation and verification of system integration on the Bell Helicopter UH-1HII |
| Lot |
| Not Applicable |
| Not Applicable |
| Not Applicable |
| Not Applicable |
| X002 |
| Phase II Delivery of the verified documentation of the prototype installation package to allow the installation into the remaining fleet of Bell Helicopter UH-1HII. |
Lot
| Not Applicable |
| Not Applicable |
| Not Applicable |
| Not Applicable |
| X003 |
| Hardware including kit for prototype installation on Bell Helicopter UH-1HII |
| EA |
| X004 |
| Phase I Proof of Concept and delivery for prototype installation and verification of system integration on the Bell Helicopter UH-1ST |
| Lot |
| Not Applicable |
| Not Applicable |
| Not Applicable |
| Not Applicable |
| X005 |
| Phase II Delivery of the verified documentation of the prototype installation package to allow the installation into the remaining fleet of Bell Helicopter UH-1ST |
| Lot |
| Not Applicable |
| Not Applicable |
| Not Applicable |
| Not Applicable |
| X006 |
| Hardware including kit for prototype installation Bell Helicopter UH-1ST |
EA
LT
| X008 |
| Engineering Technical support provide hourly rates for on call engineering level support along with field service engineering support |
LT