Attachment #5 Submittal Register.pdf
PDF 415 KB Posted
- Solicitation number
- 19AQMM20R0065
About this file
This is a summary of a solicitation notice for the supply, refurbishing, and installation of shipping containers for an antidrug school construction project in Colombia. The project involves providing 40-foot and 20-foot high cube containers to create a two-story container distribution for the school located in Muzu, Bogota. The estimated value is between $500,000 and $1,000,000, with a period of performance of 180 calendar days from notice to proceed. Interested parties must register for a pre-proposal site visit by January 23, 2020 and the site visit will take place on January 29, 2020. Questions are due by February 14, 2020 and proposals are due by March 13, 2020. The Department of State Office of Acquisition Management is the issuing agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19AQMM20R0065 Additional QA.pdf | ||
| 19AQMM20R0065 QA.xlsx | XLSX spreadsheet | |
| A-35 DINAE.pdf | ||
| 19AQMM20R0065 0002.pdf | ||
| 19AQMM20R0065 B-M 0002.pdf | ||
| Attachment 3 19AQMM20R0065 Bidding Chart 0002.xls | XLS spreadsheet | |
| Attachment 2 19AQMM20R0065 Drawings 0002 Part 1.zip | ZIP file | |
| 19AQMM20R0065 QA.pdf | ||
| Attachment 2 19AQMM20R0065 Drawings 0002 Part 2.zip | ZIP file | |
| 19AQMM20R0065 0001.pdf | ||
| Attachment #1 19AQMM20R0065 Specification.pdf | ||
| Attachment #7 Past Performance Questionnaire (PPQ).pdf | ||
| 19AQMM20R0065.pdf | ||
| Attachment #2 19AQMM20R0065 Drawings.pdf | ||
| Attachment #6 Firm and Project Information.pdf | ||
| 19AQMM20R0065 B-M.pdf | ||
| Attachment #4 Insurance.pdf | ||
| Attachment #3 19AQMM20R0065 Bidding Chart.xls | XLS spreadsheet |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 41 PAGES
COUNTERNARCOTIC SCHOOL CONSTRUCTION AT MUZU, BOGOTA
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GBaseline Construction Schedule
SD-07 Certificates
1.4Monthly Updates
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan
1.7.4Warranty Tags
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.6Operation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1As-Built Drawings
3.3Record Drawings
1.7.1As-Built Record of Equipment and Materials
3.5As-Built Record of Equipment and Materials
3.4Final Approved Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 41 PAGES
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.2Demolition Plan
1.9Existing Conditions
SD-07 Certificates
1.7Notification
03 30 00 SD-01 Preconstruction Submittals
1.6.2.1Concrete Curing Plan
1.6.4Quality Control Personnel
Certifications
1.6.6Laboratory Accreditation
SD-03 Product Data
2.2.4Joint Sealants
2.2.3Joint Filler
2.1Formwork Materials
2.2.1Concrete Curing Materials
1.6.1.1Reinforcement
2.4Reinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 41 PAGES
03 30 00 2.2.2.1Liquid Chemical Floor Hardeners and Sealers
2.4.2Mechanical Reinforcing Bar
Connectors
SD-04 Samples
1.6.3.1Slab Finish Sample
SD-06 Test Reports
3.14.2.3 GCompressive Strength Tests
3.14.2.1Slump Tests
SD-07 Certificates
2.4.1Reinforcing Bars
1.6.2.2Safety Data Sheets
1.6.4.1Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.2.2.1Liquid Chemical Floor Hardeners and Sealers
2.2.4Joint Sealants
2.2.1Curing Compound
03 55 16 SD-02 Shop Drawings
3.1Installation
SD-03 Product Data
2.2Structural Steel Tee Subpurlins
SD-07 Certificates
3.1.2Fire Rated Decks
04 20 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 41 PAGES
04 20 00 1.3.4Detail Drawings
SD-03 Product Data
2.4.2Cement
SD-04 Samples
1.4.1Concrete Masonry Units (CMU)
2.6Anchors, Ties, and Bar
Positioners
2.10Expansion-Joint Materials
1.4.2Joint Reinforcement
1.3.3Portable Panel
SD-06 Test Reports
3.21.1Field Testing of Mortar
3.21.2Field Testing of Grout
3.21.3Prism Tests
2.4Masonry Cement
SD-07 Certificates
3.2.7.1Concrete Masonry Units
2.10Expansion-Joint Materials
2.6Anchors, Ties, and Bar
Positioners
1.4.2Joint Reinforcement
2.4Masonry Cement
2.4.1Admixtures for Masonry Mortar
1.3.2Contamination
SD-08 Manufacturer’s Instructions
2.4Masonry Cement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 41 PAGES
05 05 23.13 10 SD-01 Preconstruction Submittals
1.4.1Personnel Qualification
2.1.1Procedure description
SD-03 Product Data
2.1.1Equipment and accessories
SD-06 Test Reports
1.4.4Equipment Qualifications
3.4.1Inspection Test Reports
05 05 23.16 SD-01 Preconstruction Submittals
3.2Welding Quality Assurance Plan
SD-03 Product Data
1.3Welding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3Pre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Brazing Procedure
Specifications (BPS)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 41 PAGES
05 05 23.16 1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.1Certified Brazer Performance
Qualifications (BPQ)
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-02 Shop Drawings
1.3.1 GFabrication Drawings
SD-03 Product Data
2.4Shop Primer
2.3.1Welding Electrodes and Rods
SD-07 Certificates
2.1Steel
2.2Bolts, Nuts, and Washers
1.3.2.1Welding Procedures and
Qualifications
05 50 13 SD-02 Shop Drawings
2.8 GStructural Steel Door Frames
2.5 GAngles and Plates
SD-03 Product Data
2.8 GStructural Steel Door Frames
05 51 00 SD-02 Shop Drawings
2.1Steel Shapes, Plates, Bars, and
Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 41 PAGES
05 51 00 2.2.1Metal Stair System
SD-03 Product Data
2.4.1Structural-Steel Plates, Shapes, and Bars
2.4.2Structural-Steel Tubing
2.3.1 GSteel Stairs
SD-07 Certificates
1.3.1Welding Procedures
1.3.1Welder Qualification
SD-08 Manufacturer’s Instructions
2.4.1Structural-Steel Plates, Shapes, and Bars
2.4.2Structural-Steel Tubing
2.2.3 GProtective Coating
06 20 00 SD-02 Shop Drawings
1.3Detail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1Wood Products
2.4Countertops
2.8Hardware and Accessories
SD-04 Samples
1.5Samples
SD-07 Certificates
1.7.1.1Certificates of Grade
07 21 16 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 41 PAGES
07 21 16 2.1Blanket Insulation
2.1.2Recycled Content for Insulation
Materials
2.2Sill Sealer Insulation
2.4Vapor Retarder
2.5Pressure Sensitive Tape
2.6Accessories
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 22 00 SD-02 Shop Drawings
1.3Insulation Board Layout
1.3Verification of Existing Conditions
SD-03 Product Data
2.1Insulation
1.4Cover Board
2.4Fasteners
2.3Moisture Control
2.1.3Recycled Content For Insulation
SD-06 Test Reports
1.8.1Flame Spread Rating
SD-07 Certificates
1.6Installer Qualifications
1.6Certificates Of Compliance For
Felt Materials
SD-08 Manufacturer’s Instructions
2.4Fasteners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 41 PAGES
07 22 00 2.1Insulation
07 41 63 SD-01 Preconstruction Submittals
1.4.1Qualification of Manufacturer
1.4.1Qualification of Installer
1.4.1Qualifications for Welding
1.4.1Work Plan
1.4.1On-Site Inspection and
Acceptance Procedure
SD-02 Shop Drawings
1.4.1Roofing Panels
1.4.1Flashing and Accessories
1.4.1Gutter/Downspout Assembly
SD-03 Product Data
1.4.1Factory Color Finish
1.4.1Sub-girts and Formed Shapes
1.4.1Closure Materials
1.4.1Insulation
1.4.1Pressure-Sensitive Tape
1.4.1Sealants and Caulking
1.4.1Rated Wall Assembly
1.4.1Galvanizing Repair Paint
1.4.1Enamel Repair Paint
1.4.1Aluminized Steel Repair Paint
1.4.1Accessories
SD-04 Samples
1.4.1Roofing Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 41 PAGES
07 41 63 2.3.1.2Fasteners
2.5.1Metal Closure Strips
1.4.1Insulation
1.4.1Manufacturer's Color Charts and
Chips
SD-06 Test Reports
3.4.1.2Leakage Tests
3.1Coatings and Base Metals of
Metal Roofing
1.4.1Factory Finish and Color
Performance Requirements
SD-07 Certificates
2.3.1.2Fasteners
1.4.1Galvanizing Repair Paint
1.4.1Enamel Repair Paint
1.4.1Safety Data Sheets
2.4.5Coating Physical Properties
SD-08 Manufacturer’s Instructions
1.4.1Installation of Roof Panel
Assemblies
SD-11 Closeout Submittals
1.7Warranty
3.3.5Information Form and Placard
3.4.2Manufacturer's Field Inspection
Reports
1.4.1Application Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 41 PAGES
07 41 63 3.6.2Date of Installation Wall-Mounted
Placard
1.7.1 G20-year 'No-Dollar-Limit'
Warranty for Labor and Materials
07 60 00 SD-02 Shop Drawings
2.2.1Exposed Sheet Metal
3.1.17Gutters
3.1.18Downspouts
3.1.26Expansion Joints
2.2.1Gravel Stops and fascia
3.1.22Splash Pans
3.1.19Flashing for Roof Drains
3.1.11Base Flashing
3.1.12Counterflashing
3.1.27Flashing at Roof Penetrations and Equipment Supports
2.2.15Reglets
3.1.20Scuppers
3.1.30Copings
3.1.16Drip Edges
3.1.21Conductor Heads
3.1.23Open Valley Flashing
3.1.24Eave Flashing
2.1Recycled Content
SD-03 Product Data
2.2.12Cool Roof
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 41 PAGES
07 60 00 SD-04 Samples
1.4.2Finish Samples
SD-08 Manufacturer’s Instructions
1.4.3Instructions for Installation
3.5Quality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3Cleaning and Maintenance
07 92 00 SD-03 Product Data
2.1Sealants
2.2Primers
2.3Bond Breakers
2.4Backstops
3.1Field Adhesion
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.2Accessories
SD-03 Product Data
2.1 GDoors
2.2Accessories
2.2.1Antipanic bar type Yale
2.2.1Hydraulic arm
08 11 16 SD-04 Samples
1.5.1.1Finish Samples
SD-08 Manufacturer’s Instructions
2.1Doors and Frames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 41 PAGES
08 39 54 SD-02 Shop Drawings
3.1Installation
SD-03 Product Data
1.2Door Description
1.2.1Design Requirements
3.3Manufacturer's Field Service
SD-06 Test Reports
3.2Tests
2.6Tests, Inspections, and
Verifications
2.6.5Fire Rating Test and Inspection
2.6.1Prototype Static Test
2.6.2Prototype Blast Test
SD-07 Certificates
2.1Materials
2.6.5Fire-Rated Door Assemblies
2.4.3Thermal Insulation
2.6.4Sound Rating Test
SD-10 Operation and Maintenance
Data
1.2Door Description
08 44 00 SD-02 Shop Drawings
1.5Glazed Curtain Wall System
1.5Installation Drawings
2.4.2Shop-Painting Aluminum
2.4.3Shop-Painting Steel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 41 PAGES
08 44 00 SD-03 Product Data
1.5Glazed Curtain Wall System
2.2Metals For Fabrication
2.3Nonskinning Sealing Compound
2.4.1Metal Accessories
2.5Curtain-Wall Framing Members
2.6Aluminum Doors and Frames
2.1.10.2Laminated Panels
2.8Thermal Insulation Materials
1.7.1Warranties
SD-05 Design Data
2.4.5Exposed-to-View Aluminum
Finish
SD-06 Test Reports
1.3.6Factory Test Results
1.4.1Field Water Spray Test Results
1.4.2Air Infiltration Test Results
1.4.2.1Water Penetration Test Results
SD-07 Certificates
1.3.6.6Energy Performance Certificates
1.3.1Engineer Qualifications
1.3.3Qualifications for the Curtain-Wall
Installer
SD-08 Manufacturer’s Instructions
1.5Glazed Curtain Wall System
3.3.13Insulating Glass
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 41 PAGES
08 44 00 3.6.2Preventive Maintenance and
Inspection
SD-11 Closeout Submittals
1.7Warranty
08 51 13 SD-03 Product Data
2.1Windows
2.2.7.1Hardware
2.2.2Fasteners
1.8Window Performance
2.2.9Screens
2.4Weatherstripping
2.2.7Accessories
2.2.3Adhesives
SD-04 Samples
1.3.1.1Finish Sample
1.3.1.2Window Sample
SD-10 Operation and Maintenance
Data
2.1Windows
08 60 45 SD-02 Shop Drawings
3.2Shop Drawings
SD-03 Product Data
2.1Skylights and Translucent Panels
1.6Warranty
SD-06 Test Reports
2.1Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 41 PAGES
08 60 45 SD-07 Certificates
2.5Systems
1.4Qualifications
08 71 00 SD-03 Product Data
2.1Hardware Items
08 81 00 SD-03 Product Data
2.2Insulating Glass
2.3Plastic Glazing
1.3Glazing Accessories
2.4.3.1Sealants
2.4.4Joint Backer
SD-04 Samples
2.2Insulating Glass
3.2.7Plastic Sheet
2.4.2Glazing Compound
2.4.6Tape
2.4.6Sealing Tapes
SD-07 Certificates
2.2Insulating Glass
2.3Plastic Glazing
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 41 PAGES
08 81 00 1.7.2Warranty for Polycarbonate
Sheet
1.7.3Monolithic Reflective Glass
1.7.4Monolithic Opacified Spandrel
08 87 23.13 SD-03 Product Data
2.2Fragment Retention Film
3.3Cleaning
SD-04 Samples
2.2Fragment Retention Film
SD-06 Test Reports
2.2Fragment Retention Film
SD-07 Certificates
2.2Fragment Retention Film
08 91 00 SD-04 Samples
1.4Wall louvers
2.2Wall louvers
1.4Door louvers
2.3Door louvers
09 23 00 SD-03 Product Data
2.2Gypsum Base Coat Plaster
2.3Gypsum Finish Coat Plaster
SD-04 Samples
1.3.1Sample Panel
1.5Gypsum Plaster Full Size Sample
SD-08 Manufacturer’s Instructions
2.6Ready-Mix Gypsum Plaster
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 41 PAGES
09 30 10 SD-03 Product Data
2.2Mortar, Grout, and Adhesive
2.1 GAccessories
2.1.1 GAccessories
SD-07 Certificates
2.1Tile
2.2Mortar, Grout, and Adhesive
3.2 GInstallation
09 84 20 SD-02 Shop Drawings
2.2Approved Detail Drawings
SD-03 Product Data
3.2Installation
2.2Acoustical Wall Panels
SD-04 Samples
2.2Acoustical Wall Panels
SD-07 Certificates
2.2Acoustical Wall Panels
SD-11 Closeout Submittals
1.4Warranty
09 90 00 SD-03 Product Data
2.1 GCoating
2.1Manufacturer's Technical Data
Sheets
SD-08 Manufacturer’s Instructions
1.4.2Manufacturer's Material Safety
Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 41 PAGES
09 90 00 2.1Coatings
09 96 00 SD-01 Preconstruction Submittals
1.3Material, Equipment and Fixture
List
SD-03 Product Data
2.1Heat-Resistant Coatings
2.2Epoxy Coatings
2.3Polyurethane Coatings
2.4Chlorinated-Rubber Coatings
SD-04 Samples
1.3Color Chips
SD-07 Certificates
2.1Heat-Resistant Coatings
2.2Epoxy Coatings
2.3Polyurethane Coatings
2.4Chlorinated-Rubber Coatings
09 97 13.00 40 SD-01 Preconstruction Submittals
Part 2Material, Equipment, and Fixture
Lists
1.3Safety Plan
SD-03 Product Data
2.1.1Abrasive Blasting Material
2.1.2Sealant Compound
SD-04 Samples
1.3Manufacturer's Standard Color
Charts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 41 PAGES
09 97 13.00 40 3.3.2Inspection Forms
SD-06 Test Reports
3.3.1Inspection Reports
2.1.3Test Reports
SD-07 Certificates
2.1.2Sealant Compound
SD-08 Manufacturer’s Instructions
2.1.3Protective Coatings
SD-11 Closeout Submittals
1.5Warranty
09 97 13.27 SD-07 Certificates
1.4.2Coating Work Plan
1.4.3.1Coating Materials
SD-08 Manufacturer’s Instructions
1.5.1Coating System Instructions
10 14 00.20 SD-02 Shop Drawings
1.4.2Detail Drawings
SD-03 Product Data
3.1Installation
1.6Warranty
SD-04 Samples
1.4.1Interior Signage
1.3Software
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 41 PAGES
10 14 00.20 3.1Approved Manufacturer's
Instructions
3.1.2Protection and Cleaning
10 21 13 SD-03 Product Data
1.2Cleaning and Maintenance
Instructions
2.6Colors And Finishes
2.1.1Galvanized Steel Sheet
2.1.2Anchoring Devices and Fasteners
2.1.4Hardware and Fittings
2.1.3Brackets
2.1.5Door Hardware
2.4Pilaster Shoes
SD-04 Samples
2.6Colors and Finishes
2.1.4Hardware and Fittings
2.1.2Anchoring Devices and Fasteners
SD-07 Certificates
1.5Warranty
10 28 13 SD-03 Product Data
2.1.2Finishes
2.2Accessory Items
SD-04 Samples
2.1.2Finishes
2.2Accessory Items
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 41 PAGES
10 28 13 2.2Accessory Items
12 21 00 SD-02 Shop Drawings
3.2Installation
SD-03 Product Data
2.1Window Blinds
SD-04 Samples
2.1Window Blinds
SD-06 Test Reports
2.1Window Blinds
SD-08 Manufacturer’s Instructions
2.1Window Blinds
SD-10 Operation and Maintenance
Data
2.1Window Blinds
12 36 00 SD-02 Shop Drawings
2.2Fabrication
3.1Installation Drawings
SD-03 Product Data
2.2.1Granite
2.3Fasteners
2.3Stainless Steel Sinks
2.3Service Fixtures
2.4.2Joint Sealants
SD-04 Samples
2.2.1Countertop
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 41 PAGES
12 36 00 2.1Manufacturer's Standard Color
Charts
SD-08 Manufacturer’s Instructions
2.1Manufacturer's Instructions
13 34 19 SD-01 Preconstruction Submittals
1.6.3Manufacturer's Qualifications
SD-02 Shop Drawings
1.6.1Detail Drawings
1.2.7Erection Plan
SD-03 Product Data
1.6.1Manufacturer's Catalog Data
SD-04 Samples
1.4.2Insulation
SD-05 Design Data
1.6.1Manufacturer's Descriptive and
Technical Literature
SD-06 Test Reports
1.6.1Test Reports
1.6.1Coatings and Base Metals
1.6.1Factory Color Finish Performance
Requirements
SD-07 Certificates
1.6.1System Components
1.6.1Aluminized Steel Repair Paint
1.6.1Galvanizing Repair Paint
1.6.1Enamel Repair Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 41 PAGES
13 34 19 1.6.1Qualification of Manufacturer
1.6.1Qualification of Erector
SD-08 Manufacturer’s Instructions
1.7Shipping, Handling, and Storage
SD-11 Closeout Submittals
3.3.1Manufacturer's Warranty
3.3.2Contractor's Warranty for
Installation
14 24 23 SD-02 Shop Drawings
2.1Elevator
1.2.1Elevator Components
1.2.2Elevator Components
1.2.1Elevator Machine
1.2.1Elevator Controller
1.3.4Wiring Diagrams
SD-03 Product Data
2.1Elevator
1.2.1Elevator Components
1.2.2Elevator Components
1.2.2Data Sheets
2.5.2Elevator Microprocessor
Controller
SD-05 Design Data
1.2.3.3Emergency Power Systems
1.2.3.2Heat Loads
1.2.3.1Reaction Loads
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 41 PAGES
14 24 23 SD-07 Certificates
1.3.2Price Lists
1.4Warranty
1.3.1.1Endorsement Letter
1.2.4Welders' Qualifications
2.5.2.3Elevator Controller Certification
SD-10 Operation and Maintenance
Data
2.1Elevator
1.2.5Maintenance Control Program
(MCP)
2.5.2.2Software and Documentation
21 12 00 SD-02 Shop Drawings
1.4.4Standpipe system
SD-03 Product Data
2.1.1Pipe and fittings
2.1.3Valves
2.1.8Alarm valves
2.1.9Fire hose cabinets
2.1.11Backflow preventer
SD-06 Test Reports
3.8.1Preliminary tests
3.8.2Acceptance tests
SD-07 Certificates
1.6.1Qualifications of installer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 41 PAGES
21 12 00 SD-10 Operation and Maintenance
Data
2.1.8Alarm valves
2.1.11Backflow preventer
SD-11 Closeout Submittals
1.6.2System as-built drawings
22 00 00 SD-02 Shop Drawings
3.7.1Plumbing System
SD-03 Product Data
2.4Fixtures
3.7.1Plumbing System
SD-06 Test Reports
3.7Tests, Flushing and Disinfection
SD-07 Certificates
1.3Materials and Equipment
SD-10 Operation and Maintenance
Data
3.7.1Plumbing System
23 00 00 SD-02 Shop Drawings
1.4.5Detail Drawings
SD-03 Product Data
3.2.2Air Handling Units
2.10.1Room Fan-Coil Units
2.10.1Test Procedures
1.2.1.2Diagrams
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 41 PAGES
23 00 00 3.8Performance Tests
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.9.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.9.1Operation and Maintenance
Manuals
23 11 25 SD-02 Shop Drawings
1.5.3Gas Piping System
2.2Gas Piping System
3.3Gas Piping System
SD-03 Product Data
1.6.1Pipe and Fittings
1.5.3Gas Equipment Connectors
1.5.3Gas Piping System
2.2Gas Piping System
3.3Gas Piping System
2.1Pipe Coating Materials
2.6Pressure Regulators
2.4Risers
2.2.6Transition Fittings
2.3Valves
2.2.2Warning and Identification Tape
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 41 PAGES
23 11 25 SD-06 Test Reports
3.19Testing
3.19.1Pressure Tests
3.19.2Test with Gas
SD-07 Certificates
1.5.1Welders Procedures and
Qualifications
1.5.1Assigned Number, Letter, or
Symbol
SD-08 Manufacturer’s Instructions
1.5.2PE Pipe and Fittings
2.1Pipe Coating Materials
SD-10 Operation and Maintenance
Data
1.3.1Gas Facility System and
Equipment Operation
1.3.2Gas Facility System Maintenance
1.3.3Gas Facility Equipment
Maintenance
23 23 00 SD-02 Shop Drawings
2.3Refrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
1.3.1Qualifications
3.5Refrigerant Piping Tests
3.4Demonstrations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 41 PAGES
23 23 00 3.1Verification of Dimensions
SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-10 Operation and Maintenance
Data
1.5Maintenance
3.4Operation and Maintenance
Manuals
23 81 00.00 20 SD-02 Shop Drawings
2.5.2Field-Assembled Refrigerant
Piping
1.4.2Control System Wiring Diagrams
SD-03 Product Data
2.1Room Air Conditioners
2.2Air Conditioners
2.2.10Thermostats
2.5Refrigerant Piping and
Accessories
2.3Coatings for Finned Tube Coils
SD-06 Test Reports
3.8.3Start-Up and Initial Operational
Tests
SD-08 Manufacturer’s Instructions
2.2Air Conditioners
2.5Refrigerant Piping and
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 41 PAGES
23 81 00.00 20 SD-10 Operation and Maintenance
Data
2.2Air Conditioners
SD-11 Closeout Submittals
1.4.4Posted Operating Instructions
26 05 00.00 40 SD-01 Preconstruction Submittals
2.1Material, Equipment, and Fixture
Lists
SD-03 Product Data
2.1.1Conduits and Raceways
2.1.3Wire and Cable
3.2.1.9Splices and Connectors
2.1.4Switches
2.1.5Receptacles
2.1.6Outlet Boxes, Pull Boxes and
Junction Boxes
2.1.8Circuit Breakers
2.1.7Panelboards
2.1.9Lamps and Lighting Fixtures
2.1.12Dry-Type Distribution
Transformers
SD-06 Test Reports
3.3Continuity Test
3.3Phase-Rotation Tests
3.3Insulation Resistance Test
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 41 PAGES
26 05 00.00 40 1.4Certification
SD-08 Manufacturer’s Instructions
Part 2Manufacturer's Instructions
3.1Manufacturer's Instructions
26 05 13.00 40 SD-03 Product Data
2.2.1 GMultiple-Conductor Shielded
Cables
2.2.2 GMultiple-Conductor Nonshielded
Cables
2.2.3 GSingle-Conductor Shielded
Cables
2.2.4 GSingle-Conductor Nonshielded
Cables
2.2.5 GPortable Cables
2.3.2 GNonmetallic Jacket
SD-06 Test Reports
3.2Dielectric-Absorption Tests
3.2Medium-Voltage Tests
3.2 GRadiographic Tests
SD-07 Certificates
2.5Flammability
3.1.4Minimum Bending Radius
3.2Medium-Voltage Tests
3.2Dielectric Absorption Tests
1.4Cable Splicers
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 41 PAGES
26 05 13.00 40 3.3Medium-Voltage Power Cables
3.3Pothead Terminations
26 05 19.10 10 SD-03 Product Data
2.1.1Wire and Cable
2.1.3.1Conductors
3.1Cable Manufacturing Data
3.1Installation instructions
SD-06 Test Reports
3.2Test Report(s), Inspection
Report(s), and Verification
Report(s)
26 12 19.10 SD-02 Shop Drawings
1.4.1 GPad-mounted Transformer
Drawings
SD-03 Product Data
2.1 GPad-mounted Transformers
2.2 GPad-mounted Transformers
SD-06 Test Reports
3.6.1 GAcceptance Checks and Tests
SD-07 Certificates
2.1.1.1 GTransformer Efficiencies
SD-10 Operation and Maintenance
Data
1.5.1 GTransformer(s)
26 20 00 SD-02 Shop Drawings
2.10Panelboards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 41 PAGES
26 20 00 2.11Transformers
2.13Wireways
3.1.8.1Marking strips
SD-03 Product Data
2.9Receptacles
2.10.3Circuit breakers
2.7Switches
2.11Transformers
3.1.7Enclosed circuit breakers
3.1.13.5Grounding Busbar
2.15Surge protective devices
SD-06 Test Reports
3.5.2600-volt wiring test
3.5.5Grounding system test
3.5.3Transformer tests
3.5.4Ground-fault receptacle test
SD-07 Certificates
2.8Fuses
SD-09 Manufacturer’s Field
Reports
2.17.1Transformer factory tests
SD-10 Operation and Maintenance
Data
1.5.1Electrical Systems
26 24 16.00 40 SD-02 Shop Drawings
2.1.1Detail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 41 PAGES
26 24 16.00 40 2.1.1Outline Drawings
SD-03 Product Data
1.3Panelboards
2.1.1Panelboards
SD-06 Test Reports
3.2Continuity Tests
3.2Insulation Tests
SD-07 Certificates
1.4.1Certifications
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
26 36 00.00 10 SD-02 Shop Drawings
1.3.1Detail Drawings
2.1Equipment
3.1Installation
SD-03 Product Data
2.1Equipment
SD-06 Test Reports
2.6 GTesting
SD-07 Certificates
2.1Equipment
1.3.2Switching Equipment
SD-10 Operation and Maintenance
Data
1.3.2 GSwitching Equipment
3.2 GInstructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 41 PAGES
26 41 00 SD-02 Shop Drawings
1.4.1.1Overall lightning protection system
1.4.1.2Each major component
SD-03 Product Data
2.2.1Air Terminals
2.3Main and Secondary Conductors
1.4.4Ground Rods
2.2.4Clamp-Type Connectors
2.2.6Lightning Protection Components
2.5Lightning Protection Components
2.1Accessories
SD-06 Test Reports
1.4.3Grounding System Test Plan
1.4.4Lightning Protection System
Inspection
SD-07 Certificates
1.4.2UL Listed or Label or equivalent
26 51 00 SD-03 Product Data
1.6.1LED lighting fixtures
2.7Lighting Contactor
2.8Photocell switch
2.10LED Exit Signs
2.11LED Emergency Lighting
Equipment
2.12Occupancy Sensors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 41 PAGES
26 51 00 SD-06 Test Reports
3.2Operating Test
26 56 00 SD-01 Preconstruction Submittals
1.7.1 GLED Luminaire Warranty
SD-02 Shop Drawings
1.5.1.1 GLuminaire Drawings
1.5.1.2 GPoles
SD-03 Product Data
2.2 GLED, Luminaires
2.2 SEnergy Star Label for LED
Luminaire Product
2.2.2 GLuminaire Light Sources
2.2.3 GLuminaire Power Supply Units
(Drivers)
2.3.1 GLighting Contactor
2.3.2 GLighting Control Relay Panel
2.4.1 GConcrete Poles
2.5Brackets
SD-04 Samples
2.2 GLED, Luminaires
SD-05 Design Data
1.5.2 GDesign Data for Luminaires
SD-06 Test Reports
1.5.3 GLED Luminaire - IES LM-79 Test
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 41 PAGES
26 56 00 1.5.4 GLED Light Source - IES LM-80
Test Report
3.2Operating Test
SD-07 Certificates
1.7.1 GLuminaire Useful Life Certificate
SD-08 Manufacturer’s Instructions
2.4.1Concrete Poles
SD-10 Operation and Maintenance
Data
1.8Operational Service
26 56 13.00 40 SD-02 Shop Drawings
1.3.1Poles
1.3.1Installation Details
SD-03 Product Data
1.3.1Concrete Poles
1.3.1Brackets
1.3.1Anchorage Systems
SD-05 Design Data
2.2.1Lighting Standards
1.3.1Manufacturer's Catalog Data
1.3.1Safety Data Sheets
SD-08 Manufacturer’s Instructions
1.3.1Foundation Requirements
2.1Mounting Details
SD-11 Closeout Submittals
1.3.1Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 41 PAGES
26 56 13.00 40 3.3.1Record Drawings
27 10 00 SD-03 Product Data
2.3Telecommunications cabling
2.4.5Patch panels
2.5Telecommunications outlet/connector assemblies
2.4.2Equipment support frame
2.4.3Connector blocks
1.9.3Spare Parts
SD-06 Test Reports
3.5.1Telecommunications cabling testing
1.6.1Test plan
SD-09 Manufacturer’s Field
Reports
2.10.1Factory reel tests
SD-10 Operation and Maintenance
Data
1.9.1Telecommunications cabling and pathway system
SD-11 Closeout Submittals
1.9.2Record Documentation
28 31 64.00 10 SD-02 Shop Drawings
1.3.1Detail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 41 PAGES
28 31 64.00 10 1.4 GTechnical Data and Computer
Software
3.7Testing
SD-07 Certificates
1.3.1Equipment
SD-10 Operation and Maintenance
Data
3.6 GOperating and Maintenance
Instructions
31 00 00 SD-01 Preconstruction Submittals
3.5Shoring
1.6.2Dewatering Work Plan
SD-03 Product Data
3.9Utilization of Excavated Materials
1.6.1.2Rock Excavation
3.4Opening of any Excavation or
Borrow Pit
3.15Shoulder Construction
SD-06 Test Reports
3.18Testing
SD-07 Certificates
3.18Testing
31 23 00.00 20 SD-01 Preconstruction Submittals
1.5.1Shoring and Sheeting Plan
1.5.2Dewatering work plan
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 41 PAGES
31 23 00.00 20 3.12.2.1Fill and backfill
3.12.2.2Select material
3.12.2.3Density tests
32 16 19 SD-03 Product Data
2.1Concrete
SD-06 Test Reports
3.8Field Quality Control
33 11 00 SD-03 Product Data
2.1.1Piping Materials
2.1Water distribution main
2.2Water Service Line
2.1.2.2Valve Boxes
2.2.2.2Valve Boxes
3.1.4.1Corporation Stops
SD-06 Test Reports
2.2.2.4Bacteriological Disinfection
SD-07 Certificates
2.1Water distribution main
2.2Water service line
33 30 00 SD-01 Preconstruction Submittals
1.4.1Drawings
SD-03 Product Data
2.1Pipeline Materials
SD-06 Test Reports
2.2Reports
33 71 02 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 41 PAGES
33 71 02 3.13.1.1Low voltage cable
2.11.2Manhole frames and covers
2.11.3Handhole frames and covers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .